You are on page 1of 50
DAMAC DELTA (il il DAMAC CRESCENT PROPERTIES LLC AL EMARATE am il jana ‘AritaBintoak Form No.: SPMIPAVSTS/001/00 | ProjectName | DAMAC HILLS PARKS RESIDENCE | ProjectNo. | P021.41 324 VILLAS Date 09/42/2022 [Submittal No.: [P021.41-DB51-MTS-CIV-011 Revision: [ot |Submittal Title: Method Statement for Tiling Works |We are sending herewith under separate cover the drawings / documents / samples listed below TEM NO. | DWGS. SPECS 80 DESCRIPTION TyPE| COPIES | REMARKS REF. 01 [Method Statement for Tiling | OT | 1 Hard Works. ‘SD= Shop Drawings, SU Sarilo, GT= Gusrantae, ND» Manufacturers Dala, CT= Gonicals, TT= Text Resule, OT= Other We cerify that the documents / materials submitted herewith have been reviewed in detail and ere in stricl ;onformance with the contract drawings and specifications except as otherwise stated. Contractor (Name) [Signature Revd By lEng. Ziad Ahmad Shehadi Projects Manager fate: Date: [Resident Engineer Review Comments. [Consultant Decision CA Approved CB Approved As Noted © ‘C'Not Approved © __D'NotReauired Resident Engineer's (Name): |Signature: Reva By Date: Date: [Corracions or comments made relive to subrniat dunn Wis review do ra eave tne contarir Tom complance wih the requreme Jor The Contract. This check Is only for review of general conformance withthe design concept of the project and general complance wih ne information gven inthe contract cocuments. The conracto is responsibe fo confirming and corouang all quailes and simensions, ng fabrication procasses and techniques of constuction, coordinating his work Wit hal of Ofer rages and perfocang his work ste ard satstactory manner Copy to: Employer [] Consuitant [~] as Other ‘SheetNo,__ of _ Head Office CEN PEI ax. DAMAC CRESCENT PROPERTIES LLC Form No.! SUBMITTAL TRANSMITTAL SHEET # |MTS-Civ-017 i! ProjectName | DAMAC HILLS PARKS RESIDENCE | ProjectNo.__| P027.41 sPMIPA'STS/001/00 /i3 DAMAC DELTA Ai beninls 324 VILLAS Date osrior2022 [Submit No PO21.44-DB61-MTS-CIV-011 [Revision a0 [Submittal Title: Method Statement for Tiling Works Weare sending herewi under separate cover the drawings / documents / samples sed Bow: ITEM NO. DWGS. SPECS BOQ DESCRIPTION TYPE COPIES REMARKS REF. o1 Method Statement for Tiling | OT | 1 Hard Works. [TEBE 50> Shp Doman, SE Ba OTF Wafers Daa, C= Cone, TT Tan Res OTE OF e cer that the documents [mal rewith have been reviewed in deta and are In si [conformance with the contract drawin, tions except as otherwise stated. Contractor (Name): Sig Rveny | Eng. Ziad Ahmad Shehadi F OCF 2x Projects Manager Date: Date: | Resident Engineer Review Comments “Rf tn Lorneen tS oot PRM pessoa ‘Approved As Noted ao ahcluct MSA lan met | SEC Not Approved | ekeb yur t () D'Not Required Resident Engineer's (Name): [Signature: [Rev'd By \? |Contractor: % Date: Date: a Jef The Contract. This check is any for review of general conformance with the design eoncopt of he project and general conplanes wid the information given inthe contract documents. The contrecos responsible for confining and covrlting al enilies od arcevlone| electing fabrication processes and techniques of constuction, coordinating his work wih fat of ofr vades ae performing sworn [sae and satisteciony manner. Copy to: Employer [~] Consuttent [7] as Other Head Office ate Subject: Submittal Review Comment Sheet (Project -1713A¢) Submittal :_ | Method Statement & Risk Assessment for Tiling Works ‘Submittal Ref. + | P023.41-DB53-MTS-CIV-O11 Rev 00 Status: “B” Approved As Noted 1. All activities must comply with legal and contractual requirements related to Environmental Health & Safety. 2. Hazardous substance/chemicals~ handling/storage/use, MSDS and training on MSDS to be included in MS. 3. MSRA training/briefing and communication procedure to be included in MS. 4. All work shall be carried out as per the approved MSRA. 5. COSHH assessment of all the chemicals used is to be submitted separately. 6. Ensure DM HSE Technical Guidelines (Whichever appropriate) are followed/considered. Regards, Date: 13/10/2022 ‘Shyam Kumar i HSE Engineer ( 4! ‘Arif & Bintoak Consulting Architects & Engineers, P.O. Box 3670, Dubai - UAE, Tel. +971 (6) 3372888, Fax. +971 (4) 3870352; Email: afoot @emivats The Employer DAMAC DAMAC CRESCENT PROPERTIES LLC The Engineer The Contractor The Subcontractor i | oT Arif&Bintoak Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS lethod Statement for Tiling Works Material Statement Submittal No. + DECC/DB51 /MS/C/O11 Rev-O1 Rev. Date Prepared By Checked By ‘Approved By 0 | 09-10-2022 Senthilvel Ziad Ahmad Construction Manager QA/QC Manager Project Manager o1 | 09-12-20222 Vinddea Manager ve hil QA/QC Manager Zia id Projéét Manager The Employer The Engineer The Contractor ‘The Subcontractor DAMAC sib ge MUA CRESCENT PROPERTES LC ase mostra Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti Table of Contents S.No Description Page No. 1. | Purpose 3 2. | Scope 3 3. | Reference Documents 3 4, | Definitions 3 5. _ | Project Details & Responsibilities 45 6. | Health, Safety & Environment (HSE) 6-14 7. | Material / Equipment Resources 14 8. | Method / Procedure 15-18 9. | Quality Assurance / Quality Control 18 10. _ | Inspection and Test Plan (ITP) 18 11. | Distribution 18 The Employer The Contractor The Subcontractor DAMAC DDAVIAC CRESCENT PROPERTIES LLC The Engineer Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti > Purpose ‘The purpose of the method statement is to describe the system and sequence of activities related to the Floor and Wall Tiling Works of Damac Hills Parks Residence Project (327 Villas) in accordance with the contract project specification, contract drawings, approved shop drawing and project standards. > Scope This Method Statement is intended to outline the requirement for activities and the method used for the Floor and Wall Tiling Works. 3. Reference Documents > Project Specification > IFC Drawings / Approved DM Drawings > Shop drawings submittal > Bill of Quantities (BOQ) > Project Quality Plan > Project HSE Plan > DM, DDA & DEWA requirements 4. Definitions > Project Name - DAMAC HILLS PARKS RESIDENCE 327 VILLAS > Employer - M/s, DAMAC CRESCENT PROPERTIES LLC > Consultant = M/s, ARIF & BINTOAK CONSULTING ARCHITECT & ENGINEERS > DECC - M/s. Delta Al Emarate Building Contracting Co. LLC > PM - Project Manager > QA/Qc ~ Quality Assurance / Quality Control > ITP = Inspection & Test Plan > HSE - Health, Safety & Environment > PPE - Personnel Protective Equipment >_R - Inspection Request The Employer DAMAC ‘OMVAC CRESCENT PROPERTEES LLC The Contractor ‘The Engineer Uae ish Cay Je AifeBintosk | aa ora Eee The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS 5. Project details & Responsibilities PROJECT NAME | DAMAC HILLS PARKS RESIDENCE (327 VILLAS) PROJECT Located at Sector: ADDRESS. DAMAC HILLS - Dubai, UAE Name Contact Info. Dubai- UAE CLIENT M/s DAMAC Crescent Properties L.L.C Tel. 04 5205470 P.O Box 3670 CONSULTANT M/s Arif & Bintoak Consulting