Sr No. Location Work


1 PMCC Room Earthpit Reading work and cover of chamber
2 HT Room (VCB Room) Chequered Plate work at HT room
3 HT Room (VCB Room) Trench cleaning at HT Room
4 HT Room (VCB Room) Insulating Mat laying at HT Room
5 HT Room (VCB Room) 6 kg -2 Nos fire extinguisher placing at PMCC Room-
6 HT Room (VCB Room) Fire Bucket with dry and cleaned sand placing at HT room
7 HT Room (VCB Room) Danger Sign & painting on Rolling Shutters at HT Room
8 HT Room (VCB Room) Earthpit Cover Placement and lettring works
9 HT Room (VCB Room) Trench closing in front of HT Room
10 Near PMCC Room DG Set 750 KVA DG Commissioning
11 Near PMCC Room DG Set Disel tank placement and piping work for DGs.
12 Near PMCC Room DG Set Structure earthing of 750 KVA DG Disel tank
13 Near PMCC Room DG Set Painting of 750 KVA DG Disel tank
14 Structure earthing of 750 KVA DG Disel tank
15 Near PMCC Room DG Set Earth grid works at DG Room
16 Near PMCC Room DG Set Lighting Works at DG Room

17 Near PMCC Room DG Set Neutral Earthpit connection works with all aspect for DG

18 Near PMCC Room DG Set Neutral Earthpit connection works with all aspect for DG
19 Near PMCC Room DG Set Disel tank placement and piping work for DGs.
20 Structure earthing of 250 KVA DG Disel tank
21 Near PMCC Room DG Set Painting of 250 KVA DG Disel tank
22 Structure earthing of 250 KVA DG Disel tank
23 Near PMCC Room DG Set Earth grid works at DG Room
24 Near PMCC Room DG Set Lighting Works at DG Room
25 Near PMCC Room DG Set 6 kg -2 Nos fire extinguisher placing at PMCC Room-

26 Near PMCC Room DG Set Neutral Earthpit connection works with all aspect for DG

27
28 Near PMCC Room DG Set 6 kg -2 Nos fire extinguisher placing at PMCC Room-
29 Near PMCC Room DG Set Fire Bucket with dry and cleaned sand placing at DG room
30 Near PMCC Room DG Set Chequered Plate work at DG room
31 Near PMCC Room DG Set DG exhaust erection work
32 DG Exhaust Structure Earthing connection work
33 Near PMCC Room DG Set DG earthing work
34 PMCC Room Earthing for 1250 KVA Transformer
Phase & Neutral identification for 1250 KVA transformer
35 PMCC Room
cable.
36 PMCC Room Wheels of all transformer to be locked
37 PMCC Room Chequered Plate work at Transformer room
38 PMCC Room insulating Mat laying at transformer Room
39 PMCC Room Shock treatment chat at Transformer Room
40 PMCC Room Authorised persons Chart
Danger Sign & painting on Rolling Shutters at Transformer
41 PMCC Room
Room
Phase & Neutral identification for 250 KVA transformer
42 PMCC Room
cable.
PMCC room panel earthing to grid connection and cover
43 PMCC Room
placing and lettering to be complete.
44 PMCC Room Single Line Diagram (SLD) placing at PMCC Room
45 PMCC Room Overall Earthpit layout
46 PMCC Room Identification of Feeders
47 PMCC Room First-Aid box Placement at PMCC Room
48 PMCC Room Resuscitator 2 nos. placement at PMCC Room
49 PMCC Room 6 kg -2 Nos fire extinguisher placing at PMCC Room-
50 PMCC Room Fire Bucket with sand placing at PMCC room
51 PMCC Room Cable dressing at PMCC Room
52 PMCC Room Cable trenchs to be covered at PMCC Room
53 PMCC Room Battery to be placed at battery Room

54 PMCC Room All the panels should always kept closed and cleaned

Danger Notice in english & local language to be placed at


55 PMCC Room
PMCC Room
56 Emergency Panel Earthing worke
57 Transformer Room 6 kg -2 Nos fire extinguisher placing at PMCC Room-
58 All Location Strip Back filling work
Work Planning
Status
Earth pit white wash, Reading and cover with earthpit to main grid
connection work pending
Done
Done
work done by 01-11-2023
Done
Done
Done
Done
Done
Pending
Installation work completed but piping work pending.
Strip laying work completed but welding work pending (Note- Both
Side earthing connection required)
Done
Pending
Earthpit to grid connection work pending (Strip laying work
completed)
Done

