LATEST Attempt 1 37 minutes 24 out of 35
Question 1 1 / 1 pts
Who shall have the primary duty to effectively enforce the provisions of
RA 9266 as provided in Sec. 44?
DILG
DPWH
Correct! PRC-PRBoA
UAP-IAPOA
Question 2 1 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 1/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Under what article of RA 9266 are the provisions with regards the signing
of architectural documents limited to architects and the ownership of plans
of the architect?
Art. I
Art. II
Art. III
Correct! Art. IV
Question 3 1 / 1 pts
contract documents by the architect?
Section 29
Section 40
Correct! Section 33
Section 20
Question 4 1 / 1 pts
The architect who is directly and professionally responsible for the total
design of the project for the client.
https://canvas.instructure.com/courses/6975801/quizzes/14491056 2/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Specialist Architect
Principal Architect
Project Architect
Correct! Architect-of-Record
Question 5 1 / 1 pts
The architect who shall assume the civil liability for the plans,
specifications and contract documents he/she has signed and sealed.
Correct! Architect-of-Record
Consulting Architect
Specialist Architect
Architect-in-charge of Construction
Question 6 0 / 1 pts
The architect who is directly and professionally responsible and liable for
the construction supervision of the project.
Professional Consultant
Expert Professional
https://canvas.instructure.com/courses/6975801/quizzes/14491056 3/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Question 7 0 / 1 pts
Structural system
Structural analysis
Question 8 1 / 1 pts
Schematic design
https://canvas.instructure.com/courses/6975801/quizzes/14491056 4/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Space planning
Question 9 1 / 1 pts
Under Space Planning, the Architect determines the adequate size and
appropriate configuration and assemblage for a proposed project in
consideration of these 3 elements of spaces for given activities.
Question 10 1 / 1 pts
Lot location
Owner’s budget
Lot description
https://canvas.instructure.com/courses/6975801/quizzes/14491056 5/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Question 11 1 / 1 pts
Estate Planning
Physical Planning
Master Planning
Question 12 1 / 1 pts
The space planning, architectural lay-outing and utilization of spaces
within and surrounding a specific building / structure in relation with the
existing natural and/or built environments.
Complex Planning
Master Planning
Question 13 0 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 6/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Architectural programming
Question 14 0 / 1 pts
recommended professional fee for architectural interiors (A.I.) is how
much of the cost of architectural interiors work?
12-15%
7-12%
ou Answered 5-10%
Question 15 0 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 7/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
PhP 120,000.00
PhP 500,000.00
Question 16 0 / 1 pts
interiors for a restaurant project. It was submitted and accepted by the
client. The estimated cost of A.I. work is PhP 5.0 M. How much should the
Client pay him afterwards?
PhP 225,000.00
PhP 300,000.00
Question 17 1 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 8/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
The Architect shall assist the proper third parties in seeing to it that all
equipment (air-conditioning, sprinkler system, generators, transformers,
telecommunications equipment, etc.) are properly maintained and in good
working condition.
Building Maintenance
Question 18 1 / 1 pts
The architect shall evaluate the initial design program vs the actual use of
the facility and study, research, and give solutions to any discovered/
emerging/ evolving defects and failures such as shrinkage, water seepage
and other problems in the building.
Post-Construction Investigation
Post-Construction Assessment
Post-Construction Supervision
Question 19 1 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 9/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Retainer
Lump Sum
Question 20 1 / 1 pts
For post-construction services, the Architect may enter a contract with the
Owner as:
Construction manager
Architect-of-record
Architect manager
Question 21 1 / 1 pts
Norms that instill moral and professional standards, principles and values
such as justice, honesty and responsibility among others to which
professionals aspire and by which their actions can be judged.
https://canvas.instructure.com/courses/6975801/quizzes/14491056 10/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Standards of practice
Professional practice
Professional regulation
Question 22 1 / 1 pts
Permit issued by the Building Official for activities being undertaken prior
to or during the processing of the building permit.
Building
Occupancy
Ancillary
Correct! Accessory
Question 23 1 / 1 pts
https://canvas.instructure.com/courses/6975801/quizzes/14491056 11/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Construction
Accessory
Correct! Building
Ancillary
Question 24 1 / 1 pts
Construction logbook
Certificate of completion
Question 25 0 / 1 pts
The portion of a roadway or public way that should be kept open and
unobstructed at all times for the expedient conduct of firefighting
operations.
Fire area
https://canvas.instructure.com/courses/6975801/quizzes/14491056 12/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Hazard zone
Question 26 0 / 1 pts
Fire area
Fire barrier
Question 27 1 / 1 pts
Spray booth
https://canvas.instructure.com/courses/6975801/quizzes/14491056 13/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Spraying area
Question 28 1 / 1 pts
Question 29 1 / 1 pts
35
Correct! 30
25
40
https://canvas.instructure.com/courses/6975801/quizzes/14491056 14/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Question 30 0 / 1 pts
For public telephones, the dialing controls, coin slots, receivers, and
instructional signs shall be located at a maximum height of ____ from the
finish floor. (BP 344)
1500 mm
ou Answered 1400 mm
1000 mm
Question 31 0 / 1 pts
Parking size for SUV?
3.0m x 6.5m
2.5m x 6.5m
https://canvas.instructure.com/courses/6975801/quizzes/14491056 15/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Question 32 1 / 1 pts
Correct! 10 m
20 m
16 m
14 m
Question 33 1 / 1 pts
Minimum lot area for single detached in a subdivision for 20 families and
above.
120 sqm
150 sqm
180 sqm
https://canvas.instructure.com/courses/6975801/quizzes/14491056 16/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
Note: PD 957 minimum lot area for single detached medium cost is
100 sqm and for open market is 120 sqm.
Question 34 0 / 1 pts
Minimum lot area for an interior lot in a subdivision for 20 families and
above.
150 sqm
120 sqm
orrect Answer 100 sqm
Question 35 1 / 1 pts
460 mm
440 mm
450 mm
Correct! 480 mm
https://canvas.instructure.com/courses/6975801/quizzes/14491056 17/18
6/5/23, 11:20 PM Special Coaching Area 1 Quiz Part 1B: SPECIAL COACHING
https://canvas.instructure.com/courses/6975801/quizzes/14491056 18/18