III.21 Risk analysis guide for vehicle and machinery traffic (pages 212 to 217)
Activity phases
The prevention measures of this guide apply to all vehicle and machinery traffic (trucks, vans, cranes,
mechanical diggers, etc.).
Questioning
If the answer to the following questions is yes, check the corresponding box.
For each box checked, define at least one suitable preventive measure in the following "preventive
measures" table.
I-1 Are there personnel aged under 18?
I-2 Is medical fitness required for the work?
I-3 Are supervisory personnel required?
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
Questioning
If the answer to the following questions is yes, check the corresponding box.
For each box checked, define at least one suitable preventive measure in the following "preventive
measures" table.
Ta-1 Does the work require locking out (electrical or fluid)?
Ta-2 Does the work require means of communication?
Ta-3 Does the work involve the use of excavation machinery?
if so, also complete the risk analysis guide for excavation or earthwork
Ta-4 Does the work involve handling heavy or bulky items?
if lifting as defined in chapter II.9.1 of the HSE Prevention Plan -, also complete the risk
Task analysis guide for lifting works
Ta-5 Does it involve fuel supplies?
if so, also complete the risk analysis guide for fuel replenishment
Ta-6 Does the work generate waste?
Ta-7 Other:
Ma-1 Does the equipment used need to be checked regularly by the user?
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
En-1 Is there is a risk of hitting overhead equipment for vehicles with "variable
geometry" (crane, mechanical digger, etc.)?
En-2 Is there a risk of collision with sensitive equipment by the vehicles/machinery?
En-3 Does the work generate disturbances for local residents?
En-4 Are there sewage systems nearby?
En-5 Is the work performed at weekends or on public holidays?
En-6 Is the work performed outdoors?
En-7 Is the work performed close to hazardous substances?
En-8 Is the work performed close to moving machinery?
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
Action to be performed by
Prevention measures
(specify the reference of the question – e.g.: I-1, Ta-2 , etc. - alongside the checked boxes)
EC UC
Personnel authorised to: Drive the company truck or salon car:
Raphael Teyie
Verify compatibility of products entering the site with those already on
the site (other Contractors, operations, etc.)
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
Wearing of the following protection for the respiratory tracts: N95
Wearing of protective gloves compliant with current standards against
risks
Wearing of 100% cotton or synthetic work clothes compliant with
current anti-static standard
Action to be performed by
Prevention measures
(specify the reference of the question – e.g.: I-1, Ta-2 , etc. - alongside the checked boxes)
EC UC
Wearing of protective overalls compliant with current standards against
risks:
Make sure that the site does not disturb local residents (where
applicable, inform them)
Only use diesel engine vehicles, equipped if necessary with a spark
arrester, within the station
Park non-diesel engine vehicles and vehicles not fitted with a spark
arrester on the visitor parking lot
Observe the traffic plan defining the work areas and authorised traffic
areas
Observe the highway code and speed limit on the site
Park vehicles at locations provided and in the "ready to leave"
direction, keys in the ignition
Priority to emergency vehicles and vehicles that are going to be loaded
in the depot
HSE prevention plan applicable to work and services
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
Vehicles and site machinery equipped with a buzzer to indicate
reversing
Ensure that the access paths are clear before using them with a load
Schedule all necessary absorbent and/or recovery materials in case of
an accidental spillage
Install dustbins (or other identified recipients) to collect gloves, rags,
dirty paper, etc.
Disposal of the following waste by the Contractor
Depots for the following waste: on site, in the following bins
Additional measures EC UC
Revision: 01 Revision: 01
PSR/HSE/MS/AFR PSR/HSE/MS/AFR
TEMPLC/PP/CCTV/KDRB/2/2023/001
site Excavation permit
Acknowledgement of receipt of instructions
signed by all personnel from the EC
Operating procedure(s):