2B DAMAC DELTA (Al i! dha} ) DAMAC CRESCENT PROPERTIES LLC AL EMARATE am Si! jlo Arif&Bintoak Form No.: SPMIPA/STS/001/00 paso] Ee Name DAMAC HILLS PARKS RESIDENCE | ProjectNo. | P021.41 324 VILLAS Date 17/10/2022 [Submittal No. P021.41-DB51-MTS—CIV-012 [Revision: [oo [Submittal Title: Method Statement for Wooden Works lWe are sending herewith under separate cover the drawings / documents / samples listed below: ITEM NO. | DWGS. SPECS DESCRIPTION TYPE. COPIES REMARKS BOQ REF. 1 Method Statement fonWooden| OT | 1 Hard Works. [TEBE SO= Shop Dranings, St Sample, GT= Guaraes, MO= Mar actirers Data, OT= Canales, TT= Tea Resi, OT= Other We certify that the documents / materials submitte rewith have been reviewed in detail and are in strict] conformance with the contract drawings ificatiohs except as otherwise stated. Contractor (Name): Signatur Rev'd By Eng. Ziad Ahmad Shehadi | \ 2 Projects Manager Date: DEK Date: Resident Engineer Review eames |Consultant Decision CW Approved © ___B Approved As Noted © __‘C'Not Approved CD’ Not Required Resident Engineer's (Name). Signature: Revd By IContractor: Date: Date: [Corrections or comments made relaive to submittals during tis review do not raleve the conlradlor Rom compliance wih We requrem ent) Jor The Contact. This check is only for review of general conformance with the design concept ofthe project and general ompiance with the information given in the contract documents. The contactor i response fr confirming and correlating all quantties end dimensions selecting fabrication processes end techniques of construction, coordinating his work wih tha of ther trades and performing his workin 3 safe and satisfactory manner Copy to: Employer [] Consultant [7] as Other Sheet No. Head Office athe Employer DDAVAC CRESCENT PROPERTIES LLC The Engineer gb oy ie Arif&Bintoak en The Contractor The Subcontractor DELYT. SRIRATES Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Material Statement Submittal No. : DECC/DB51 /MS/C/012 Rev-0 Date Prepared By Checked By ‘Approved By 0 | 11-10-2022 Construction Manager IHL Ziad Ahmad QA/QC Manager ProjectsManager The Employer The Engineer | The Contractor The Subcontractor DAMAC oa —a Arif&Bintoak OMNAC CRESCENT PROPERTIES LLC sapere PEL s Project: DAMAC HILLS PARKS RESIDENCE 927 VILLAS Method Statement for Wooden Door Works Table of Contents ‘S.No Description Page No. 1. | Purpose 3 2, | Scope 3 3, | Reference Documents 3 4, | Definitions 3 5. | Project Details & Responsibilities 45 6. _ | Health, Safety & Environment (HSE) 6-14 7. | Material / Equipment Resources 14 8. | Method / Procedure 15-18 9. | Quality Assurance / Quality Control 18 10, _ | Inspection and Test Plan (ITP) 18 11, | Distribution 18 The Employer The Engineer The Contractor The Subcontractor DAMAC ey | intoal DEL ie DAMWAC CRESCENT PROPERTIES LLC eee PELTA Project: DAMA HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works > Purpose The purpose of the method statement is to describe the system and sequence of activities related to the wooden door Works of Damac Hills Parks Residence Project (327 Villas) in accordance with the contract project specification, contract drawings, approved shop drawing and project standards. > Scope This Method Statement is intended to outline the requirement for activities and the method used for the Wooden door Works. 3. Reference Documents > Project Specification > IFC Drawings / Approved DM Drawings > Shop drawings submittal > Bill of Quantities (BOQ) > Project Quality Plan > Project HSE Plan > DM, DDA & DEWA requirements 4, Definitions > Project Name - DAMAC HILLS PARKS RESIDENCE 327 VILLAS > Employer - M/s, DAMAC CRESCENT PROPERTIES LLC > Consultant - M/s. ARIF & BINTOAK CONSULTING ARCHITECT & ENGINEERS > DECC - M/s, Delta Al Emarate Building Contracting Co. LLC > PM - Project Manager > QA/QC - Quality Assurance / Quality Control > ITP ~ Inspection & Test Plan > HSE - Health, Safety & Environment > PPE - Personnel Protective Equipment > IR - Inspection Request The Employer The Engineer The Contractor The Subcontractor DAMAC shoe ‘OAMAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 027 VILLAS Method Statement for Wooden Door Works 5. Project details & Responsibi PROJECT NAME DAMAC HILLS PARKS RESIDENCE (327 VILLAS) PROJECT Located at Sector: ADDRESS DAMAC HILLS - Dubai, UAE Name Contact Info. CLIENT M/s DAMAC Crescent Properties LLC Dubal- UAE Tel. 04 5205470 P.O .Box 3670 CONSULTANT | M/s Arif & Bintoak Consulting Arch & Eng. LLC | Dubai, UAE ! Tel. 04 3372686 P.O, Box 87425 MAIN M/s Delta Al Emarat Building Contracting LLC. | Dubai - UAE. CONTRACTOR Tel. 04 4541211 Mr. - suB Mea Tretion 9602608880 CONTRACTORS Tee TBA Engr. Ziad Ahmed (Projects Manager) 055-2376630 1.6 RELEVANT Mr. Muhamed Thahir (HSE Manager) 050-4969493 PERSONNEL —_[Mr. Senthilvel (QA/QC Manager) (055-6267154 Muhammed Azhar (Str. Engineer) 055-3793881 1.6 DOCUMENT ni Code of Construction Safety Practice, DEWA & DDA REFERENCES equirements UAE Fire & Life Safety Code Practice 2018. | The Employer The Engineer The Contractor ‘The Subcontractor DAMAC io | DAMC CRESCENT PROPERTESLIC etc RPELTFA Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Responsibilities > Manpower Responsibility It is overall responsibility of Project Director to ensure that the work procedure is safe and activities are carried out according to approved MS, shop drawing and specified quality is achieved to the Engineer's satisfaction, > Project Manager. Overall Management of the Site Team