TDoc - 013 - METHOD STATEMENT FOR EXCAVATION AND BACKFILLING
TDoc - 013 - METHOD STATEMENT FOR EXCAVATION AND BACKFILLING
Planners
CONTRACT SUBMITTAL
Golf Residential Community-DAMAC TDoc-013 (00)
DESCRIPTION: REF. No.:
PROJECT
PROJECT NAME: Golf Residential Community-DAMAC 3045
NUMBER:
Rev.
Rev. Date No. of Pages Description Prepared By: Approved By
No.:
Issued to the
09/12/13 00 12 pages Engineer for A.Karim Ahmed C.M Ammar P.M
approval
_____________________________________________________________________________________________
Page 1 of 6
Ghantoot Gulf Contracting Naga Architects, Designers & DAMAC Properties
Planners
CONTENTS
4.0 RESPONSIBILITIES
5.0 EQUIPMENT
6.0 PROCEDURE
7.0 QA/QC
8.0 SAFETY
9.0 ATTACHEMENTS
_____________________________________________________________________________________________
Page 2 of 6
Ghantoot Gulf Contracting Naga Architects, Designers & DAMAC Properties
Planners
4.0 RESPONSIBLITIES
4.1.1 Ensuring that the work is carriedout as per this method statement.
4.2.1 Different discipline Foremen and other trade will follow this method
statement as directed by Construction Manager/Project engineer and
Engineers.
4.3 QC ENGINEERS
4.3.1 QC Engineers will document all inspections and check lists, and
inspection request will be raised as per the Inspection and Test Plan
_____________________________________________________________________________________________
Page 3 of 6
Ghantoot Gulf Contracting Naga Architects, Designers & DAMAC Properties
Planners
specific to this activity and shall be submitted separately for review and
approval of the Engineer.
4.3.2 All tests required shall be carried out in accordance with Specifications
and Applicable BS codes by an approved Independent Laboratory.
4.3.3 In-situ dry density tests shall be carried out as guided in the table under
Section: 312000 of Earth Moving.
5.0 EQUIPMENT
5.1 Excavator, Tipper, Loader, JCB, Bob Cat, Motor grader, Water Sprinkler,
Pneumatic or Steel wheeled rollers, Plate Compactor etc.
6.0 PROCEDURE
_____________________________________________________________________________________________
Page 4 of 6
Ghantoot Gulf Contracting Naga Architects, Designers & DAMAC Properties
Planners
_____________________________________________________________________________________________
Page 5 of 6
Ghantoot Gulf Contracting Naga Architects, Designers & DAMAC Properties
Planners
7.0 QA/QC
7.1 Relevant quality control documentation as per the approved Project Quality
Plan will be applied to all the aspects of the work.
7.2 Inspection record will be maintained on the prescribed checklist.
7.3 Test Reports once received shall be forwarded to the Engineer and Client
8.0 SAFETY
8.1 Proper PPE shall be used. Dust masks shall be worn while doing the excavation.
8.2 Excavation will be carried out as prescribed in the approved HSEM Plan and all
prerequisite will be met as required and identified in the approved HSEM Plan to
execute the job and excavation permit will be taken to minimise the risk of personal
injury, damage to property and systems interruptions from accidentally striking
underground services etc.
8.3 Material will be stacked at the location agreed with the Engineer.
9.0 ATTACHMENTS
_____________________________________________________________________________________________
Page 6 of 6
Golf Community Villa Doc Number
Refer attachment
3 struck)
Collapse of sides proximity
Personnel in the pit, supervisor 5 5 25 S,SE,PM 1 2 2
4 Lack of access and egress Personnel involved, supervisor 4 4 16 S,SE,PM,CM 1 3 3
Fall of people / material Personnel working / moving around, supervisor, 5 5 25 S,SE,PM,CM 1 3 3
56 Toxic gases Personnel working in pit / moving around, 4 4 16 S,SE,PM,CM 1 3 3
7 Ingress of liquids supervisor,
Personnel working in pit, supervisor 4 4 16 S,SE,PM,CM 1 3 3
8 Inadequate lighting / Personnel working in pit, supervisor 4 3 12 S,SE,PM,CM 1 3 3
9 Ventilation
Slip / Trip Personnel working in pit / moving around, 4 5 20 S,PM,CM 2 2 4
supervisor
PI: Plant in charge PM: Project Manager, CM: Construction Manager, SE: Site engineer, S: Supervisor, O: Operator, BM: Banks
man, SK: Store keeper
Page 1 of 2
Golf community Villa Doc Number
1) Damage to a. NOC from the concerned authority shall be obtained prior to deal
underground services. with the activity.
b. PTW system shall be in place and followed strictly.
c. Sample pits process to be preferred as required.
d. Depth tests to be conducted by competent personnel for any
additional information or suspect ions.
4) Lack of access and a) Safe access and egress to be provided as required (at every 15
egress. meters and depending on the work force).
b) Unambiguous and clear signage to be posted.
5) Fall of people / a) Adequate and rigid fall protections together with toe board to be
material. provided.
b) Suitable signage and flashing lights to be provided.
c) Adequate information to be provided especially for new entrants
and visitors.
6) Toxic gases. a) Gas tests to be carried out and recorded at regular intervals.
b) Construction / other vehicles to be restricted to move near by the
excavation as it emits CO gas which may rest in deep areas.
c) Entry to be restricted in case of any evidence of toxic gases.
d) Signage to be posted.
e) Appropriate personal protective equipment (SCBA) to be
provided to the workmen whilst working in excavation.
Page 1 of 2
Golf community Villa Doc Number
concerned engineer.
c) Signage shall be posted or standby man at the entry shall be
ensured.
8) Inadequate lighting /
ventilation. a) Adequate lighting and ventilation to be provided as required.
b) Purging of air into the excavation by suitable methods.
Page 2 of 2
Golf Community Villa Doc Number
Refer attachment
2 Over turning of equipment’s Personnel in proximity, banks man , supervisor 4 5 20 O,BM,PM,CM 1 2 2
3 Dust exposure ,property
Personnel in proximity, 5 4 20 O,S,,PM CM 1 2 2
4 Hydraulic / Pneumatic Personnel in proximity, contamination of 4 4 16 PI,O,PM,CM 1 2 2
5 failures in
Burying of equipment
construction ground,
Material lying in theproperty
area of back filling 5 4 20 BM,S,PM,CM 1 2 2
6 material
White finger Vibrate roller operator 5 4 20 PI,PM,CM 1 2 2
PI: Plant in charge PM: Project Manager, CM: Construction Manager, SE: Site engineer, S: Supervisor, O: Operator, BM: Banks
man, SK: Store keeper
Page 1 of 1
Golf Community Villa Doc Number
1. Strike from the reversing a) All lifting equipment to be barricaded to restrict personnel
vehicles used for shifting approach.
sand levelling b) Stand by man to be provided. Appropriate signage to be in
place.
c) Adequate lighting and suitable weather conditions to be
ensured.
d) Proper coordination between the rigger and the operator the
lifting equipment by means of suitable communication devices.
e) Avoid blind spots for the operator at the workplace as far as
reasonably practicable.
f) Traffic control marshal shall be provided to monitor and
control all the construction vehicles / equipment entering and
moving at site.
g) All the workmen involved and in proximity to be attentive.
h) Workmen mobbing over the work place to be avoided.
i) Pure coordination to be maintained among the workmen on
ground and the equipment / vehicle/ truck.
2. Over turning of equipment a) Suitable and safe acceleration shall be maintained during job
execution.
b) Ensure the operator is competent.
c) Maintain the speed limit applicable to the ground level
mentioned in manufactures instruction
d) Ensured that proper and periodical maintenance is carried out.
Page 1 of 2
Golf Community Villa Doc Number
Page 2 of 2