Scheme No.

: RHB/01/REL/2023-24

Lease of Plot for


RELIGIOUS USE
(MOSQUE)
to local religious Trust
(Trust formed by PAP's of
I N D E X Navi Mumbai)

Sr. No. Description Page No.

1 Press Ad ii

2 Glossary iii

3 Disclaimer iv

4 About Navi Mumbai 1

5 Notice Inviting Application 3

6 Instructions to Applicants 9

7 Special Conditions 12

8 Special Development Conditions 14

9 General terms & conditions 17

10 Plan of Navi Mumbai 25

11 Nodal Plan of Kharghar 26

12 Layout Plan of plot 27

13 Application Form 29

14 Details of Authorized Signatory 31

15 Undertaking 33

16 Annexure I to VI 35-40

45i
46ii
GLOSSARY

1. CIDCO : City & Industrial Development Corporation of Maharashtra Ltd.

2. RHB : Rehabilitation

3. EMD : Earnest Money Deposit

4. GST : Goods & Services Tax

5. CA : Chartered Accountant

6. AD : Application Document

7. GDCR : General Development Control Regulations

8. NMMC : Navi Mumbai Municipal Corporation

9. REL : Religious

10. PDF : Portable Document Format

11. Applicant : Applicant Names the registered Trust

12. L&L : Leave & License

13. NMDLR : Navi Mumbai Lands Disposal Regulations.

14. L.P. : Lease Premium

15. R.P. : Reserve Price

16. PMC : Panvel Municipal Corporation

17. NOC : No objection certificate.

18. LP & LDP : Land Pricing & Land Disposal Policy.

47
iii
DISCLAIMER

The information contained in this Application Document (the “AD”) or subsequently provided to
Applicant(s), whether verbally or in documentary or any other form, by or on behalf of CIDCO or any of
its employees or advisors, is provided to Applicant(s) on the terms and conditions set out in this Application
Document and such other terms and conditions subject to which such information is provided.

This Application Document is not an agreement and is neither an offer nor an invitation by CIDCO
to the prospective Applicants or any other person. The purpose of this Application Document is to provide
interested parties with information that may be useful to them in the formulation of their application for
qualification pursuant to this Application Document (the “Application”). This Application Document
includes statements, which reflect various assumptions and assessments arrived at by CIDCO in relation
to the Plot allotment. Such assumptions, assessments and statements do not purport to contain all the
information that each Applicant may require. This Application Document may not be appropriate for all
persons, and it is not possible for CIDCO, its employees or advisors to consider the objectives, financial
situation and particular needs of each party who reads or uses this Application Document. The assumptions,
assessments, statements and information contained in this Application Document may not be complete,
accurate, adequate or correct. Each Applicant should therefore, conduct its own investigations and
analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the
assumptions, assessments, statements and information contained in this Application Document and
obtain independent advice from appropriate sources.

Information provided in this Application Document to the Applicant(s) is on a wide range of matters,
some of which may depend upon interpretation of law. The information given is not intended to be an
exhaustive account of statutory requirements and should not be regarded as a complete or authoritative
statement of law. CIDCO accepts no responsibility for the accuracy or otherwise for any interpretation
or opinion on law expressed herein.

CIDCO, its employees and advisors make no representation or warranty and shall have no liability to
any person, including any Applicant, under any law, statute, rules or regulations or tort, principles of
restitution or unjust enrichment or otherwise for any loss, damages, cost or expense which may arise from
or be incurred or suffered on account of anything contained in this Application Document or otherwise,
including the accuracy, adequacy, correctness, completeness or reliability of the Application Document
and any assessment, assumption, statement or information contained therein or deemed to form part of
this Application Document or arising in any way with pre-qualification of Applicants for participation in
the selection Process.

CIDCO also accepts no liability of any nature whether resulting from negligence or otherwise howsoever
caused arising from reliance of any Applicant upon the statements contained in this Application Document.

CIDCO may, in its absolute discretion but without being under any obligation to do so, update,
amend or supplement the information, assessment or assumptions contained in this Application Document.

The issue of this AD does not imply that CIDCO is bound to select or short-list Applications for allotment
of plot to trusts or education societies, as the case may be and CIDCO reserves the right to reject all or
any of the Applications without assigning any reasons whatsoever.

The Applicant shall bear all its costs associated with or relating to the preparation and submission of
its Application including but not limited to preparation, copying, postage, delivery fees, expenses
associated with any demonstrations or presentations which may be required by CIDCO or any other costs
incurred in connection with or relating to its Application. All such costs and expenses will remain with the
Applicant and CIDCO shall not be liable in any manner whatsoever for the same or for any other costs
or other expenses incurred by an Applicant in preparation or submission of the Application, regardless of
the conduct or outcome of the Application Process.

