Code
NO. Drawing Title Target Date Drawing Title Submitted Target Date
number
Remark
1 Conceptual design Conceptual design
General layout drawing (PV module, pile foundation, General layout drawing (PV module, pile foundation,
0101
road , fence, drainage, pond, guardhouse ) road , fence, drainage, pond, guardhouse )
0102 PV plant electric layout drawing (Equipment) PV plant electric layout drawing (Equipment)
0104 Detail Topographic Survey Drawing 7/23/2019 8/23/2019 8/28/2019 Detail Topographic Survey Drawing 7/23/2019 8/23/2019 8/28/2019
04/07/19 04/07/19
0201 Administration and Control Building layout drawing 09/08/19 Administration and Control Building layout drawing 09/08/19
23/08/19 To confirm 23/08/19
11/09/19 with design 11/09/19
20/09/19 institute 20/09/19
0202 Warehouse Layout Drawing 8/15/2019 Warehouse Layout Drawing ? 8/15/2019
0103 Pond layout Pond layout ?
2.2 C Civil drawing Civil drawing
0100 Earthwork drawing
0101 Road and drainage drawing 9/26/2019 10/17/2019 Road and drainage drawing 9/26/2019
0102
24/07/19
04/09/19 19/08/19
Mounting structure drawing 10/10/19 21/10/19 10/9/2019 Mounting structure drawing 8/19/2019
0103 Mounting structure foundation drawing 10/21/2019 Mounting structure foundation drawing
0104 Transformer foundation drawing 30days after transformer bidding Transformer foundation drawing
0105 Foundation of MMF and fence
0106 Fence and fence gate drawing 9/17/2019 10/1/2019 Fence drawing 9/17/2019
Approved (100%)
Correction (60%)
Correction (60%)
Comment (80%)
Comment (80%)
Approved with
Approved with
Rejected (0%)
Rejected (0%)
Return for
Return for
Submitted
Code
NO. Drawing Title Target Date Drawing Title Submitted Target Date
number
Remark
2.3.2 SEC Secondary Equipment Secondary Equipment
0602
21/05/19 21/05/19
18/07/19 18/07/19
SCADA diagram drawing 15/08/19 9/11/2019 SCADA diagram drawing 15/08/19 9/11/2019
0605
07/08/19
27/08/19
09/09/19
29/08/19
23/09/19
11/10/19 20/09/19 29/08/19
CCTV Conceptual Drawing 8/21/2019 29/09/19 10/21/2019 AC CCTV Conceptual Drawing 8/21/2019 20/09/19
0606 Indoor CCTV layout 7/18/2019 7/30/2019 8/21/2019 Indoor CCTV layout 7/18/2019 7/30/2019 8/21/2019
0607
05/07/19
30/07/19
07/08/19
26/08/19
12/09/19 18/07/19 18/07/19
01/10/19 30/07/19 29/08/19 30/07/19 29/08/19
Outdoor CCTV Layout 21/08/19 20/09/19 10/21/2019 AC Outdoor CCTV Layout 21/08/19 20/09/19
0610 33kV Control Relay Panel Drawing after TNB SLD approval and shop drawing provided by supplier 33kV Control Relay Panel Drawing
0620 PV plant Communication Diagram Scada contract not sign PV plant Communication Diagram
0630 33kV switchgear secondary wiring drawing after TNB SLD approval and shop drawing provided by supplier 33kV switchgear secondary wiring drawing
0640 33kV transformer secondary diagram drawing 8/21/2019 7/24/2019 After procument 33kV transformer secondary diagram drawing 8/21/2019 7/24/2019
0650 DC and UPS system wiring drawing 10/25/2019 DC and UPS system wiring drawing
0660 33kV transmission line protection drawing after TNB SLD approval and shop drawing provided by supplier 33kV transmission line protection drawing
0670 Common part wiring drawing Scada contract not sign Common part wiring drawing
0680 Communication system Scada contract not sign Communication system
2.4 CAL Calculation sheet Calculation sheet
24/07/19
0301 Mounting Structure calculation 05/08/19 07/08/19 Mounting Structure calculation
04/09/19 18/09/19 07/08/19
10/10/19 21/10/19 10/9/2019 18/09/19
0302 Mounting Structure Foundation calculation 10/28/2019 Mounting Structure Foundation calculation
0303 Transformer Foundation calculation UITM confirm the RMU design Transformer Foundation calculation
0304 33kV control building structure calculation 10/18/2019 33kV control building structure calculation
0305 Guard house structure calculation 10/31/2019 Guard house structure calculation
0701 DC & LV cable size and loss calculation sheet 10/28/2019 DC & LV cable size and loss calculation sheet
0702 PV plant lighting protection calculation sheet 10/28/2019 PV plant lighting protection calculation sheet
0703 PV plant earthing calculation sheet 10/28/2019 PV plant earthing calculation sheet
0704 UPS loading calculation sheet 6/21/2019 9/27/2019 9/13/2019 UPS loading calculation sheet 6/21/2019
0705
21/06/19
Battery and charger calculation sheet 21/10/19 10/9/2019 Battery and charger calculation sheet 6/21/2019
0706 CT &VT calculation sheet 10/28/2019 CT &VT calculation sheet
0708 33kV underground cable size calculation 10/28/2019 33kV underground cable size calculation
TOTAL 62
CIVIL and GENERAL 16
ELECTRIC 46
May June Aug Sep
1.8 1.2 9 12.4
Current 2.9% 2% 15% #REF!
Correction (60%)
Comment (80%)
Approved with
Rejected (0%)
Code
NO. Drawing Title
Return for
Submitted
number
1 Conceptual design
0000 TNB Building Layout 5/15/2019
2 Detailed design
2.2 C Civil drawing
2.2.1 0101 Metering room structure drawing
2.3 E Electrical drawing
2.3.1 PRM Primary Equipment
22/04/19
17/05/19
18/06/19 27/06/19
05/07/19 07/05/19 26/09/19
0101 Single Line Diagram 12/07/19 24/05/19 4/10/19
23/09/19 08/07/19 10/10/19
27/09/19 21/10/19
09/10/19
16/10/19
Comment (80%)
Approved with
Rejected (0%)
Code
NO. Drawing Title
Return for
Submitted
number
6/14/2019
7/24/2019
Sep
2
Approved (100%)