750 KVA DG Earthpit to earthpit grid connection and earthpit to DG


neutral connection also work pending

Main Earth strip grid to DG body strip connection work pendind


Installation work Pending
Installation work completed but piping work pending.
pending
Pending
Earthpit to grid connection work pending (Strip laying work
completed)
Done
Done

250 KVA DG Earthpit to earthpit grid connection and earthpit to DG


neutral connection also work pending

Main Earth strip grid to DG body strip connection work pendind


Done
Pending
Done
Pending
work in progress
Done
Main grid to Transformer strip connection work pending
Done
Done
Pending by Client
work done by 01-11-2023
pending
Pending by Client
Done

Done

Done
Done
Done
done
Done
Pending by Client
Done
Done
pending
work in progress
Done

Done

pending
One side Pending
Done
Pending
Work to be carried out by RC.
Work to be carried out by Mind Construction
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by IOCL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL


Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL


Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by RC


Work to be carried out by HAIL

Work to be carried out by HAIL


Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by RC
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by IOCL
Work to be carried out by IOCL

Work to be carried out by HAIL

Work to be carried out by HAIL


Work to be carried out by IOCL
Work to be carried out by IOCL
Work to be carried out by IOCL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL
Work to be carried out by HAIL

Work to be carried out by HAIL

Work to be carried out by HAIL


Sr No. Location Work

1 PMCC Room
Earthpit Reading work and cover of chamber
2 Admin Office
3 VCB Room and HT Room
4 Perimeter , Light Pole 4 Way JB Connection Work
5 Control Room
6 PMCC Room Smoke Detector Fixing work
7 Admin Office
8 DG Room Light Cable Laying and Glanding work
9 Light Fixing work
Store
10 36/40W Emg light -3, 14 Light 70W Non FLP
11 Security Room Tenstile, ACS JB installation work-
Motor and Local control switch Glanding with termination
12 Loding shed work
MCC- MC-01 and MCC- MC-02, Main cable glanding and
PMCC Room termination worl
Control Room Instrument main cable glanding and
DG Room termination work
13
1 HT Room (VCB Room) Chequered Plate work at HT room
2 HT Room (VCB Room) Trench cleaning at HT Room
3 HT Room (VCB Room) Insulating Mat laying at HT Room
4 HT Room (VCB Room) 6 kg -2 Nos fire extinguisher placing at PMCC Room-
5 HT Room (VCB Room) Fire Bucket with dry and cleaned sand placing at HT room
6 HT Room (VCB Room) Danger Sign & painting on Rolling Shutters at HT Room
7 HT Room (VCB Room) Earthpit Cover Placement and lettring works
8 HT Room (VCB Room) Trench closing in front of HT Room
9 Near PMCC Room DG Set 750 KVA DG Commissioning
10 Near PMCC Room DG Set Disel tank placement and piping work for DGs.
Structure earthing of 750 KVA DG Disel tank
11 Near PMCC Room DG Set Painting of 750 KVA DG Disel tank
Structure earthing of 750 KVA DG Disel tank
12 Near PMCC Room DG Set Earth grid works at DG Room
13 Near PMCC Room DG Set Lighting Works at DG Room

14 Near PMCC Room DG Set


Neutral Earthpit connection works with all aspect for DG
Near PMCC Room DG Set Neutral Earthpit connection works with all aspect for DG
10 Near PMCC Room DG Set Disel tank placement and piping work for DGs.
Structure earthing of 250 KVA DG Disel tank
11 Near PMCC Room DG Set Painting of 250 KVA DG Disel tank
Structure earthing of 250 KVA DG Disel tank
12 Near PMCC Room DG Set Earth grid works at DG Room
13 Near PMCC Room DG Set Lighting Works at DG Room
Near PMCC Room DG Set 6 kg -2 Nos fire extinguisher placing at PMCC Room-