48
iv
to Gateway of India. Navi Mumbai has thus
1. The City of the future
attracted high order facilities such as
Navi Mumbai (formerly New Bombay), the educational research institutions, health and
brand new city is situated on the mainland sports facilities.
across Mumbai harbour. It is four fifth as big as
CIDCO Established in March 1970 with a seed
Greater Bombay in size and has three large
capital of Rs. 3.95 crores, CIDCO was entrusted
industrial estates and the most modern Sea
with 344 square kilometers of marshy wasteland
Port of India. It was conceived as a counter
off the west coast of Maharashtra. The brief
magnet to the congested Mumbai city.
was simple, or so it seemed, to plan and create
Planned for a population of 20 lac people,
an environment-friendly city with full-fledged
Navi Mumbai now has approx. 9 lac
infrastructure to meet its residential,
population. There are 14 townships in Navi
commercial, socio cultural, and industrial
Mumbai, referred to as nodes, such as Vashi,
needs for generations to come.
Nerul, CBD-Belapur, New Panvel, etc. Each
node is self-sufficient in educational, health,
Flash-forward more than 48 years hence and
social, religious, cultural, sports and
what do we have; A city featured in National
recreational facilities. Each node has self-
Geographic Channel’s Super Cities of the
contained nodal settlements, strung along
World Series. A city Complete with
mass transport corridors, with their own
well-planned roads, internal expressways,
residential and commercial areas. The lush
flyovers, multi-structured rail corridors, modern
green gardens, arterial roads lined with rows
railway stations that house, commercial
of trees, aforesaid hills, well laid out railway
complexes, state-of-the-art IT parks,
system are some of the salient features of the
broadband connectivity, super specialty
new city. The city is connected to Greater
hospitals, superlative educational facilities, with
Mumbai by bridges across Thane Creek, by
an airport, a special economic zone and a
commuter railway to Chhatrapati Shivaji
trans-harbour link on the way. A city that one
Terminus Station by Hovercraft water transport
and a half million people call ‘home’.

1
2. Social Infrastructure in Navi Mumbai To take care of religious needs of people
residing in Navi Mumbai & belonging to various
Right from the inception CIDCO has given religions. Religious facility plots has earmarked
special importance for providing Social for this purpose in all the nodes of Navi Mumbai.
infrastructure facilities in Navi Mumbai. A Social
Services Department was created in order to 3. Term of Application:-
channelize Social facility related activities. The
plots for Education, Social Welfare, Regional, The general terms and conditions prescribed

Cultural and Religious purposes are for disposal of plots by invitation of application

earmarked as per the planning norms and for setting of Religious worship facilities as per

adequate care has been taken to ensure terms and conditions stated in the Scheme

provision of essential Social facilities in every Booklet

node of Navi Mumbai.

During the last decade Navi Mumbai has


witnessed growth of large scale of population
residing in various nodes of Navi Mumbai. The
people shifted in Navi Mumbai from the
various states of India needs to preserve their
rich religious , spiritual, cultural heritage &
values, so as to enable the residents belonging
to various religion residing in Navi Mumbai to
follow their religions religious activities.

2
NOTICE INVITING APPLICATIONS
· CIDCO of Maharashtra Limited, Navi Mumbai through the process of applications invites for “Lease of Plot
for Religious use (mosque) to local Religious Trust (Trust formed by PAP's of Navi Mumbai)” from
registered Trusts under Bombay Public Trust Act,1950.

Sr. No. Description Details


01 Scheme No. RHB/01/REL/2023-24
02 Cost of Scheme Booklet Rs. 1180/- (One Thousand One Hundred Eighty only)
(Inclusive of GST) (Non-Refundable)

Details of Plot : Ulwe Node


Sr. Node Sector Plot no. Area of the Rate per Total Lease
No. No. No. plot 300 m² Sq.mtr. (Rs.) EMD(Rs.) Premium(Rs.)

1. Ulwe 19 94A 01-500 m² 1,559/- 46,770/- 4,67,700/-

The amount of L.P. is likely to be changed at the time of issue of allotment letter to the eligible applicant
Trust & allotment letters are issued at prevalent applicable Pricing Policy & Reserve Price of the Financial
Year in which the allotment letter shall be issued.

