Environmental tests:
Electrical tests
3. Check of LF Shielding
4. Check of HF shielding
Test Items:
Electrical Continuity
Insulation Resistance
LF Shielding
HF shielding
3) Measure the resistance of each conductor . It must be less than or equal to 1 ohm.
Measure of the Insulation Resistance
Use the dielectric meter
1) Procedures NO. 1.
a) Connected all the conductors together.
b) Measure the insulation resistance between the conductors and the mechanical ground of the plug
connectors(shell)
c) Measure the insulation resistance between each conductors and all the other conductors connected
together.
© MAPNA Group, All rights reserved 11
مراحل تست كابل
2) These measure are done under a 500V DC voltage when the harness is new .Then , they will be done
under a voltage between 45V and 250V DC during the life of the harness.
3) The specified valve of the insulation resistance is more then equal to 100 meg ohms
Check of LF Shielding
LF Shielding: the Shielding braid which is put around the conductors which transmit.The assembly
makes a shielded cable.
1) Use the kelvin procedure
2) Use a DC stabilized power supply set to 1A.Also, Use a digital multimeter.
3) Measure the line resistance between the connector C51 and the contacts are “8 “.These contacts are
connected to the LF shielding on the plug connector C52.
4) The resistance measured must be less 1 ohm.
© MAPNA Group, All rights reserved 12
مراحل تست كابل
Check of HF shielding
HF shielding: the shielding braid which is put around one or several shielding cables. The two ends of the HF shielding
are always connected to the ground of the plug connectors.
1) Use the kelvin procedure
2) Measure the resistance between the mechanical grounds of the plug connectors:
C51 C52
1 6
2 7
3 8
4 9
5 10
250
200
RTD Temp
150
100
50
0
-60 -40 -20 0 20 40 60 80 100