and Project Programs, including the current subject. He is responsible to plan and manage all tasks related to submittals/ execution of this activity to the completion and to take the requested corrective action related to any raised NC. He is also responsible to coordinate with the Consultant and with other concerned persons to finalize any variation/ problem related to this activity. > The Construction Manager shall liaise with the Engineers& Safety Engineer to ensure work is carried out in accordance with Quality & Safety requirements. The Construction Manager shall coordinate with PE of PY, Site PE/SE to ensure that the necessary resources to implement the works as per approved MS, AHA and JHA have been allocated. > The Project Engineer shall ensure that the site preparation activities are conducted according to the approved Method Statement and that all in-situ testing as required by Inspection and Test Plan are resourced and implemented, The PE shall follow up SE and construction team for the proper and timely execution of the works. > The Material Engineer will ensure that the materials being used are in accordance to the Project specification and tested through TPT and forward all the results to the QS Section in order to submit with Inspection Request for approval. > The QA/QC Engineer liaise with consultant site representative for conducting Inspection on day to day basis upon receive Inspection request through Site Engineer. > The SE/Foreman is responsible to organize the work in a safe and efficient manner, including all safety requirements and PPE, implementation of the work as per the MS and the ITP. > The Site Engineer shall report to the Project Engineer and confirm, day to day, all the Work Inspection Request (WIR) status approved by the Consultant representative. > Responsibility of the Survey Team is to perform all the required surveying activities required to achieve target dates and confirm the survey part of the Inspection request are approved by Consultant. > HSE Inspector / Officer Ensure safe work procedures implemented and followed, provide required tool box talk, verify site activities are followed RA, Stop all unsafe work activities. The Employer The Engineer The Contractor The Subcontractor oy DAMAC io | = DDAMAC CRESCENT PROPERTES LLC seatig aos ogee DELTA Project: DAMAC HILLS PARKS RESIDENCE 927 VILLAS Method Statement for Wooden Door Works 6. Health, Safety & Environment (HSE) Activity Hazards Safety Health Working at Confined Spaces WNoise / Vibration Height Hot Works Asbestos Fragile Roofs | Gases CHezardous Substances/atmosphere Plant, GFire / Explosion Manual Handling Equipment & Falling Materials Rats/Binds or Other Tools Collapse of Structure | ClLead CiMobile Plant | Environmental pollution | Other Overhead BOther Services Underground Services Electrical ‘An emergency procedure is established and communicated to the workforce and in the event of an accident, the emergency preparedness and response plan shall be Emergency: | followed. The risk assessment shall be used as a guideline to implement the necessary corrective/remedial measures. esl Name(s) of first aid trained [ES | | Location of First aid box: personnel: Khaleel (HSE i Dr. Naseem Officer) 052-7072157 First ald: Location of nearest Hospital NMC Royal Hospital- DIP 04-8108800 Personal It shall be ensured that no workers be allowed to work on site without wearing an Protective | appropriate Personal Protective Equipment such as safety shoes, safety hard hats, Equipment: | reflective vest, hand gloves or net being properly inducted by DECC HSE Engineer prior to deployment on the work site. The Engineer The Contractor The Subcontractor The Employer DAMAC DAMAC CRESCENT PROPERTES LLC ceitig aces pet Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Name: Contact No. “Ambulance 998 Fire Brigade 997 Police. 999 Coast Guard 996 Emergency Electricity Failure 991 Contact Details: Water Failure 922 [Engr. Ziad Ahmed (Projects Manager) __—_—_‘| 055-2376630 ‘Mr, Muhamed Thahir (HSE Manager) 050-4969493 Mr, Senthilvel (QA/QC Manager) 055-6267154 ‘Mr, Mohammed Abu Nazer (Construction 0504112399 Manager) ‘Method Statement Review, Approval and Communication Method Statements shall be reviewed and approved internally by the Project Manager and EHS Lead Engineer being issued for site operation. The assigned Construction Manager shall ensure that the method statement and risk assessments are communicated to the site execution team, Records and signatures shall be maintained by the Construction Manager. Job Safety Analysis (JSA) and Task Briefing Job safety analysis and task briefing shall be completed by Construction Manager along with all staff involved on the Storm water activities. JSA’s shall be communicated to site team by the area Project Engineer/Site Engineer/General Foreman/Foreman prior to commencement of works and at regular intervals thereafter or after any significant change in the location, activity, personnel, equipment, climate, etc. All persons attending JSA briefings shall sign the JSA attendance form. Supervising consultant personnel shall attend JSA/Task briefings. Risk Assessments The Project Manager and HSE Manager shall identify the potential hazards before starting any activities on project site and they will plan a proper safety procedures and measures to mitigate or eliminate these defined hazards. A thorough risks assessment shall be carried out whereby various activities are identified along with their possible dangers and hazards. The existing controls are checked for adequacy and if it requires an additional controls and resources to mitigate the consequences of possible incident, DECC shall deploy and provide such measures. Risk assessments shall be produced for all tasks described in this method statement. Risk assessments shall be communicated to the workforce prior to commencement of works. Risk assessment is attached as annexure with this method statement. 