Arch & Eng. LLC | Dubai, UAE Tel, 04 3372686 MAIN P.O, Box 87425 M/s Delta Al Emarat Building Contracting LLC | Dubai - UAE. ee Tel. 04 4541211 ‘SUB CONTRACTORS Engr. Ziad Ahmed (Projects Manager). (055-2376630 1.6 RELEVANT | Mr. Muhamed Thahir (HSE Manager) (050-4969493 PERSONNEL Mr. Senthilvel (QA/QC Manager) 055-6267154 Muhammed Azhar (Str. Engineer) 055-3793881 1.6 DOCUMENT DM Code of Construction Safety Practice, DEWA & DDA REFERENCES | Reduirements UAE Fire & Life Safety Code Practice 2018. The Employer The Contractor The Subcontractor The Engineer DAMAC sh ay je Arii&Bintoak DAMS RESON PRPERESLLC i Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Responsibil > Manpower Responsibility It is overall responsibility of Project Director to ensure that the work procedure is safe and activities are carried out according to approved MS, shop drawing and specified quality is achieved to the Engineer's satisfaction > Project Manager. Overall Management of the Site Team and Project Programs, including the current subject. He is responsible to plan and manage all tasks related to submittals/ execution of this activity to the completion and to take the requested corrective action related to any raised NC. He is also responsible to coordinate with the Consultant and with other concerned persons to finalize any variation/ problem related to this activity. > The Construction Manager shall liaise with the Engineers& Safety Engineer to ensure work is carried out in accordance with Quality & Safety requirements, The Construction Manager shall coordinate with PE of PY, Site PE/SE to ensure that the necessary resources to implement the works as per approved MS, AHA and JHA have been allocated. > The Project Engineer shall ensure that the site preparation activities are conducted according to the approved Method Statement and that all in-situ testing as required by Inspection and Test Plan are resourced and implemented. The PE shall follow up SE and construction team for the proper and timely execution of the works. > The Material Engineer will ensure that the materials being used are in accordance to the Project specification and tested through TPT and forward all the results to the QS Section in order to submit with Inspection Request for approval. > The QA/QC Engineer liaise with consultant site representative for conducting Inspection on day to day basis upon receive Inspection request through Site Engineer. > The SE/Foreman is responsible to organize the work in a safe and efficient manner, including all safety requirements and PPE, implementation of the work as per the MS and the ITP. > The Site Engineer shall report to the Project Engineer and confirm, day to day, all the Work Inspection Request (WIR) status approved by the Consultant representative. > Responsibility of the Survey Team is to perform all the required surveying activities required to achieve target dates and confirm the survey part of the Inspection request are approved by Consultant. ‘The Employer The Engineer The Contractor The Subcontractor DAMAC shai Arif&Bintoak pucceEaTrmEMEsuG | LAM secre | SRR Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for > HSE Inspector / Officer Ensure safe work procedures implemented and followed, provide required tool box talk, verify site activities are followed RA, Stop all unsafe work activities. 6. Health, Safety & Environment (HSE) Activity Hazards [Projected neem. a ao a | Safety Health Working at | CiConfined Spaces FANoise / Vibration Height CHot Works Asbestos Fragile Roofs | CGases Hazardous Substances/atmosphere Plant, Fire / Explosion Manual Handling Equipment & Falling Materials Rats/Birds or Other Tools Collapse of Structure OLead Mobile Plant | ZEnvironmental pollution | Other DlOverhead Other Services (Underground Services Dlectrical ‘An emergency procedure is established and communicated fo the workforce and in the event of an accident, the emergency preparedness and response plan shall be Emergency: | followed. The risk assessment shall be used es a guideline to implement the necessary corrective/remedial measures. Name(s) of first aid trained personnel: Khalee! (HSE Officer) Location of First aid box: Dr. Naseem. 052-7072157 cienaes Location of nearest Hospital: NMC Royal Hospital- DIP 04-8108800 Personal | It shall be ensured that no workers be allowed to work on site without wearing an Protective | appropriate Personal Protective Equipment such as safety shoes, safety hard hats, Equipment: | reflective vest, hand gloves or not being properly inducted by DECC HSE Engineer prior to deployment on the work site. @/@ The Employer The Engineer The Contractor The Subcontractor Poa DAMAC tear ‘OAMAC CRESCENT PROPERTIES LLC one Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti wy w 4 wy oO wi z Name: Contact No. ‘Ambulance 998/999 Fire Brigade 997/999 Police 999/100 e [ Coast Guard 99/1001, Conte t Petails: | Engr. Ziad Ahmed (Projects Manager) 055-2376630 Mr. Muhamed Thahir (HSE Manager) 050-4969493 Mr. Senthilvel (QA/QC Manager) 055-6267154 ‘Mr. Mohammed Abu Nazer (Construction ee Manager) Muhammed Azhar (Str. Engineer) _ | 055-3793881 ‘Method Statement Review, Approval and Communication Method Statements shall be reviewed and approved internally by the Project Manager and EHS Lead Engineer being issued for site operation. The assigned Construction Manager shall ensure that the method statement and risk assessments are communicated to the site execution team. Records and signatures shall be maintained by the Construction Manager. Job Safety Analysis (JSA) and Task Briefing Job safety analysis and task briefing shall be completed by Construction Manager along with all staff involved on the Storm water activities. JSA’s shall be communicated to site team by the ‘area Project Engineer/Site Engineer/General Foreman/Foreman prior to commencement of works and at regular intervals thereafter or after any significant change in the location, activity, personnel, equipment, climate, etc. All persons attending JSA briefings shall sign the JSA attendance form. Supervising consultant personnel shall attend JSA/Task briefings. Risk Assessments The Project Manager and HSE Manager shall identify the potential hazards before starting any activities on project site and they will plan a proper safety procedures and measures to mitigate or eliminate these defined hazards. A thorough risks assessment shall be carried out whereby various activities are identified along with their possible dangers and hazards. The existing controls are checked for adequacy and if it requires an additional controls and resources to mitigate the consequences of possible incident, DECC shall deploy and provide such measures. The Contractor ‘The Subcontractor The Employer DAMAC ‘DAMAC CRESCENT PROPERTIES LLC The Engineer Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS lethod Statement for Ti Risk assessments shall be produced for all tasks described in this method statement. Risk assessments