Scheme Schedule:-
Sr. No. Description Schedule
01. Sale of Booklet 30/05/2023 to 31/08/2023 (10.30 Hrs to 13.00 Hrs &
14.00 Hrs to 17.30 Hrs)
02. Last date of Online EMD 20/09/2023
acceptance
03. Date of receipt of sealed 22/09/2023 between 10.30 Hrs. to 13.00 Hrs. at
Applications along with the Rehabilitation Dept., CIDCO Ltd. 7th Floor, Tower No.7,
required documents & receipt CBD Belapur Railway Station Commercial Complex, CBD
of EMD Belapur, Navi Mumbai -400614.
04. Date & time of Opening of 22/09/2023 , 14.30 Hrs onwards ( If possible)
applications
05. Place of Opening of Rehabilitation Dept., CIDCO Ltd. 7th Floor, Tower No.7, CBD
applications Belapur Railway Station Commercial Complex, CBD Belapur,
Navi Mumbai -400614.

NOTES :

1) Sealed Application shall have to be personally submitted and deposited in the Scheme
Application Box kept at the above said office address.

2) Scheme Application Documents/ Booklet shall neither be sent nor received by Post/Courier.

3) CIDCO reserves full right to reject any or all Scheme Applications without assigning any reason

3
and the same shall be at the entire discretion of CIDCO. CIDCO also reserves full right to modify
/ change, cancel Scheme Application program at any stage or to extend the date of scheme
towards accepting the applications. CIDCO’s decision in this respect shall be final and binding.

4) a) For qualification application submission shall be accompanied by the attested copies as


per eligibility criteria & various Annexure as mentioned in the Scheme Booklet.

b) Failure to submit necessary documents with the applications will render applicant ineligible.

c) The applicant should also produce original documents for verification, if called for.

5) a) Applicant shall submit the hard copies of application documents along with Booklet duly
signed by the Authorized Signatory on all pages and or as indicated in Application
Schedule.

b) The Application document as indicated above and original online receipt generated
towards Booklet Cost & EMD amount shall be submitted in one envelope. In no way the
receipt of Scheme Booklet cost & EMD shall be clubbed together.

6) Applications received with reference to the subject Scheme shall be processed on the basis of
documents/ information submitted by the Applicant Trust.

7) Inadequate amount paid towards EMD of the plot shall be summarily rejected and shall not be
accepted.

8) Any application without original receipt towards amount paid for EMD shall be summarily rejected.

9) Conditional Scheme Applications shall be summarily rejected.

10) The offer shall remain valid for a period of One Hundred Eighty (180) days from the date of
submission of Scheme Application or as such period of time till all the process on the Scheme are
completed. If required, CIDCO reserves the right to extend the validity of application till the
completion of the scheme under reference for which no separate intimation shall be sent.
During such period no interest shall be paid on EMD.

11) Cost of Scheme Booklet/Application document & EMD will be accepted only by online transaction.

For further details regarding the above Scheme, contact office of


Manager (Rehabilitation),
Rehabilation Dept.,
CIDCO Ltd. 7th Floor, Tower No.7,
CBD Belapur Railway Station Commercial Complex,
CBD Belapur, Navi Mumbai -400614.
Contact Phone No. 022-6242 1911, 6242 1918, 6242 1921.

Manager (Rehabilitation)
CIDCO Ltd

4
ELIGIBILITY CRITERIA:-

A Trust formed & registered by the resident of Navi Mumbai under Bombay Public Trust Act, 1950 and
meeting mandatory Eligibility Criteria as prescribed under, is entitled to submit application for the plot.
Sr. Criteria Documents to be submitted to CIDCO along with
No. the application
1. Trust should be registered under Bombay 1) Registration Certificate and Trust Deed,
Public Trust Act, 1950. Constitution & By-laws copy, Articles &
Memorandum of Association with all
amendments, if any, duly attested by Notary.
2) Bio-data of all Trustees with KYC documents
towards address & photo ID proof as annexed
format.
3) Self Certified affidavit about the good
track record of Trustee on appropriate value of
stamp paper stating that in any criminal case
the Trustee is/was not convicted by any court of
law which invokes moral turpitude or other
criminal cases.
4) Latest Public Trust Register (PTR) copy of the
applicant Trust indicating names of present
Trustees issued by the office of Charity
Commissioner.
2 Trust should have completed period of 1 year 1) Annual Activity Report for past 1 year indicating
from the date of registration. the details of activities conducted by the Trust
(preceding the date of advertisement).
2) Project Report containing information such as
activities proposed, built-up area requirement for
each activity and financial resources available
and proposed to be raised for completion of
project, etc.
3) Audited Statements of Accounts for past 1 year
indicating expenditure incurred on Trust’s
activities (preceding the date of
advertisement).
4) Documentary proof such as if
activities are run at rental premises, Leave &
License Agreement & if on Ownership relevant
property documents from where the activities
are conducted.
3. Trust should submit 1 year Audited Audited Statement of Accounts (preceding
Statement of Accounts. the date of advertisement) after the date of
Registration.
4. Trust should have minimum 10 % of Lease Latest Bank Balance Certificate / T.D./ Fixed
Premium amount (Cost of the plot). Deposit / Investment of the applicant Trust
Plot cost = Area in sq.mtr. x rate per sq. mtr. confirming availability of funds towards 10% of land
(as worked out by Economics Dept..) cost of the plot advertised.
5. Trust should submit minimum member List of member families belonging to Jain Religion
families 200 or more. residing in the node for which the application is made
with clear addresses and contact no. along with
KYC Documents towards address and photo ID
proof.
Note:- Trust to whom the Corporation has already allotted plot in Navi Mumbai for Religious/Spiritual
activities are not eligible to apply.

