(V2014-V1.0)
Site ID JAW-EJV-0035-M-B
Vendor ID ZTE_7214/ZSBY_0664
Site Name KLAMPIS/KEPUTIH
Site Address Jl. Keputih Perintis Kavling No.61, Kel. Keputih,
Kec. Sukolilo, Kab. Surabaya
Subcon Company PT. GCI INDONESIA
Surveyor BAMBANG
Survey Date 7-Jan-15
ZTE CORPORATION
Site Survey Report (LTE Site)
1. Current Information
1.1 Site information
Survey
Survey Contents
Items
Site ID: ZTE_7214/ZSBY_0664 Site Name: KLAMPIS/KEPUTIH
Site locatin
Address: Jl. Keputih Perintis Kavling No.61, Kel. Keputih, Kec. Sukolilo, Kab. Surabaya
information
Longitude (E): 112.80116 ° Latitude(S): -7.28882 °
Property type Equipment room location Installation type
High rise building Roof Fan room Shelter
Government premises Platform Pump room Equipment room
Site Public housing estate Water tank Meter room ✘ Cabinet
environment
checking ✘ Village type housing Floor no.: CTER
The link Elevator room Other :
Private shopping arcade Need to climb ladder
Other: ✘ Other : Greenfield
Site attach Smart Mobile 8 ✘ Tower Provider: PROTELINDO
Defined by coverage Indoor ✘ Outdoor
Defined by equipment location Indoor ✘ Outdoor
Site type: Rooftop ✘ Greenfield BSC&RNC&CN
Site type Tower type: Angular ✘ Tubular Mini Pole Others:
Tower/Pole Height (mAGL) 43 M Building Height: (mandatory when using rooftop site)
Wiring way of cable: Not Applicable ✘ Applicable, Way of Installation :
Existing anti-static floor Available ✘ Not Available
Height of anti-static floor _____ cm Anti Static Floor Connected to _______________
Access Restriction Yes ✘ No Specific Reason: Only name in permit can access
Twenty-four hours ✘ Yes No Specific time:
Prior appointment for access ( person to be informed before site access )
✘ Yes No
Contact: Protelindo Helpdesk team as permission letter
Site access Phone: 0800-1-009900
information Fax: Day before :
Need Access Key ✘ Yes No
Need Landlord Key Yes ✘ No
Site access key
Need Other Access Key Yes ✘ No
Please specific:
Equipment delivery method Lift Stairs ✘ Other : Direct
Remarks
Tower/Pole No. Diameter antenna Height Ant. Type Pole number Azimuth
Transmissio 1 0.3 37 WTC03-7214DAR Leg A 30
n 2
3
4
IDU Brand Capacity FE Site ID
1 ZTE 50 SBY_01N033 283.46
2
3
4
Existing Length Pole GPS: 30 cm
GPS Length Of GPS Cable to BTS: 18 m
System GPS Antenna Height: 8 mAGL
- Grounding bar 1 outdoor Spare = 8 port
- Grounding bar 2 outdoor Spare = 12 port
Remarks - Grounding bar 3 outdoor Spare = 11 port
- Grounding bar 4 outdoor Spare = 12 port
- Battery not yet finish installed on progress installed
Remarks
M5-2: Co_located with existing BS8900 site,TDD+FDD, New power system.Proposed BC8910A+PC8910A which house the BBU and IPRAN if any.Proposed
3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M6-1: Co_located with existing BS8800 site,TDD+FDD, Reuse power system. Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE.
TDD&FDD share dual-band 6 ports antennas. For BBU installation,it depends on existing situation, it could be installed in existing 19"rack if
it's available, or it could be installed in new BC8181A BOX on wall or new 19" rack if space available.
M6-2: Co_located with existing BS8800 site,TDD+FDD, New power system. Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE.
TDD&FDD share dual-band 6 ports antennas. For BBU installation,it depends on existing situation, it could be installed in existing 19"rack if
it's available, or it could be installed in new BC8181A BOX on wall or new 19" rack if space available.