shall be communicated to the workforce prior to commencement of works. Risk assessment is attached as annexure with this method statement. Permit to work (PTW) The purpose of this procedure is to provide a safe system of work in the Site, and to give guidance to those carrying out the work. The Construction Manager have the overall responsibilities for ensuring this provision are made for the implementation of safe systems of work. A duly signed PTW shall be available in the work location Inspection and Monitoring The EHS Lead Engineer shall ensure that inspection and monitoring is carried out in accordance with DECC Project Health and Safety Plan. All inspections and monitoring to be recorded Personal Protective Equipment PPE shall be worn at all times and shall be reinforced by site supervision at all times. The PPE requirements are Hard Hat, Steel Cap Safety Boots, and High visibility vest, safety glasses and gloves. The Project EHS team shall be responsible for the selection and issue of mandatory PPE. All job specific PPE shall be provided by the Construction Management through the Stores. Competence and certification UG services locator operator shall be 3 party trained and competent. All drivers shall be holding valid UAE license and defensive dri ‘training. All Plant and Equipment operators shall be holding valid UAE driving license and approved Third Party Certificate. All Plant and Equipment shall have a valid Third-Party Inspection Certificate Flagman- Internal Flagman training course. Plant and Equipment The Plant Manager shall be responsible for ensuring that all vehicle& equipment used by the Construction Team are in good condition, preventative maintenance is performed, holding valid registration documents, insurance coverage and 3" party inspection & test certificates. All heavy vehicle & equipment shall be fitted with audible reverse alarm and revolving warning lights. Fire extinguisher shall be provided for all plant and equipment DECC Lead EHS Engineer shall carry out periodic inspection of fire extinguishers. 8 The Employer The Engineer __| The Contractor The Subcontractor DAMAC ~_ COAMAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti Works All plant and equipment shall maintain a buffer zone to avoid interaction, in addition situational ‘awareness training will be given to all operators. The Plant Manager to ensure that all Plant and Equipment, daily inspection checklist are being carried out and completed by a competent person DECC Lead EHS Engineer shall carry out periodic inspection DECC management will ensure that arrangements are in place to ensure the controlled or organized delivery, collection of materials, and Loading and unloading of Plant and equipment. DECC Construction Manager shall provide suppliers and subcontractors with full information on the access way and traffic regulations so that any congestion and disruption may not arise by the vehicles operated, All Delivery collection drivers shall attend induction with regards to traffic management. This shall include site layout and designated route, speed restrictions, site traffic requirements, loading, unloading requirements, any specific risks and any additional relevant information. DECC management shall establish appropriate dedicated vehicle parking areas for delivery / collection vehicles, Parked vehicles shall be turned of f with hand brakes on. DECC shall ensure the following: > arrangements are in place to ensure all delivery, collection drivers report to security upon arrival to site: > material delivery, collections is made at designated storage, collection areas; > materials can be unloaded, loaded safely by mechanical means where appropriate in safety and without risk to others on site; Those involved in material handling are trained in the site delivery procedures; > vehicle loads are checked prior to entry to site to ensure that they are safe; > vehicle loads are checked and approved by both the employer and the driver following loading on site prior to release of the vehicle for exit from site: Traffic Management Traffic Management Plan (Logistics/ Traffic Management Security Plan) has been established, In summary: > Construction team to ensure that all DECC site access roads are monitored. > Supervisor shall be responsible for segregation of pedestrian from Plant and Equipment movements. Flagman shall be assigned for purposed of managing the traffic and plant and equipment movement. The Employer The Contractor The Subcontractor DAMAC ‘OMVAC CRESCENT PROPERTIES LC The Engineer as dish Oy He Avif&Bintoak > Site access roads will be designed to minimized reversing operations by having one-way system and assigning turning points. > Site access roads shall be maintained by the construction team at all times. All reversing movements shall be controlled by competent flagman, > Control of traffic routes and priorities shall be established and separated where practicable between normal site traffic and heavy earthmoving plant. Loaded plant shall have right of way at all times, and procedures for reversing and maneuvering shall be implemented and shall include the use of audible alarms on dump trucks and banks men where necessary. Particular attention shall be paid to plant operator ‘blind’ areas where plant is maneuvering in confined areas. > Traffic Signage shall be provided on access roads i.e. Danger Excavation, Heavy Vehicle Movement, Heavy Vehicle Crossing, Speed Limit, Hump/ Ramp, Men at Work, etc, by the construction team. > All vehicle driver, Heavy equipment operators/drivers, Plant and Equipment operators shall follow all traffic management signage's and project speed limits. > Flagmen's on fixed location will be provided with shades and drinking water. All flagmen's will be positioned on safe locations. > Pedestrian movement will be segregated using necessary measures (Hand barricading, demarcations, signage, etc.) from vehicles and equipments. Training The Project Health and Safety Plan contains the EHS Training Matrix for the project. The Project Manager is responsible for ensuring that time is allocated for the delivery of the project training matrix. The EHS Manager/Engineer is responsible for the delivery of the training, All necessary training and certifications will be obtained for operatives and supervisors prior to the commencement of activities, If Employer/Supervising Consultant inspection are needed, Employers/Supervising Consultant inspectors will be provided with necessary training and briefing prior to the commencement of inspection and training/briefing records must be sent to Supervising Consultant HSE representative. Third Party certification training is required for all person operating service locator equipment. Full list of Environment, Health and Safety training requirement are listed on the Project Health and Safety Plan. 10 The Employer The Contractor DAMAC COMNAC CRESCENT PROPERTIES LLC The Engineer ‘The Subcontractor feat acs pe