You are on page 1of 1

A B

A B

4390
4390

1
1
CB
KS

50MM Ø (3" Ø) PVC ORANGE


75MM Ø (3" Ø)
SANITARY PIPE, S1000 PVC ORANGE

2410
SANITARY PIPE,

2410
S1000

75MM Ø (3" Ø) PVC ORANGE


SANITARY PIPE, S1000

4070
50MM Ø (3" Ø) PVC ORANGE
SANITARY PIPE, S1000

4070
50MM Ø (3" Ø) PVC ORANGE
SANITARY PIPE, S1000 LAV WC FF
FD

1660
FD FF FD

1660
LAV WC
co
co

co 2
2 100MM Ø (4" Ø) PVC
ORANGE SANITARY

1000
100MM Ø (4" Ø) PVC PIPE, S1000

1000
ORANGE SANITARY
PIPE, S1000

2000
2000

1000
1000
SEPTIC TANK
3
3

860
860

3000
3000

2140
2140

75MM Ø (3" Ø) PVC ORANGE SANITARY PIPE, S1000


4
4

3000
3000

100MM Ø (4" Ø) PVC ORANGE SANITARY PIPE, S1000


5
5 CB

75MM Ø (3" Ø)
PVC ORANGE
SANITARY PIPE,
S1000

3000
3000

FD

6
6
TO THE NEAREST
MANHOLE(VERIFY SITE)

1
P1
GROUND FLOOR SANITARY LAYOUT 2
P1
SECOND FLOOR SANITARY LAYOUT
1 : 40 1 : 40

Project Title Owner Sheet Content Project number Project Number


1 GROUND FLOOR SANITARY LAYOUT

Date Issue Date


Emelita De La Cruz 2 SECOND FLOOR SANITARY LAYOUT
ENGINEER
De La Cruz Residential Building(Upgrade) 3 PRC. REG no . P1

23/06/2020 9:26:13 PM
Drawn by
4 Date
ENGR. JULIUS MAE TOLENTINO

Gumamela St. Villa Antonio Subd. Phase II, Gumamela St. Villa Antonio Subd. Phase II, 5 Place
Location San Pablo CIty
Location San Pablo CIty Scale 1 : 40
6