Professional Documents
Culture Documents
Account/Client Code:
Company Name: RE SINILOAN
Branch: MUNICIPAL PLAZA, BRGY. BAGUMBARANGAY, SINILOAN, LAGUNA
Address: MUNICIPAL PLAZA, BRGY. BAGUMBARANGAY, SINILOAN, LAGUNA
Contact Person: C/O SALES
Contact No.: C/O SALES
Sales Person: RST
Prepared By: CERJJ RALPH JASON J. JACINTO
Project Scope: Vertical Drop, Termination, Testing and Activation of 15 cameras, DVR, HDD, Monitor and UPS
Remarks:
< Option Number: 1 >
< With Plan: YES >
< With Ocular: YES >
< CE#: 22-000XXX >
Labor 20.00 1
Unit Price Remarks
Labor (3 Day/s x 2 Installer/s)
Labor 20.00 2 personnel per day 3
Labor Unit Price Remarks
Labor (10 Day/s x 1 Technical/s)
Labor 60.00
Labor 250.00
Labor 5,000.00
Labor 2,000.00
Labor 4,000.00
Labor 5,000.00
Labor
Labor
Labor 1,500.00
Labor 600.00/day
Labor
TOTAL
BREAKDOWN:
BULLET 0
DOME 0
PTZ 0
TOTAL 0
LAN EXTENDER
FLOOR LEVEL
1
2
3
4
5
TOTAL
TOTAL PLUS 10%
FLOOR LEVEL
1
2
3
TOTAL
TOTAL PLUS 10%
FLOOR LEVEL
1
2
3
TOTAL
TOTAL PLUS 10%
GI Clamp
Pipe Hanger
Anchor Drop 5/16
Threaded Rod 5/16
GRAND TOTAL
GI Clamp
Pipe Hanger
Anchor Drop 5/16
Threaded Rod 5/16
Cement
Sand
Gravel
Water
Volume of Concrete Mix (C+S+G+W)
Reference:
CABLES (LENGTH ARE IN METERS)
0
7150
ROUGHING INS
EMT / IMC 1/2 EMT / IMC 3/4 EMT / IMC 1 EMT / IMC 1-1/2
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
EMMBEDD
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Bags m3
Cement 0
Sand 0 0
Gravel 0 0
https://theconstructor.org/concrete/calculate-quantities-of-materials-for-concrete/10700/
ARE IN METERS)
0 0 0
0
Cat6 UTP 0
Panduit 305/roll 0
RG6 Coax 0
Philflex 305/roll 0
THHN 3.5 0
Phelps dodge 150/roll 0
TF# 18 0
Philflex 150/roll 0
FOC Homerun 0
0
EMMBEDDED PIPE
PVC 1/2 PVC 3/4 PVC 1
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
PIPE 2
0
0
0
0
0
0
0
PVC 1-1/2 PVC 2
0 0
0 0
0 0
0 0
0 0
0 0
0 0 % safety factor can be adjust
0 0
0 0
0 0
0 0
for Restoration B
0
he Pipe will use
Color
Red
Black
Green
White
Yellow
Blue
Orange
Aqua Blue
N/A
Size
#18 AWG
#16 AWG
2.0mm2
3.5mm2
5.5mm2
8.0 AWG
50uM-MM
9uM-SM
N/A
SCOPE OF WORK
Vertical Drop, Termination, Testing and Activation of 15 cameras, DVR, HDD, Monitor and UPS
DETAILED SCOPE OF WORK: NEW PROJECT _______√________ ADDITIONAL _______________ REVISION _______________
V.OTHERS (Data Cabinets, Riser location, Terminal locations, Monitoring Rooms, etc.):
DVR/ CCTV Monitoring is located at Back Office