NCR 1358
Submission of Compliance
Closing of NCR
Sr. No Close-Out Remarks Re-Inspection Date
4219 0000-00-00
Status Comments
Document Attachment
id Name Date Description Type
3749 NCR for installed 2023-05-16 It has been observed that pdf
permanent rings damage the non-conformances of
segment edge damage
and extrados damage
after installation. The
installed rings damaged
which affect the integrity
of the lining or its long-
term durability.
NON-CONFORMANCE REPORT
ENGINEER
EMPLOYER: CHENNAI METRO RAIL
1) It has been observed that the non-conformances of segment edge damage and extrados damage
after installation. The installed rings damaged which affect the integrity of the lining or its long-term
durability.
2) Contractor needs to submit proposal for remedial or other measures to correct the defects or
negate its effects as appropriate. Also, shall undertake precautionary measures to avoid the
segment edge damage for achieve the required design life as stipulated in contract.
Permanent Ring-11 (S2)- Segment edge damage Permanent Ring-35 (S2)- Segment Edge
damage
Permanent Ring-42 (S2)- Segment Edge damage Permanent Ring-44 (S2)- Segment Edge
damage
PB-58 (S1)- Segment Edge damage PB-60 (S1)- Segment Edge damage
Proposed Corrective
Action(s)
Remarks:
Engineer’s
Originator’s Name Signature Date
Organization Name
Submission of Compliance
Correction & Corrective Action:
Re-Inspection date
Engineer’s Organization
Originator’s Name Signature Date
Name
Annexures: Documentary evidence such as Photographs, revised drawings etc.,