oe Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Disciplinary Procedure Project personnel and subcontractor personnel who violate the EHS requirements shall be subject to the Disciplinary action procedure. A full copy of the disciplinary procedure is contained in the Project Health and Safety Plan. The disciplinary procedure applies to all personnel irrespective of position and seniority. Hazard Warning Signage Applicable Hazard warning signage’s shall be provided on site (Excavation signs, Men at Work, Speed Limit, Emergency Number, Emergency Response, etc.) by the Construction team, Environmental Litter and waste shall be controlled by disposal into designated covered skips/ containers. Waste collection, transportation and disposal shall be carried out only by companies registered with ECS Dubai Municipality. Wastes generated during the Dewatering works (food wastes and other) shall be collected at site and disposed through waste skips, The construction teams shall be responsible for ensuring this happens. Fuel and oils will be stored in bunded tanks and waste oils will be collected and disposed of by a licensed specialist contractor. Static plant, i.e. compressors, generators and pumps, will be sited over drip trays. Approval will be obtaining approval (permit for discharge point) for discharge of water pumped through dewatering Ground water shall be pumped away and disposed of as directed in the discharge license. Refueling of plant will not be carried out adjacent to water courses or rivers and mobile refueling bowsers will be equipped with spillage kits, containing absorbent mats and granules etc., for which specific training in their use has been provided by the manufacturer, Maintenance of plant all vehicle, plant and equipment will be carried out at designated places, Spill kits will be carried by the maintenance team. Weather Condition Work shall not commence or continue in case of poor weather or visibility Welfare Arrangements The Project Manager will be responsible to ensure the provision of adequate resources for welfare facilities on the project. The following welfare arrangements will be provided for the project employees: 11 [ Tae Employer The Engneer The Contractor The Subcontractor DAMAC DAAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti Works Drinking Water + Adequate water dispensers with provision of cold drinking water will be provided. The water dispensers will be located at all shaded rest areas and offices: > Chilled drinking water will be provided at suitable points and marked "drinking water" using the applicable languages required. > Filtered will be available by maintaining water supply lines with filters, and that filters are cleaned, replaced twice per week and records are kept, > Water storage tanks are cleaned and maintained on monthly basis. > Drinking water will be provided in personal water bottles (BPA free) for all personnel on site. > Drinking stations will be available at an approachable distance Sanitary Facilities DECC Project Management will ensure that appropriate welfare facilities are provided and maintained according to the size of the workforce and nature of the work on the project. > DECC will provide an independent toilet with the mobile sewage system and with running water. > The site toilets shall be cleaned and sanitized on regular basis and the results of inspection recorded. > Toilets will be available at an approachable distance Facilities for shelter and taking meals DECC will make the following provisions: > Provide sufficient and conveniently accessible air-conditioned rest areas closed to work area > Eating on site is strictly prohibited, all workers will be taken on air-conditioned dining halls with air-conditioned food storage areas. Prevention of Heat Stress/ Heat Stroke Heat Stress/ Heat Stroke are one of the main occupational health issues in construction sites during the summer days. A Heat Illness protection plan has been developed prior to commencement of works. To prevent heat stress and heat stroke the Project Manager will appoint a water superintendent prior to works commencing, 12 The Contractor ‘The Subcontractor The Employer The Engineer JAMAC saad Avif&Bintoak WMCCRESETIROPTESLG | AMEN tyes Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS jethod Statement for Tiling Works Emergency Arrangements The (ERT) role is to manage any emergency situation which may arise on site, The ERT team shall help to minimize any human suffering and economic losses that can result from emergencies. ‘The Emergency Response Plan is detailed in Project Health and Safety Plan. Emergency number and response measures shall be displayed at worksites. Summary of procedure > Duty phone Holder responds to call and confirms details from caller > Duty phone Holder assumes control stating he is the Person In Charge (PIC) > PICalerts other ERT members to the scene > PIC or other ERT member carries out an assessment and takes appropriate action > PIC calls ambulance if necessary > The PIC may also decide to call an external emergency services such as fire brigade or civil defense ambulance service > PIC instructs members to bring appropriate equipment i.e. first aid bag, rescue equipment, chemical spill kits etc. > PIC arranges crowd control/ security/ access egress issues, > PIC announces end of drill and informs ERT Leader and senior construction manager of the emergency Incident Reporting to Employer /PMC/ Supervisory Consultant Arrangements by DECC to Report Incidents to Employer /PMC/Supervising Consultant. DECC will inform Employer /PMC/Supervising Consultant in the event of the following. > Fatality-Immediate Serious/ lost time injury - within 30 minutes’ medical treatment injury First Aid Cases - in monthly report Significant near miss - within 30 minutes Any environmental incident that requires the DECC to report to Dubai Municipality. vvvv In all of the above cases the DECC HSE Engineer will notify the Employer / Supervisory Consultant by telephone call and SMS immediately. DECC will prepare within 24 hours, an initial report, describing the incident and issue to Employer / Supervisory Consultant. In the event of a serious injury or a significant near miss/ environmental event, DECC will submit a detailed written investigation to Employer / Supervisory Consultant within 72hours in the. In the event of a fatality a detailed written investigation 13 The Employer The Contractor ‘The Subcontractor DAMAC DAVAC CRESCENT PROPERTIES LC The Engineer Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Ti Works report, including police reports, is to be submitted to Employer / Supervisory Consultant within five working days. In cases where sub-contractors are appointed, DECC shall ensure that the reporting requirements of the relevant authorities and Employer are met. All incident records will be securely retained as long as the site/ service are operational plus three years thereafter. Legislation, References and Code of