You are on page 1of 34
DAMAC DAMAC CRESCENT PROPERTIES LLC DELTA (Ai bmsins! Form No.: SPM/PA/STS/001/00 ProjectName | DAMAC HILLS PARKS RESIDENCE | ProjectNo.__| P021.41 324 VILLAS Date 17/40/2022 [Submittal No. P021.41-DB51-MTS-CIV-013 [Revision: [oo [Submittal Title: |Method Statement for Wardrobe Works fe are sending herewith under separate cover the drawings / documents / samples listed below. ITEM NO. | DWGS. SPECS DESCRIPTION TYPE | COPIES REMARKS BOQ REF. 01 Method Statement for Wardrobe} OT | 1 Hard |Works. [TZPE" SD= Shop Drawings, Si= Sample, GT= Guarantes, MD= Manvtachrer® Data, = Ceifictas, TT= Test Results, OT= Other |We certify that the documents / materials submitted herewith have been reviewed in detal and are in strial Jconformance with the contract drawings and specifica IContractor (Name) lEng. Ziad Ahmad Shehadi Projects Manager [Signature: Cépt ai otherwise stated IRov'd By ‘| Date: RATE Date: Resident Engineer Review Comments [Consultant Decision ‘Approved CB Approved As Noted (CO __‘C'Not Approved C) D'NotRequired Resident Engineer's (Name): Signature: Date: Revd By |Contractor: [safe and satstaciory manner. Date: [Corrections or comments made relatve fo submitals during ths review do not relive the contractor fom compance wih the Tequrement Jot The Contract. This check is ony for review of general conformance withthe design concept ofthe projact and general compslance with the information given in the contract documents. The contractor is responsible for confirming anc corelating ell erties and éenensions| selecting fabrication processes anc techniques of constucten, coordinating his work wth that of ethor rade and performing his work in Copy to: Employer [] Consuttant [] as Other Head Office ESS ae aaa ALEMARATE tm i! slamtd! The Employer DAMAC OAHAC CRESCENT PROPERTIES LLC an +. | AdtgBintoak | ara The Engineer The Contractor The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Material Statement Submittal No. : DECC/DB51 /MS/C/013 Rev-0 thks Manager Rev. | Date Prepared By Checked By ‘Approved By 4 oO 11-10-2022 v S Si ilvel Ziad Ahmac QA/QC Manager ProjectsManager The Employer The Engineer ___] The Contractor DAMAC Ee |) it ———- DAAC CRESCENT PROPERTIES LLC bn Rae gg Baa = The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Table of Contents ‘S.No Description Page No. 1. | Purpose 3 2. Scope. 3 3. | Reference Documents 3 4, Definitions 3 5. _ | Project Details & Responsibilities 45 6. Health, Safety & Environment (HSE) 6-14 7. | Material / Equipment Resources 14 8. | Method / Procedure 15-18 9. | Quality Assurance / Quality Control 18 10. Inspection and Test Plan (ITP) 18 11, Distribution 18 The Employer The Engineer The Contractor The Subcontractor ‘DAWAC CRESCENT PROPERTIES LLC DAMAC —— ToGo oN Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works > Purpose The purpose of the method statement is to describe the system and sequence of activities related to the wardrobe Works of Damac Hills Parks Residence Project (327 Villas) in accordance with the contract project specification, contract drawings, approved shop drawing and project standards, > Scope This Method Statement is intended to outline the requirement for activities and the method used for the Wardrobe Works. 3. Reference Documents > Project Specification > IFC Drawings / Approved DM Drawings > Shop drawings submittal > Bill of Quantities (BOQ) > Project Quality Plan > Project HSE Plan > DM, DDA & DEWA requirements 4. Definitions > Project Name - DAMAC HILLS PARKS RESIDENCE 327 VILLAS. > Employer = M/s, DAMAC CRESCENT PROPERTIES LLC > Consultant —- M/s, ARIF & BINTOAK CONSULTING ARCHITECT & ENGINEERS > DECC - M/s, Delta Al Emarate Building Contracting Co. LLC > PM - Project Manager > QA/Qc - Quality Assurance / Quality Control > ITP - Inspection & Test Plan > HSE - Health, Safety & Environment > PPE - Personnel Protective Equipment > IR - Inspection Request ‘The Employer DAMAC DOAHAC CRESCENT PROPERTIES LLC The Engineer The Contractor oe ak dys ite Arif&Bintoak fa ee | Ee. The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works 5. Project details & Responsibilities PROJECT NAME DAMAC HILLS PARKS RESIDENCE (327 VILLAS) PROJECT Located at Sector: ADDRESS, DAMAC HILLS - Dubai, UAE Name Contact Info. Dubai- UAE CLIENT M/s DAMAC Crescent Properties L.L.C ‘Tel. 04 5205470 P.O .Box 3670 CONSULTANT M/s Arif & Bintoak Consulting Arch & Eng. LLC | Dubai, UAE Tel. 04 3372686 MAIN. P.O. Box 87425 ONTR M/s Delta Al Emarat Building Contracting LLC | Dubai - UAE. a cobs Tel. 04 4541211 aa Mis Prestige CONTRACTORS ne Hee 1.6 RELEVANT ISE Manager) (050-4969493 _ PERSONNEL Manager) 055-6267154 Muhammed Azhar (Str. Engineer) 055-3793881 ie inocee S a oan Safety Practice, DEWA & DDA REPERENCES UAE Fire & Life Safety Code Practice 2018, The Employer The Engineer The Contractor The Subcontractor Goudie DAMAC sera ‘OAVAC CRESCENT PROPERTIES LLC mem Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Responsibilities > Manpower Responsibility Tt is overall responsibility of Project Director to ensure that the work procedure is safe and activities are carried out according to approved MS, shop drawing and specified quality is achieved to the Engineer's satisfaction, > Project Manager. Overall Management of the Site Team and Project Programs, including the ‘current subject. He is responsible to plan and manage all tasks related to submittals/ execution of this activity to the completion and to take the requested corrective action related to any raised NC. He is also responsible to coordinate with the Consultant and with other concerned persons to finalize any variation/ problem related to this activity. > The Construction Manager shall liaise with the Engineers& Safety Engineer to ensure work is carried out in accordance with Quality & Safety requirements. The Construction Manager shall coordinate with PE of PY, Site PE/SE to ensure that the necessary resources to implement the works as per approved MS, AHA and JHA have been allocated. > The Project Engineer shall ensure that the site preparation activities are conducted according to the approved Method Statement and that all in-situ testing as required by Inspection and Test Plan are resourced and implemented. The PE shall follow up SE and construction team for the proper and timely execution of the works. > The Material Engineer will ensure that the materials being used are in accordance to the Project specification and tested through TPI and forward all the results to the QS Section in order to submit with Inspection Request for approval. > The QA/QC Engineer liaise with consultant site representative for conducting Inspection on day to day basis upon receive Inspection request through Site Engineer. > The SE/Foreman is responsible to organize the work in a safe and efficient manner, including all safety requirements and PPE, implementation of the work as per the MS and the ITP. > The Site Engineer shall report to the Project Engineer and confirm, day to day, all the Work Inspection Request (WIR) status approved by the Consultant representative. > Responsibility of the Survey Team is to perform all the required surveying activities required to achieve target dates and confirm the survey part of the Inspection request are approved by Consultant. > HSE Inspector / Officer Ensure safe work procedures implemented and followed, provide required tool box talk, verify site activities are followed RA, Stop all unsafe work activities. The Employer DAMAC ‘OMNIA CRESCENT PROPERTIES LLC The Engineer The ia is je Arif&Bintoak wines wpe The Subcontractor Contractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works 6. Health, Safety & Environment (HSE) Activity Hazards Safety Health Werking at ‘CiConfined Spaces EZINoise / Vibration Height Hot Works DAsbestos Fragile Roofs | OGases CHazardous Substances/atmosphere Plant, Oire / Explosion Manual Handling Equipment & Falling Materials CiRots/Birds or Other Tools Collapse of Structure Olead CiMobile Plant Environmental pollution OOther Overhead Other Services (Underground Services Electrical ‘An emergency procedure is established and communicated to the workforce and in the event of an accident, the emergency preparedness and response plan shall be Emergency: | followed The risk assessment shall be used as o guideline to implement the necessary corrective/remedial measures. Name(s) of first aid trained Location of First aid box: personnel: Khaleel (HSE Dr. Naseem Heo Officer) (052-7072157 inst alee Location of nearest Hospital NMC Royal Hospital- DIP (04-8108800 Personal Tt shall be ensured that no workers be allowed to work on site without wearing an Protective | appropriate Personal Protective Equipment such as safety shoes, safety hard hats, Equipment: | reflective vest, hand gloves or not being properly inducted by DECC HSE Engineer prior to deployment on the work site. a uw w a a a DAMAC shi Arif&Bintoak CAMAC CRESCENT PROPERTIES LLC cays ng Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works eet Name: [ Contact No. ‘Ambulance 998 Fire Brigade 997 Police 999 | Coast Guard 996 Enea Electricity Failure 991 Contact Details: [Water Failure. 922 | Engr. Ziad Ahmed (Projects Manager) 055-2376630 ‘Mr. Muhamed Thahir (HSE Manager) 050-4969493 ‘Mr. Senthilvel (QA/QC Manager) 055-6267154 ‘Mr. Mohammed Abu Nazer (Construction souLeaso Manager) Muhammed Azhar (Str. Engineer) 055-3793681 Method Statement Review, Approval and Communication Method Statements shall be reviewed and approved internally by the Project Manager and EHS Lead Engineer being issued for site operation, The assigned Construction Manager shall ensure that the method statement and risk assessments are communicated to the site execution team. Records and signatures shall be maintained by the Construction Manager. Job Safety Analysis (JSA) and Task Briefing Tob safety analysis and task briefing shall be completed by Construction Manager along with all staff involved on the Storm water activities. JSA’s shall be communicated to site team by the area Project Engineer/Site Engineer/General Foreman/Foreman prior to commencement of works and at regular intervals thereafter or after any significant change in the location, activity, personnel, equipment, climate, etc. All persons attending JSA briefings shall sign the TSA attendance form. Supervising consultant personnel shall attend JSA/Task briefings. Risk Assessments The Project Manager and HSE Manager shall identify the potential hazards before starting any activities on project site and they will plan a proper safety procedures and measures to mitigate or eliminate these defined hazards. A thorough risks assessment shall be carried out whereby various activities are identified clong with their possible dangers and hazards. The existing controls are checked for adequacy and if it requires an additional controls and resources to mitigate the consequences of possible incident, DECC shall deploy and provide such measures. _| 7 The Employer The Engineer | The Contractor The Subcontractor DAMAC ‘OAMAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 227 VILLAS Method Statement for Wardrobe Works Risk assessments shall be produced for all tasks described in this method statement. Risk | assessments shall be communicated to the workforce prior to commencement of works. Risk assessment is attached as annexure with this method statement. Permit to work (PTW) The purpose of this procedure is to provide a safe system of work in the Site, and to give guidance to those carrying out the work. The Construction Manager have the overall responsibilities for ensuring this provision are made for the implementation of safe systems of work. A duly signed PTW shall be available in the work location Inspection and Monitoring The EHS Lead Engineer shall ensure that inspection and monitoring is carried out in accordance. with DECC Project Health and Safety Plan. All inspections and monitoring to be recorded Personal Protective Equipment PPE shall be worn at all times and shall be reinforced by site supervision at all times. The PPE requirements are Hard Hat, Steel Cap Safety Boots, and High visibility vest, safety glasses and gloves. The Project EHS team shall be responsible for the selection and issue of mandatory PPE. All job specific PPE shall be provided by the Construction Management through the Stores. Competence and certification UG services locator operator shall be 3" party trained and competent. All drivers shall be holding valid UAE license and defensive driving training. All Plant and Equipment operators shall be holding valid UAE driving license and approved Third Party Certificate, All Plant and Equipment shall have a valid Third-Party Inspection Certificate Flagman- Internal Flagman training course. Plant and Equipment The Plant Manager shall be responsible for ensuring that all vehicle& equipment used by the Construction Team are in good condition, preventative maintenance is performed, holding valid registration documents, insurance coverage and 3" party inspection & test certificates. All heavy vehicle & equipment shall be fitted with audible reverse alarm and revolving warning lights. Fire extinguisher shall be provided for all plant and equipment DECC Lead EHS Engineer shall carry out periodic inspection of fire extinguishers. 8 The Employer | The Engineer The Contractor The Subcontractor DAMAC ghaadi Arif&Bintoak ‘DANAC CRESCENT PROPERTIES LLC mca per Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works All plant and equipment shall maintain a buffer zone to avoid interaction, in addition situational ‘awareness training will be given to all operators. The Plant Manager to ensure that all Plant and Equipment, daily inspection checklist are being carried out and completed by a competent person DECC Lead EHS Engineer shall carry out periodic inspection, DECC management will ensure that arrangements are in place to ensure the controlled or organized delivery, collection of materials, and Loading and unloading of Plant and equipment. DECC Construction Manager shall provide suppliers and subcontractors with full information on the access way and traffic regulations so that any congestion and disruption may not arise by the vehicles operated All Delivery collection drivers shall attend induction with regards to traffic management. This shall include site layout and designated route, speed restrictions, site traffic requirements, loading, unloading requirements, any specific risks and any additional relevant information. DECC management shall establish appropriate dedicated vehicle parking areas for delivery / collection vehicles. Parked vehicles shall be turned of f with hand brokes on. DECC shall ensure the following: > arrangements are in place to ensure all delivery, collection dri arrival to site: > material delivery, collections is made at designated storage, collection areas; > materials can be unloaded, loaded safely by mechanical means where appropriate in safety and without risk to others on site; Those involved in material handling are trained in the site delivery procedures; > vehicle loads are checked prior to entry to site to ensure that they are safe; > vehicle loads are checked and approved by both the employer and the driver following loading on site prior to release of the vehicle for exit from site: rs report to security upon Traffic Management Traffic Management Plan (Logistics/ Traffic Management Security Plan) has been established. In summary > Construction team to ensure that all DECC site access roads are monitored. > Supervisor shall be responsible for segregation of pedestrian from Plant and Equipment movements. Flagman shall be assigned for purposed of managing the traffic and plant and equipment movement. The Employer The Enginesr The Contractor The Subcontractor ploye je Engineer | The Contraci 1@ Subcontractor DAMAC DDANAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Work: jethod Statem: flardrobe Works > Site access roads will be designed to minimized reversing operations by having one-way system and assigning turning points. > Site access roads shall be maintained by the construction team at all times. All reversing movements shall be controlled by competent flagman. > Control of traffic routes and priorities shall be established and separated where practicable between normal site traffic and heavy earthmoving plant. Loaded plant shall have right of way at all times, and procedures for reversing and maneuvering shall be implemented and shall include the use of audible alarms on dump trucks and banks men where necessary. Particular attention shall be paid to plant operator ‘bling’ areas where plant is maneuvering in confined areas, > Traffic Signage shall be provided on access roads ie. Danger Excavation, Heavy Vehicle Movement, Heavy Vehicle Crossing, Speed Limit, Hump/ Ramp, Men at Work, etc. by the construction team, > All vehicle driver, Heavy equipment operators/drivers, Plant and Equipment operators shall follow all traffic management signage’s and project speed limits. > Flagmen's on fixed location will be provided with shades and drinking water. All flagmen's will be positioned on safe locations. > Pedestrian movement will be segregated using necessary measures (Hand barricading, demarcations, signage, etc.) from vehicles and equipments. Training The Project Health and Safety Plan contains the EHS Training Matrix for the project. The Project Manager is responsible for ensuring that time is allocated for the delivery of the project training matrix. The EHS Manager/Engineer is responsible for the delivery of the training. All necessary training and certifications will be obtained for operatives and supervisors prior to the commencement of activities. If Employer/Supervising Consultant inspection are needed, Employers/Supervising Consultant inspectors will be provided with necessary training and briefing prior to the commencement of inspection and training/briefing records must be sent to Supervising Consultant HSE representative. Third Party certification training is required for all person operating service locator equipment. Full list of Environment, Health and Safety training requirement are listed on the Project Health and Safety Plan. 10 The Employer The Engineer The Contractor The Subcontractor eT DAMAC aes ‘OAVAC CRESCENT PROPERTIES LLC Te Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Disciplinary Procedure Project personnel and subcontractor personnel who violate the EHS requirements shall be subject to the Disciplinary action procedure. A full copy of the disciplinary procedure is contained in the Project Health and Safety Plan. The disciplinary procedure applies to all personnel irrespective of position and seniority. Hazard Warning Signage Applicable Hazard warning signage’s shall be provided on site (Excavation signs, Men at Work, Speed Limit, Emergency Number, Emergency Response, etc.) by the Construction team. Environmental Litter and waste shall be controlled by disposal into designated covered skips/ containers. Waste collection, transportation and disposal shall be carried out only by companies registered with ECS Dubai Municipality. Wastes generated during the Dewatering works (food wastes and other) shall be collected at site and disposed through waste skips, The construction teams shall be responsible for ensuring this happens. Fuel and oils will be stored in bunded tanks and waste oils will be collected and disposed of by a licensed specialist contractor. Static plant, i.e. compressors, generators and pumps, will be sited over drip trays. Approval will be obtaining approval (permit for discharge point) for discharge of water pumped through dewatering Ground water shall be pumped away and disposed of as directed in the discharge license. Refueling of plant will not be carried out adjacent to water courses or rivers and mobile refueling bowsers will be equipped with spillage kits, containing absorbent mats and granules etc., for which specific training in their use has been provided by the manufacturer. Maintenance of plant all vehicle, plant and equipment will be carried out at designated places, Spill kits will be carried by the maintenance team. Weather Condition Work shall not commence or continue in case of poor weather or visibility Welfare Arrangements The Project Manager will be responsible to ensure the provision of adequate resources for welfare facilities on the project. The following welfare arrangements will be provided for the project employees: it The Employer The Engineer ___| The Contractor The Subcontractor DAMAC (DANAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Drinking Water + Adequate water dispensers with provision of cold drinking water will be provided. The water dispensers will be located at all shaded rest areas and of fices; > Chilled drinking water will be provided at suitable points and marked “drinking water* using the applicable languages required. > Filtered will be available by maintaining water supply lines with filters, and that filters are cleaned, replaced twice per week and records are kept. > Water storage tanks are cleaned and maintained on monthly basis. Drinking water will be provided in personal water bottles (BPA free) for all personnel on site, > Drinking stations will be available at an approachable distance Vv Sanitary Facilities DECC Project Management will ensure that appropriate welfare facilities are provided ‘and maintained according to the size of the workforce and nature of the work on the project. > DECC will provide an independent toilet with the mobile sewage system and with running water, > The site toilets shall be cleaned and sanitized on regular basis and the results of inspection recorded, > Toilets will be available at an approachable distance Facilities for shelter and taking meals DECC will make the following provisions: > Provide sufficient and conveniently accessible air-conditioned rest areas closed to work area > Eating on site is strictly prohibited, all workers will be taken on air-conditioned dining halls with air-conditioned food storage areas. Prevention of Heat Stress/ Heat Stroke Heat Stress/ Heat Stroke are one of the main occupational health issues in construction sites during the summer days, A Heat Lliness protection plan has been developed prior to commencement of works, To prevent heat stress and heat stroke the Project Manager will appoint a water superintendent prior to works commencing. 12 The Employer The Engineer ___| The Contractor ‘The Subcontractor iy die DAMAC ee DAAC CRESOENT PROPERTES LC sey 3a tomers Project: DAMA HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Emergency Arrangements The (ERT) role is to manage any emergency situation which may arise on site. The ERT team shall help to minimize any human suffering and economic losses that can result from emergencies. The Emergency Response Plan is detailed in Project Health and Safety Plan. Emergency number and response measures shall be displayed at worksites. ‘Summary of procedure > Duty phone Holder responds to call and confirms details from caller > Duty phone Holder assumes control stating he is the Person In Charge (PIC) > PICalerts other ERT members to the scene > PIC or other ERT member carries out an assessment and takes appropriate action > PIC calls ambulance if necessary > The PIC may also decide to call an external emergency services such as fire brigade or civil defense ambulance service > PIC instructs members to bring appropriate equipment i.e. first cid bag, rescue equipment, chemical spill kits etc. > PIC arranges crowd control/ security/ access egress issues. > PIC announces end of drill and informs ERT Leader and senior construction manager of the emergency Incident Reporting to Employer /PMC/ Supervisory Consultant Arrangements by DECC to Report Incidents to Employer /PMC/Supervising Consultant, DECC will inform Employer /PMC/Supervising Consultant in the event of the following. > Fatality-Immediate Serious/ lost time injury - within 30 minutes’ medical treatment injury First Aid Cases - in monthly report Significant near miss - within 30 minutes Any environmental incident that requires the DECC to report to Dubai Municipality. vvvyv In all of the above cases the DECC HSE Engineer will notify the Employer / Supervisory Consultant by telephone call and SMS immediately. DECC will prepare within 24 hours, an initial report, describing the incident and issue to Employer / Supervisory Consultant. In the event of a serious injury or a significant near miss/ environmental event, DECC will submit a detailed written investigation to Employer / Supervisory Consultant within 72hours in the. In the event of a fatality a detailed written investigation 13 The Employer DAMAC ‘OWWAC CRESCENT PROPERTIES LLC. The Engineer ae oy je Avif&Bintoak The Contractor The Subcontractor Project: DAMAG HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works report, luding police reports, is to be submitted to Employer / Supervisory Consultant within five working days. In cases where sub-contractors are appointed, DECC shall ensure that the reporting requirements of the relevant authorities and Employer are met. All incident records will be securely retained as long as the site/ service are operational plus three years thereafter. Legislation, References and Code of Practice As per Contract Conditions and Specifications > vvvv vvvvvvy Relevant Authority Specifications (Dubai Municipality) Project Quality Control Plan Dubai Municipality Code of Construction Safety Practice - 2008 Ministerial Order 32/1982- Regarding the Determination of the Ways and Means to Protect Employees against Occupational Hazards DECC Environmental Management Plan DECC Waste Management Control Plan DECC Integrated Management System TSO 45001:2018 DECC Project HSE Plan DDA & DEWA Requirements UAE Fire & Life Safety Code Practice 2018. 7. Material & Equipment Compressor Ett] eemareel ei Cutei-t| 14 The Employer The Engineer The Contractor The Subcontractor 0 DDAMIAC CRESCENT PROPERTIES LLC 8 | Cleaning Tools/MDF/Screws 7.1 Resources {Construction Manager — | Carpenter I Engineer {Land Surveyor. -QA/QC Engineer __ Foreman | HSE Manager na HSE Personne) = | Machinery Operator Laborers 8. Method / Procedure 8.1 Mock - Up Prior to Fabrication, a Mock-up shall be installed at site which is made under approved sample submittal to demonstrate aesthetic effect as well as qualities and material of execution. ‘The Mock up sample shall be approved by the engineer before installation of all the assembly for the mentioned plots. 8.2 DELIVERY OF STORAGE AND HANDLING * Deliver all items such as Wardrobe cabinet & other items to complete the assembly with protection cover against dust. © The internal shall be quality constructed at factory prior to delivery free from any defects. Any item shall be replaced if found damage by Prestige Team. 15 DAMAC oie | aT ‘DANAC CRESCENT PROPERTIES LLC. The Employer The Engineer The Contractor The Subcontractor Arif&Bintoak Sera eee ECT ES Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works ‘© Storage of materials at building site should be under with flat form with 10cm height from ground or out flat surface. Packaging shall be kept dry and shall be stock of 6mm spacer for installation and air circulation. 8.3 FABRICATION 8.3.1 Wardrobe Cabinet All MDF Carcass, Shutter, & Drawer should be cut by using cutting equipment according to the cutting list. These edges shall be clean from dust or dirt for lipping. Covered with Polythene Sheets for protection for dust. Ensure that proper markings are in place for identification. 8.3.2 Installation of Wardrobe Cabinet 1. geen Ensure that the following conditions are met: 8, The location should be clear from any activities b. The floor area is clean, dry and level. Ensures the materials are in the right location according to the sizes. Remove Packing Materials. Assembling the Materials of Carcass. Place Carcass and fix according to the approved shop drawing and ensures all are in leveled and aligned. (The Maximum Tolerance of the Wardrobe Cabinet from the wall is 3mm), Install the shutters. Install the necessary accessories to completion. Our site supervisor will check the complete Wardrobe Cabinet if all of the above procedure was. done properly 16 The Employer The Enaeer The Contactar The SuboonTaaor DAMAC 2. | AfeBintoak ‘| DEE ‘DANAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works 9. Quality Assurance / Quality Control The complete work shall be inspected by the consultant and approval shall be obtained for the same, The following shall be maintained to control the Quality of work: > Inspection & Test Plan > Inspection Request > Check Sheets 10. ITP & Checklist = Inspection & Test Plan is attached in the Appendix - 2 ~ Check sheet is attached on Appendix-3 11. Distribution = Construction Team = QA/QC Engineer - Technical Office Team - Safety Staff 7 The Employer The Engineer] The Contractor The Subcontractor DAMAC so: | DAAC CRESCENT PROPERTIES LLC. Ewe Ss Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Appendix - 1 Risk Assessment st02 Ame znow-ez rani ‘jssody wounsedap fray axa yo soqureuse pue equows WED) aus € hg porydluoD 24 pjnoys woWSsaSse SIy “3LON EON’ ON STON !91eg moIRay pasa Ie yaya paxanpud> aq 04H} x0qIOo ‘Anayes pue Buyeug vs >uoN-4d | ‘PAMO|OS ARDNS eq cr uonepuowworsseimoenueW «| “ayauiowsue payj9> Buisnsiseq quanbax, aye yn109 ‘Aouayadusoa Aed pays pue asua0y avn pljen ssassod oj yei2d0 aues) + ‘sananpe uy aypuey oy paultsse aq 01 1088 ppayyi90 Aued pay pue wwayadwiog | papiooes ue paujewujew aq 01 ue vosiad wayeduioo SING, ‘Atep wo au0p 24 03 uonsadsul ue) | sadaaya01s passe ewig us pue papesiieg aq or ea.e Bun | 29u)8u3 aus 2 | luo paloyjuows aq 03 paads pum « | | | souo pue s20usv3 paleug | senpiew | oxpaus zt] »| | swopnoy 0 a ars nba 1 JonU09 40 sonpo4o favor | seen | aaa prronvesiozoesict | Gyre) | sy | seen wernuas | asexsovonéursea | on eu ys cage SIOWSIA D "219d eu D ‘Auedordn) ‘SioweNUO® J8yI0 /aNst) ‘eeko|dwia 39300 EPEwEYe Oq IM I1e YeUM PUE OU vauoe eag2eid | ‘p00 Mayes 99 84 3. sveweunbou ymaa SHO saBeuEW 3H aie. paweynw Ja8euey uonmnysuoy Jase nay sa8eueW 001d pewiyy pez 18u3 woneusiseg ‘ls wuauissosse fu st :uone|si#97 tha porajduioa uawissessy 41 zeoe-ov-er ea | (SVTHA ZZ€) SONZGISTY SHUVd STU DYNA 32og ‘eyo Ta8eg AINSSS3SSV STH SRIOM S3BOUTUVM “ALIALLIV ‘toe Aneznou-sc-otHnts Joquiause pue sequiaw wea 24s e Aq pore|dwo9 aq pinoys 1uaUsSaESE YE TON EON ZoN—:ToN :ayeq maynay, I T roma T fee zs 390 lene Bulpioy aq jjeys Si\e1ad0 uaudins uauudinba pue ue ‘0M Iv | ‘pue awed “paunoyed st yo Buuimuan0 aoueuazureus angeyuansid “uonipu0a so Budd, p008 u ase weay vonsniisuc) quauidinte ‘242 -Aq pasn quowidinba ¥ apyan lie eq Suynsua 404 ajqisuodsas ‘ag yeysseeveW weg, quawdinbs “Ayange ers soud “sapiyon 2o9jd ust warshs mid axeudordde Aayonas Bune aegi ansug 4321 ayp apuauwoD o1 puuosieg 0118 sannesado 943 0} payeaqunuiwo> oie Bunaaus ue payaidusoa s1 wawayers pons, ‘suawaiuene yeip aunsu 01 2BeUEW Dafoug ‘ils “ays 01 84108 a1042q uonanpul sHa ALorepueW wey PEO ‘fowjod Supsionas ‘SH at9 papuane ancy raleud ayy Jom syeas oun je eu aunsua_.