Price Schedule For Goods Offered From Within The Philippines
Price Schedule For Goods Offered From Within The Philippines
_________________________________________________________________________________________________________
For Goods Offered from Within the Philippines
Name of Bidder: SULU LUMBER & CONSTRUCTION SUPPLIES Project ID No. Kalingalan Caluang 2021-10
1 2 3 4 5 6 7 8 9 10
Transportatio Sales and Cost of
n and all other other taxes Total Price
Item Unit Price Incidental Total Price,
Country of costs payable if delivered Final
Numbe Description Quantity EXW per Services, if per unit (col
Origin incidental to Contract is Destination (col
r item delivery, per awarded, per applicable, 5+6+7+8)
9) x (col 4)
item item per item
1 Project Billboard Philippines 15,000
4.00 3,750.00 3,750.00 .00
a. 1/4"x4x8' Plywood - 1 pc
b. 2"x2"x10' Coco lumber - 80 bd. Ft.
c. Assorted C.W. Nail - 1 kgs
d. 32 sq. ft - tarpaulin
2 Occupational Safety and Health
174.00
a. First-aid Medicine kit - 1 set 2,60
2,600.00 2,600.00 0.00
b. Construction Safety Shoes - 25 pair 37,200
1,488.00 1,488.00 .00
c. Construction Safety helmet - 25 pcs 8,75
350.00 350.00 0.00
d. Dust mask - 100 pcs Philippines 8,00
80.00 80.00 0.00
e. Safety Gloves - 25 pair 5,00
200.00 200.00 0.00
f. Safety Spectacles - 25 pcs 7,50
300.00 300.00 0.00
g. Reflectorized vest - 25 pcs 1,87
75.00 75.00 5.00
h. Safety boots - 25 pair
- -
3 Aggregate Sub-base Course (Gravel Philippines 2,806.00 2,188,000.
2") 679.76 100.00 779.76 00
4 Aggregate base Course (Gravel 3") Philippines 1,270.00 990,600
680.00 100.00 780.00 .00
5 Common Borrow Philippines 9,563.00 7,220,065.
655.00 100.00 755.00 00
6 PCC Pavement 12,200.00
- -
a. Reinforcing Steel Bar (10 mm) - 419,680
5,246 kg 80.00 80.00 .00
b. Curing Compound - 3,538 lit. 424,560
120.00 120.00 .00
c. Asphalt Sealant - 1,464 lit. Philippines 117,120
80.00 80.00 .00
d. Steel Forms - 5,612 ln.m. 549,976
98.00 98.00 .00
e. Sand - 1,544 cu.m. 3,396,800.
2,150.00 50.00 2,200.00 00
f. Gravel - 2,806 cu.m. 7,015,000.
2,400.00 100.00 2,500.00 00
g. Cement - 26,718 bags 9,084,120.
330.00 10.00 340.00 00
h. Concrete Saw (diamond blade 14") - 16,400
2 pc 8,200.00 8,200.00 .00
i. Pipe Sleeve, 2" dia. - 87 ln.m. 3,91
3,915.00 3,915.00 5.00
j. Greaser/Tar - 107 ln.m. 34,240
34,240.00 34,240.00 .00
7 Warning Sign
10.00 - -
a. Portland Cement - 6 bags 62,000
6,180.00 20.00 6,200.00 .00
b. Sand - 1 cu.m.
- -
c. Gravel - 1 cu.m.
- -
d. Form lumber, Good (4 uses) - 24 Philippines
bd.ft. - -
e. 3" diameter GI Pipe - 38 meter
- -
f. Plate - 24 kg
- -
g. Bolts, 5 mm dia. - 144 pcs
- -
h. Sign face, 3 mm thick aluminum
sheet - 12 pcs - -
i. Assorted CWN (1 kg/100 bd.ft of
lumber) - 1 kg - -
8 Pavement Markings (White) Philippines 248,062
450.00 501.25 50.00 551.25 .50
9 Service Vechicle Maintenance
80.00 - -
a. Diesel (20 lit./day) - 1,600 Lit. Philippines 80,000
40.00 10.00 50.00 .00
b. Motor oil (2 lit./day) - 12.00 Lit. 2,04
170.00 170.00 0.00
10 Tress (Furnishing)
- -
a. Tress (Acacia, Talisay, Pine Tree)(3 24,000
feet) - 16 pcs 1,500.00 1,500.00 .00
b. HDPE Plastic Netting, Philippines 16,000
25mmx25mmx5mm THK - 16 ln.m. 1,000.00 1,000.00 .00
c. Plastic Cable Ties, 2.5mmx100mm - 28
240 pc 288.00 288.00 8.00
d. 9mm thick Steel bar - 32 kg 4,19
131.20 131.20 8.40
11 Solar LED Street lights
16.00 - -
a. Marine Plywood (1/2"x4'x8') - 8 pcs 5,60
700.00 700.00 0.00
b. Good lumber (2"x2"12') - 154 bd.ft 7,70
50.00 50.00 0.00
c. Assorted CW Nails - 5 kg 37
75.00 75.00 5.00
d. Gravel - 8 cu.m. Philippines 20,000
2,500.00 2,500.00 .00
e. Sand - 3 cu.m. 6,60
2,200.00 2,200.00 0.00
f. Cement - 48 bags 16,320
340.00 340.00 .00
g. G.I. Tie wire #16 - 11 kg 90
82.00 82.00 2.00
h. 16mm dia. RSB, G60 - 197 kg 15,760
80.00 80.00 .00
i. 12mm dia. RSB, G40 - 213 kg 17,040
80.00 80.00 .00
j. 10mm dia. RSB, G40 - 136 kg 10,880
80.00 80.00 .00
k. Anchor bolt with nuts & washers 9,92
(19mm dia. x 457) - 64 pcs 155.00 155.00 0.00
l. Tapered G.I. Pipe (75mm dia. top, 40,000
125mm dia. bot.) - 16 pcs 2,500.00 2,500.00 .00
m. Base plate (16mm thick) - 126 kg 53,241
422.55 422.55 .67
n. Rib steel plate (12mm thick) - 82 kg 26,240
320.00 320.00 .00
o. Welding rods - 1 kg 10
100.00 100.00 0.00
p. LED 60 watts (8700 lumens) - 16 528,000
pcs 33,000.00 33,000.00 .00
12 Tubular Markers Philippines
a. Portland Cement - 10 bags 60.00
b. Gtavel - 2 cu.m.
c. Sand - 1 cu.m.
d. 10mm dia. RSB - 28 kg
e. 75mm dia. G.I. Pipe x 6m - 15 pcs
f. Form lumber - 80 bd.ft.
g. Warning Tape - 5 roll
h. Reflectorized 3" - 120 ft.
i. Reflectorized Paint - 5 gal.
58,943
962.39 20.00 982.39 .16
32,800,611.
Total 73
Total exclusive of 5% tax 31,238,677.
84
Tax 5% 1,561,933.
89
32,800,611.7
Total 3
Name: ______________________________________________________________________
Legal Capacity: _______________________________________________________________
Signature: ___________________________________________________________________
Duly authorized to sign the Bid for and behalf of: ____________________________________