Practice > As per Contract Conditions and Specifications Relevant Authority Specifications (Dubai Municipality) Project Quality Control Plan Dubai Municipality Code of Construction Safety Practice - 2008 Ministerial Order 32/1982- Regarding the Determination of the Ways and Means to Protect Employees against Occupational Hazards DECC Environmental Management Plan DECC Waste Management Control Plan DECC Integrated Management System TSO 45001:2018 DECC Project HSE Plan DDA & DEWA Requirements UAE Fire & Life Safety Code Practice 2018. vvvv > > > > > > > 7. Material & Equipment | Description | Wall & Floor Tile | Tile Adhesive, Mortar, and grout Ete.,) ‘Tile Accessories (PVC Comer beads, PVC spacers "| Potable water | 14 The Employer The Engineer The Contractor ‘The Subcontractor DAMAC sk casio Arif&Bintoak “OAMAC CRESCENT PROPERTIES LLC ce'g acess ogee Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Black washed sand 7.1 Resources onstruction Manager ________| Mason | | Proiect Engineer __ [Land Surveyor |.QA/QC Engineer _____| Foreman Hee [HSE Manager -HSE Personnel _ | ‘Machinery Operator Laborers 8. Method / Procedure 8.1 General MEP clearance will be verified prior to star tile setting out, Material inspection to be submitted for Engineer's approval: Al types of tiles and its accessories, mortar, adhesive and grouting items, in every delivery at site, 8.2 Surface Preparation > Wall Plaster Completion Inspection Request and floor Wet Area Waterproofing Inspection to be approved by the Engineer. > Wall and floor substrate to receive tile. Should be ensured clean, free from laitance, oil, waxy films eto. > Loose mortar on the floor to be remove and MEP conduits to be protected properly. 8.3 Mixing of Tile Adhesive and Mortar > Tile fixing Adhesive and mortar shall be prepared as per manufacture’s recommendation and as approved by the Engineer. 15 The Employer The Subcontractor DAMAC COAIACCRESCENT PROPERTIES LC The Engineer ish oy ae Arif&Bintoak cenit ep ers The Contractor LY, SmORATES Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS lethod Statement for 8.4 Wall Tile Fixation > Plaster at wall to be completely cured. Tile setting out levels, offset gridlines to be marked by the surveyor. Wall plastered area to received tile, surface to be roughen. Check the verticality and true Horizontal plane of wall rectify as required. > Wet area walls (Shower area) waterproofing to be done as per the specs/Approved drawing. > Start tile at setting out point by snapping horizontal chalk line 90° angle with vertical, tile spacer distance from top of floor tile level. Below this datum line, fix temporary plywood to hold upper tile layout. Install the upper tile as per approved shop drawing. Adjust as required. > Setting out should be checked and approved by consultant prior to commence tile work (each type) Ensure correct spacing/location of wall tiles. Wall tile grooves should coincide with floor tile if tile size of wall is the same with floor, otherwise refer to approved shop drawing. > Provide approved adhesive beds over the substrate as per manufacturer's recommendation prior to placing tiles. Utilize PVC tile spacers as per approved size to maintain tile spacing. > Tile cutting to be made with tile cutting machine/nippers. Wall tiling to be extended above false ceiling minimum 100mm. Epoxy Grouting (Wet Area) shall start only after full hydration of tile glue as referred from material technical data and after all tiles were checked from hollow sound. Tile fixation should be done properly without hollow sound, Prior to start grouting, PVC spacers to be removed, tile joints to be cleaned removing thoroughly all loosed mortars and debris, provide at least 5mm grouting depth. > Tile curring around the services to be done properly. > Grouting joints to be filled with grout uniformly. Excess grouting to be clean-off with wet sponge before setting. Grout completed wall shall be protected against surface dust and contact pressures for minimum five hours. Note: Bottom wall tiles to be installed after finishing floor tiles since its base should sit over floor tiles, ‘Avoid using tile cut size smaller than 2/3 of the dimensions in both directions, 16 The Employer DAMAC DDAMAD CRESCENT PROPERTIES LLC The Engineer The Contractor ‘The Subcontractor SmORATES Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS jethod Statement for Tiling Works 8.5 Floor Tile Fixation > Surveyor will mark out levels, offset gridlines as shown on approved shop drawings for floor tile setting out. Floor substrate for dry area: To be cleaned from any debris, dry, free from laitance and chemical contaminants, > Bedding material: Cement and sand (black washed sand 10mm downsize for formation of soreed), = to be laid semi dry, prior to start tiling works. Use Mortar/cement slurry to grout the bedding mortar during tile fixation works. > Mechanical Mixer to be used for mixing the screed in ratio of 1:4 > Floor substrate for wet area: Waterproof application, leak test and its protection as per approved shop drawing to be completed, prior to start tiling works. > 1st course axis (X & Y), tle layout to be prepared as per approved shop drawing, and to be approved by the Engineer for location adjustments, prior to commence tile completion work (as per type). > Utilize PVC tile spacers as per approved size (2mm) to maintain tile spacing. > Ceramic tile to be immersed in water prior to its laying for the accent wall. Cutting to be made with tile cutting machine. Tile fixing should be done properly without hollow sound. > Slope shall be maintained in wet area floor tile towards floor drain as per approved shop drawing or as per Engineer's instructions. Tile skirting to be fixed as per approved shop drawing details. Grouting to be started after getting approval from the consultant. > Prior to start grouting, PVC spacers to be removed, tile joints to be cleaned removing thoroughly all loosed mortars and debris, provide at least 5mm grouting depth > Ensure the slope maintained property. > Grouting joints to be filled with grout uniformly. Wet area tiles shall be grouted with special type of ‘epoxy grout material as per approval. Excess grouting to be clean-off with wet sponge before setting > Grout completed floor tile shall be completely protected from traffic or usage for any other work at least 24 hours. 7 The Employer The Engineer | The Contractor The Subcontractor ae DAMAC ae oak ‘OAMAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Works | Method Statement for Ti Note: - On Completion of tiling (flooriwall) inspection shall be submitted for consultant approval. Tile accessories fixation to be referred to approved shop drawing details 8.6Tile Repairing Works Tf any hollow sound, chipped tile é& up and down found to be replace. 