7 The Employer The Engineer The Contractor The Subcontractor aie DAMAC | —— i —" ANAC CRESCENT PROPERTESLLC cicero | ETA. Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Permit to work (PTW) The purpose of this procedure is to provide a safe system of work in the Site, and to give guidance to those carrying out the work. The Construction Manager have the overall responsibilities for ensuring this provision are made for the implementation of safe systems of work. A duly signed PTW shall be available in the work location Inspection and Monitoring The EHS Lead Engineer shall ensure that inspection and monitoring is carried out in accordance with DECC Project Health and Safety Plan. All inspections and monitoring to be recorded Personal Protective Equipment PPE shall be worn at all times and shall be reinforced by site supervision at all times. The PPE requirements are Hard Hat, Steel Cap Safety Boots, and High visibility vest, safety glasses and gloves, The Project EHS team shall be responsible for the selection and issue of mandatory PPE. All job specific PPE shall be provided by the Construction Management through the Stores. Competence and certification UG services locator operator shall be 3" party trained and competent. All drivers shall be holding valid UAE license and defensive driving training, All Plant and Equipment operators shall be holding valid UAE driving license and approved Third Party Certificate, All Plant and Equipment shall have a valid Third-Party Inspection Certificate Flagman- Internal Flagman training course. Plant and Equipment The Plant Manager shall be responsible for ensuring that all vehicle& equipment used by the Construction Team are in good condition, preventative maintenance is performed, holding valid registration documents, insurance coverage and 3" party inspection & test certificates. All heavy vehicle & equipment shall be fitted with audible reverse alarm and revolving warning lights, Fire extinguisher shall be provided for all plant and equipment DECC Lead EHS Engineer shall carry out periodic inspection of fire extinguishers. All plant and equipment shall maintain a buffer zone to avoid interaction, in addition situational awareness training will be given to all operators. The Plant Manager to ensure that all Plant and 8 The Employer The Engineer The Contractor The Subcontractor DAMAC at) intoa DOANAC CRESCENT PROPERTIES LLC eee Rrra Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Equipment, daily inspection checklist are being carried out and completed by a competent person DECC Lead EHS Engineer shall carry out periodic inspection DECC management will ensure that arrangements are in place to ensure the controlled or organized delivery, collection of materials, and Loading and unloading of Plant and equipment. DECC Construction Manager shall provide suppliers and subcontractors with full information on the access way and traffic regulations so that any congestion and disruption may not arise by the vehicles operated, All Delivery collection drivers shall attend induction with regards to traffic management. This shall include site layout and designated route, speed restrictions, site traffic requirements, loading, unloading requirements, any specific risks and any additional relevant information DECC management shall establish appropriate dedicated vehicle parking areas for delivery / collection vehicles. Parked vehicles shall be turned off with hand brakes on. DECC shall ensure the following: > arrangements are in place to ensure all delivery, collection drivers report to security upon arrival to site; > material delivery, collections is made at designated storage, collection areas; > materials can be unloaded, loaded safely by mechanical means where appropriate in safety and without risk to others on site; Those involved in material handling are trained in the site delivery procedures; > vehicle loads are checked prior to entry to site to ensure that they are safe; > vehicle loads are checked and approved by both the employer and the driver following loading on site prior to release of the vehicle for exit from site; Traffic Management Traffic Management Plan (Logistics/ Traffic Management Security Plan) has been established. Tn summary: > Construction team to ensure that all DECC site access roads are monitored, > Supervisor shall be responsible for segregation of pedestrian from Plant and Equipment movements, Flagman shall be assigned for purposed of managing the traffic and plant and equipment movement. > Site access roads will be designed to minimized reversing operations by having one-way system cand assigning turning points. The Employer The Engineer ___ | The Contractor The Subcontractor day oie DAMAC nt) ‘DAWAC CRESCENT PROPERTIES LLC aeeeenes EMORAT ES Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works > Site access roads shall be maintained by the construction team at all times. All reversing movements shall be controlled by competent flagman. > Control of traffic routes and priorities shall be