5
Processing of application & Ranking (if more than one eligible application received proposal shall be
processed on following priority sequence)

Sr. Criteria- Local religious Trusts for minority religion


No.

1 Proposed facilities which is not provided in that node.

2 Supported by maximum number of families from the node where the plot is advertised.

3 Applicant Trust having maximum years of experience.

* If more than one Trust qualifies for applied plot then the selection shall be done by drawl of
lots.
Note:- The Selection process shall be followed purely by the merits of preference as indicated above

Process of Allotment  If the Office of Navi Mumbai Police


Department, reject the NOC for the
The process of allotment shall be as follows:-
advertised plot which could be
 The eligible applicant Trust or Trusts name suggested for allotment to the qualified
shall be displayed on Notice Board in Local Trust then the plot advertised shall
local area on the plot advertised and on be cancelled & EMD amount paid by
CIDCO’S Website, Public will be the qualified Trust shall be refunded
requested to give their suggestions and without any interest thereon & the
objections. application of the qualified Trust shall be
cancelled.
 KYC document of 200 or more persons
supporting to application shall be  On approval of the Board to the qualified
submitted along with application. This list Trust application, as per NMDL(R), 2008,
will be sent to Commissioner of Police Chapter-III Clause (4) (iii) (b) shall be
Navi Mumbai & shall be displayed on submitted to Govt., in U.D. Dept., for
CIDCO Website and Notice Board in local approval. On receipt of Govt., approval
area on the plot advertised. for the eligible Trust letter of allotment
shall be issued to the qualified Trust at
 “No Objection Certificate” for the plot prevalent rates as per Land Pricing &
advertised will be obtained from Navi Disposal Policy.
Mumbai Police Department for the plot
which will be suggested to allot to eligible  If the Govt. of Maharashtra does not
Trust and on receiving NOC from Navi grant its approval for the proposal of plot
Mumbai Police Dept., approval of advertised, to be allotted to Qualified
CIDCO Board and thereafter approval Trust then the EMD amount paid by the
of Government in Urban Development qualified Trust shall be refunded without
Dept., will be obtained before the issue any interest & the application of the
of allotment letter at prevalent pricing qualified Trust shall be closed and fresh
policy & rates to the qualified eligible plot for the purpose may be advertised
Trust. subject to availability of the plot for the

6
purpose on approval of management. 3) Annual Activities Reports from the
date of Registration for 1 or more no.
of years (self-attested). (AnnexureI)
 EMD of the qualified unsuccessful
applicants and disqualified applicants 4) Documentary proof such as if
shall be refunded on preparation of the activities are run at place on rent,
Leave & License Agreement & if on
final report of qualified & disqualified/
Ownership relevant property
unsuccessful qualified applications on documents from where the
receipt of management approval. activities are conducted.
(Annexure-I).
1.0. DOCUMENTS TO BE ENCLOSED WITH
5) Brief Project Report about the
APPLICATION FORM
proposed Religious project in
Kharghar, Navi Mumbai which
 Copy of Scheme Booklet signed on
should include the following:-
each page. (Annexure-I)

 Application form signed on each a) Phases of completion of the entire


page. project.

 Receipt of the Scheme Booklet & EMD b) Utilization of the plot area as per
paid by the applicant Trust. admissible FSI.

 Copies of supporting documents c) Details of religious facilities that will


duly certified by the Competent be provided in the proposed
Authorities along with Annexures. Complex.

 Affidavits. d) Facilities and other benefits that


will be available to the general
1.1. The application should be accompanied
public.
with a project proposal along with
Annexures. e) Financial Resources available
and financial projections - capital
The applicant will have to fill required and recurring cost for completion
information in the application form. of project.

1.2. The applicant is requested to submit the f) Details of project cost, its financing
documents in the following sequence – / Term loan.