9. Quality Assurance / Quality Control The complete work shall be inspected by the consultant and approval shall be obtained for the same, The following shall be maintained to control the Quality of work: > Inspection & Test Plan > Inspection Request > Check Sheets 10. ITP & Checklist ~ Inspection & Test Plan is attached in the Appendix - 2 = Check sheet is attached on Appendix-3 11. Distribution - Construction Team = QA/QC Engineer - Technical Office Team - Safety Staff 18 DAMAC ghoul Arif&Bintoak COAMAC CRESCENT PROPERTIES LLC Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Appendix - 1 Risk Assessment The Employer The Engineer The Contractor The Subcontractor DAMAC auc Arif&Bintoak ‘OMVAC CRESCENT PROPERTIES LLC ~ DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Appendix - 2 Inspection & Test Plan 20 The Employer DAMAC ‘OWWAC CRESCENT PROPERTIES LLC The Engineer The Contractor so |) AitgBntoak | awa. The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Appendix - 3 Check sheet at The Employer DAMAC ‘OAVAC CRESCENT PROPERTIES LLC The Engineer igh cng vise Arif&Bintoak cent eae The Contractor ‘The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 427 VILLAS Method Statement for Tiling Works Appendix - 4 Key Plan m@ The Employer DAMAC DDAMAC CRESCENT PROPERTIES LLC The 1@ Engineer The Contractor 0 Ssh once Arif&Bintoak agunicak The Subcontractor Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS jethod Statement for Tiling Works 23 ‘The Employer The Engineer The Contractor ‘The Subcontractor oy Arif Bintoak DOAMAC CRESCENT PROPERTIES LIC aor DAMAC B Sebo | | _eailis Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works cies | Appendix - 1 Risk Assessment ‘sto Anzu ge anne EON Tae le Wim panpuo> 9q 03 18 xoRI003 ‘pies pue Buyaug VStHioM-a1d + ‘Aouayadwos hued pan pue 384824 3¥N Pen stest0d 4 mesado sues) | sane Bury apuey oy pausste aq 0 998 ypc ved puna pue uszecwoy «| papscnas senpesodo 2 031049 2894)0 38H woo 49 51529 sang ‘Atep uo 2uop aq. uonzedsu suei9 | asewep sadaayauois seous paasod wawdina uewios Aoyes , anf sreuayeu Jaaufivg ays 2A mH sotew | Jawo pue sou, seousua oto | » | » | 1] aeapsen ser} »| ce] swopooy « aupeowo eauun | 10 ws ups a | pournbay +431 J021U02 40 vanped o1 0 7 exon aweowuutis | yse1 jo uo ° Aq uony soe aaa Peanbau suonay wien) | iy | prsren egg | asesjouonduaseg | on sey Sewn 0 Phen et ‘Auedo1ae) ‘sioxenUG> FouIO /@nsO ‘Seko}dwy 93q0 EPeRAyeE aq IA EIEN PUR OU ‘toe snes “hauomonynaene ot bo Jeseuen ash siyeus paweyn } P ] refeuew vononasuey vo s98euey yol014 pewyy per won eUBisG auieN Aq pavajduion queuissassy HSH (SVTHA £2€) SON3GISIY SNUVE STIH OVINE AAI Trot eBed ANSWSSASSV SIE SOM ONT ?ALIALLIW ‘sss0d awousedop Ayes oy; yo zequi e pus Jaqulou Leas au € Aq paroKulo> 29 pos WUsUAEEaEe YB SION EON "ZON) EON ‘ane maine ‘Aynaoe ‘uipeo-un pue Suypeo) Suunp sanjersdo 5140 38H sien sadaayaiers saous faders ewos ‘hayes | eisteweg « aus ou uy saauiu3 a5 9A uctH | als 01 pasn aq 01 seo BUR 2018 dni sreuareMi Jo Buns -20uidua peloid eH pie | pewi29 pue parrodsu Aes pus «| at |v Jhayeres fuonevodsvess | zo souevarujeus annewansid “uosypuoe 008 u 248 weD) uoKansisueD ‘294i Aq pasn wwawdinba araan re xeyn Buynsua 305 aqysuodse. ays ays yjo8 10j0q voRnpul sH9 A;OyepueW 24 a49/du109 i}eys stoxesado/sienup. ‘3p1YIR ArBAIP lly "HOM ays yo qauieouauiuioD 04048 uoranput Js3pyan yuowiab3, ‘soqyan 4Aqxonas 34738 pofoig iain svanup Avaniag seAueywau *hjuo punos8 pana pue Paredwon uo papeie 9qoyaue) | 40 2e0u As 03 pamojie eo} 34a yim TEUOD wo, Trio za8es ANAWSS3SS¥ »STY SHYOM ONT “ALIALLOW st02 snrvow-eeornvws ‘ystod auauavedap oj Jo 19QUaW @ pueJ2gUIBU WED a Ag pata}duia aq PiNOUS AUBLEEONE I BLON EON ON "TON meq mainay 3dd yo asn ayes 104 10m jo warshs uuoyue asoyaq dew ays /uononpu ‘24s 9n291 0 SLERF=P/SICNSI IY «| sa2qyo ‘puek ul Suydaayasnoy poop «| (pauinbos 52) popuaaxe An s19891N0 Im. ‘szepns puey auerd uo pauonysod aq 01 aIQOW waUdNOD IUeIE “suom Buy pue Bun sno havea 0 pamoye aq jum ss038/J8KuO fuoyessdo 2ue) Supeoy-un/Avanop ze iene pue Suguedap apyan oa oud say i0ds | “Hom jo waasAs ayes Suymojo} svanup aunsua 0) 99249 10d5 390 Aaseo 0 szzayyo sHa/siospuadns aus «| “uossed uayadwn e Aq paraidwion ue ano patie 8y9q 222 3599349 ‘quowdinba pue weg we yeu ainsua oy adeuew auel4 aul | “yon ses) plone 01 u07 J2yInq @ 10) papyaaid aq jeus saysindusye aug ‘uoqesado 913 0} a1eaysi89 founaduos hued pug pancidde se 9m Se quauidinba pue wed 943 105 sayeayjue0 1801 uohadsuy fused PIE anoudde pue ‘suswin2op uonensias ue sionug - Men uw eys uowsdinba pue weld jy | una aug | ‘spay (ewowuosaue so siueyjwenuoa jouorsswa ey. «| wauidiad3 aun / 40 Buuns9s i008 | ange} tang «| oweruawjdu Aveo Sunous pus Buyin un pue savewdint3 auyyoanies «| sopiuan yo-sued auyous ‘ua s26wU99 wePDD + Tr 30 € aie ANAWSSaSS¥ »SIE SOM ONT FALIALLOV staz hnresawarorawius ‘ON __Z0N" sannesado, -22u)0 35H ewe saoys 1uJ0d aBe1o4oue sodoud @ 04 paxo0y 124 ABO ny Se yons Wa3eh= “uoponnsge Aue ‘od 9p waned SupH0M Ue spalge 20 eeu uoste6 ue yoy 241 worse panes Aypidu pe iduans “suorsuowip wo.yns io s2ueq ue uoR29}010 389940 uoIsO!s + ss Pasn saAnesado jeaInsU; + ‘Antu shuees_ s8papuaiay woryiies | saqneiado, 39H Bier "9582 ay yop uaym 34g a1eUdosdde aphrorg - ‘panou 9g 30UyeYs Agi Las: yoxymn sjeusiew ang pue anous Aysea ued 204 15y“sjeuayeUs Aneoy Buy jum aimsod Apoq sadoud ainsug Augesia Pisa wag 20 puey -| suypuen enuew «| uypuey (everew yom Bun | je sieq geal pue sdars pax “pOMo|o} 2q 03 warshs yen, AeM-aUD + Papione yea ata jo peg ay3 vo BupHON Tro vates IN3ISSASSV YSIE SRUOM ONL FAL Lv Syeis0d y wowniedop Asses a0 saquiou e pueJaquiaU wat st # Ag paieyuon 29 prnoys wou eon ZoN "TON :aaea menou, T ad sep ao ayes aunoeu a s20iyo 35H HORI Jen Jamod Busn sannerado Jamod piay ‘sno wewsos se len | orpopinoid aq yeysBunien AeEs200N puewjosesn | pueseuowsosuncw | so Som Deas or 008 ‘YSr¥onpuo2 pue ve/S penaiddy + sie aya Suse u0U 142 a9 1eusuosmodns uareewey + {gym 2upew Busy aan vaya ‘anno 95508 ou Suro 0 940m Bupina su Sid Ao.epUeU 2s0u yong 420M snus SanyeIedo + “sono eu a1geuns eom2snu soneieda + “uaweinbs ue H001Apow 10 sa4e OU 0g 53003 37804 cae saoys | um poxeossespuezey ino sonpay souoperoues 2ueto>yenuew sonnesado ‘sagas | sony aria ques enuew asn uo + ssoxg «| aysn aun sa, 040 38H 2A iH spuerey uewios 22H piel | os pepwnoudag yes uwen uessa20N auouodis «| suonesedaig onpois | $0 spain 28 vo ayqoyene sooys | s!one\au0N sneyrD [20] 50 semeiadg ‘ayes | _“Aannoe au Suu asp jo uoneeuLy s201y0 38H ason pik | uonosd ose np jo sacha agen ewuo4 2H pie | am popioud ag pinoys sonnesad wo_- ss0ys ayes ANH “spo santa 20H pieH | au eau paiois2q ou eysneuoreW « PAweres | feuaren auiies _« Trio saieg ANAISSaSSV HSIE SOM ONT FALIALLOW stor Ane anoue 4onas ‘a1gss0d ‘EON ‘unuedap Asjes 94 Jo aqui e pue aquioU Lea a5 © 49 paajduoo 29 pindys WAUISESS SI 3LON soaneva6g, 229140 35H ewes RT sanoj9 pueH se0us ‘ayes AW seu pie, We 49009 Apod (fA pue yseu (8 sano puey se yond 344 Dd 9 Su puty erwew paujen 99 jeus or jain snus saaneNaCO. « UUs Ui BoBeBua sanaesaco « aRauep THON Fare MAINO 009 “e704 pueyjoan aqwouoaia sno freuow Busy + TrjogsHeg sew isng sanoig pues “aisisiod anss, ‘aug 