You are on page 1of 21
Darras FOUNDATIONS L.L.C. Te E-mail : dalla SHARJAH BRANCH Tel. 009714 - 3834337 Fax : 008714 - 3994778 RO. Box : 20605, Dubai - UAE. (009716 - 8737047 Fax : 009716 - 5737045 Teawyt = FAP ERFY SHAVED rarEyWA, ah Ead = gtd eV e308 dallas@emirates.net.ae zis 5501 ssarzone Date: 101912008, Job No PILE DESIGN & METHOD STATEMENT. 8+G+10 COMM. & RESIDENTIAL FOR MR. MOHD. HUMAID ABDULLA SULTAN DALMOUK PLOT No. 129-194, PORT SAEED BIN DALMOUK CONSULTANTS: M/S. BIN DALMOUK CONSULTANTS CIVIL CONTRACTOR = M/S. TALA CONTRACTING CO. LLC. PILING CONTRACTOR = M/S. DALLAS FOUNDATION L.L.C Prepared By cheesy Renrvez BY tris | Soiawe | —taist | signee | tots! Senate Teas PL-se4 ©: \PLaM4. PILING -REV-B+G+10_TALA-16:10-2008 rontcover DALLAS covnosnonsucc, CONTENTS A. PILE DESIGN At PILELOAD Att Pile Diameter 750 mm A142 Pile Diameter 1000 mm A2 SOIL PROFILE & PILE SECTION 3 PILE BEARING CAPACITY A341 Pile Diameter 780 mm A32 Pile Diameter 1000 mm 3.3 Extract from Soil Report Aa PILE REINFORCEMENT DESIGN A4A PILE STIFFNESS FACTOR A411 Pile Diameter 750 mm ‘A412 Pile Diameter 1000 mm A42__ BENDING MOMENT ALONG PILE DEPTH A421. Pile Diameter 750 mm ‘A422. Pile Diameter 1000 mm A43 CALCULATION FOR REINFORCEMENT ‘A43.1_ Pile Diameter 750 mm ‘A432 Pile Diameter 1000 mm A433. Pile Reinforcement Sketch B. _ PILING SPECIFICATIONS ¢, METHOD CONSTRUCTION OF PILE D. METHOD PILE LOAD TESTING E. PILE INTEGRITY TESTING F. MATERIAL F.1 CONCRETE MIX DESIGN F2 STEEL MILL CERTIFICATE G. REPORT FORMS G1 DAILY PILING REPORT G2 TABULATED LOAD TEST RESULTS ‘sA2000 Oat: 11182008 (C:\PLO84-PILING-REV.B+6+10_TALA5-10.2008: Contents DavraS FOUNDATIONS LLC. PILE DETAILS Pile type Piling system Pile Diameter Pile depth below 0.0 Pile reinforcement Bored, castin situ Bentonite Siury Support 750 mm 20m Main Bars 18 T 20, Spiral TOS - 200 mm cle LOADS FROM STRUCTURE ‘Compression Uplift Lateral Moment Load transferred to the pile Vertical Load = from Structure + Self Wt. Of cap Moment 1494 KN OKN OKN OKNm 1494 KN OKN 1494 KN Where the pilecap consists of more than two piles, moment is resolved as vertical reaction. In the. case of one or two pile group, Tie beam is provided to arrest moment and transfer to other pile cap 2 vertical reaction. Itis understood that all pilecaps are tied with Tie Beam. Therefore the moment from the structure or the eccentric moment due to out of position, are transferred as vertical pile reaction and no moment is transferred on the pile. However where there are single piles and no Tie Beam is not provided, moment from structure is transferred tothe pile Mex Me eM ‘Shoar From Structure OL+LL From Earthquake From out of verticality DESIGN LOAD FOR PILE Vertical Load Shear Moment DALLAS FOUNDATION LLC. Dates: 1rr82008 OkNm 12.05 kNm 192 kN OKN ( moment due to 0.078 m eccentric) TAT