1) Certified copy of the Board/Trust’s g) Human resource to manage the


Governing Committee’s resolution, proposed project, etc.
authorizing signatory of the
6) Self Declaration/Affidavit by the Trust
applicant. (Application form)
regarding activities undertaken by
the Trust. (Annexure-II)
2) Registration Certificate and Trust
Deed, Constitution & By-laws copy,
7) Latest Bank Balance Certificate / T.D./
Articles & Memorandum of
Association with all amendments, if Fixed Deposit / Investment of the
any, duly attested by applicant Trust confirming
Notary. (Application form) availability of funds towards 10% of

7
land cost of the plot advertised. a) Photo identity of head of family i.e.
(Annexure-III) Voter ID card, Driving License, PAN
card, Passport, Govt. employee ID
8) The Audited Statement of Accounts card, Aadhar card etc. all Trustees
for the past preceding 1 year & indicating the address proof &
photo identity. (Annexure-V)
above, to confirm that the Trust has
incurred expenditures on Social/ b) Address proof- Electricity Bill, Water
Religious Activities.(If Trust is claiming Bill,Telephone Bill of MTNL,
experience of having more than 1 Agreement copy of the flat owner,
year).(Annexure-III) Property Tax demand letter, etc.
(Annexure-V)
9) Certificate in prescribed format from
17) Certificate from Statutory Auditor
Chartered Accountant (C.A.) of the
confirming that the Trust has
of Applicant Trust stating that the incurred expenditure towards the
Accounts of Applicant Trust are objectives of Trust i.e. for the no. of
maintained properly as per years’ experience of conducting
requirement of applicable Social/Religious activities claimed
regulations. (Annexure-III) by the Trust. (Annexure-VI)

*No document other than the mentioned in the


10) Income Tax Return filled for the
Scheme Application Document will be considered
year 2021-22 & 2022-23
for evaluation process. All financial record shall be
acknowledgement copy.
of applicant Trust’s. Scrutiny of documents will be
(Annexure-III)
done with supporting documents as mentioned in
11) Copy of PAN card of the Applicant and list of Annexures given in the Scheme
Trust. (Annexure-III) Application Document.

12) Copy of TAN card of the Applicant For further details please contact the office at
Trust (if available). (Annexure-III) the:
The Manager (Rehabilitation),
13) Bio-data of all Trustees with KYC Social Service Section, 7th Floor, CBD Belapur
documents towards address &
Railway Station Commercial Complex,
photo ID proof as annexed format.
Tower No.7, CBD Belapur,
(Annexure-IV)
Navi Mumbai- 400614.
14) Latest Public Trust Register (PTR) copy
of the applicant Trust indicating Phone : 022-6242 1911, 6242 1918, 6242 1921.
names of present Trustees issued by
the office of Charity Commissioner.
(Annexure-IV)

15) Affidavit on Rs.500/- Stamp Paper


stating that in any criminal case the
present trustees are/were not
convicted by any Court of law which
invokes moral turpitude or other
criminal cases. (Annexure-IV)

16) List of member families along with


KYC documents along with Photo
ID & Address proof. (Annexure-V)
8
INSTRUCTIONS TO APPLICANTS accepted under any circumstances
and the application will be
Name of Scheme:
disqualified. For details regarding
Lease of plot for Temple of Jain Religion in Kharghar online payment of amount towards
node of Navi Mumbai. Earnest Money Deposit and the
scheme booklet cost, please visit the
Scheme No.: RHB/01/REL/2023-24 website www.cidco.maharashtra.
gov.in
1.0 SCHEME APPLICATION DOCUMENTS
Please note that online acceptance
1.1 Complete set of documents along
of EMD does not imply acceptance
with corrigendum if any issued duly of application by the Corporation.
filled in and initialed on each page Online challan generation along
and signed by the Applicant(s) at with EMD payment should be done
prescribed places of the Scheme on or before date indicated in the
Booklet. Scheme Booklet.

1.2 Information and particulars of b. Unsuccessful/ ineligible Applicant’s


Applicants are to be furnished along Earnest Money Deposit shall be
with a declaration and an discharged/ returned after the
finalization of the result of Scheme.
undertaking to execute the works
No interest shall be paid on Earnest
within the time all as detailed in the
Money Deposit (EMD). The Earnest
form given in Appendix to Scheme
Money Deposit will not be adjusted
Application notice with requisite
against any other scheme.
Annexures.
c. The successful qualified Applicant’s
2.0 ISSUE OF SCHEME APPLICATION Earnest Money Deposit (EMD) shall
DOCUMENTS : be adjusted against the lease
premium to be paid by the
2.1 Trust intending to apply for the plot shall
applicant.
produce information concerning to
eligibility, financial capacity, etc. The right 3.1 Refund of EMD
to decide whether a Trust fulfill the
The EMD of the unsuccessful eligible
requirements of eligibility for Scheme rest
applicants shall be refunded without
entirely with the Management.
interest after the finalization of Scheme.