0120p answ09 se yee 104 eae ado 0} uossad 243 3u “fejap anouays uonuanye enjpaus ya3s ue seem jo 3uld 2u0 aig uonsesuy ‘vaso ‘uy Buproy asym sayem BuywUTs 1m ue) “Aelap Ave OLA 1a,eM ABM Ai@eaauiul Use DEIUOD OA “deos pue 8100 AUOId LHe Apog Uo wwaLIID J-sOusefes He YSepA~1DeIUOD UNIS « vempesnueW wk aq heys 291 suowssesse HHSO9 UO payauq frauen 2q 104 ‘3504340 a8esn seoueqsqns snopiezey 9910} 3 aq eus auauissesse Kiso puesaeW + foneieuuy : 1d wounsievew age prog ‘edu 20u1N ey ‘ewep JouN wis sou sovourieisss | 90 yosoyserds | ‘emu sosued Suneos Yummz2wwoy + ALNAINSSASSY DISTE ‘SHYOMONTIL :ALIALLOW version ‘EON ‘TON “TON :aeg mainay aD pH Faas | ‘sasou‘soum ‘0199 58 vane | semeaco sees | Serer een irae sunt «| sapiomsicoa « 222440388 sen ini usnne Pie uewlog Tenoen| pneu apioaispeotuewen «| g| ¢ sneio push bee Agrees s28p3 seed nels: Monta «| pansaraudun, 2940 38H Saimin vewieg 184 uel x | tam ueap feap Avernowumieiem || im Amrepawuy ysem-soeue00g =| || eos ue | Jem J a2} yn 4909 vo UE. pamanspeusem-spewoyuns «| | ‘ainsodea Jo wars ay suneeou pie “sonyre au Buucvou 43 2g us woswecrswueieduc) ano | joo puey urdeayasnou seintoy | ea109 pue pepeaiieg | ‘peau jisujo ase auL « an ~uoapveo poo8 ur aq veus 2204 21s}00 pe ae pow og» sun Thy Lae ANAINSS3SSV ¥STE ‘SRIOM ONT FALIALLW st02 snr zev-aeorawus ‘sod auouaiedop Aaj a jo Jequibu pueJaquioW wear mh pete}dwoD aq pyNOUs AUAWEEDSSE RI :SLON ON DONO sabe narod ry ue sno uarard sero puen | 28.0 450 Bupuom voun wom ope eee Oe eens sgpng | HHO on Kaes| a pue wenn revo Buypuny 22410 384 nin saimporeposse spezey ajo a veh pied | ame spew Avenel ave soholy = Senapo puny Sou] Pa ‘ous | 83m uae Buicooyesnou noon « ee eomendo diay | "Aor un Bvunp snp yo wonee4u, na s390 38H 489A IIH | BABUE 04 ys0W yENp Jo sada aiqeuins HRA weed OHPIEH | uum pepnoud oq pROYSsantemdg = appey p02 snojeapue pened hue n= s99 pun “wuonels wspous | AML ange AsreUIKoLede wr popu ‘ants | smppeyostern_| omen a0 35H ceuios pus pape.e aq ime fupiojes iy « sje naewoau oy sexe uaa on pave squeyr sits puosuaieauniem « — pinuuaineg neon fares | supeses pd seioyue ado. 01 poyooy EBL 09 I eons were sono. pun mos ied Fors | so pue seco yr pues ss 354 en pe infu dunyan ‘seo = ayenbspeu | Tryp gs8ed AN3WSSaSSV ¥SIY SWYOM ONT ZALIALLOW Stor horzomeeeoravits ‘550d awewnsedop nes a4 Jo sequieu e pve saquiaustuen aye 8 fa praiduod aq prnoys aus eon oN -_ nog nen swauptueue penny suaenéoiy ino nase suo a camera ror ine ana er | ceases saausaug efosg @ ayons way Baxonsyeay «| 80, ee feasiaapeadngeemecres ‘imap sooeme meade, « i oougude ares piston adh aatoea mower yao ane inp | eon» ounysons jem + iewen | seve anes ee ewer pur eset ene as pnd ecin Ake + wan mwas ayes “pawawajduy angowaesun « miaucate: wont simi oneirseryi ant aad ina | woe upryorses pvowag «| st saovunyted_ e Tie sea ANAINSSASS¥ ISTE ‘SHUOM NTL =ALIALLIW staeAnavow se orews sst0d y awounedop Ayes cesses ou ut pn pou tnuen-04 ‘TON :0}e0 MaIAay fousSieu3 aay Aiaes equ :fou98.903 yoase> uy ‘Heis 3240 pue sannesado ays iy s9j9009 sono puey TE] »sew apes aus aur suoiduike srpn02 uruson pus usnoy wuonvenaid aH | erpmoa>.uepueg | 69 20m ye Busdaayesnoy pood YUEN + Trs9 oF seq ANSINSSASSV ISTE ‘SHMOM ONTIL =ALIALLOW S100 herenese ocyatis eqstod y awouaedop Aes ua jo soquinw © pve soquiou wes ay © hg pain}dUo> aq plnous WOWESOSSE YR 3LON ———g0N ON TON Fane MINS a0 aumeuBis oneusisaq wen oureug | ON “spiezey aWy pooIssepun pue pes! BAeY | PUR P/aq A TUSURTONSE VEN SnOge BUT Pardope oq oy vei senses fOUGD pUe HET TEM Tr sted ANAWSSassy »SId SOM ONT ZALIALLOW The Employer The Engineer The Gontradior The Subaanacar se DAMAC dub cusise | | glia uucerecerravemesuc | 4 | See Project: DAMA HILLS PARKS RESIDENCE 27 VILLAS Method Statement for Tiling Works Appendix - 2 Inspection & Test Plan 20 seaueie3p 2aue daa : ‘ 4eouibuy 90 Gumesp parcudde iad 3S1ppayD ? , 3s1PBUD sBumesp p SOM i H |} - | H |] 4aau6u3” | 40m yoeg | se adojs ‘squjof josquoo Iddy/uonesypad: v 20 ‘piovey pated jana} ‘ynoke| ‘Waxed uoppedsuy | aro. rere uPadS | Burl) Jo UoRa|du0> won2adsuy A id uBiseg “Buimeip ms doys paroiddy | seouereaps | eae daw aeeuj6ua 3 Suymesp ‘sbulmesp p | opmeme |e |] | spouses | momyoea | coys penoiade | 200% | aroxcyumcerods |, MOFeLARA0H | | 20 ‘piosay yefoug dad se ynokey HORS CUL pofog #0 [lem soy uoRpedsuT uonsadsut Seniedoid | ajay sjgendaase oday ysay 4a0u}6u3 90. an ‘UIUIM saadoid ‘piosay, H | = | H | 4eeurbug | saya oa asay | jeaisAyd ali “Buimesp Tensi,, - drow ai. z vopadsuy pafoig 1eo1sAyd 2uQ doys paroidde “dny20W Bug dad se ynoAe] pucoany 490u18t330 | emo clue’ ssnoe y Sunolb JeuD}e ‘paloug ‘WO pafoid uoRsedsuy jeuazeW Poe u “on paosoy |9/3] § | ¥ fouanbo1s | evoy0 eauerdanoy | M9484 | Gumeiq'io/pue | uonduosea hunnoy | -on a REPL | “uoneoupeds Buijs, 400]4 pue jem 103 Ue} SOL pue uonsedsuy pen (seIna £z€) ~ SIN Dewed © seIA doUEp|sey Y1ed: Wefosa lg soe Wie y sblasseboxa Pm Vile 00-Aay Sulu 400} pue jem 403 Ueld 382, pue UORDadsUT . sebeuewsoafoig da6euew 90-WO 400|4 PUR [12M 40J Leld 3S8L UO|DadsuT ‘%Z0Z-0T-60 00 penciddy HO uonduoseg seq “AON piooos maine = a qualid / 48euj6u3 = 9/3 (pauinbas auneuBjs ou ‘aouepuaye Wopues) aoueijianins = § doqesjuoogns = § (pae.0ud 03 pauinbas ainjeubis) qulog ploH = H Auedwiog 6uj2e.qQU0D sazesW3 ejaq = y Gaays 9242 Uo ainjeubys ‘payvedxe souepuayje) ssouIM = A avaon a ‘sGujmeup p_ Game s0ubua 30 aroldyhioneyoods a H]- | a | aaausu3 ease yoea | paride aq oj Ajuang | ysipjpauD Pefoug Bune s vensaceul ‘pelo a picoay woRoy woneoyien | Aouanbeig | eHeyio sueydesov | “Aenins | _uonesyioods | wonduosea Auanpy [ON Zoe (se TE) ~ SIH 2eWwWe © seiIIA GQUapIsay y4eg: olo1g ie "4 Beg A £28) HH Deweg HA e2uapIsoY r4ed: Doh yas wa oppiau/tsaaro3e es VV 00-Aey ILL 4004 pue [12M 40y UeId 3Say, pue UONVadsuT is The Employer DAMAC COAUAC CRESCENT PROPERTIESLLC The Engineer The Contractor wa The Subcontractor Appendix - 3 Check sheet at JAMAC 4 43 DELTA lm Feed DARTS le Styl Project Number = P201.44 ra Tone eeeresem rn CHECKLIST FOR TILE WORKS ( WALL TILES ) Gesaiy [oo [ea ale (Fle lz ]$ le le le IHSE Requirements |QA/QC Req ‘ments: ae For Final Approval Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative eat i mete JAMAC 43 DELTA Ain | Seg SHITE project Number 7 P21 ack + DAMAG Hills Parks Residence 927 Vilas (DBS1) cen DAMAC Crescent properties employer i constant 1 RATA Bntoak Oonsling Arhtoats & Engheors sain Contractor + Delta Al Emarate Building contracting [sub-contractor : CHECKLIST FOR TILE WORKS ( FLOOR TILES ) [win No. Location: Date: | ‘heckedby | Checked by | Creches by sn} lems to be checked Contractor | QCTeam | Connitrae Remarks &)5 |S lel iSlele ls HSE Requirements 1 [Al the HSE requirements are fulfiled JQA/QC Requirements [check Ceremic ties glue,grout shop drawings and method of |Applcation approved by Supervision Consutant [Check approved somple are avalable et site and material delivered to ste are as per the approved sample. Ensure MEP works completed and cearance obtained from the Iconcerned department. [Verify Leyout of tiling showing the poston of cut Wes, pattern and spacing line approved by the Engineer Iinwet areas check that approved Water proofing is completed as per Manufacturer's instruction ane tested for leakage [Verity the application ofthe mortar/Tle Glue has dane as per the | 1 2 |manutacture's recommendation. 