PROJECT

SHEAR WALL ELEVATION NOTES:

1. SEE PLANS FOR SHEAR WALL THICKNESS. WALL THICKNESS IS THE SAME AS
THE WALL BELOW, UNLESS NOTED OTHERWISE.

2. 1 A INDICATES A CONCRETE COUPLING BEAM. SEE TYPICAL CONCRETE


COUPLING BEAM DETAILS FOR SCHEDULE.
T1-AG T1-AF T1-AE T1-AD T1-AC 3. WALL OPENINGS RETAIN THE SAME SIZE AS OPENING DIMENSIONED BELOW,
UNLESS NOTED OTHERWISE. OWNER

T1 - LEVEL 68
242600
4. WALL OPENINGS AND SLEEVES NOT SPECIFICALLY INDICATED ON THE STRUCTURAL
DRAWINGS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO Ortigas&Company
Limited Partnership
CONSTRUCTION.
9/F ORTIGAS BUILDING,ORTIGAS AVENUE, PASIG CITY
TELEPHONE: (632)631-1231 TO 38 FAX:(632)631-6517

T16x (4) TIES 5. VERTICAL REINFORCEMENT RETAINS THE SAME MARK AS THE BAR BELOW,
H8 H8 UNLESS NOTED OTHERWISE. LAP VERTICAL BARS Lsb, UNLESS NOTED OTHERWISE.
@ 100 HORIZ SPCG

T16x (4) TIES T16x (4) TIES T16x (4) TIES 6. SEE SHEAR WALL SECTIONS FOR ADDITIONAL REINFORCEMENT NOT SHOWN.
@ 100 HORIZ SPCG @ 100 HORIZ SPCG H8 @ 100 HORIZ SPCG

THOMAS F. MIRASOL
V11 V11
CHIEF OPERATING OFFICER, SENIOR VICE

700 2200
PRESIDENT & GENERAL MANAGER
REAL ESTATE DIVISION
V4 V4 V11 V11 V4 V4 V4 V4
T1 - LEVEL 66
RED - Technical Planning Department
235400
12 A 13 A 13 A 12 A

TECHNICAL PLANNING MANAGER

T1 - LEVEL 65 ARCHITECT OF RECORD


232250
12 A 13 A 13 A 12 A GF & Partners
SHEAR WALL VERTICAL REINFORCING SCHEDULE A r c h i t e c t s

MARK REINFORCING REMARKS ANNETTE F. GADDI-LIGANOR


A R C H I T E C T
V1 T20 @ 300 EF PRC REG. NO. : 6813
PTR NO. : 4754954
DATE: 11-12-1982
DATE: 01-12-2015
TIN : 108-782-800
PLACE : MAKATI CITY

T1 - LEVEL 64 V2 T25 @ 300 EF


TEODORO H. NARCISO
ANNETTE F. GADDI-LIGANOR
XAVIER ANTONIO J. GARCIA
TEOFILO A. SANTIAGO JR.
ARNULFO M. VILLANUEVA

229100 11TH FLOOR, BDO PLAZA, 8737 PASEO DE ROXAS, MAKATI CITY, PHILIPPINES

12 A 13 A H2 13 A 12 A V3 T28 @ 300 EF TELEPHONE (632) 553-7232 FAX (632) 553-7230 E-MAIL: postmaster@gfparchitects.com

H2 STRUCTURAL
V4 T32 @ 300 EF
V5 T36 @ 300 EF
V6 T28 @ 150 EF incorporated
JOSE A. SY
V3 V3 ASSOCIATES
T1 - LEVEL 63 V7 T32 @ 150 EF STRUCTURAL ENGINEER
225950 V8 T36 @ 150 EF Unit 504 Pryce Center, 1179 Chino Roces Avenue
12 A 13 A 13 A 12 A cor. Bagtican St., Makati City
Telephone No. 896-97-04 to 05
REG. NO. 22404 TIN 123-489-697

V9 T36 @ 150 (5) LAYERS Fax No. 896-97-60 to 61


e-mail address: info@sysquared.com
PTR NO. 5330036 DATE 01-07-16
PLACE MAKATI CITY
V10 T36 @ 150 (6) LAYERS ELECTRICAL
V11 T32 @ 300 (4) LAYERS

