You are on page 1of 1

A B C D E F

10.00 11.00
5.00 5.00 3.00 5.50 2.50

2.50 2.50 2.50 2.38

2"X2"X1.50MM. THK. SQUARE TUBE


AUTO PAINT FINISHED FOR PURLINS
SPACED @ 0.60M. BOTH WAYS

RAFTER 04

RAFTER 04

RAFTER 04

RAFTER 04

RAFTER 04
6.00
5.00

5.00
2
3.50

5.00
G R O U N D F L O O R P L A N
1.50
10.00

3
1.50

5.00
3.50

4'

4
1.50

step up

GROUND FLOOR ROOF FRAMING PLAN (PARKING AREA)


S C A L E 1 : 1 0 0 M T S

PREPARED BY: CHECKED BY: CHECKED/REVIEWED BY: PROJECT TITLE: RECOMMENDING APPROVAL: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.

CONSTRUCTION OF EMERGENCY OPERATION S-4 22


ALVIN JOHN P. HALLARSIS, UAP ZALDY A. GAYOSA, REA, REB AND TRAINING CENTER CYRUS JOSE J. UBANO, CPA, MBA RUEL C. TIANCHON, MPA, REA, REB ATTY. ELIORDO U. OGENA
ARCHITECT I CHIEF, PLANNING, DEVELOPMENT CITY HALL COMPOUND, CITY OF KORONADAL CDRRMO CITY ENGINEER CITY MAYOR
60
REPUBLIC OF THE PHILIPPINES
PROVINCE OF SOUTH COTABATO AND DESIGN DIVISION
CITY OF KORONADAL

OFFICE OF THE CITY ENGINEER

You might also like