7 [Nery that spacings uniform between Hes [Cheek thatthe tiles are Installed as per drawing Pattern & the 8 [Manufacturers instruction. Ensure thatthe back ofthe Tiles recelving |corcect Adhesive coverage to prevent Hollow Tes) [Ensure Ficor ties aid level or enough Tals In wet areata may be | required to prevent low spot and pooling of wate [verfy the application of Tile Grout has been completed as per the Imanutacture's recommendation. 1 Ensure that area has been protected from outside wale For Final Approval 20] Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative | Name Name: Name: | Signature signature Signature pate Date: Date: | TGC/QAQC/CHK/CVL/TIW/02 8 REV-00 Page tof | AnteBintoak DAMAC A pra DELTA A Gilt | pene: DOAMAC CRESCENT PROPERTIES LLC es, = = Revision: PROJECT: DMAC Hills Parks Residence 324 Villas CUNT: DAMAC CRESCENT PROPERTIES LLC Procedure CONSULTANT: ARIF & BINTOAK CONSULTING ARCHITECT & ENGINEERS. aa MAIN CONTRACTOR: DELTA AL EMARATE CONTRACTING CO. LLC INSTALLATION OF TILES - QUALITY CONTROL CHECK SHEET LOCATION / AREA: S1.No. Activities / Items to be Inspected QCI Verifications DECC | REMARKS ‘Ensure Method Statements and TTP has been prepared and approved (Check & verity thatthe Latest Drawing and the Tile installing pater is approved. ‘Verify that Tiles, Moria mix and the Grout material are approved and the same quality used oa site Ensure thatthe Mock-ups are approved by the Consultent/Ciient “Ensure thatthe mortar mixing or wall Paster(i' any) i in good condition & to specified Tolerances Check alignment, setting out, and floor level and/or wall plumpness before installing tes. ‘Ensure the flocn/wall area is oil fee, clean and dampen to receive the mortar mix and dry 0 receive the edesive. ‘In Wet areas check that approved Water Proofing is completed as per Manufictue's instraction and tested for leakage ( Raise Inspection Request ) ‘Verify the application Mortar mix tthe floor and Adhesive tothe wall i done in accordance with the Manufacturer's instruction, ‘Check thatthe Ceramie Tiles are installed as per drawing Patiem & the Manufacturers instruction, Ensue thatthe beck ofthe Tiles receiving corect Adhesive coverage to prevent Hollow Tiles) “Engore all the comers properly terminated by means of epproved comer beads| Ensure all the sevioes are pressure testa & accepted. ‘Verify the square camera the wallfloor tie termination area. Ensure thatthe Grouting is done es per Manufacturer's instruction, Tile Surkuce is accepted 16 ‘Ensure the completed Tile area fs protected from wate. Comments / Discrepancies (if any ) DECC - QA/QC APPROVAL SIGNATURE NAME DESIGNATION DATE Checklist # 16-16-Rev 2-OCT 2010 The Employer The Engineer DAMAC A whowe The Contractor Ast Biniozk sustmee ‘DAMACCRESOENT PROPERTIES LLC ne Ea The Subcontractor Project DAMAC HILLS PARKS RESIDENCE 327 VILLAS Method Statement for Tiling Works Appendix - 4 Key Plan 22 3 DAMAC DELTA A, bein!) DAMAC CRESCENT PROPERTIES LLC eer -_ Ee cau SUBMITTAL TRANSMITTAL SHEET # | MAT-CiV-110 | ProjectName | DAMAC HILLS PARKS RESISDENCE | Project No. [ Po21.41 327 VILLAS Date 22/09/2022 [Submittal No. P021.41-DB51-MAT-CIV-110 Revision: [oo [Submittal Tith Material Submittal for Tile Adhesive |We are sending herewith under separate cover the drawings / documents / samples listed below: ITEM NO.| DWGS. REMAR SPECS DESCRIPTION TYPE} COPIES KS BOO REF, 4 > ial Si ile Adhesive. OT | 01 Hard +04 0 Material Submittal for Tile lesive. ‘Soft Copy (SikaCeram 51) SOE Sap Draws, SH Sarl, T= Carers, NO= Manvlacurers Cala, T= Ga = Tas esis OT= Oar upplier: Mis. Sika We certfy tat the documents / materials submi Jconformance with the contract drawings and speci IContractor (Name): Signature; lEng. Ziad Ahmad Shehadi |Dal Projects Manager Resident Engineer Review Comments mn ‘onsultant Decision | {fer to Ye Commnetf on octt salad PES Re aeeroed 8B Approved As Noted Book ©) C'Not Approved| CO) D’Not Required Rava By 4 [Contractor: ¥ Date: Date: [Gerrectons or comments made relative t cubital during tis review Wa pBt relieve the corrector Yom complance wih ie requveven) Jot The Contract. This check is ony for resiow of generel conformance wih the design concept ofthe project and general cmplnce wi tne intormason given in the contact documents. The contactors responsible for confiming and carrelating al queries end cimensions| electing fabioaten processes and techniques of conetucton, coordinating his work wih ‘hat of ther trades and pertrming Ns work fo] sate and saislactry manner Copy to: onto i" [] Other Head Offica [Resident Engineer's (Name): Signature: ee Recelvervallco ‘Submittal Review Comment Sheet (Project-1713A¢) ‘Subject ‘Material Submittal for TILE ADHESIVE ‘Submittal Ref. P021.41-DB51-MAT-CIV-110 Status “B” Approved As Noted, No objection for SIKA CERAM 51 for tile adhesive subject to, 1) Fully compliance with project specs and authority requirement. 2) Pull off test to be done at site. 3) Raise MIR for each delivery. 4) Method statement to be submitted. We Date: one Regards, “Arif Binoak Consulting Architects & Engineers, P.O. Box 3670, Dubai - UAE, Tel: +971 (4) 3372886; Fax: +971 (4) 3370352; Email: qrtook@emivates.e.ae Project! DAMA HILLS Contract Ret: POZ.¢1 Asif PARK RESISDENCE 327 VILLAS (08-51) ra pest ° General information Material Submittal Date 22-08-2002 D aul Itc intoak Audit Check Sheet igang REVO. No P021,41-DB51-MAT- civ-110 ‘Name of Materia/Equipment_| _Spaciication Reference Drawing Reference “Ares of Application Tile Adhesive : Tile Works Review Check int Remarks . ‘Consultont DAMAC Table of Contents ‘Material/Equipment os per Approved List of Suppliers NG ‘Supplier Reference is ‘Country of Ogin ‘Specification Compliance Statement Every Page Stamped ond Signed 2 toca Atory conpionceSoiementbay 7 Page Stamped and Signed Material/Equipment Performance Data 7 ‘Sign Off 0 ‘Gansulignt's inspector ‘Consultant's SR. Engineer DAMAC Representative Audit Date: py Date: Date: sm (Ye sor se DO Status — NOR (against the Check/Audit comments) Initiated by Consultant NR cose out action ‘Sign off Audion | RenaratConmen Ne cum, and Nona ooies | “at bates | Renaistonmeris |} — ; 7 z ‘Note: 1.The aforementioned check points the least that DAWAC expects the Consultant o cary out. This check point shal no way Tims the inspection process of Consultant n any aspect of Constrecéon including qually ives, documentation, testing ‘ad on ste execution of various components and the Consultant shall generate additonal check Ists as aporopiate. 2. )-Comply (X)-Does Not Comply require substantaton In remarks columa (N/A) - Not Applicable

You might also like