KN (5% of vertical load) 19.92 kN 94.62 kN 1494.0 kN 94.62 kN M = 112.05 kNm (according to BS 8004 Section 7.4.2.5.4) PL SEA PILING-REV-26G+10_TALA'S-10.2008: Load 750 DALLAS cooscononsicc PILE DETAILS Pile type Piling system Pile Diameter Pile depth below 0.0 Pile reinforcement Bored, cast in situ Benentonite Slury Support 4000 mm 2730 mm Main Bars 20T 20 Spiral T10 - 200 mm cle LOADS FROM STRUCTURE Compression Uplift Lateral Moment Load transferred to the pile Vertical Load = from Structure = Self Wt. Of cap Moment ‘Where the pilecap consists of more than two piles, moment is resolve 2730 KN OKN ON OkNm 2730 kN GkN D730 kN 1s vertical reaction. In the case of one or two pile group, Tie beam is provided to arrest moment and transfer to other pile cap 2 vertical reaction. Itis understood that all pilecaps are tied with Tie Beam. Therefore the moment {rom the structure or the eccentric moment due to out of position, are transferred as vertical pile reacton and no moment is transferred on the pile. However where there are single piles and no Tie Beam is not provided, moment from structure is transferred to the pile Nx Me eM ‘Shear From Structure DL+LL From Earthquake From out of verticality H DESIGN LOAD FOR PILE Vertical Load Shear H ‘Moment u (OALLAS FOUNDATION LLC. Dates 19192008 OKNm 204.75 kNm 204.8 kNm OKN 198.5 kN 38.4 kN 172.9 KN 2730 KN 172.9 KN 204.75 kNm (‘moment due to 0.075 m eccentric) (5% of vertical load) {according to BS 8004 Section 7.4.2.8.4) PL224 PILING-REV.B+G+10_TALA-16-0:2008 Load 1000 DALLAS sounomorsiic PROJECT 'B+G+10 COMO & RESIDENTIAL, MR. MOHD. HUMAID ABDULLA SULTAN DALMOUK, LOCATION PLOT No, 129-194, PORT SAEED CONSULTANTS : MIS. BIN DALMOUK CONSULTANTS: CIVIL CONTRACTOR : M/S. TALA CONTRACTING CO. LLC. SOIL PROFILE & PILE SECTION Standard Penetration Test Daum "Blows BHt aH Medium Dense, Greishtrown, Sty 63 Fine SAND wits Cemented Paces aon 5 4 Loose avery Laose grey sity Fine SAND 7m ‘tn sessional oat Fragments SS 19 019 so 18 so 18 uM BoM aon ‘Medium danse, ght Brown. Very Sit, Fine no [SAND wth Qeeasloral Comeniod of lees. a. a ed pon nT 2 50 0 50 ‘i ‘ 060 ‘ Rag 0 50 ‘ees Donee, Ugh brown, veya, Fe 0 0 SAND wh oecasionel Camertad pices Pay i S050 so 50 so 50 5050 Very weak, massive, brow, Fine Gisined so 80 CCacarente,Intepedsed wie camentes 2 0 ‘SAND os so 90 \AAS FOUNDATION LLC ues root PLQCAPLNG:REVeNGH0_TALA1E-02008: Sl Poe DALLAS sounomorsire PILE BEARING CAPACITY IN SAND PROJECT: 'B+G+10 COMM. & RESIDENTIAL , MIR. MOHD, HUMAID ABDULLA SULTAN DALMOUK LOCATION PLOT No. 129-194, PORT SAEED CONSULTANTS: WS. BIN DALMOUK CONSULTANTS CIVILCONTRACTOR: MS. TALA CONTRACTING CO. L.L.C. ‘SPT'N blow Depth Stwoaum yoo et eH? BH Ne iNpur pata, 19. ed 2s Pile dameter = 075m 20 27 30 Pile Cut OF Lave = 45m 25 5s 4 omy2s Pile Length below Ste Datum = 200m a8 sou ° Efecto Pile Loney = 6m as 2 ou “ Sol Unit Wight = tak 50. ou @ owt = asm 55 ou 2 ‘Average SPT Base = S08 50 0 9 38 Average SPT Sha = Blows 88, 2 19 38 Fecton Length = sm 70 2 19 38 7 0 18 3 CALCULATION a0 0 18 a9 = 8s 2 ve os nM 4 Pri seee 100. aon 2 Ph shat 108 na es Ng no n 2 2 K - 1 10 2 2s 130° nom » RESULTS 140 non 2 Unsmate End Besrng Pie = S480 kN 150 nm 2s Unumate Sat Fricion = atin 180 2 90 38 timate Pie Capacity 007 A we 0 69 = Waring Load pore) Ws 9 so Fact of Safely = 42 140. 2 89 * as. 2 9 * 198 2 90 0 where 200 as * Ap = Area ofthe ple section 205 0 90 *” ‘As = Panmeter af the ple sacton 218 90 * ta Etectve Verical Siaes 25 2 50 0 Phi = Freten Angle 25 0 50 0 Nq = Bearing Capacty Factor 245 0 9 * ke =conmant 25 0 89 * 268 90 0 REFERENCE 9 Py The above calculation is based on the formula Quit = Ap x Vo x Nq + Lx Asx k x Vo mid x tan phi from’ SOIL MECHANICS ' by T, William Lambe & Robert V. Whitman DALLAS FOUNDATION LL (tea 011972008, PL-SB4PILING-REV B+G+10_TALA-16.10-2008 Bearing Cap. O14 759 DacraS FOUNDATIONS LLC. PILE BEARING CAPACITY IN SAND PROJEC" "B¥GH10 COWM. & RESIDENTIAL , MR MOHD, HUMAID ABDULLA SULTAN DALMOUK LOCATION PLOT No. 128-194, PORT SAEED ‘CONSULTANTS: WS. BIN DALMOUK CONSULTANTS CIVILCONTRACTOR: MIS. TALA CONTRACTING CO. LLC. SPT Sows Depth Sieosum — Jae ext an2 ane Ny nour oars 10 wos 2 Pe dimster tm 20 aon x0 Pe cit OF Leve 45m as su 0 PieLenghbeiow SteDaum = mam 35, au * tecve Pe Lengin 155 m as] ef bas 2 “ Sot une weght akin 50. Poy 2 wt 28m 88 eu a sveage SPT Base = SGom —8¢ 2 2 Pa ‘verage SPT Sha eo 68. 2 2 a Freon Leng 2m 70 2 x 75 so. u carcuaTion 80 2 8 ou ~ 0.786 a? 85. eB eo as aim to nou 0 ve tamu? as eo 2 Pr aac0 a or) eon 2 Prishak a 95 eon 2 Na oy no. na 2 « 1 20 sm 2 0 2m 2» sesuMs 40 za 2 Una End Bearing of Pe sain ise uz 2 Uteatestanocen == MESA 180 n 8 % teste Pe Capt, sai 570. © 9 2 weg oud > mw ots ey © Factor Satety > oan te 2 9 2 wes 2 9 2 190 par) % as ary 2 vere 200 | Pu Too © ‘Ao = Area cto secton ms © ‘As = Pesach pe acon as © Vo =I Ete Vries Sess zs 2 P= Fon Ange ns © Ny = Seeing Copsey Factor as © ie = Constant as 2 es wo 2 2 REFERENCE 0 9 * The above calculation is based on the formula : Quit = Ap x Vo x Nq + Lx As xk x Vo mid x tan phi from' SOIL MECHANICS ‘by T. Wiliam Lambe & Robert V. Whitman DALLAS FOUNDATION LLC. Dated: 107192008 PLAG4PILNG-REV.S+G+10_TALA15-10.2008 Bening Cap. DIA 1900 DALLAS couvomorscic PROJECT 1 BFG+10 COMM, & RESIDENTIAL , MR. MOHD. HUMAID ABDULLA SULTAN DALMOUK: LOCATION PLOT No. 128-194, PORT SAEED CONSULTANT —— = MIS. BIN DALMOUK CONSULTANTS CIVILCONTRAGTOR : MIS. TALA CONTRACTING CO. LLC. CALCULATION FOR STIFFNESS FACTOR INPUT Pile Diameter 0.75 m Pile Depth 15.00 m Concrete Strength 440 Nima? cu OkNIm? SPT'N' blows 14 Below water table N H 19.92 kN. Formulae Casa -Conesve Soi R=«eNK)" ese - Cohesionless Soi T= (Elin) CALCULATION 1 0.0155 m* E = 28 Nim? K #N/A MNIm? n, 6 MNim? RESULT R aNIA T 2.355 m DALLAS FOUNDATION LLG (ates: wrrarzcos PLSB4PILINGREV.S+G+10_TALA-T6-10-2008: tne 759 DALLAS sounomorsere. PROJECT (8+GHOCONM, & RESIDENTIAL , MR. MOHD. HUMAID ABDULLA SULTAN DALMOUK LOCATION PLOT No, 129-194, PORT SAEED CONSULTANT —: iMIS..BIN DALMOUK CONSULTANTS CIVILCONTRACTOR : MS. TALA CONTRACTING CO. L.L.C. CALCULATION FOR STIFFNESS FACTOR INPUT Pile Diameter 1.00 m Pile Depth 15.00 m Concrete Strength 440 Nim? cu kN? SPT'N’ blows 14 Belowwatertable yin oN H = 36.4 kN Formulae case - Cohesive Sal R= (EK) Case -Conesionias Sol T= (Eun) CALCULATION 1 0.0491 mt E = 28 kNimm? K = BNA MNim® A 6 MNim* RESULT R NIA m T 2.965 m DALLAS FOUNDATION LLC Dated 1r192008 PLB PILING-REV.B+G+10_TALAt5-102008; sess 1000 BENDING MOMENT VERSUS DEPTH 300.00 250.00 200.00 ‘9°77 sNouvannos GV TIVg 150.00 100.00 Bonding Moment ( kNm ) 0.00 60.00 Depth (m.) DALLAS FOUNDASTION LLC. Dated : 10/19/2008 PL-384-PILING-REV-B+G+10_TALA-15-10-2008 : BM Curve 750 Oo DALLAS -ounomovsice CALCULATION FOR BENDING MOMENT ALONG DEPTH input Pe Damete 075m Pile Depth 1500m CConzreta Srensth 49 Nom ou KN 4 945 40 % 1923 Nm Formulae Meee Aw T* BHT ‘CALCULATION Zou UT : sarm Maximum Moment = 259 kam DALLAS FOUNDATION LLC Dates 10192008 PL.S84-PILNG-REV-B+G+10_TALAS-102008: 8780 BENDING MOMENT VERSUS DEPTH 4 800.00 | | 500.00 ovreonenro: BY AW | 3 | 400,00 | 300.00 | 200.00 Bending Moment ( kNm ) 100.00 | | 2 j 3 I pote 100.00 Depth (m.) DALLAS FOUNDATION L.L.C. Dated : 10/19/2008 PL-384-PILING-REV-B+G+10_TALA-15-10-2008 : BM Curve 1000 7 DALLAS sousomons ive CALCULATION FOR BENDING MOMENT ALONG DEPTH Inpur Pe ameter 100m Pile Depth 1500 Conese Strength 40 Ninn? cu KN x wag % 205 win Formulae Mole Ae T+ By HT CALCULATION Zeus =U 508 m Maximum Moment = 559 kN DALLAS FOUNDATION LLG. (ates: 10132006, PLSS4PILING-REV.8+G+10_TALA1S:10-2008: BMIC09 BENDING MOMENT VERSUS DEPTH 7 7 T 1 1000.00 ‘977 sNoLvaNNOs s wri q BH | 900.00 800.00 | No 700.00 | ij = ) | 600.00 2 | | = | f | re =H | | 500.00 5 | | 2. | | | 400.00 3 | | | | at +} — — / 300.00 | | | | | 200.00 | | t ~--K- | 100.00 | | | I | - | 0.00 4 8 8 10 1 4 | ! ——----! -100.00 Depth (m.) DALLAS FOUNDATION L.L.C Dated : 10/19/2008 PL-384-PILING-REV-B+G+10_TALA-15-10-2008 : BM Curve 1000 (2) ee DALLAS pouscsnous ic CALCULATION FOR BENDING MOMENT ALONG DEPTH iweur ie Diameter 140m Pe Dep 1500 m Conerete Suength 49 Ninmé cu ‘OKNI H 094 aN M 205 «kim Formut MoMy Ag A THB HT catcuLaTion Zyee™ UT s 508 m Maximum Moment = 89 fen DALLAS FOUNDATION LLG Dates 19719208 PLOB4-PILING-REV.8G+10_TALA 15-10-2008: BANG00 2) DALLAS sosnosnors irc. ‘STEEL CALCULATION FOR COMPRESSION AND BENDING MOMENT. (As Per BS 8110) VERTICAL LOAD = 1494 KN BENDING MOMENT = 260 kNm LOAD FACTOR . 15 ULTIMATE BENDING MOMENT = 1.6x260 =~ 390kNm PILE DIAMETER (h) . 750 mm. ULTIMATE AXIAL LOAD (N) = 2241 KN CONCRETE COVER = 78mm CONCRETE STRENGTH (f,,) = 40 Nimm? STEEL YIELD STRENGTH (f,) = 460 Nimm? hs = 750-2x 75 = 600 mm hsh= 600/750 = 0.80 Nh? = 2241 x 1000/7502) = 3.98 Nimm? M,/h? = 390 x 1046 / 75093 . 0.92 Nimm? (AsciAe) value obtained from graph = = 04 Using BS 8110) (Steel Required) —_% of the pile cross section area = 04 Steel section area = = 1767.1 mm? (Stee! Provides) bar ciameter [mm] - 20 n. of bars [n.] * 16 area of steel available = 5027 mm? DALLAS FOUNDATION LLG Dated: 111672008 (1.14% cross-section area of pile) PLOSE-PILING-REV.5¢6+10_TALA-TS-102008: CompuMITSO DALLAS souscsnonsicc ‘STEEL CALCULATION FOR COMPRESSION AND BENDING MOMENT (As Per CP110) VERTICAL LOAD. BENDING MOMENT LOAD FACTOR ULTIMATE BENDING MOMENT = PILE DIAMETER (h) ULTIMATE AXIAL LOAD _(N) CONCRETE COVER CONCRETE STRENGTH (fa) STEEL YIELD STRENGTH (f,) hs= 1000-2 75 hsin= 50/1000 Nih?= 4095 x 1000 / 100072) Myih? = 831 x 1086 / 100043 (Asc/Ac). value obtained from graph = (Stee! Required ) Stee! section area = (Stee! Provided) boar diameter [mm] 0 of bars [9] area of steel avaliable DALLAS FOUNDATION LLC sted: torer008 1.5 x 554 % ofthe pile cross section area = 2730 kN = 554 kNm = 18 831 kNm = 1000 mm = 4095 KN - 75 mn = 40. Nimm? = 480 Nimm? = 850 mm. = 085 = 4.10 Nimm? = 0.83 Nim? = 04 (Using Bse110) 04 3141.6 mm? 20 20 6283 mm? (0.80% cross-section area of pite) PL 224 PIUNGREVE+C+:0_TALAS-10-2008 Comm BMC0s DALLAS povnossos cc ‘STEEL CALCULATION FOR COMPRESSION AND BENDING MOMENT (As Per CP110) VERTICAL LOAD BENDING MOMENT LOAD FACTOR ULTIMATE BENDING MOMENT = PILE DIAMETER (h) ULTIMATE AXIAL LOAD (N) CONCRETE COVER CONCRETE STRENGTH (f.) STEEL YIELD STRENGTH (f,) hs= — 1000-2x 75 hsin= 850/100 N/h®= 4095 x 1000/ 10002) Mu/h? = 1305 x 106 / 1000°3, {AScIAc)_ value obtained from graph = (Steel Required) % of the pile cross Steel section are: (Stee! Provided) bar diameter [mm] 1. of bars [n.] area of steel available DALLAS FOUNDATION. Le. (ned 111972008 = 2730 kN = 870 kNm = 18 1.8870 1305 KNm_ = 1000 mm, = 4095 KN = 75 mm = 40 Nimm? = 460 Nimm? = 850mm = 085 = 4.10. Nimm? = 1.31 Nimm? = 04 (Using 88110) om 3141.6 mm* section area 20 20 6283. mm? (0.80% cross-section area of pile) L984 PALING-REV-B+G410_TALA5-10-2008: Comp-6M1000 2) DALLAS sounomorsece Shear Reinforcement eee i Meus wre sifpue werd 10x) EARTHOUAKE FORCE [EARTHQUAKE FORCE Hoon 94.62 172.9 309.4 ron 182 242 433 Pile Diameter (mm 750 1000 7000 [Ac mma 441786 785308 785398 Jas (rma) 5027 6283 6283, 100 As/AG 114) 0.80 0.80 F., = Nimm? 40 40 40 [Verosers0 panry. TABLE 3 085 085 065 Weeameo, 076 076 076 [Shear siress{v) = Harea 030 oat 055 [A.,required in mm. Minimum Minimum 137.30 Provide 28 @ Be Be 200 200 150 [A,, provided mm 100.53 700.53 157.08 NOTE ( AS PER BS8110: PART1: 1997, TABLE 3.9) :~ 1-IF V< 0.5 Ve THEN NO SHEAR REINFORCEMENT IS REQUIRED 2-IF 0.5Vc Vo+0.4 THEN SHEAR REINFORCEMENT TO BE PROVIDED As inquires) ( By * Sy) * (V-V.) 1 (0.95 *f,) CHECK FOR 0.5 Vc (Nimm2) 0.33 0.33 0.33 CHECK FOR Ve + 0.4 (Nimm2) 1.05 1.05 1.05 CHECK FOR 0.8\Feu OR § Nimm2 5 5 5 PILE BEARING CAPACITY CALCULATION ao > Pile C.O.L above gl. Im) 45 forking load [Safety Factors e Puc ciameter thm 1000 [ompreeason 2730 kN feompression 3.0 BE Pie length (rs) -20.00 [Tension = 1522 __iksy_[rension 28 b lGround Water Table__[m]__-3.00 in Pile | Nepl —~] Uncont [Utimate|Utimate] Tatar] End] Ulimate| —Tolal | Factor [DO% reduced’ Went] Factor depth | average fompress| size | tition | ticion | bearing | end | pile | of | shan of of 3 trem strenath| fiction capacity] cepacty |resistance| bearing | capacity | Safety] capacity | Concrete | Safety € EGL ave | fs a | Gb Comp. Tension 8 tui’ | eth tevin’) | py Hy ey 2 aa | 18 10 04 & vo | 230 20 02 cr io | 422 29 03 5 11 | era 49 05 12 | 935 69 o7 os | i078 a8 08 a1 | tz | 108 | 09 12 | ia | ize | 10 43 | 1598 | tz Jott as | te | wr | 13 1s | 1991 ier | 14 2 ts | 270 | 206 | 16 20 | 2450 | 26 | 18 24 | 2027 | 245 | 20 26 | 3200 | 265 | 23 28 | 3681 20s | 25 30 | 3058 | 308 | 28 31 | 4335 | 328 | at [- 50 as |_a7 | wa | a3 REFERENCE & NOTES = The ultimate site feson in sand is calated as per Gwizdala method - appendix equation 1.2.13, ihe uma end bearng in sands calculated as per Dacaur metho - eh appends, equation 1.26 + The ultimate side fetan in eck fs atulate as 10% of te unconfined compressive svength “Te uitnate end bearing in och stat sequal othe uneoninad compcessve strength “The Factor of Satay ntencion i calcunted as olows : FOS =ulimste ple capac (ension load - weight the ile) DALES FOUNDATION LLC Se dead 008 CPL a8 PLING REV.8vG10_TALAAS-10200Rbar cp 1000 hk PILE BEARING CAPACITY CALCULATION PieCOLabowe gt Im) a2 [Working loa [Safety Factors ire ciameter mm) 750 [Compression = 1494 tax [Compression 37 Pile length tm 20.00 [Tension = i141 fen [Tension Ground Water Table = spt r Factor average of Safety Tension or voWONO: BY TAY REFERENCE & NOTES + The ulate side fiction in sand is calculated as per Gwizdala method - appendix equation 1.2.13 + The ultimate end bearing in sand is calelated as per Decourt method - re. appendix, equation 1.2.6 The ulate sie fiction in roc is calculated as 10 % of the unconfined compressive strength ~The ulimate end bearing in rock stata is equa tothe unconfined compressive strength The Facter of Safely in tension is calculated a fons : FOS = ulate pile capacity /( tension load - weight ofthe ple) DALLAS FOUNDATION LLG ‘S399 dated 101192004 C\PL38¢-PILING-REV.B+G+10_TALAAS-10.2008be0r cp. 750

You might also like