3.0 EARNEST MONEY DEPOSIT (EMD) 3.2 Invitation by CIDCO to submit the Scheme
Application Document shall be a
a. Amount of Earnest Money Deposit
proposal and the submission of
which is indicated in Scheme Booklet
application shall be an acceptance of
should be paid online only. On
such proposal to win the allotment of plot.
payment of amount towards Earnest
Money Deposit and the scheme The applicant shall not revoke his/her
booklet cost, an online receipt will application or vary its terms and
be generated which has to be conditions without the consent of CIDCO
submitted along with the during the period of 180 days counted
application. Applications without from the last day of submission of
the receipt of EMD paid will not be documents. If the applicant shall revoke

9
the application or vary its terms or 5.1 COST OF SCHEME APPLICATION
conditions contrary to his / her promise to DOCUMENT
abide by this condition, the Earnest
Money Deposit paid by him/her shall The Applicant shall bear all costs

stand forfeited to CIDCO without associated with the preparation and

prejudice to its other rights and remedies. submission of its Application, and the
Advertising Authority shall in no case be
3.3 The E.M.D. of the successful applicant shall responsible or liable for these costs,
be forfeited if: regardless of the conduct or outcome of
the allotment process.
3.3.1 Applicant withdraws / revokes his
/her application or modifies / 6.0 METHOD OF SUBMISSION OF APPLICATION
changes the same during the
validity or if after the acceptance The complete application, can be

of his / her application, the submitted as per the schedule mentioned

applicant fails or neglects to furnish in the Scheme Booklet-

the balance amount of plot as


6.1 Original online transaction receipt
mentioned in the document.
generated towards EMD amount shall be

3.3.2 Applicant fails to execute submitted.

Agreement to Lease within the


6.2 Late Applications: Applicant’s grievance
prescribed time limit.
/ complaint on account of non- submission

4.0 INTERPRETATION OF CONDITIONS OF of application due to transportation,

CONTRACT electricity problems, non-availability of


documents or any other reason shall not
The applicant shall be deemed to have be considered.
studied all plans, terms & conditions, other
documents of the Scheme Application 7.0 METHOD OF OPENING OF APPLICATION

Document and visited the site satisfying


Applications will be opened on the date
himself/herself before submission of
and time specified above in the
application, whether the applicant
Application Schedule.
inspects them or not.
8.0 VALIDITY OF APPLICATION
In case of difference of opinion or dispute
regarding the interpretation of conditions,
Validity of the Scheme Application
the interpretation of any of the conditions
Documents shall be 180 days from the
by Competent Authority of CIDCO
specified date of receipt of application
Limited shall be final and binding on the
as indicated in the Scheme Application
applicant.
Document or as such period of time till the

5.0 COST OF SCHEME BOOKLET:- all process on the Scheme are completed.
If required, CIDCO reserves the right to
Only those Applications shall be extend the validity of application till the
accepted for which non-refundable completion of the scheme under
Scheme Booklet cost of Rs.1180/- reference for which no separate intimation
(inclusive of GST) (INR One Thousand One shall be sent.
Hundred and Eighty Only), is paid.

10
9.0 IMPORTANT POINTS TO BE NOTED BY THE and allotted to eligible Trust on
receipt of management approval.
APPLICANT
10.0 ACCEPTANCE OF APPLICATION
a] The Scheme Application Document
should be submitted by the eligible All the required documents/ information
Trusts, as per application schedule. shall be submitted by the applicant with
supporting documents/proofs as
b] Applicant shall be deemed to have
indicated the Scheme Booklet.
studied all plans, terms and
conditions, eligibility criteria and After attaching all the required supporting
should make themselves
documents with the application,
acquainted, before submitting the applicant shall submit the application
application.
along with original online transaction
receipt generated towards EMD as
c] At any time prior to the deadline for
indicated in Application Schedule of the
sale of Scheme Booklet, CIDCO Ltd.
EMD amount to CIDCO on the Due Date.
may amend the Scheme Booklet or
extend the date of sale of Scheme The documents (Duly signed Application
Application Document by issuing Form and supporting documents) as
Corrigendum. specified in the Scheme Booklet shall be
placed in a sealed envelope. The
d] Any corrigendum as well as
envelope should bear the following
clarification thus issued shall be a
identifications:
part of the Scheme Booklet and it
will be assumed that the information “Application for Lease of Plot for Religious
contained in the amendment have
use (Mosque)”
been taken into account by the
Node- Ulwe, Sector No. 19 Plot No. 94 A
applicant while submitting the
application. The envelope shall be addressed to:

e] If any amendments are made then The Manager (Rehabilitation),


to give prospective applicant a City and Industrial Development
reasonable time, for preparing their Corporation Limited (CIDCO)
application, CIDCO Ltd. shall Tower No.7, CBD Belapur Railway Station
extend, at its discretion, the deadline Commercial Complex, 7th Floor, CBD
for submission of application, in such Belapur, Navi Mumbai- 400614.
case, will be notified to all applicants
by placing it on website /
Newspaper and same will be
binding on applicants.

