Professional Documents
Culture Documents
C CO
UD
CO
FD
CO WC FD FD FD FD
WC CO
100 mm Ø PVCWP WC WC STO. FD
HE
WC
100 mm Ø PVCWP
FD FD
50 mm Ø PVCVAC 50 mm Ø PVCVAC
FD
SHE
SD SD FD
CO CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CO
1 2 3 4 5
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
UP UP
B
DN DN
C O R R I D O R C O R R I D O R C O R R I D O R
CD CD CD CD CD CD CD CD CD CD
A
100 mm Ø DS 50 mm Ø PVCDP RD RD
R
(TYPICAL) (TYPICAL)
LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018) R
2 SECOND AND THIRDFLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT)
SCALE 1: 100 M.
R P-1
- ADDITIONAL DETAIL OF CISTERN TANK.
- ADDITIONAL PLUMBING LAYOUTS FOR HOME
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM.
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.
1 2 3 4 5 6 7 8 9 10 11 12 13
150 mm Ø PVCSP
TO NEAREST SEWER LINE
(VERIFY SITE CONDITION)
50 mm Ø PVCVS 150 mm Ø PVCSP
100 mm Ø PVCDS
100 mm Ø PVCSP (TYPICAL) 50 mm Ø PVCVS
SEPTIC VAULT
100 mm Ø PVCDS
150 mm Ø PVCSS (SEE DETAIL) (TYPICAL)
100 mm Ø PVCSP
150 mm Ø PVCSS
50 mm Ø PVCVS 50 mm Ø PVCVS
CO
150 mm Ø PVCSP 150 mm Ø PVCSP CO
CB CB CB CB CB CB CB CB CB CB CB CB
100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP CO CO 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP
100
P
C
D
CO
VC
CO
mm
CO CO
UD
ØP
FD FD FD FD LAV WC FD
ØP
SD SD
WC WC WC WC WC
m
FD
VC
0m
UD
PWD PWD
DP
100 mm Ø PVCWP
10
100 mm Ø PVCWP FD
CB
SD HE SD CB
FD
SHE
FD
SD
50 mm Ø PVCVP SD 50 mm Ø PVCVP
HANDWASHING
HANDWASHING
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
100 mm Ø PVCDP
100 mm Ø PVCDP
CO CO
LANDING LANDING
CONCRETE PLATFORM
CONCRETE PLATFORM
50 mm Ø PVCWP SD
50 mm Ø PVCWP
SD
1 2 3 4 5
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
BLACKBOARD BASE
SD SD
STO. STO.
CB CO CO CB
B
150 mm Ø PVCDP
150 mm Ø PVCDP
UP UP
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
A CB CB CB CB CB CB CB CB CB CB
CB CB
150 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP UP UP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 150 mm Ø PVCDP
RAMP UP RAMP UP SLOPE 1:12
LINE OF CANOPY ABOVE
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR PLAN (SEWER & DRAINAGE LINE SIGNED
CADD:
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
LAYOUT)
SECOND & THIRD FLOOR PLAN (SEWER & DRAINAGE
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-1
BUILDINGS DIVISION LINE LAYOUT) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV