You are on page 1of 32
KZEEE (roliog cLypaSaira | GOVERNMENT OF DUBAI Dubai Electricitya Water Authority Ref: No. PN&E/E & JO/LV/03/2017. LV Network De: 105 5638 yuhtl*y.evjasusy+ 0432481 11 ution 04324-44 Dubai Electricity & Water Authority FO Box 564: 18-01-2017 MIS- KEO INTERNATIONAL CONSULTANTS. DUBAI. UAE Dear Sir, 2D) 1n Approval for AKOYA by DAMAG (Arex With refer to your revised submissions on dated 13/12/2016 with the changes for the above subject; please be informed that, we do not have any objection to accept the LV network design subject to the following conditions: 1. Prop. Load of each Service point shall be within the approved design limit. Any changes in Main incomer Rating, KWH meter & sjstn location shall be updated with revised submission 2. 6" duct (150mm2) shall be provided for the each Road crossing point for DEWA cable with additional/ spare ducts (50%), close to the proposed road crossing points or throughout the route for the Future maintenance and emergency works. 3. LV cable shall be laid within 60cm with 90cm depth clearance (for Seven Cable’s in two layers) from the building line & out side of c/wall, Corridor shall be reserved accordingly. Width of the corridor shall be increased if the numbers of cables are more than seven as indicated above. 4, Demarcation of LV corridor, MFP location & road crossing duct shall be identified by the consultant at site during job execution. MFP to be installed (on LV corridor) in safe & protected area (adjacent to c/ wall) road side. Minimum 2meters away from the water meter location. 5. Length of main cable from sub-station to MFP shall be limited to 220M (overall length 250M), to minimize the voltage drop within 5%. 6. LV Cables up to meter location, 4W M=P, KWH meter, Cable lugs for terminations in sub- station & MFP shall be provided by DEWA. Total quantity of materials requirements shall be initiated to DEWA through client, “one year” in advance for the procurements purpose. 7. TCL 1000KW (+_5%) to be considered for each 1000KVA Trans. (for residential load only). 8. Infrastructure approval for the services corridor shall be obtained from I.I & P through RTA website. Dedicated LV corridor shall be reserved for DEWA (in landscape area). 9. Coordinate with CSD-Design Approval Unit for the proposed sub-station location approval. 10. Network design and as built drawing (if job executed by the client appointed cont.) in digital form (CAD/Micro station) to be provided to DEWA at the earliest. 11. Any other conditions not specified above to be as per DEWA'S rule 12. Separate approval to be obtain from DEWA’s execution departrhe! details of DEWA’s feeder pillar. and regulations. for space and installation oma SE aiUAE #7 08 324 48 Revised Final Design Approval LV Network Design —4 a KEON h INI D E X Area 2D Summary of Changes to LV Network Area 2D Revised Total LV load Summary Area 2D Revised LV Load Schedule Area 2D Revised LV Network Drawings Typical Feeder pillar & House Connection Location Previous Load Approvals Previous LV Load Schedule & Network Drawings Approvals September 2016 Summary of Changes to LV Network - Area 2D e LV Network Revised as per the revised Master Plan Rev.W. The changes are clouded on the LV Network drawing. © No changes to the Total connected Load & Demand Load for Cluster 2D. Project : DAMAC AKOYA [Calculation for: AREA 2D Load Summary DAMAC AKOYA [CONSULTANT = KEO INTERNATIONAL DivnDept [Calculated By IDAMAC AKOYA - DISTRIBUTION SUBSTATION LOAD SCHEDULE - AREA 2D Summary mm2 Al (Nos.) [Sheet No. Dec 2016 qoror | TOTAL|TxTOTAL| TotaL | Max. | Tait ot OF |CONNE|maximuu| maximum |Demand] MEX FLLAR | CTED | DEMAND DEMAND | @ 0.7 | Peron {Kay | LOAD |@085 DF @oasoF| cr. | SP cam Fey | em | TR | FR 761 648 533 4,508 4,264 41,056 77 636 523 600 | eos | sia | sie | 426 | 426 316 778 oa 1613 4,373 4,129 698 504 488 976 aa 683 4,987 41,580 4,300 881 749 616 355 728 598 4,820 4,549 4.274 965 e2t 676 935 796 654 1,915 4,630 4,344 981 835 686 oso | 989 | saz | 42 | 603 | 03 10,312 877 7.219 mm2 Cu (Nos.) ‘SUBSTATION MAIN CABLE LENGTH (m) XLPEISWAIPVC —_| BRANCH CABLE L(m) XLPE/SWA/PVC| no.or | tot oF | Jom SUBSTATION free) 40x80 | aoxos | 4X12 |soxras]acxsoo{*%| acy aacraifacrai|acr al] acy |IRET|FEEDER| “Srey NO. "| mm2Al | mm2 Al mm2 Al] mm2 Al 25 | 50 | 95 | 120] 185 LOAD Al cu SFROM] (kw) | Kay ss | Current | sissio [T1310] 16 164 262 4 resin) eaten (2X1000 kVA) | t2/310] 114 530 249 1 747 : ae 8 149 140 349 | 349 gisaiz2 | 1312 656 307 08 (2X1000 kVA) _ 2/312 374 261 695, i sis3i3_ | T1313 208 271 G10. aes eee) 12313| 16 306 116 1 362 gisaia | 11314[ 104 472 237 1 co ee (2x1000 kVA) | T2/a14 321 283 e218 |e gis332 | 11332| 35 444 268 1 wate] oes (2x1o00 kVA) [T2332 | 31 306 127 1 S67E |e SIS 333 Kaxioon kvay_ | 12232 462 27 ess | 698 TOTAL 316 4,392 2,798 6 8,122, WASTAGE 15% 47 659 420 [GRAND TOTAL 363 5,054 3,218 (Ml) DENOTES METRING (DEWA) CABNET FOR ASSOCIATED FEEDER PILLAR! SMDB TO BE LOCATED ADJCENT SUBSTATION SECTOR AREA - 2D SUMMARY SECTOR AREA - 2D CABLE SUMMARY MAIN CABLE MLPERSWAPVC| H(i ae ra wo (Nos.) | (Nos.) “4OX50 mma Al “ACIAI25 Direct Feed from Substation 40X95 mm2 Al ‘ACIAL5O. Branch Cable ‘40X120 mm2 Al ACIAI95 Main Cable for MFP “4GX185 mm2 Al ‘4GX300 mm2 Al [4x30 mm2 Cu MP Rev.W Page 1 of 1 AKOYA BY DAMAC exon ove sean Distribution Sub-Stations Load Schedules Sector- 20 “a commend | Mooe- air wer | ior catre ax oun at cae ona) er goraes| eosscr fown-curen] crea | oS Tc | woes | oxo | sons MP Rev ec 2018 won [an [on erry te a ect Water Athrty sees) aga seb Bd (et ee en tit) Page ot7 AKOYA BY DAMAC extn Distibution Sub-Stations Load Schedules Sector- 20 in cab aa) i "aorer” | Gomer ‘ima. | (ser oon core MP Rew (a2) Connection ote basil Services Dep (Eve) ec 2018 wen] ow | on Page 2017 AKOYA BY DAMAC exon) oe seek) [st see: Distibution Sub-Stations Load Schedules Sector- 20 ‘eeusce | 7 (Cosme Joon cures] “crea | ‘en MP Revw Mn case eran eta sest) Sse Srroaion see ep (Electr) ee 2016 Page sot? AKOYA BY DAMAC extn Distribution Sub-Stations. Load Schedules Sector- 20 ‘eosscr (usa ‘er Jovrantcrne] @a7er eon curt | cr MP Rew ‘an cae eran) ppg sa 5 Sabai Eecicty & Water Aut (oat en ee ee 2016 Pages of? AKOYA BY DAMAC. extn eee sores Distribution Sub-Stations Load Schedules Sector- 20 srrarcomer 807 CF lean cares] “ae MP Rew ‘gosscr (eusamee ‘Se Man Case era) ae eeereny Brbal ecty & Water Ato (eas) nga ennet a es Det ucly) Dee 2016 Pages 17 AKOYA BY DAMAC. Distribution Sub-Stations Load Schedules Sector- 20 ec 2018 an Cate art) eaeeeeeeeee Pio sore papel tage satin Dubai leccty & Water Authority (eae) Je gall as 8 5) Connection Services Dept (Elect) MP Reew Page of 7 AKOYA BY DAMAC Distribution Sub-Stations Load Schedules Sector- 20 ee 2016 pepe | erent [icone] Se! = at Co Mater Cabinet | 00 7 en ma aa xt) anol papaya 58a ‘Dubai lectiy & Water Authority (clipes!) Joga hes Gonocetin Seniors Dap Eee) MP Reuw a FINAL DESIGN IDAMAC CRESCENT PROPERTIES LLC| ‘PROPOSED LV NETWORK as ga ee er = saw, oP cee oe | a nee ee — i" sutton nose conection a et ce oe a es oo Aide TOWN TOWN TOWN Maeda HOUSE HOUSE HOUSE FINAL DESIGN wins cnescenr PROPERTIES Lc AKOYA BY DAMAC : UTI Huse comecron eras SRE ee a a ft as pee Tecsecensxos [0 EIFS RTE PROUT DONT -WIERAL WORS Oo ann STC STAY WE Pofteama § | i | | \ VILLA \ VILLA. fe aan — font FINAL DESIGN DAMAC CRESCENT PROPERTIES LLC| 3 P 5 = 8 KEN see AKOYA BY DAMAC UTIUTY HOUSE CONNECTION DETALS Vulas =e Pe Previous Load Approvals DAMAC AKOYA DAMAC for, AREA 20 Loed Summary eis] = & e|e ; tlalslalelejalalelsl/s|s HI Ble} a]ale]a le Bla}e|alsls|slelalalals Bye; eb] es] ay ale elalalalslalalele|sjals ! Siepey eps iaie elalslslalsisleislz/als *{-[+|-]-[-[-[-]-]-]-]- A sle}s|alelslelaialelals i 8 eleleleleleleleoleleo alals|sislelslzlals|ele alele|slelejelejelelel. ele] elelelele]elelels| > HVEVEVEVEVEVAVEVEIEIATE (7) DNOTES METRING(OENA) CABNET FOR ABSOCLATED FEEDER PLLAR/SMDO TO BE LOCATED ADJCENT BUBETATION AKOYA BY DAMAC Page t0t7. AKOYA BY DAMAC Page 2087 AKOYA BY DAMAG Page ot7 Pogo sot? AKOYA BY DAMAC Page 5t7 AKOYA BY DAMAC Page 8 ot7 ‘AKOYA BY DAMAC Dietribution Sub-Stations Load Schedules: Page 7017 ‘ONS WFIRON- PROT BELNERY-TIEIOON WOT Delon Draknqlbd EncalL VOIGT Roe WaT ELE FOR BOO RAL Dia NOT TELLTALE WW .

You might also like