AL-WAREED ENGINEERING (PRIVATE) LIMITED

Daily Attendance Labor & Staff ( Site Team)


Project Name: Pehur High Level Canal Extension Project
Project ID: PHLCEP-1008 Printing Date: 23/05/2023 00:00
User ID Malik Akmal Haider Financial Year 2022-23

Sr # Name Father Name Designation Working Area Status

Technical Staff & Supporting Staff:-

1 Liaquat Ali Noor Nabi Director A


2 Muhammad Yaseen Manzoor Hussain Project Manager P
3 M Akmal Haider M Ashraf Engr Mech -
Staff:
4 M.Abubkar Abdul Ghani QA/QC Engineer lot 2 - 3
5 M Zeeshan Raza M Yaseen Assistant Engineer lot 2 P
6 Muhammad Tanveer Manzoor Hussain Supervisor lot 2 P
7 Nazakat Ali Ali Nawaz Supervisor Lot 2 -
Fabricator:-
1 Jabir Ali Fabricator lot 2 P
Fab: 1
5 Tahir Usman Fabricator lot 2 -
Fitter:-
1 Maaz Ullah Fitter lot 2 P
2 Muhammad Shahzad Fitter lot 2 A
Fitter:
3 Muhammad Umer Fitter lot 2 P
4
4 Imran Khan Fitter lot 2 P
5 Bilal Fitter lot 2 P
Welder:-
1 Mujahid Hussain Multi Welder lot 2 P
2 Numair Zman Multi Welder lot 2 -
3 Usman Manzoor Multi Welder lot 2 - Welder:
4 Muhammad Arshad Multi Welder P 3
lot 2
5 Waqas Multi Welder lot 2 P
6 Hamza Multi Welder lot 2 A
Painter:-
1 Toseef Haider Painter lot 2 P Painter:
2 Suleman Khan Helper lot 2 P 2

Helper :-
1 Waleed khan Helper lot 2 -
2 Sabir Ali Helper lot 2 P
Helper:
3 Noor Ahmad Helper lot 2 P
2
4 Saed Ul Hasaan Helper lot 2 -
5 Talha Helper lot 2 -
Total Present 15 15

Submitted By
M.Akmal Haider