800 1000
EBCRUZ & PARTNERS
T1 - LEVEL 62 V12 (190) T36 A706, GRADE 75 ELECTRICAL ENGINEERS

1335 A. MABINI ST., KALOOKAN CITY.

12 A 13 A 13 A 12 A 222800 TEL. NOS. 287-5631 288-7054


email : ebc@philonline.com.ph

2200
E F R E N B. C R U Z
PROFESSIONAL ELECTRICAL ENGINEER

50
T1 - LEVEL 61 SHEAR WALL HORIZONTAL REINFORCING SCHEDULE MECHANICAL

219800 DCCD ENGINEERING CORPORATION

800 1000 1200 750


12 A 13 A 5 A 5 A 5 A 13 A 12 A MARK REINFORCING REMARKS SOL BUILDING 112 AMORSOLO ST., MAKATI M.M.
TEL. NOS. 892-45-86 TO 89
H1 T20 @ 200 EF
H2 T20 @ 150 EF
V3 V3 V4 V4 V3 V3 PROF. MECHANICAL ENGINEER
H3 T20 @ 120 EF PTR NO. REG. NO.
T1 - LEVEL 60 H4 T25 @ 150 EF ISSUED ON. TIN

12 A 13 A H4 H4 13 A 12 A 216800 H5 T25 @ 120 EF


ISSUED AT
f'c = 6000 PSI

H6 T28 @ 150 EF DCCD ENGINEERING CORPORATION


2300 1800 1800 1800 1800 1800
H7 T28 @ 120 EF SOL BUILDING 112 AMORSOLO ST., MAKATI M.M.
TEL. NOS. 892-45-86 TO 89

H8 T28 @ 120 (4) LAYERS


T1 - LEVEL 59 H9 T28 @ 120 (5) LAYERS SANITARY ENGINEER

12 A 13 A 13 A 12 A 213800 H10 T28 @ 120 (6) LAYERS


8 PTR NO. REG. NO.
S3.71 ISSUED ON. TIN
ISSUED AT

FIRE PROTECTION
DCCD ENGINEERING CORPORATION
T1 - LEVEL 58 SOL BUILDING 112 AMORSOLO ST., MAKATI M.M.
TEL. NOS. 892-45-86 TO 89

12 A 13 A 13 A 12 A 210800
FIRE PROTECTION ENGINEER

PTR NO. REG. NO.


ISSUED ON. TIN
ISSUED AT
T1 - LEVEL 57 CONSTRUCTION MANAGER

12 A 13 A 13 A 12 A 207800

T1 - LEVEL 56
12 A 13 A 13 A 12 A 204800
QUANTITY SURVEYOR

T1 - LEVEL 55
12 A 13 A 13 A 12 A 201800 Arcadis Philippines, Inc.
4th Floor King's Court 1, 2129 Pasong Tamo Makati City
Tel: +632 8112971 Fax: +632 8112071
E-mail: info-ph@arcadis.com www.arcadis.com

REVISIONS
T1 - LEVEL 54 NO. DATE DESCRIPTION
12 A 13 A 13 A 12 A 198800

T1-AH

T1 - LEVEL 53
12 A 13 A 13 A 12 A 195800 T1-AG

NOTES:

SHOULD THERE BE DISCREPANCIES, CONFLICTS


T1 - LEVEL 52 AND/OR AMBIGUITIES ON THE CONSTRUCTION
H2 12 A H2 13 A H2 H2 13 A H2 12 A H2 192800 DOCUMENTS (ie. ARCH'L., ENGINEERING DRAWINGS,
TECH'L. SPECS ETC.), THE CONTRACTOR SHOULD
T1-AF FIRST CALL THE ATTENTION OF THE DESIGNERS FOR
CLARIFICATION BEFORE PROCEEDING WITH THE WORK
ON THE AREA CONCERNED.

THIS DRAWING, AS AN INSTRUMENT OF SERVICE, IS A


T1 - LEVEL 51 PROPERTY OF ORTIGAS AND COMPANY, LIMITED
12 A 13 A 13 A 12 A 189800 PARTNERSHIP, AND AS SUCH MUST NOT BE
REPRODUCED OR COPIED IN PART OR IN WHOLE
16
WITHOUT THEIR CONSENT. ALL DRAWINGS ARE TO BE
S3.37
RETURNED WHEN NO LONGER IN USE.
2200

2200
TYP

TYP

V2 V2 V2 V2 V2 V2 REPUBLIC ACT 545

T1 - LEVEL 50 T1-AD PURPOSE OF ISSUANCE


186800
50 TYP

50 TYP

PROGRESS PLANS
2337 2350 2950 2900 2900 2950 2350 2337
SHEET CONTENTS

T1-AC TOWER 1 SHEAR WALL ELEVATION


T1-2
17
S3.10 T1-3 DRAWN SHEET NO.
DATE
T1-AB
REVISED S3.10
TOWER 1 SHEAR WALL ELEVATION TOWER 1 SHEAR WALL KEY PLAN CHECKED

16 1 : 100 20 PROJECT NUMBER : 140721

C:\Revit 2015 Project Files\CapitolCommParcelF__CD_WS2015_ym.rvt 6/16/2017 4:43:15 PM MAG