| sangesado 1904J0 38H yo wawenou! quawdinba 9 a/149n Aa hyodoug pue uoaerodo ana] s0UBIy e 02 punos® wos euareus or aeueg ssappoy ys axa unyafon 9A iH | Ys or pasn 9q 01 s08e9 BURy) POI ‘Ainfu yeuarew | sjeuarew yo Buryus eH pueH | payed pue paivadsuAued pauL | | pkweres yo Buje fuonewodsuest | 70 ‘Auo punos8 pjanay pue perpeduo> uo paivara aq oyaueg «| Pamolio} 2g or 1uawoye%s pouaus panaiddy « Paya Aued puna pue paredsuy pueauey «| ayn sepun 40 s89u eis 0} pemoyfe 51 2U0 ON, ‘peo} aya yum 1321U09 1aup BuIpione saul] $e Buisn payionuoa aq 0} peor | jozaReg ANINSSASSY SIE ‘SRIOM SIGOUGUYM :ALIALLOV toe Amz0au ee rns ‘81 'speo| Suypuey oj LOM Jo wash | 1949 $2240 ‘pueA ul Bujdaayasnoy poo | 1 WUM ayayaquy “uossed quareduleo & Aq paraidusoo ue ano pauses Bujaq ase sippy vwonzadsu) Ayep “wuowidinby pue weld Up aunsue 01 19BeUE UE BL “s101es0d0 je 03 won! Buyuies, onippe ty von2evaqut ploae 03 auor saying @ ‘wequjew jeus avaudinda pue ru {uauudinbs pue ued 410) pepinosd aq j1eys s0UsIMAUINA a “soyesado au Jo} aye0y2109 fouaradwoo Aused pug panoidde jam se yuawidinbs pue weld axa sos ys90 sa uoRsedsul Led BIE ide pve ‘squowno0p vonensifas so squeuwseyue> Je uoyss}uia ayy, uauudinb suyn/ yeu vvonewour9jdu) ave ye13 s123f00 40 5193/40 fneay Sunou pue aunyn Suypuey enue, soi pue sus '1ea8 souossas3e aun pue squaudinb3 jo sued dujnow um s223U09 lewapeay B10 € aBeg ANAISS3SSW SITY ‘SOM S3POUCUWM FALIALLW sto Amv esou sc Oran soquiow pue soqwaw wie as © Aq paraiduion 2q pinoys 1uawssa5Se WS LON ‘EON ZON ‘TON :21eq MaInOY "ash 9g 03 H|a 7 = Jeatn29j0 sadoug juiem pue pasn j2Ued jeaynn9j@ pue s.gq iedorg + seaueydde ‘joued joa.99}2 Jeounpaya yee yum pasn 2g 03 Se913 + ulsea BussiN hyo uawodeuew s2jqe> eD.a39I8 parejnsulajgnop esr. « ajqeosedosdw) + ‘umes “si@yp05 Jana}904 ayn yim pauleruew oq reussnpuy lieys 1283] y “sopunie> Ayduia /pasn suouyoasn + jo aya jo wisias aun vo Aiuo panss) 'j002 js saBpunue9 aN * Jadaaya1035 huo> ANDLS 9q eys ans Ue s1001 parssse sespneD + spie0q us sadoud Jeq 2g 01 ease YOM, + “syeojuey> spien® auiyoeu Aq paxna.osd snopsezey ‘aq eys aunysew aun jo sued Sunency + yooinsoda ‘puezey ie) pue dit ‘ais Aue plone “ansopuiom ©) pauiewuiew 29 03 Suidaayasrioy pauenun pue Ayadoud pasos 2g 01 peo} Anes wonmon201g areds sannesedg pparaplasuo aq 01 SWOUERLA OM + agewep | 0m: upay seqoups0% 4891410 38H ‘pom 241 304 poAo|dap aq 02 sua%.0m fusodorg 003, 404 51003 puey pue uew0s Hp paouayade pue wareduion Alu + Aunfuy snows Buomdusn «| _sjoorsamogjoasn | £0 ‘one(d Buinivas jevaiew pue 7 ‘yoe1 a8eso%s jouarew ajgeqns aprnoig «| svea pue sauauidinbe Buri 40 (1s) ‘uuuy Supjiom ajos poeaxa rou og | ‘desis 3ujpeo} a1eudosdde Avo pas) ‘saynou uauysopad poxseu-jom ajes | mag 01 S228 IY | “hoges qea ss030e 01 Sianp moje sieq geu8 pue sdais paxty “pomoyjo} oq 0: warshs ayer Aem-2ug «| papione 12911623 843 Jo pag ayy uo Supom, ajopeaeg ANSINSSASSV STH SIYOM S3BOUGEVM =ALIALLW st0z Ane enouer rans EON ‘ON S14 ON TON ‘leq MaInOy sanyesado ewes | sanoj9 puey ‘s20u5 ‘ayes 389\ INH wim 40 a)gedea asmannis paxy 01 ajaissod 10 104m uuiom pue sossousey Apog Inj ap!ncsg + sseusey ‘ayes Apoa ny se yans weishs 50.18 lje}.8do.d Suisn ase saakojduia aunsug ‘uonysod 3ujyonos9 @ uj 90m 224 yo Aue 03 paau saahoidure araym le aye/poun01 i1rsuI pue punoie 24 puey /Sia.seq puey sadoud ‘ney seaze Buns0m payenaa ie 2unsu3 ayeypau surg sites puey sadosd yay Buypiojseas /uuopeid Suuom ayes eaunsua aBewep huadoid « suoysin pue hyodous 249 on sewed reyarew Jo nes [euuosiad joes 29ppeijo.25n1 auBiey ze vom, Ey ‘suoneinas W186 se yo pasodsip pue pay2e1109 9q oy aysem snopuerey ty + son ‘fousdsaus ja1od Aue puowe ‘oy ays ye aigeyiene 2q 0) 19pIe 3513+ “paddesaq orsieqai Buipnnicig + ‘als ye ajgeene 9q oy aysINBUIAD O15 + “squid ypurd wosy sea day aq 01 sued Apog pue spueH + “saSewep wou 9915 pue por9adsul 99 0% sjoon pul gol 1yBls ayy 40 pasn 29 0} uoswuadns ‘2418 Aq yers aus ye yim paronpuce 2g 013/21 xogjoo: pue Buyaug vst + “pasn 9g 03 5}001 Jamod pue Addns samod AQET AUD + papuno.8 8q 01 sjoued jeoyn29y0 pue joyuoU 01 uoIsMNadns waradWIOD - wate + lw + a0 50804 ANSINSSASSV ISTE SHUOM S3GOUGEVM ALIALLW sro Aer ener orunuts ‘2fjssod | suounsedop Aaayes ayn so Jaquaus © pue saquiou weds aus Aa pevodwoo aq pious suaLI ‘EON ‘TON 56 9514 LON TON :a1eq Majnay SoD Saw ayes away sayes'6an yal) ofoud an Jos wawidinbs anjaeioid (euosied Auoiepvew ‘BUR JBM 24S [BUUOSIOG |v - seid >yom ye Buidaayasnoy pod u * aus ze ajqeyene 01 x0q ps aim padinbs suapre asi paynead ‘29014 410m age} 0) ease Buuysom pu si9}01 3 sorrce aye sweusdueue cae ns ple 8 pi oo semnerado iv renoinpuy | #5100312 payrUao (I 0c so Auigeyeneun saainean 10440 38H S905 sped Hom e ayaeene nem | aosonpe u Sunuom ewes ras | 9402 2:honDI9 @ J9teM SUNIL PION» so fugeveneun souiiuaaus | | Senin wonsnegea 73 eee seouitua nolo |v WH pIeH | 9g orstedous sos pa tp eaaitnsenitel ete eae veal Baan wiley Wor two 533)108 fe Aq usom ag asr st ‘uno waim sey pse sion ‘Aq wom pue van ase sagg aunsug ‘Aunnoe ‘4 noyBnouyy voIsiuedns ayenbapy + pa pays sounseaus Aseuonnesaad wpm ‘duos pue yuiad 7e yom WeIGO + 5 40 je) 4 waKad ‘BROge 320M JO S040 wHO}U! OT fiom mojaq siauieq