M7: Co_located with existing BS8906E site,TDD+FDD, New power system. Proposed one power rack(ZXDU48 H002) which could house the BBU and
IPRAN if any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M8-1: Co_located with existing CBTS12 Indoor site,TDD+FDD, Reuse power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M8-2: Co_located with existing CBTS12 Indoor site,TDD+FDD, New power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M9: Co_located with existing CBTS12 Outdoor site,TDD+FDD, Reuse power system.Proposed one intergrated rack(ZXDU48 Outdoor Rack) which
house the BBU and IPRAN if any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M10-1: Co_located with existing SAMSUNG Indoor site, TDD+FDD, Reuse power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M10-2: Co_located with existing SAMSUNG Indoor site, TDD+FDD, New power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M11-1: Co_located with existing SAMSUNG Outdoor site,TDD+FDD, Reuse power system.Proposed one intergrated rack(ZXDU48 Outdoor Rack) which
house the BBU and IPRAN if any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
Site Model M11-2: Co_located with existing SAMSUNG Outdoor site,TDD+FDD, New power system.Proposed BC8910A+PC8910A which house the BBU and IPRAN if
summary any.Proposed 3*RRU(R8964)for TDD LTE,proposed 3*RRU(R8862A) for FDD LTE. TDD&FDD share dual-band 6 ports antennas.
M12-1: Co_located with existing BS8900 site,FDD only, Reuse power system.Proposed one intergrated rack(ZXDU48 Outdoor Rack) which house the
BBU and IPRAN if any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M12-2: Co_located with existing BS8900 site,FDD only, New power system.Proposed BC8910A+PC8910A which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M13-1: Co_located with existing BS8800 site,FDD only, Reuse power system.Proposed 3*RRU(R8862A) for FDD LTE. FDD use singal-band 4 ports
antennas. For BBU installation,it depends on existing situation, it could be installed in existing 19"rack if it's available, or it could be
installed in new BC8181A BOX on wall or new 19" rack if space available.
M13-2: Co_located with existing BS8800 site,FDD only, New power system.Proposed 3*RRU(R8862A) for FDD LTE. FDD use singal-band 4 ports
antennas. For BBU installation,it depends on existing situation, it could be installed in existing 19"rack if it's available, or it could be
installed in new BC8181A BOX on wall or new 19" rack if space available.
M14: Co_located with existing BS8906E site,FDD only, New power system.Proposed one power rack(ZXDU48 H002) which could house the BBU and
IPRAN if any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M15-1: Co_located with existing CBTS12 Indoor site,FDD only, Reuse power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M15-2: Co_located with existing CBTS12 Indoor site,FDD only, New power system.Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M16: Co_located with existing CBTS12 Outdoor site,FDD only, Reuse power system. Proposed one intergrated rack(ZXDU48 Outdoor Rack) which
house the BBU and IPRAN if any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M17-1: Co_located with existing SAMSUNG Indoor site,FDD only, Reuse power system. Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M17-2: Co_located with existing SAMSUNG Indoor site,FDD only, New power system. Proposed one 19" rack which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M18-1: Co_located with existing SAMSUNG Outdoor site,FDD only, Reuse power system. Proposed one intergrated rack(ZXDU48 Outdoor Rack)
which house the BBU and IPRAN if any.Proposed 3*RRU(R8862A) for FDD LTE. FDD use single-band 4 ports antennas.
M18-2: Co_located with existing SAMSUNG Outdoor site,FDD only, New power system. Proposed BC8910A+PC8910A which house the BBU and IPRAN if
any.Proposed 3*RRU(R8862A) for FDD LTE.FDD use single-band 4 ports antennas.
M19: For existing indoor DAS site,TDD only, New power system.Proposed one 19" rack which house the BBU and IPRAN if any.Proposed
2*RRU(R8964) for TDD LTE. Reuse existing antenna & distribution system, add combiner only.
M20: For shooting site solution,FDD only,Reuse power system.Proposed one intergrated rack(ZXDU48 Outdoor Rack) which house the BBU and
IPRAN if any.Proposed 1*RRU(R8862A) for FDD LTE. FDD use single-band 2 ports antennas.
M21:For Pico Site
Remarks
ACPDB-BS8800/8900/ZXDU48 AC Length(m): 15 m
BS8800/8900/ GND cable length (m): 10 m
Indoor/Outdoor Cable type Sct1 Sct2 Sct3 Sct4 Sct5 Sct6
DC BBU - RRU power cable Length(m) 2*50 2*50 2*50
Cable BBU - RRU Fiber cable Length(m) 2*50 2*50 2*50
Jumper cable (RRU to Ant.) Length(m) 3*6 3*6 3*6
RRU GND - Grounding Bar cable length(m): 3*5 3*5 3*5
New vertical cable tray required: Yes ✘ No length:
Feeder cable tray
New horizontal cable tray required: Yes ✘ No length:
Length Pole GPS 30cm
Proposed
GPS Length Of GPS Cable to BTS 18 m
System (if GPS Antenna Height 8m
any)
Cable type ✘ Φ9mm 1/2" 7/8"
Delete antenna
Ant. No. Pole Ant. Model Ant. Pole Ant. Model Ant. Pole Ant. Model
No. No. No. No. No.
1
2
3
4
Antenna
suggestion Add antenna
(preliminary New Pole Ant. Model Pole height(m) Ant. height (m) Azimuth (°) Downtilt (°) Remark
stage) Ant. No.
N1 1 CVV65CSX-M 37 0 9 Leg A
N2 3 CVV65CSX-M 37 120 5 Leg B
N3 4 CVV65CSX-M 37 240 5 Leg C
N/A N/A
N/A N/A
N/A N/A
Remarks
3. Site Photo
3.1 Site Overview Photo
DC CURENT LOAD
53.8 V 7.8 A
Existing DCPDB external (at another rectifier rack) Existing Battery System
EN 0° EN 30°
EN 60° EN 90°
EN 120° EN 150°
EN 180° EN 210°
EN 240° EN 270°
EN 300° EN 330°
Proposed new
Cabinet for LTE
Proposed New Cabinet for LTE Proposed New Vertical Cable Ladder For Cabinet
Proposed Cable Routing for LTE Proposed New Inlet for LTE
Proposed Reuse existing IGB for LTE (Indoor) Proposed Reuse Existing MGB on Tower for LTE
(Outdoor)
Proposed New
Antenna LTE
Proposed New RF Antenna & RRU Proposed New GPS Antenna for LTE
Proposed new
Power System For
LTE
Proposed new
Battery 8 block
Proposed new rack for ODF/OTB Proposed Jumper Cable from Antenna to RRU
Note :
1. Address : Jl. Keputih Perintis Kavling No.61, Kel. Keputih, Kec. Sukolilo,
Kab. Surabaya
2. Coordinate : Longitude = E 112,80116
Latitude = S-7.28882
Page 15
4.2 Site Layout
19200
1500 2900 2100 3700 9000
1800
1800
3000
865
1600
1150
9465
5400
3464
AC 3
AC 1 AC 2
1701
1400
Page 16
4.3 Equipment Room Layout and Cable Routing
Page 17
4.4 Antenna Placement
EXISTING SMARTFREN
EXISTING SMARTFREN
AZ : 30 °
SECTORAL ANTENNA
ON ± 37.00 M.A.G.L ON ± 37.00 M.A.G.L
EXISTING MW Ø0.3
ON ± 37.00 M.A.G.L
EXISTING SMARTFREN
MB2F/3F-65-17/18DE10/8
SECTORAL 1
DOWNTILT : 0 AZ : 60 °
ON ± 37.00 M.A.G.L
PROPOSED ANTENNA
CVV65CSX-M
SECTORAL 1
DOWNTILT : 3 AZ : 0 °
ON ± 37.00 M.A.G.L
Page 18
Tower SST 43 m
EXISTING GPS PROOSED GPS
ON ± 8.00 M.A.G.L ON ± 8.00 M.A.G.L
Tower SST 43 m
Page 19