established and separated where practicable between normal site traffic and heavy earthmoving plant. Loaded plant shall have right of way at all times, and procedures for reversing and maneuvering shall be implemented and shall include the use of audible alarms on dump trucks and banks men where necessary. Particular attention shall be paid to plant operator ‘blind’ areas where plant is maneuvering in confined areas. > Traffic Signage shall be provided on access roads i.e. Danger Excavation, Heavy Vehicle Movement, Heavy Vehicle Crossing, Speed Limit, Hump/ Ramp, Men at Work, ete. by the construction team, > All vehicle driver, Heavy equipment operators/drivers, Plant and Equipment operators shall follow all traffic management signage's and project speed limits > Flagmen's on fixed location will be provided with shades and drinking water. All flagmen's will be positioned on safe locations. > Pedestrian movement will be segregated using necessary measures (Hand barricading, demarcations, signage, etc.) from vehicles and equipments. Training The Project Health and Safety Plan contains the EHS Training Matrix for the project. The Project Manager is responsible for ensuring that time is allocated for the delivery of the project training matrix. The EHS Manager/Engineer is responsible for the delivery of the training. All necessary training and certifications will be obtained for operatives and supervisors prior to the commencement of activities. If Employer/Supervising Consultant inspection are needed, Employers/Supervising Consultant inspectors will be provided with necessary training and briefing prior to the commencement of inspection and training/briefing records must be sent to Supervising Consultant HSE representative. Third Party certification training is required for all person operating service locator equipment. Full list of Environment, Health and Safety training requirement are listed on the Project Health and Safety Plan, 10 The Employer The Engineer The Contractor The Subcontractor a in ‘DAWAG CRESCENT PROPERTIES LLC ceca Z PETA Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Disciplinary Procedure Project personnel and subcontractor personnel who violate the EHS requirements shall be subject to the Disciplinary action procedure. A full copy of the disciplinary procedure is contained in the Project Health and Safety Plan, The disciplinary procedure applies to all personnel irrespective of position and seniority. Hazard Warning Signage Applicable Hazard warning signage’s shall be provided on site (Excavation signs, Men at Work, Speed Limit, Emergency Number, Emergency Response, etc.) by the Construction team. Environmental Litter and waste shall be controlled by disposal into designated covered skips/ containers. Waste collection, transportation and disposal shall be carried out only by companies registered with ECS Dubai Municipality. Wastes generated during the Dewatering works (food wastes and other) shall be collected at site and disposed through waste skips, The construction teams shall be responsible for ensuring this happens. Fuel and oils will be stored in bunded tanks and waste oils will be collected and disposed of by a licensed specialist contractor. Static plant, i.e. compressors, generators and pumps, will be sited over drip trays. Approval will be obtaining approval (permit for discharge point) for discharge of water pumped through dewatering Ground water shall be pumped away and disposed of as directed in the discharge license. Refueling of plant will not be carried out adjacent to water courses or rivers and mobile refueling bowsers will be equipped with spillage kits, containing absorbent mats and granules etc., for which specific training in their use has been provided by the manufacturer. Maintenance of plant all vehicle, plant and equipment will be carried out at designated places, Spill kits will be carried by the maintenance team, Weather Condition Work shall not commence or continue in case of poor weather or visibility Welfare Arrangements The Project Manager will be responsible to ensure the provision of adequate resources for welfare facilities on the project. The following welfare arrangements will be provided for the project employees: Drinking Water + Adequate water dispensers with provision of cold drinking water will be provided. ut The Employer The Engineer The Contractor The Subcontractor ue DAMAC io. | ‘OMNIAC CRESCENT PROPERTIESLLC Sau” Saau eee SS Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works The water dispensers will be located at all shaded rest areas and of fices; > Chilled drinking water will be provided at suitable points and marked “drinking water" using the applicable languages required. > Filtered will be available by maintaining water supply lines with filters, and that filters are cleaned, replaced twice per week and records are kept. Water storage tanks are cleaned and maintained on monthly basis. > Drinking water will be provided in personal water bottles (BPA free) for all personnel on site. > Drinking stations will be available at an approachable distance v Sanitary Facilities DECC Project Management will ensure that appropriate welfare facilities are provided and maintained according to the size of the workforce and nature of the work on the project. > DECC will provide an independent toilet with the mobile sewage system and with running water, > The site toilets shall be cleaned and sanitized on regular basis and the results of inspection recorded. > Toilets will be available at an approachable distance Facilities for shelter and taking meals DECC will make the following provisions: > Provide sufficient and conveniently accessible air-conditioned rest areas closed to work area > Eating on site is strictly prohibited, all workers will be taken on air-conditioned dining halls with air-conditioned food storage areas. Prevention of Heat Stress/ Heat Stroke Heat Stress/ Heat Stroke are one of the main occupational health issues in construction sites during the summer days. A Heat Tliness protection plan has been developed prior to commencement of works. To prevent heat stress and heat stroke the Project Manager will appoint a water superintendent prior to works commencing. 