14 Near PMCC Room DG Set


Neutral Earthpit connection works with all aspect for DG

15 Near PMCC Room DG Set 6 kg -2 Nos fire extinguisher placing at PMCC Room-
16 Near PMCC Room DG Set Fire Bucket with dry and cleaned sand placing at DG room
17 Near PMCC Room DG Set Chequered Plate work at DG room
18 Near PMCC Room DG Set DG exhaust erection work
DG Exhaust Structure Earthing connection work
19 Near PMCC Room DG Set DG earthing work
20 PMCC Room Earthing for 1250 KVA Transformer
21 PMCC Room Phase & Neutral identification for 1250 KVA transformer
cable.
22 PMCC Room Wheels of all transformer to be locked
23 PMCC Room Chequered Plate work at Transformer room
24 PMCC Room insulating Mat laying at transformer Room
25 PMCC Room Shock treatment chat at Transformer Room
26 PMCC Room Authorised persons Chart
27 PMCC Room Danger Sign & painting on Rolling Shutters at Transformer
Room
28 PMCC Room Phase & Neutral identification for 250 KVA transformer
cable.
29 PMCC Room PMCC room panel earthing to grid connection and cover
placing and lettering to be complete.
30 PMCC Room Single Line Diagram (SLD) placing at PMCC Room
31 PMCC Room Overall Earthpit layout
32 PMCC Room Identification of Feeders
33 PMCC Room First-Aid box Placement at PMCC Room
34 PMCC Room Resuscitator 2 nos. placement at PMCC Room
35 PMCC Room 6 kg -2 Nos fire extinguisher placing at PMCC Room-
36 PMCC Room Fire Bucket with sand placing at PMCC room
37 PMCC Room Cable dressing at PMCC Room
39 PMCC Room Cable trenchs to be covered at PMCC Room
40 PMCC Room Battery to be placed at battery Room

41 PMCC Room
All the panels should always kept closed and cleaned
42 PMCC Room Danger Notice in english & local language to be placed at
PMCC Room
Transformer Room 6 kg -2 Nos fire extinguisher placing at PMCC Room-
Work Planning
Status
Earth pit white wash, Reading and cover with earthpit to main grid
connection work pending
pending
Done

Earthing Work Pending

Completed

Done

Done
work done by 01-11-2023
Done
Done
Done
Done
Done
Pending
Installation work completed but piping work pending.
Strip laying work completed but welding work pending (Note- Both
Side earthing connection required)
Done
Earthpit to grid connectionPending
work pending (Strip laying work
completed)
Done

750 KVA DG Earthpit to earthpit grid connection and earthpit to DG


neutral connection also work pending
Main Earth strip grid to DG body strip connection work pendind
Installation work Pending
Installation work completed but piping work pending.
pending
Pending
Earthpit to grid connection work pending (Strip laying work
completed)
Done
Done

250 KVA DG Earthpit to earthpit grid connection and earthpit to DG


neutral connection also work pending
Main Earth strip grid to DG body strip connection work pendind
Done
Pending
Done
Pending
work in progress
Done
Main grid to Transformer strip connection work pending

Done
Done
Pending by Client
work done by 01-11-2023
pending
Pending by Client

Done

Done
Done

Done
Done
done
Done
Pending by Client
Done
Done
pending
work in progress
Done

Done

pending
Done
Erection Complete. Hook & Painting
Work to be carried out by RC.
work pending.
Work to be carried out by Mind Construction Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by IOCL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending


Light erection complete. Cable
Work to be carried out by HAIL
pending.

Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending


Work to be carried out by HAIL Pending
Light erection complete. Cable
Work to be carried out by HAIL
pending.

Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending


Pending
Work to be carried out by RC Pending
Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending


Work to be carried out by HAIL Done
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by RC Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by IOCL Pending
Work to be carried out by IOCL Pending

Work to be carried out by HAIL Pending

Work to be carried out by HAIL Pending


Work to be carried out by IOCL Done
Work to be carried out by IOCL Done
Work to be carried out by IOCL in progress
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Pending
Work to be carried out by HAIL Done

in progress
Work to be carried out by HAIL
Work to be carried out by HAIL Pending