A B C D E F

5.00 5.00 3.00 5.50 2.50


3.00 2.00 1.50 4.00 3.00
RAMP UP 1.55

100MM. THK. CONCRETE SLAB WITH 10MM.Ø


DRB MATTING BARS SPACED @ 0.50CM. ON
CENTER BOTH WAYS.

WF-2 F1 F1
C1 TB-1 TB-1 C1 C1
1 0.60m. C1
1.52

ELEV. F2
SOF.

0.30 MTRS. ELEV. WF-2

TB-1
WF-2 SLAB ON FILL 0.55m.
2.18

TB-1

TB-1
5.00

5.00
TB-1
(PARKING PAVEMENT) 0.60 MTRS. ELEV.

WF-1
ELEV.
SOF. SLAB ON FILL
1.50

F1 F1 F1 F1 F2
TB-1 TB-1 TB-1
2 C1 C1 0.55m. C1 C1 C1 C1
1.75

ELEV.
SOF.
WF-2
3.50

WF-2

WF-2
0.60 MTRS. ELEV.

0.60 MTRS. ELEV.


TB-1

TB-1

TB-1

TB-1
SLAB ON FILL
SLAB ON FILL
0.60 MTRS. ELEV. 0.60 MTRS. ELEV.
TB-1

0.55m.

5.00
1.75

WF-2
SLAB ON FILL SLAB ON FILL

TB-1
ELEV.
SOF.
WF-2
SC SC
WF-2
WF-2

0.60 MTRS. ELEV.


1.50

F1 SLAB ON FILL F1
C1 C1 C1
10.00

C1 TB-1 C1 TB-1 C1
3 0.55m.
SC
SC
TB-1 TB-1
1.50

WF-2

ELEV. F1 F1 F2
2.00

0.60 MTRS. ELEV.


WF-1

ELEVATOR
SOF. SHAFT SLAB ON FILL

TB-1

3.35
0.60 MTRS. ELEV.
WF-2 SLAB ON FILL
WF-1
5.00

0.60 MTRS. ELEV.


SEE RAMP
TB-1

TB-1

TB-1
WF-2

SLAB ON FILL DETAIL


TB-1
3.50

0.60 MTRS. ELEV. WF-1 C1


4' SLAB ON FILL
SEE STAIR F3

1.65
DETAIL 0.55 MTRS. ELEV.
SLAB ON FILL
C1 C1 C1 C1 C1

0.40
4 TB-1 TB-1 TB-1 WF-2
1.50

F1 F1 F1 F1
WF-1

WF-1
WF-2

2.00
WF-1 1.60
FOUNDATION PLAN
3.00 7.00 3.00 5.50 SCALE: 1:100 MTS
21.00

PREPARED BY: CHECKED BY: CHECKED/REVIEWED BY: PROJECT TITLE: RECOMMENDING APPROVAL: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.

CONSTRUCTION OF EMERGENCY OPERATION S-1 19


ALVIN JOHN P. HALLARSIS, UAP ZALDY A. GAYOSA, REA, REB AND TRAINING CENTER CYRUS JOSE J. UBANO, CPA, MBA RUEL C. TIANCHON, MPA, REA, REB ATTY. ELIORDO U. OGENA
ARCHITECT I CHIEF, PLANNING, DEVELOPMENT CITY HALL COMPOUND, CITY OF KORONADAL CDRRMO CITY ENGINEER CITY MAYOR