12 The Employer The Engineer _| The Contractor "The Subcontractor DAMAC |) rif& Bintoal DAAC CRESCENT PROPERTIES LLC ae Rees Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Emergency Arrangements The (ERT) role is to manage any emergency situation which may arise on site. The ERT team shall help to minimize any human suffering and economic losses that can result from emergencies. The Emergency Response Plan is detailed in Project Health and Safety Plan, Emergency number and response measures shall be displayed at worksites, Summary of procedure > Duty phone Holder responds to call and confirms details from caller > Duty phone Holder assumes control stating he is the Person In Charge (PIC) > PICalerts other ERT members to the scene > PIC or other ERT member carries out an assessment and takes appropriate action > PIC calls ambulance if necessary > The PIC may also decide to call an external emergency services such as fire brigade or civil defense ambulance service > PIC instructs members to bring appropriate equipment i.e. first aid bag, rescue equipment, chemical spill kits etc. > PIC arranges crowd control/ security/ access egress issues. > PIC announces end of drill and informs ERT Leader and senior construction manager of the emergency Incident Reporting to Employer /PMC/ Supervisory Consultant Arrangements by DECC to Report Incidents to Employer /PMC/Supervising Consultant. DECC will inform Employer /PMKC/Supervising Consultant in the event of the following, > Fatality-Immediate Serious/ lost time injury - within 30 minutes’ medical treatment injury First Aid Cases - in monthly report Significant near miss - within 30 minutes Any environmental incident that requires the DECC to report to Dubai Municipality. vyvy In all of the above cases the DECC HSE Engineer will notify the Employer / Supervisory Consultant by telephone call and SMS immediately. DECC will prepare within 24 hours, an initial report, describing the incident and issue to Employer / Supervisory Consultant. In the event of a serious injury or a significant near miss/ environmental event, DECC will submit a detailed written investigation to Employer / Supervisory Consultant within 72hours in the. In the event of a fatality a detailed written investigation report, including police reports, is to be submitted to Employer / Supervisory Consultant within five working days. In cases where sub-contractors are appointed, DECC shall ensure that the reporting 13 The Employer The Subcontractor DAMAC ‘DAVAC CRESCENT PROPERTIES LLC The Contractor The Engineer Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works requirements of the relevant authorities and Employer are met. All incident records will be securely retained as long as the site/ service are operational plus three years thereafter, Legislation, References and Code of Practice > As per Contract Conditions and Specifications Relevant Authority Specifications (Dubai Municipality) Project Quality Control Plan Dubai Municipality Code of Construction Safety Practice - 2008 Ministerial Order 32/1982- Regarding the Determination of the Ways and Means to Protect Employees against Occupational Hazards vvvv DECC Environmental Management Plan DECC Waste Management Control Plan DECC Integrated Management System 150 45001:2018 DECC Project HSE Plan DDA & DEWA Requirements UAE Fire & Life Safety Code Practice 2018 vvvvvvy 7. Material & Equipment | Spray Gun 14 [The Employer The Engineer The Contractor The Subcontractor as DAMAC aman Arif&Bintoak DAVAC CRESCENT PROPERTIES LLC ee Bree Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works 7 7 16 Paint Brush | |_| oe 7 | Scraper | I = ae e | Cleaning Tools | 7.1 Resources [Construction Manager | Carpenter | Project Engineer Land Surveyor | QA/QC Engineer Foreman Z HSE Manager ___ HSE Personnel | Machinery ‘Operator Laborers 8. Method / Procedure 8.1 Mock - Up Prior to Fabrication, a Mock-up shall be installed at site which is made under approved sample submittal to demonstrate aesthetic effect as well as qualities and material of execution. The Mock up sample shall be approved by the engineer before installation of all the assembly for the mentioned plots. 8.2 DELIVERY OF STORAGE AND HANDLING ‘* Deliver alll items such as door frame architecture and among others to complete the assembly with protection cover against dust. ‘* The internal shall be quality constructed at factory prior to delivery free from any defects. Any item shall be replaced if found damage by Prestige Team. 15 The Employer ‘The Engineer The Contractor ‘The Subcontractor = DAMAC ys | Arif&Bintoak DAAC CRESCENTPROPERESLLC cece | Te. Roomate. Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works * Storage of doors and frame at building site should be under with flat form of 10cm height from ground or out flat surface, Packaging shall be kept dry and shall be stock of 6mm spacer for installation and air circulation. 8.3 FABRICATION 8.3.1 Method of Statement for Door Frame Assembly in Factory © Adoor Frame consist of 3 parts called 2 vertical jamb pieces & 1 header piece. © Top edge of 2 Frame Vertical jamb pieces & both edge of 1 header piece receive the finger joint cuts as male & female edges for fixing. © These edges will be cleaned from dust or dirt to make perfect joint ‘* Door Frame Vertical & Header pieces will be joined in 90degree angle using right angle & Screws * Connecting Plywood @ bottom of vertical frames will be fixed to make the alignment firm while packing & delivery © This plywood will be removed @ site while fixing the frame in the door opening 8.3.2 Method of Statement for Door Frame Assembly in site * Adoor Frame consist of 3 parts called 2 vertical jamb pieces & 1 header piece. © Top edge of 2 Frame Vertical jamb pieces & both edge of 1 header piece receive the finger joint cuts as male & female edges for fixing at factory. * These edges will be cleaned from dust or dirt to make perfect joint. © These three parts are removed from the packing as per the PDN no. marked on the packing cover + Door Frame Vertical & Header pieces will be joined in 90degree angle using right angle & screws _—| 16 ‘The Employer The Engineer The Contractor The Subcontractor we DAMAC i) int mouccescarretesic | Mai sya: | a. Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works * This assembled frame will be fixed to the door opening using plumb levels & expanding foam Glue. 8.3.3 INSTALLATION 1. Ensure that the following conditions are met: a. The Sub-Frame Opening is ideally 20 mm wider and 10 mm taller than the outside frame dimensions of the door system. b. The Sub-Frame Opening is plum, square and level. c. The floor area is clean, dry and level. 2. Remove Packing Materials 3. Keeping the joint gap as per the approved drawing align the assembled frame within the door sub frame opening using plumb levels. 4. Install the shims in the correct locations and in correct sequence. 5. Fasten the Door Frame to the Sub-Frame using screw 3'-Galvanized steel fishtail anchor @600 center. Ensure Plumb line level and rigidity of finish at Installation. 6. Mask polished /painted surface by masking tape. 7. Moisten the joint gap surface by sprinkling water to apply PU foam. 8. Insulate between the jambs and the wall studs all around the door by using Insulated P.U, Foam. 9. Install the door panel as per approved shop drawing. 10. Install the Latch and dead bolt. 11. Install other necessary ironmongery to completion. 17 The Employer The Engineer The Contractor ‘The Subcontractor = DAMAC aoe | AT Arif&Bintoak CONVAG CRESCENT PROPERTIES LLC Samana. PELTA [ Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works 12, Remove the unwanted material or stains around the architrave area. And make sure that the gap between wall finishes and frame is concealed before slotting the architrave 18. Fix the architrave by applying bonding agent to the under-side of the architrave. 14. Our site supervisor will check the complete door if all of the above procedure was done properly. 15. Submit inspection request for approval. 9. Quality Assurance / Quality Control The complete work shall be inspected by the consultant and approval shall be obtained for the same. The following shall be maintained to control the Quality of work > Inspection & Test Plan > Inspection Request > Check Sheets 10. ITP & Checklist ~ Inspection & Test Plan is attached in the Appendix - 2 - Check sheet is attached on Appendix-3 11. Distribution ~ Construction Team - QA/QC Engineer - Technical Office Team - Safety Staff 18 The Employer The Engineer The Contractor DAMAC Ante = intoal Mac ctr paperT@UC ae | SECT ‘The Subcontractor Bowes Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Appendix - 1 Risk Assessment schon scores ie ett hg nest pl eo idl teh ne Neg ney Beas TUS oe mipeeeie aera pr pue ayaa py Nou cioieeuleraacsneai wo eerie peea ao soinedueshuedpn pore ayn pienso on aoe palin ed papas aay camasag puspouneu gor pers ae pueuennd eda ‘suanig ‘wep uo auop aq 0} uonsadsu) 9ueZ), a8ewep ed ions] easpuepopmueesqoieo un Sue cee | o neemraee ssouaiaons aenre moana | puesooawapeom Jaauyaug walorg 32H PACH | e eo} Jo 1184 Burpeowyo *g Buny | TO a savory puntos | smupencorernrict | omamam) | sma | mrreuwenunms | messovonicma | on eee men SOUSIA D SuGNa eu D ‘AusedosgTD ‘s1030% EAC J9YIO /ANSD ‘seAo|dwia D930 C EPa!aHE aq Im IIe YUM PUE OY ‘ar07 909 Aojes yn 8 1H AVE} sweweunbay yaa SHO ‘suauaunbay vod sH3O JaBeuew 3s aiyews paweyny, se8eueW vononnsue) 2aseN nay we saeueyya2aloid ewyy perz Bug ‘aumeusis uopeua|saq ‘aweN hq paraidwoa quauissassy 914 e0v-OT-Zr 810 (svn £e) 3ONIGISIY Suva STH DVO "Heli ByOT oBeg ANSWSSASSY ISIE ‘SOM YOOG NIGOOM :ALIALLOW ‘ayssod | suaunsedop Aajes ay jo Jaqwous e nue equiau wear aus © Aa PSVAAUOD 99 p/NOUS WOLISSSSe YIN :3LON ————'0.n_20N_ "TON :ayeq moray, wawdinbs pea asus] SUMP 23¥N pen e Buyproy 2q j}eys suoxesad0 swewdindg quoudinbs pue auejg ‘anu ily | ue aueig pawsoyad st sosuwimuano aoueuazutew angeyuansid ‘uonipU09 30 Buddy p008 uae weay uonsniisucy quawdinda ‘242 Aq pasn quawidinba apyon ssp yen we qi Buynsua 10) qjsuodsas wou sie ‘9g us aHeuEW yWe\g 24, «| quawelnb3 ‘yanze ers 1oU8 “sap1yan 209/¢ u si warshs mud aieudoidde ‘Aqponas Bund ey ainsug yse2 ay souaWUIED OF Fpuvosiag s0116 