f] CIDCO reserves the right to add


additional plots in the scheme or
delete plot from the scheme.

g] For any administrative reason if the


advertised plot is required to be
relocated. Then relocated fresh plot
will not considered for allotment.
Fresh plot will be advertised in future

11
11.0 EXECUTION OF AGREEMENT SPECIAL CONDITIONS
1. How to make an application
The successful applicant on making all
the necessary payments towards Lease Applicants shall make an application to
acquire plot in a form prescribed and
Premium of the plot is required to execute
annexed hereto along with EMD receipt
an Agreement in duplicate in the format
and all its enclosures. The applicant shall
as specified by CIDCO Ltd. and within the
deposit his/ her sealed envelope
time period indicated in the Scheme
containing his/ her application in the Drop
Booklet.
Box on the date and time indicated in the
Scheme Booklet. Non-eligible,
12.0 The applicant shall furnish truly & faithfully
applications without EMD amount receipt,
the foregoing information by an Affidavit
incomplete applications shall be
on a Non Judicial stamp paper of
summarily rejected.
appropriate value. If any information so
2. Evaluation of application
furnished shall be found to be untrue or
false, the Applicant shall be liable to be The applications will be evaluated by an
disqualified and the Earnest Money evaluation committee considering the
Deposit shall stand forfeited to CIDCO Ltd. eligibility indicated in mandatory eligibility
criteria as indicated in Scheme Booklet
13.0 Notice of scheme and these instructions and verification of documents submitted.
to the Applicants shall form part of the 3. Conditional application
Agreement.
Applicant shall not add new conditions,
14.0 The application shall be signed by one of amend/modify/alter existing conditions or
delete any condition. The applicant shall
the authorized Trustees under the
submit the application in the form as it is.
authority of the Trustees without which the
Any conditional application is liable to be
application will be held invalid. The Board
summarily rejected.
/ Trust Governing committee’s resolution
in that effect shall be enclosed with the 4. Opening of applications

application. Applications received will be opened on


the date, time and venue as indicated in
15.0 Documents/ records for Religious plot for the Scheme Booklet. The authorized
which application is submitted shall be representative i.e. any present trustee of
certified by the competent authorities as the Trust will be permitted to remain
applicable. present subject to production of
authorization letter which should be
presented along with the application or
should be submitted well in advance.

5. Acceptance of applications
The acceptance of an application of
successful applicant is at the sole
discretion of CIDCO Ltd.
6. Risk Factors
1) Applications without valid online
transaction receipt of Earnest Money
Deposit (EMD) or inadequate EMD
amount will be summarily rejected.

12
2) Conditional applications will be d) Imposement of fine.
summarily rejected. e) Black listing for making any
3) Applications without proper future applications.
documents & information will be 10. The applicant’s information shall be
rejected. kept in the Public Domain for which
4) The applicant shall keep his/her applicant shall not have any
application valid for acceptance objection.
for a period of minimum 180 days 11. The applicant shall have minimum 1
from the date of receipt of year existence from the date of
application by the Corporation or registration of the Trust under BPT
till such time the final decision about Act,1950. Existence after the date of
allotment of plot is arrived at by the registration for less than 1 year shall
CIDCO management received shall not be considered what so ever.
be extended for further period of
12. The policy of CIDCO Ltd. (modified
time for which no separate
from time to time) shall be applicable
intimation shall be sent.
for allotment or for any other matter
5) If the applicant withdraws their which shall be binding on the
application within 180 days then the applicant. Applicant shall not ask for
deposited Earnest Money Deposit any clarification in this regards.
shall be forfeited.
13. The financial soundness documents
6) Corporation reserves the right to of the applicant Trust shall be taken
amend, revoke ,modify the into consideration.
condition of the Scheme of its
14. The area of plot is approximate and
discretion or reject any or all
subject to demarcation on-site.
applications, cancellation of
scheme ,deleting plot from the 15. It will be responsibility of allottee to
scheme, extending the date of remove encumbrances, if any,
submission of application or sale of including trees, rock, outcrop, etc.
Scheme Booklet without assigning within the plot with the prior approval
any reasons thereof. of concerned competent authority.

