Steve Tshwete Local Municipality requires formal written quotations from registered
service providers to supply and install fiber optic cables at the Civic centre and 24Hr
centre in Middelburg, Mpumalanga. Here are the specifications:
Purpose
o The purpose of this request is an invitation to service providers to submit a
RFQ response for the installation of data infrastructure at the Civic centre
and 24Hr centre.
Compliancy of Installation
o The requirements of the new data infrastructure must comply with the
following standards:
Minimum Information Security Standard, SA Cabinet Approval, 4 Dec.
1996
ISS Principals and Standards
GAISP (Generally Accepted Information Security Principals),
Version 3.0;
GAIT (Guide to the Assessment of IT General Controls Scope),
January 2007;
GASSP (Generally Accepted Systems Security Principals),
1990;
Steve Tshwete Local Municipality Network Infrastructure
Standards, as amended
Detailed requirements
o Two buildings need to be wired between existing switch cabinets.
o Installation of the fiber optic cables may only be done by a certified installer.
o All fiber cables must be Multi Mode cables.
o ST termination on the fiber patch panel.
o A drawing is attached that illustrates the fiber cable lengths.
Civic Centre – Total of 490m of cable between 4 rooms
24Hr Centre – Total of 300m of cable between 4 rooms
o The following items and quantities are required:
Civic Centre
From the Server Room to the Switch Room Ground Floor
o Server Room
110m x 8 Core Fiber optic cable
1 x 24 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
o Switch Room Ground Floor
1 x 12 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
From the Server Room to the Health Office – 1st Floor
o Health Office
90m x 8 Core Fiber optic cable
1 x 12 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
From the Server Room to the Switch Room – 2nd Floor
o Switch Room
115m x 8 Core Fiber optic cable
1 x 12 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
From Switch Room Ground Floor to Health Office 1st Floor
o 135m x 4 Core Fiber optic cable
From Health Office 1st Floor to Switch Room 2nd Floor
o 40m x 4 Core Fiber optic cable
24Hr Centre
From Server Room to Traffic Office 1st Floor
o Server Room
100m x 8 Core Fiber optic cable
1 x 24 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
o Traffic Office – 1st Floor
1 x 12 Port ST Fiber Patch Panel
1 x Brush Panel Long Black
From Server Room to Licence Office Ground Floor
o Licence Office – Ground Floor
100m x 8 Core Fiber optic cable
1 x 12 Port ST Fiber Patch Panel
1 x Brush Panel Long Black
From Server Room to Radio Room Ground Floor
o Radio Room
30m x 4 Core Fiber optic cable
1 x 4 Port ST Fiber Patch Panel
2 x Brush Panel Long Black
Installation of the above mentioned cables may only be installed from Friday 14:00 to
Sunday 19:00. No one will be allowed to do installations on any hours beyond these
mentioned hours.
Additional items are included in the price schedule. These items are just for supply
and delivery.
Site meeting:
o A site meeting will be held on 10 May 2012 @ 10h00 in Room D212 (Technical
and Facilities board room) at the Civic Centre in Wanderers Street,
Middelburg for clarity purposes.
o The attendees will be taken to the different rooms where the cables need to
be installed.
o This site meeting is not compulsory. If you have visited the site on a previous
occasion and you are acquainted with the setup, you need not attend the site
meeting.
When:
o Installation of all the cables must be completed within 4 weeks after the
Municipal stores have issued the order.
Responsibilities:
o The successful supplier will be responsible for:
The supply of all the relevant material needed to install the fiber optic
cables
Opening and Closing of the roof where the cable must be installed
Splicing the cables on the patch panels
Supply test certificates to prove that the installation is correct
Method of acquisition:
o The supply and installation of the infrastructure will be purchased from the
supplier and it will become the asset of the Steve Tshwete Local Municipality.
o Full payment for the equipment will be done 30 days after the invoice was
handed to the Municipal Stores.
Pricing schedule:
o Please write your quotation on a company letterhead in the following format:
Item
Total Total
Item Order Quantity Vat
Excl VAT Incl VAT
Code
Supply and installation of Fiber Optic
cable at the Civic Centre as per 1
description above
Supply and installation of Fiber Optic
cable at the 24Hr Centre as per 1
description above
12U, 500 Deep, 19” Black Cabinet –
1
Swing frame
6U, 500 Deep, 19” Black Cabinet –
15
Swing frame
1U 19” brush panel, 250mm deep,
12
black
1U 19” brush panel, 100mm deep,
15
black
3m Duplex Patch cord with LC to LC
24
connectors, yellow in colour
2m Duplex Patch cord with ST to LC
7
connectors, orange in colour
1m Duplex Patch cord with ST to LC
5
connectors, orange in colour
1m Duplex Patch cord with ST to ST
6
connectors, orange in colour
Total
GENERAL NOTES:
1. Written quotations should be submitted to the office of the Corporate Services, room
C318, Second Floor, Civic Centre, Wanderers Avenue, Middelburg not later than 12:00
on the 16th of May 2012.
For any queries, please contact Marius Britz, telephone 013 249 7376 / 082 895 8743.