sannesado ayy 03 payeaqunuiwo> 28 Bunaoys ‘swuawatuene pue parajduico st wearers powain ye4p 31nsuj 07 aBeUEN Pa!o1g aus 331501, ‘8408 a10yaq uoranpul sHa AsoiepueW, 342 tajCus09 jeys suoresado/SiaNUp 192150) ‘sranua yo 1uawanow sadaay1035 seous | 9g 4s avowdinba g Arrodoud ue uonesado vuewsos ‘Anayes | jana] s048iy @ 0 punos® wos eumeW oy 8eueg ssoppay as ay UI A/O3 saauldu3 ays son UiH | YsOUpAEN aq oy seBe> Buny 01g | wayew | seuarew jo Sunyius seoursua wato |» |v |r| aeHpeH| — poue2puepenedsujAued ou «| ot op > soauieg Juoneyodsuess | 20 ‘Auo punos8 pansy pue papeduion uo payers eq oreuen «| "paMO||O} 2g 0} uawiereys poviaui panoiddy + | ‘paytan Aued pina pue parvadsul puesuey peo} yr «AIA. ‘ut Bea Buisn 202 9q01peOT + 840 7 Beg ANSSSASSV ISIE ace ‘SMYOM YOOG NIGOOM :ALIALLOV sroz Aneznau-ec rants ‘jssods suaunsedap Aajes au jo JaquoW e nue quisu wea a patajdusoa ag pynoys eUssasS YS “310N ‘sapIUBA Uo puE saouyo ‘piek ui Buideayesnoy p009 (payinbas Papua Any s19884N0 YL ey w aue|d Uo pauonsod aq 0% aygoyy quawidinba uela IEA, ‘sjiom 34911 pue Suny no fused 01 pamoy.e 24 I) 51093hy /ssoyeiado aues9 algo payinieo ‘ueg palys pueauaraduion AUD see ujpeo-un/ALonyp 2ejenuie pue Bunsedap apiyen oy oud spayp rods yom Jo warsAs ayes Bu1moio} ip aansus 0} 542049 Jods 91 Jo SHa/Ssosiniadns 2 Kuseo 0 ‘vosiad qwojadwio0 & Aq porajdwoo v9 0} aBeUeW Wue}4 UL ‘yo ye1ad0J@ 03 vans aq jan BULIEN, ssauazeme jevonem)s ui ujequrew jjeys quauidynbs pue ruep ‘quouidinbs pue jue} 404 papinosd 2q ileus sousinUTx@ 211g ~oyesado ay) 10) 212948.99 fouaradwoa hued pig panoidde se jam se quauidinbs pue ruejd ayn so} sarenyinia0 1501 uonoadsu! ued pe Ponoidde pue ‘swuawnaop onesies EON ON “TON :a1eq maynay Bupyom axe 2a Sanu yt UayM | 2218 2j¢6 © ul Aeis 01 p01 jauuosiad ‘sappiyon | PayUeN-un se4R0 pue si jo aujanjas | Bad Jo-9sn ayes Buung asty | JeY 40) 0m Jo wuaRshs -spaye | Jeqwouuounua inywsey sa4p0 aonposd ‘aniv21 02 SoLaMap/Siousi ty + 40 ‘2129 40 uajeay uewny ym asaya au yo uossua ayL quowidind3 40 s9afqo fneoy Bunow pue unin Suypuey jeauewy sd pue ss 1008 Juossoo7e sun ue savausdinb sosued fuinow ga peo lewapoy ayoesmeg ANISSASSV STH ‘SHUOM YOOT NIGOOM ZALIALLOV ‘ste Arw-ziowe2 orHnts 2 1qssod jr wowsedap Aiajes ayo soquiow e pue soquous eer ay € Aq poajdiuo> 9q pynoUs AWSSO5Se 95 LON ‘EON ON TON “212g MaInay paar og or sang ue siay90s eusnput jeouna9/9sad01d + ;paisod aq 03 suis Bulusem pue pasn 2q 03 sjaued seoueydee “hyo s9iqeo jeaiaja pareinsuy ajqnop asy + aumuedis sanaj904 943 am poulerulew 24 lieys 1283) y “SeBpurie> Aidure /pasn lo ay Jo wiai9s axa ue Ajuo pans: ‘aq eys Sa3puie> man * Jadaayau0%e A 1v09 ADIs aq jeYs aNs5, 1003 peasisse soBpLIED 15u] 9g 03 sp180q Ulis sadoud ue papeatseg aq oi ease 1.09 + 218 pue s.aq sedeld + 910 yoee yumm pasn aq orsEs13 + ‘sjaued jeau99)2 wowo8euew ‘geo sadeuduy) « s1a9205 reusnpur suoujo.as + S@0 BUSSIN + spien® auju2eu Aa 92) snopsezey 2g joys aununew aun jo syed 3 ypaunsodg « Je} pue din ‘dys Aue plone | “aau0p10m (0 paujequrew aq 04 Buidaaxesnoy pauenun + pue Auedoud pasors 2g 015 eo} AneaH s20us aoeds sannesado ‘Aaajes | 219 IASU02 aq 03 sMOUEHLE WOM + yuom warayynsuy Suny s00p 1921j10 35H 59Q iH | >OMayIJ04 pOAO|dap aq 0 s1ByL0m 003 40} 51001 puey pue uewo wen pie | panvayiadxe puewarduo Aud + Suoum sus «| sioexsomedyo aen | co -— “| ‘wroyie|d Bujas3er [evayeW DUE ‘998s afesois jeuareu ajgeuns apircig « siea pue squawdinbs Suny 30 (7Ms) Buiom ayes paasxe jouog - Suypeoy axeudosdde A\u0 pasn ‘seqnou uauysapad paysewfom'3j05 « liamaqorseaseliy «| ‘ayes qea ssa000 0 suanup moje sieq qeu8 pue sdars pax Pamoi10} 2q 01 warsAs yj Aem-2ug «| papione 519609 249 Jo paq ayy Uo BuBLOM 810 y a8eg ANSINSSASSV »SIE ‘SYOM YOOd NIGOOM :ALIAILOW st0z Anreneuee ora susuniedep Kayes oy Jo sequioUse pue soquiou wear ays @ fe parajdwo aq pnous IUaUSSASS YY “ION ————so1n——20N TON :aeg mayne em T paxy 01 paunaes sod 100 5] uoppai04d as0yn trom pue sassousey A909 ny pincid« ssourey Ayes Apog ny Se yons wayshssause le .2do10 dusn ave saakojduipaunsuy + ‘onsod Suyonlo@ w syuom sau no Aueo 03 paau sookojdwo a104m sBewep s2K019 pucy eae says ayes, 382A INH 21 puey sedoud yim Buyproyeas oH Puc /uuoperd Sunpom ayes eaunsua« fuadoud ayo aBeweg leyarew jo es Joppeiyo 251 euuosiod Joes audiay ze yom | 90 sannezado vewios |» suoneyriaa wad se yo pasodsip pue parsaijoa aq 0} a3sem snopsezey iy + aus ye aigayene.g 01 soysrURN O11) + “sued ypuid wos, | aj doy 99 01 ued fog pur soueH + | “sa¥ewep wou, | 9 pue paxsadsul aq 015}003 puey jy + got i4Sl 24) 10) pasn ag oF jo00 Wy + | aus Aq ye | £84 014123 xogjoo pue Buyaiq vst + | “pasn aq amod pue Ajddns semod nOTT AUD + papunoi £24 0} sjaued jeau0910 BU S,EOIIY + 8105 a8eg ANSIWSSASSW MISTY ‘SHOM HOOT NIGOOM ALIALLOV st02 Anezrou-ee Orns uaredep hiajes aya go Jaqurou e pue sequous Wea) aus & Aq patydluoD 2q p/OYS IUBUISSSSE SII ‘LON ‘EON ON "TON ‘med moInay SBAOID FOESRD ‘hayes "aUyaH Mayes ain) i on au | aoeid | Home Buidaaxesnoy pooB UIEWWIEW. « i ‘as 1 aIgeION2 01x04 pu ' ‘yam padinbe step assis pauiea> + 200}6 yuom e ajgejene 03 ease Suiysem pues sem swowafuene | aupjuup | _% sanneiado iy | enpywpuy | 2544 2]et paysnis9 Ypum as0d eyeem 12140 3SH | s00us, a2erd 30m 1 2 a so.0npe u Bupuom, ‘vewso4 Aaajes | 29 0120.29, B 212M BUHLUP PIOD + pay assis Ja0uliug aus | ASOAIIH, papinosd uonsneysy ecaiueustueiny seoutua els | yo en eH | oqorsssyeys sos pereinonsedors + eam tiieceee Soma {Uiay won sjeusyeu Buiddoup suay0m ‘iq wiom pue van ase szag aunsuy + fannve. ‘ay ynoysnouyy