Professional Documents
Culture Documents
MANHOLE
1/2 Ø uPVC
DR
AIN
A GE
P IPE AV
0.50
. PVC
4'' DIA
AV
CB
1/2 Ø uPVC
UP UP UP UP
4'' DIA. PVC DRAINAGE PIPE
4'' DIA. PVC OUTLET PIPE
0.90
0.50
4"Ø pvc OUTLET MANHOLE MANHOLE
0.50
1/2 Ø uPVC
CB
HB 4"Ø pvc INLET
CB
4"CHB
4'' DIA. PVC DRAINAGE PIPE
10mm.BARS @.20M.O.C.B.W.
PRECAST SEPTIC TANK COVER
2.80
R.C. MANHOLE
CB PLAN
PLAN 10mmO BARS (HANDLE)
CB
4'' DIA. PVC DRAINAGE PIPE
CV
4'' DIA. PVC DRAINAGE PIPE
M
PRECAST
GV
10mm Ø HANDLE BAR
1/2 Ø uPVC
co SEPTIC TANK COVER
MANHOLE MANHOLE
TO STREET DRAINAGE TO STREET DRAINAGE
0.30
0.10
10mm VERT. BARS
SPACED @.80 M.O.C.
SCALE 1 : 100 M. SCALE 1 : 100 M.
AIR SPACE
0.60
0.40
WELL
1.20
4"CHB
10mm HOR. BARS
@ EVERY 3RD LAYER
0.10
1
2"PLASTERED FIN.
(ROUGHT)
SECTION
1/2 ONE SIDE
THREADED ELBOW
0.10
0.15
0.15
1/2 ONE SIDE
THREADED ELBOW
1/2 PLAIN
ELBOW 1
2 TEE PLAIN CATCH BASIN DETAIL
MULTI-POINT
SCALE 1: 10 MTS.
1
1
2 TEE PLAIN 10MM BARS
SE VC TEE PLAIN
2
PTIC 1
TEE PLAIN uP 1
2 2 TEE PLAIN 1/2 ONE SIDE
TA
NK 1/2
Ø
1/2 THREADED ELBOW 0.15 0.15 0.15
AV
Ø
uP
1/2 ONE SIDE SECTION
CB 4'' D
IA. P
HB VC THREADED ELBOW
IPE VC D AV 1/2 ONE SIDE
EP RAIN
AV
AG AGE 1/2 PLAIN THREADED ELBOW
P IPE AIN PIPE PU
ET DR ELBOW AV
TL VC 1/2 PLAIN
VC
OU
DIA
.P
4"
CB ELBOW
IPE
.P 4'' Ø 2"
Ø 1/2 PLAIN
IA DR
D
CB DR
EP
4'' AI
NA AIN ELBOW
VC
AG
AG
GE E
PI PIP
uP
IN
PU PE E
Ø
DRA
1/2
PVC
IA.
4'' D
C CV
AGE
E B
PIP ISO GV
M
A IN
DR GV
M
SC (W E GENERAL PLUMBING NOTES:
C
PV
A.
AL AT T
DI
ISO TO S
4''
E ER
LIN
RIC LEGEND:
M TREET
SC (P E IN
C
EP
AG B
IPE
E
1:1 LAY LA
AL LU T YO
A
DR DR
F FAUCET
E MB R
PV
C 00 OU
AIN A. M. T) ALL PLUMBING INSTALLATIONS AS WELL AS OTHER SANITARY FACILITIES SHALL
ING IC
I
AG 4'' D
UT
1:1 AYO LA
L E CONFORM WITH THE PLUMBING CODE & THE NATIONAL BUILDING CODE OF THE FD FLOOR DRAIN
00 UT Y PHILIPPINES & OTHER RULES & REGULATIONS ENFORCEMENT IN THE LOCALITY.
M. ) O UT HB HOSE BIBB
ALL MATERIALS & FIXTURES TO BE USED SHALL BE NEW & OF APPROVED TYPES DOWNSPOUT
DS
& ACCORDANCE TO ITS USED & PURPOSED.
CV CHECK VALVE
WATER SUPPLY LINES SHALL BE EMBEDED AT THE DEPHT OF 75mm. TO 125mm.
FROM FINISH FLOOR LINE SD SHOWER DRAIN
ALL PLUMBING PIPES SHALL BE INSTALLED & TESTED BEFORE POURING GV GATE VALVE
CONCRETE OR BACK FILLING TO COVER THE SAID PIPES
CB CATCH BASIN
ALL EXPOSED SURFACES FITTING & TRIMMING MUST BE CLEANED & FREE FROM WM WATER METER
GREASE & MUST BE POLISH.
WATER LINE
ALL PLUMBING TEST SHALL BE DONE UNDER THE SUPERVISION OF AN
ARCHITECT,ENGINEER OR A MASTER PLUMER. DRAINAGE LINE
PLANNER: SHEET CONTENT: PROJECT TITLE: DESIGNED BY: CERTIFIED BY: SHEET NO.:
PLUMBING LAYOUT
WATERLINE LAYOUT 70 SQM SINGLE ATTACHED END LOT(IMP.)
HAUS-LAND DEVELOPMENT CORPORATION CATCH BASIN DETAIL
SEPTIC TANK DETAIL SAFFRON CHECKED/APPROVED BY:
P-1
ISOMETRIC LAYOUT
SPECIFICATION
MANSFIELD RESIDENCES PRC NO.:
TIN:
PTR NO.:
DATE:
8
ADDRESS: BLK 43 LOT 35 DON BONIFACIO AVENUE, PULUNG MARAGUL, ANGELES CITY OWNER: LOCATION: BRGY. STO.DOMINGO, ANGELES CITY PLACE: