ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
Date: 30.Sep.2020
Dept.: ME
Signature: F.Lak
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
REVISION INDEX
2 X X X X
3 X X
X
4 X
X
5 X X
X
6 X X
7 X X X X
8 X X X X
9 X X X X
10
11 X
12 X
X
13 X X
X
14 X X
X
15 X X
X X
16 X
X X
17
X
18
X
19
X
20
X X
21 X
X X
22 X
X
23 X
24
25
26
27
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
TABLE OF CONTENT
1. Scope ................................................................................................................................................... 4
2. Definition .............................................................................................................................................. 4
3. Applicable, Code, Standards And Specification ............................................................................... 4
4. Preparation .......................................................................................................................................... 4
4.1. Equipment list............................................................................................................................... 4
4.2 Tank preparation .......................................................................................................................... 4
4.3 Thermocouple installation ........................................................................................................... 4
4.4 Heating elements .......................................................................................................................... 5
4.5 Insulation ...................................................................................................................................... 5
5. Post Weld Heat Treatment .................................................................................................................. 5
5.1. Standard........................................................................................................................................ 5
5.2 Notifacation .................................................................................................................................. 5
5.2.1 Before PWHT ................................................................................................................................ 5
5.2.2 Duration of PWHT ......................................................................................................................... 5
5.2.3 After Pwht ..................................................................................................................................... 5
5.3 Heating Operation ....................................................................................................................... 6
5.4 Temperature Measurement .......................................................................................................... 7
6. Hardness test....................................................................................................................................... 8
7. Records ................................................................................................................................................ 8
8. ATTACHMENTS .................................................................................................................................................... 9
8.1 Attachment # 1: ............................................................................................................................................. 9
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
1- SCOPE
This Instruction covers the method and requirements for applying local Heat Treatment nozzles of
storage tanks which will be erected by petrosaz Company for Abadan Refinery Project.
2- DEFINITION
The following defines the meaning of specific words used in this document:
4- PREPARATION
4-1- Equipment list
- Programmer 6 channel (Brand Name: BATEC)
- Capacitor discharge attachment device
- Recorder 12 canal (Brand Name: CHINO)
- Element ceramic 8x15
- Thermocouples of Type K
- Generator 155 KVA
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
4-5- Insulation
a) The insulation material is fiber ceramic with density 128 Kg/m3 and thickness of at least 50 mm
and width of 600mm
b) Soak band (width of the volume of the material where the holding temperature equals or
exceeds the minimum and equals or is below the maximum required):Ð(b) For opening less than
or equal to NPS 4 (DN 100), the soak band shall be 1.5t on each side of the weld at its greatest
width.Ð(c) For opening greater than NPS 4 (DN 100) but less than or equal to NPS 8 (DN 200),
the soak band shall be 6t on each side of the weld at its greatest width.Ð(d) For opening greater
than NPS 8 (DN 200), the soak band shall be 10t on each side of the weld at its greatest
width.ÐHeat band (width of heat source),:Ðhe minimum requirement for the heated-band width
shall be the soak-band width plus 2 in. (50 mm).ÐGradient control band (minimum width of
insulation and/or gradient heat source):Ðhe gradient-control-band width shall as a minimum be
equal to or greater than the heated-band width plus 4t on each side of the weld.
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
c) The insulation panel will be kept by welded spike to pad or shell plates.
d) Insulation shall be held in position using steel wires.
When any problem is happened or the work is interrupted in the period of PWHT, the QC inspector
shall be informed. He will evaluate the situation and take necessary remedial action. Details of
remedial action shall be indicated in the PWHT report.
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
Note: Nozzles and manholes of TK-4251 & 4102 shall be stress relieved within a temperature
range of 600 °C to 650 °C for 1 hour per 25 mm (1 in.) of shell thickness.
- TK 5101 & 7501shall be stress relieved within a temperature range of 635 ± 14 °C (1,175 ± 25
°F) and hold at that temperature for one hour for each 25 mm (1.0 in), or fraction thereof, of metal
thickness, with a minimum holding time of one hour.
A Until 300°c, heating operation will be done freely and after that, the heating rate should be
controlled and recorded as the following table:
Temperature C
Phase Time Note
Start Finish
O
0 - 0 c 300Oc
1 113 min 300Oc 600Oc
According to API 650
2 85 min 600Oc 600Oc
3 100 min 600Oc 300Oc
4 - 300Oc 30Oc
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
B The cooling rate should be controlled up to 300oC and after that it is allowed to cool down until
ambient temperature.
5-3-3- Before removing of insulation and PWHT equipment, the effectiveness of PWHT will be
checked by hardness test.
C The maximum difference between highest and lowest temperature in heating time period within
the heated band is 70oc, in holding time is 50°c and in cooling time period within the heated band
is 110°c.
D During the heating, holding time, and cooling, the maximum axial temperature gradient for
PWHT shall be limited such that the temperature at the edge of the heated band shall be no less
than one-half the temperature at the edge of the soak band.
ACCORDING TO API 650 PARAGRAPH 5.4.3 ALL NOZZLE AND MANHOLE CONNECTED TO
SHELL PLATE TO GROUP IV AND V WITH THICKNESS THAN 13mm SHALL BE
PREFABRICATED INTO THE SHELL PLATE OR THICKEN INSERT PLAT AND STRESS
RELIVED BEFORE WELDING TO SHELL PLATE.
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
NOTE:
-The radiograph of the bottlenecks, after the completion of the construction process and the
installation on the site, is determined according to the opinion of the employer and NDT map.
- In case of any welding after PWHT, related NDT and PWHT shall be repeated after welding.
f) Proper insulation shall be applied on the thermo cable joint so that the thermocouples tip is
separated from the heating band.
g) Each recorder shall have constant voltage unit fitted to it in such a way to show a consistent
functioning during heat treatment.
h) Heat treating surfaces shall be free from any oil, grease and metals with low melting
temperature.
i) Damaged or repaired thermocouples shall not be used.
j) Each thermocouple shall be connected to the recorder separately. No connection between
thermocouples is permitted.
6- Hardness test
hardness of HAZ, BM, WM for caustic storage tank, amine storage tank, sulphur storage tank and
sour water reservoir storage tank shall not exceed 200HBW.
for other services
Hardness of weld metal and the related heat affected zone (HAZ) of all welds shall not exceed 225
Brinell.
7- Records
7-1- Upon completion of the PWHT operation, the subcontractor supervisor shall attach the PWHT
report to the recorder chart and submit them to the QC inspector for review and approval.
7-2- The quality of PWHT is evaluated by hardness test of the weld metal and heat affected zone.
7-3- The record and /or report of PWHT shall include the following information:
- The date of PWHT
- Nozzle no
- Element type
- Time – temperature recorder no
- Number and placement of thermocouples
- Heating and cooling rates
- Holding time and temperature
- PWHT Subcontractor Name.
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
- ATTACHMENT 1
Contractor Employer
DATE : DATE :
SIGN : SIGN :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
DOCUMENT TITLE:
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
TABLE OF CONTENTS:
1- SCOPE
2- DEFINITION
3- APLICABLE CODE, STANDARDS AND SPECIFICATION
4- MOBILIZATION
5- PREPARATION WORKS
5-1 Tank preparation
5-2 Assembly and welding works
5-3 Thermocouple installation
5-4 Insulation
6- POST WELD HEAT TREATMENT
6-1 Notification
6-2 Heating
6-3 Temperature controlling
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
1- SCOPE
This Procedure covers the stepwise functions for applying Post weld Heat Treatment on Storage
Tank (5101 A/B, 7501A/B) which will be erected by FARA PETROSAZ Company.
The descriptions of activities in this procedure are intended to be a guideline for the heat treatment
group and shall be detailed in the execution step by them.
2- DEFINITION
The following defines the meaning of specific words used in this document:
4- MOBILIZATION
4-1- High velocity burner installation
a- High velocity gasoline burners with suitable capacity shall be employed to heat up the tank.
They install in horizontal manhole of the tank and will be massed fire appropriately into the tank.
For shell protection during the firing, a plate should be installed in front of the flame.
b- In normal conditions, exhaust opening should be on top of the tank that has a hand operated
damper to control the internal pressure and hence the heat distribution in the tank will be steady.
An exhaust opening through which the burner is fired into the shell and should be insulated well.
c. Gasket contact surface of flanges must be protected by resistant paint to high temperature
against oxidation during Post Weld Heat Treatment.
d. For best temperature distribution, an electrical circulator should be installed inside the roof
manhole.
4-2- Gasoline and air pressure systems
A stationary or mobile gasoline tank shall be employed to supply the fuel for burner. The
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
containers shall be placed at the safe of at least 10 meters form the tank being heat treated.
Firefighting service must be ready for 15 Hours. During heat treatment electric power with 50
amperes and constant 3 phases shall be provided.
The burner is ignited by electric spark and, a centrifugal fan supplies the combustion air to the
burner. The air supply to the burner is manually adjusted by a graduated butterfly valve.
5- PREPARATION WORKS
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
20 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
5-4- Insulation
a) Before erection start of (5101 A/B, 7501A/B), the insulation material shall be lay down under
bottom plates and protected up PWHT completed.
b) The main insulation material is Mineral Wool .The density of them shall be 128 Kg/m 3 with
thickness of at least 70 mm after compellation the inside bottom insulation.
c) Total surface of tank (including bottom) shall be insulated, as well as tanks must be completely
enclosed with insulating material.
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
21 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
flame intensity. The cooling rate is again controlled by manual adjustment of the firing rate. As an
alternative to the above mentioned controlling operation, a temperature programmer shall be used
to control the heat treatment cycle.
AFTER PWHT
a) The temporary tools and materials should be removed from inside and outside of thank.
b) The jig trace shall be tested by MT or PT for %5 of total points.
c) Pad plate shall be considered for connection of all temporary supports / bracings and lifting
lugs. These pads will not be removed after P.W.H.T.
6-2- Heating
a) Heating and cooling rate in 50oc/hr (divided by the maximum metal thickness of the plate in
inches, or fraction thereof, of metal thickness, but in no case more than 50°C/hr), maximum
difference between highest and lowest temperature in heating step is l30oc, in socking time is 30°c
and in cooling step is 60°c.
b) During the heat treatment process appropriate precautions shall be considered for protection of
stainless steel parts from heating.
c) Heat treating surfaces shall be free from any oil, grease and metals with low melting
temperature.
D) During heating from 300oC & during cooling up to 300oC, the tank shall be lifted and kept by
crane according to attachment 1 & 2.
22 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
5-3-2- On completion of heat treatment operation the tank is allowed to cool down until ambient
temperature and after this stage, the insulation may be removed.
Note: TK 5101 & 7501shall be stress relieved within a temperature range of 635 ± 14 °C (1,175 ±
25 °F) and hold at that temperature for one hour for each 25 mm (1.0 in), or fraction thereof, of
metal thickness, with a minimum holding time of one hour.
Tl: The temperature that heating rate should be controlled above it. (oc)
T2: Holding temperature. (oc)
RH: heating Rate. (oc/hr)
Rc: Cooling Rate. (oc/hr)
Hp: Heating period. (hr)
H: Holding period. (hr)
Hc: Cooling period. (hr)
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
23 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
24 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
25 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
26 OF 60
Correct PO No: ARUP-CN-C-046
ABADAN REFINERY
UPGRADING PROJECT
DOCUMENT .NO :
- ATTACHMENT 1
Contractor Employer
DATE : DATE :
SIGN : SIGN :
This document belongs to NIOEC and is confidential and shall be used according to provisions of Abadan Refinery Upgrading Project, Islamic Republic of Iran.
Contract No.: 1071/GC-GN/CON/EPC8
27 OF 60