uossiedns aenbapy « uaa js seunseaus A1euonnersid Lain, ‘Adwico pue yusrad ye yom UIEIGO « '}00} 0 ej ayy UaRDI ‘qm moar £:21109 pure Suis 4 910m 43 03 paianpuoD aq isnU 83 X09 JOO} 310M yy HERS O10 + owuemun quanaid 01 e21e 30M, mojag Anpauip aneds ay apeaiueg + (830.9 aBeg ANSWISSASSV STE SHYOM YOO NIGOOM ZALIALLOV sto Amezouse-orunats ‘ajassod y quounsedop Aojes ou Jo Joquows € pue Joquiow wea) a5 © Aa pare\dwOD 99 pMNOUS UOWESOSSE ASI :3LON ‘EON ON "TON ‘918 malnay} "DOI unuanienb ul Ajaerpaw paryos, ue pauiodas agi pavadsnsAuy «| || auson eimeaaenea ‘usuaysod pue suaisssousseme AésIG. = vovelsau3 sanssouaieme asearnul 01 Buell + swoyduuss sanyo Aaayes sew seam shemyy + st IND spewo9 sfoua8.0W3 Auanbaa14 puey usom + urmuson 40.2589 u} 919005 ugeu Bunpund 0} sea pue ysnog 95 224)0 pue sono puew | —sospiues epnoid pue sosnuesasn «| || weed ured Apo wuonuanaid sangesado 24s ly seus 3004 aouersp yesdoay «| ot waieoun | aimevedwion usin { _erpino 80 ‘SHYOM YOOG NEGOOM :ALIALLIV 810 Le8eg N3INSSASSW STH S102 Amr znow-ez omnes ‘jssody wousedap Aras axa yo soqureue pue sequiou Wea) ays & Aq parjdluos aq p/IOYS ]WALSESSE SI “ILON €ON ON ——CTON :030q MONRO aia aumeusis uoneuaisea awen ourdug | OY Padope aq 03 ye1p Somnseau [OnUCD pue SYST “SpIeZeH Bip POOISIOPUN PUE peor BABY | PUE pajoHq S| WOUISSSETE YSU Snoge DYL 840.8 28e¢ ANSWISS3SSV STE SHYOM YOO NIGOOM :ALIALLIV The Employer The Engineer The Contractor The Subcontractor DAMAC gaya ‘DAMAC CRESCENT PROPERTIES LLC on aes DELT s Project: DAMAC HILLS PARKS RESIDENCE 927 VILLAS Method Statement for Wooden Door Works Appendix - 2 Inspection & Test Plan 20 92 J09) obea Te Uuonipuoo age yom sodosd 48771 9984. Aow ‘Buyreysuy 7 s}sj;a| sue wenes | 914180295 | ueospaewauing | *F uoqoedsuy ° ‘94; yim posao,d 0} Buyacac, doug poxaidde oun yooug 381199040, Aunoo : s | m | H | Sihbe | voreursaozenc ou ains oxen | yer ‘eunjog | SIF180 29S. Suersuy eure eb uoppedel u0iA Uoge|eSUI soedg Wary 19 un peeooid 0} sSumesp dous poxoldde au) y90U5 UoRe|EYSUI eR UK paeDoAd 0} 204d fn ae Amy | gtvigo'20s eg , s|s]u IM. a ise ope | secede tia, esedeid ous, ze uy Aq ponaide pu payersut ‘hotordusoo st qwelco a4y 2283 aus uonoedsuy seyiddns ‘QLpLg0 29S “OYS UO BABB BY wf} ada uo paronjog | 9LP180 98 a wb reuerenn ‘Preveren poroxidy sod sy | gOPHONIES | “svedg vary | sjeaoidde reusrew 49040 | eecerea (oo) oll collet pore eee oe Ss SUBLAWYuvd SONVUSTOL | O3ASNULSAL | O/8>9¢8/6"G) | NOUOSSCISAL | oy 1.5 ae IRiaLIwO 3ONVLdIOOW 40 4NaWN000 | /ALINLOVINOLLOZASNI Aonanoaus | SONEYSITE NOLLOWALI ALNYNd (sy10qM Uepoom) ‘S100 Jequit| 404 (dL!) NVId LS3 8 NOILOSdSNI 0/F00/dLUVOINAS "ON Uo SEIIA LZE ‘OeWEQ BIA SeOUApISeY eq ——— ME wee 87J0 11 e624 I ‘squeynsucg ~ SNO ‘SIOEUOD UIEN— IW odow 1991 aL wlOd PIOH~ H ‘Squowino0q Jo me!nens ~ SS0UM—M eee es ae ae) SON aoa ‘souel|!eAing~§ :3009 NOLLOV poroidde ae err¥eeu | exe eusrews pur Sumer dous | ,fWMOEOM | oe ea i -Bysenboy penoidde on ode ey vorsadsu yom | S12 S0uey oun ey eeu eee Leet 9LbL80 “905 Suyjeysu| enenyory OL : Bisondou, vers euojoa S980 "yony Uogoedsu ‘voneqeisut ‘aug ta posn0id 0 Bumesc dous "BIRVOTENN panaidde aug YOu uopipuod ojqeys0n edosd uu pus oxetene are ajc) ou} IY 3sn ¥o0uD ‘do{ 2 ysiuy 01 YBnoU S| humo : . sono} revarew eiqeyene ou ans oven | yes owyeg | 947#80'20S | —Buypeyou1 seo 40a ot topole ‘voqeeisut ‘sods “yary uomedsH our uum pone. 0) Bulmexg dous "8 eUOIEW penaidde ew o8UD — Se wie SEIIIA LZE SIH DEW Bj|I\ SeOUaPISeY Ed The Employer The Engineer ‘The Contractor = DAMAC 2 | jintoal DEL ‘DAAC CRESCENT PROPERTIES LLC nana iano PELT. The Subcontractor Project: DAMA HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Wooden Door Works Appendix - 3 Check sheet ai JAMAC 73 DELTA Ali Seseble ArieeBintoak 201.47 DAMAC Hills Parks Residence 327 Villas (DB51) Project Number Project [Client : DAMAG Crescent propertios Jemployer consultant Arif & Bintoak Consuling Architects & Engineers Main Contractor Delta Al Emarate Building contracting [sub-contractor CHECKLIST FOR INSTALATION OF WOODEN DOORS WIR No. Location: Date: Cheeked by | Checked by | checked by SN Items to be checked Contretor [GC Team | ‘Consutnat Remarks le [5 l#ls[$lelels HSE Requirements 1 [Allthe HSE requirtments are fufiled |QA/QC Requirements Ensure that Material submittal,shop drawings sample,mock up and Method Statement approved by the Supervision Consultant. [Check approved sample are avallable at site and materials delivered to ste areas per the approved sample. 3 [ensure the Doors stored and protected properly [Ensure that all the openings for Doors are as per the measurement forwarded for fabrication. 5 |Ensure that Gaps ,f any in the units and masonary are propery sealed. 6 Ensure that installation has been completed with foam. Ensure that allthe fittings, ronmongery are installed as per approved Shop lérawing. [Ensure that approved sealant has bean applied around doors and windows las per the requirements. 9 |Necessary appoval obtained from Consultant. 10 [Ensure that Section and colour are as per the approval For Final Approval Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative Name: Name Name: signature: signature: Signature: bate: Date bate: CCHECKLIST-TGC-QAQC-CVLIDW-01.A REV-00 Poge 1 of 1 | [The Employer DAMAC ‘OMUAC CRESCENT PROPERTIES LLC The Engineer The Contractor yh oy se AnteBintosk | Serer, REL The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 927 VILLAS Method Statement for Wooden Door Works Appendix - 4 Key Plan 22

You might also like