Professional Documents
Culture Documents
30THK GRATING
8.ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH PROJECT
SPECIFICATION DOC No. 101591PF-C-G0-G000-CI-SPC-1001.
0.50m
9.ALL BACKFILLING AND SUBGRADE SHALL BE COMPACTED TO 95%
4.60m
0.20m 0.300 concrete protection OF MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT
OBTAINED IN ACCORDANCE WITH MODIFIED PROCTOR TEST PER
0.100
ASTM 1557. THE CONTRACTOR SHALL USE PROPER METHOD OF
50mm blinding COMPACTION TO ACHIEVE THE REQUIRED COMPACTION
4.60
PERCENTAGE.
200
4.60m
1.00m Detail 3
2.15m
pre cast part 2
0.60m
02 02
Detail 3
2
Section B-B
REFERENCE DOCUMENTS
2.15
Detail 3
1.00m pre cast part 2 3.20m
0.80m
1.85m
02
1.355m 2.15m 02
02
02 02
0.40m
02 4.60m