pue suBisaigeying « ‘440% 41 01 paraNnpLUOD aq ASML Je9 Nog oor Yom ayy UES O04 + aiuemun quaneud 01 eave 110 smojaq Apauip aneds aun apentuieg + 20} 4191 x0qI00L + 8109 e8eg LN3INSSASSV STE ‘ROM SIGONGUVM FALIALLOW ‘toe Anezoaw-sc orunais asd pt wounsedop Ayes a jo saquinu#pue sco wea as & hapa} 24 FyNOUsURLASESSE SION fon Z0N TON sa1eq mayne wor sown suzunun Aiea prt ue pooda1 2q 0 po}odene uy. = eays uo.aq oe 7 eae | uy suasod pue sul ssouaseme A Hel ase senssguauene 9509.04 i swords Payrrn pewseamshemy «| ‘tino aia Anwonbaay pueyysem «| | Suniwon peu saro05 uypew Buyound or 3008 | ue winoy senojl puen | Josaiues apnoid pue ssnyues asm + sae0 ‘ued Apo uonuanoud ysew 9984 atl y uuweoun | sumeisdun ya | 6rPiRe9 a1wopued | 90 830 £aBed NBINSSASSV ISIE ‘SUOM SIBOUGUYM :ALIALLOW ‘toe Ane nou sc orunats 2yqissod y awaunsedap Aros oy o s9quuow e pue soquraus ules aus € Aq paajdluo> 99 pANOUS WALISaSSE YS LON ON ON ‘TON :21eq MANDY ‘ON area aumeuais uoneusisaq auleN ou dug a ‘Pardope oq 07 jeys sainsesul [omU09 pu SYS “SpIEzeH] Oy POOISISPUN UE ped! SACU | PUE POJSLIG S| TUSUETOSTE NSU ANTE YL 840 g oBeg AN3SSaSSY SIE SOM S3EONQUVM. :ALIALLOW The Employer The Engineer The Contractor The Subcontractor DAMAC oie | Arif&Bintoak COMHAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Appendix - 2 Inspection & Test Plan a 6740 2 28eg TOS BIGEHHON TSTOT Ul pue eiqertene e.e sj001 64) iy of eu ysiuy 0} yBnous 5 18119980 Aunpoy oy, | XEN ® S| S| HY) pisenbay Tes | ues asoyea | oo0ses ‘29g st uonoadsuy oi ab ip ‘soeds ‘yoy doys panoudde ou 49049 nel (ueweovewwog Bumeip doys ponoidde ae cia 0 s]myu] am asia anoy 0} omnsu3 socoser 295 | SMOMMON) OUNIO | Ft soads \piy xuen 2 payeiduioo Auagoy eu Mi : : S| HM] H | Bm | omen Avepnased oinsug | vers amon | 200821 209 | vonemeondous | 7 aS xen? es uo Hf ow | aw | UoReadsur ae ‘o0szt 29g | enjsoos ayy sienoudde | 4-4 ore °B 1BueIEW panoiddy Jog sy tee | Seen Jed sy SSLLUOHINY a oes eatin BNO) POEL IESe | areas SUBLSWVEVd SONVUSIOL | 3ASNULLSAL ] O%0ds/6"0) | NOWLARHOSSISAL | oy Kangnee ‘MRIALIHO 3ONV1d300¥ 0 4N3WN900 | /ALINJOVINCLLOZESNI Me Aonanozud | 3ONaSS3 NOWSW/ALIIBISNOSS3Y Aun md (s410m uapoom) i = PAD YUIGeD oqoupseym 404 (dll) NVId LS ® NOLLOAdSNI O0/LOO/ALIVOINAS "ON UO SEIIIA LZE SIIIH DeWeQ eIII\ SeoUaPISEY Ye (—— Me vila ———————S_ 62 J0 BT aBeg yeanboy uonsedsuy 0M — YIM, uonoedsuj — | oden 3501 - aL {wed PIOH ~ H queynsuog ~ SNo syuauno0g Jo moInoy — 402811009 WeW- OW ‘SS0\N1M ~ sopenueo-qns 9/8 :aN3037 souelaning-$ 3009 NOLOY 4811 798UD Pir H | oH |W | B38enbed | yeurges eqoupiem so Suysiuy. oe uoyoedsu} jeul4, Lb Uuopoedsu »g Bujjone] ou yeuy eunsus, esa deed HOM, "soeds “YoY ‘UO|PUCD ajqexJOm Jedoud BYERE O12 $100} O44 IY 3811 30940 1uy 0} yBnoue S| Aunoy ey, | xuew e Suyjeysuy S| S| H | gisonbey | jeuojew ojqelene oy auns oyew | we\g o1jog | googzi ‘eg e1pueHy 9 s100q oF uojoedsuy ‘soedg “you 84} UHM pascoud 0} ‘sBuymeup doys paroudde uj 40840 O0/F00/dLIVOINAS "ON WHO = = SPIIIA LZE SII DELUEQ Bll S8OUAPISEY ed, Se Se arravers 1 Seong sity (—— Me Vilaa Zeno mee The Employer The Subcontractor DAMAC (DAVAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wardrobe Works Appendix - 3 Check sheet 20 JAMAC 43 DELTAMgR mie jal ‘AriteBintoak 201.41 DAMAC Hills Parks Residence 327 Villas (0851) Project Number Project client DAMAG Crescent properties Employer 5 [consultant + Adf& Bintoak Consulting Architects & Engineors IMain Contractor Datta Al Emarate Building contracting [sub-contractor CHECKLIST FOR WARDROBE [wir No. Location: bate: ‘Checked by | Checked by | Checked by is.no| Items to be checked Contractor | aC Team | Consutnat Remarks le [Sle lz ls lelels IHSE Requirements 1 [Althe HSE requirments are fuflled [QA/QC Requirements Ensure tools, equipment and materials are selected and checked prior 1. |to use to ensure that they are appropriate for the work serviceable andl ina safe condition [Ensure that colour and pattem sas per the approved Sample Ensure that subcontractor end Method Statement epproved. Locate uneven areas and shim wardrobe in order to make the installation plumb, true and square [Check dimensions of wardrobe conforms to approved drawings. [check the outlines ofall the wardrobe on the wall marked to ensure actual cabinet cimensions Ensure the instalation of liner to wall and underneath the bottom rack. [check the installation oiler, drawer compartment, sheves and door loanet JEnsure that screwes tightens properly and the wardrobe is true, plumb land level Wardrobe is inspected for quality of work and repaired, refabriested oF 10 reinstalled as required in accordance with workplace procedures Tr [Work areas cleaned and rubbish dispased of as appropriate 12. | Check installation ofronmongeries is as per the requirements. For Final Approval Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative IName Name: Name: signature: Signature: signature: ate: Date: pate: TGC/QAQC/CHK/CVLWRB/O1 REV-00 Page 1 of 1 The Employer The Engineer | The Contractor The Subcontractor DAMAC oa int CHUA CRESCENT PROPERTIES LC corn | DELTA Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS it for Wardrobe Works Method Statemen’ Appendix - 4 Key Plan at

You might also like