7) The applicants are advised to visit 16. The plots are marketed on “as is
the site and inspect the status of the where basis is.”
infrastructure in the area of the plot, 17. Rates prevalent at the time of issue
before making any application. of actual allotment letter on
8) Original online receipt generated receiving the approval of Govt. for
towards EMD shall be submitted the proposal are applicable or as per
separately as per application the prevalent Land Pricing & Land
schedule to avoid disqualification. Disposal Policy as amended from
time to time.
9. If any false information is given, then
it may lead to:- 18. Corporation reserves the right to
amend ,modify, alter or add any
a) Cancellation of application /
Terms & Conditions of allotment by
Plot allotment.
executing the modified agreement.
b) Cancellation of plot even after
19. The interest on EMD shall not paid for
allotment as the case may be.
the period of completion of process
c) Legal action against applicant of the plot under the Scheme.
Trust.

13
SPECIAL DEVELOPMENT CONDITIONS ix) The approval of CIDCO’s Chief
Planner should be obtained with
1. In addition to the general terms and
reference to elevation and
conditions for disposal of plots of land,
aesthetics views of the project
the offer is subject to the following
before submitting the building plans
development conditions:
to the Competent Authority for
i) The plot is offered on ‘’as is where is approval and also for obtaining
basis’’. Occupancy Certificate.
ii) FSI: The permissible FSI for plot is 1.1 x) The Corporation shall be entitled to
In case of technical difficulty if any impose any other terms & issue
arise in future in such case the directions or conditions as may be
permissible FSI granted may vary. deemed fit for efficient and better
iii) Sub-division of the plot shall not be management of the religious facility
permitted. If it is observed, that any from time to time in the Agreement
part of allotted plot is being used, to Lease by executing the modified
other than the specified purpose Agreement to lease the plot. The
action for cancellation of the plot Corporation in Estate Dept. shall
will be initiated. appoint its two nominees on the
Managing Committee of the
iv) The plot shall be used only for running
proposed religious facility Complex
religious activity for which plot is
who shall have the same rights,
advertised along with the
immunity of the existing Trustees of
permissible ancillary facilities.
the Trust.
v) Religious activity proposed to be
2. Solid Waste Management:
started should be open to all people
belonging to Muslim religion or The intending lessee shall observe
otherwise. scrupulously the following conditions in
order to ensure the directives and
vi) The plot is offered on lease basis
recommendations of the Hon’ble
subject to the provisions of Navi
Supreme Court regarding solid waste
Mumbai Disposal of Lands
management.
(Amendment) Regulations, 2008
and as may be amended from time a) The intending lessee shall keep two
to time. streams of waste, one for food waste
and biodegradable waste and
vii) The General Development Control
another for recyclable waste such
Regulation of Panvel Municipal
as papers, plastic, metal, glass, tags
Corporation (PMC)/ CIDCO as the
etc.
case may be at the time of
submission of development b) The intending lessee shall identify
proposal and building plan to town locations for composting and
Planning Officer PMC / CIDCO shall disposal of waste within their social
be applicable in addition to the facility Complex.
above conditions. c) The intending lessee shall ensure that
viii) Land Use: no domestic / institutional waste shall
be thrown on the streets, foot-paths,
The above plot of land is to be used
open spaces, drains or water bodies.
exclusively for establishing Mosque
of Muslim religion for which the plot d) Intending lessee shall make separate
is advertised. arrangement for disposal of toxic or

14
hazardous household waste such as d) Rain Water Harvesting in a building
used batteries, containers for site includes storage or recharging
chemicals and pesticides, into ground of rain water falling on
discarded medicines and other toxic the terrace or on any paved or
or hazardous household waste. unpaved surface within the building
e) The intending lessee shall ensure site.
proper segregation and storage of e) The following systems may be
household waste in two separate adopted for harvesting the rain
bins containers for storage of food water drawn from terrace and the
waste, bio-degradable waste and paved surface.
recyclable waste.
i) Open well of a minimum of 1 m
3. The following provisions shall be diameter and 6 m Depth into
applicable for installation of Rain Water which rain water may be
Harvesting Structures (RWHS) channelized and allowed after
a) All the layout open spaces / amenity filtration for removing silt and
spaces of housing societies and new floating material. The well shall be
constructions / reconstructions / provided with ventilating covers.
additions on plots having area not The water from the open well may
less than 300 sq.mtr. in non-Gaothan be used for non potable
areas of all towns shall have one or domestic purposes such as
more Rain Water Harvesting washing, flushing and for watering
structures having a minimum total the garden etc.
capacity as detailed in sub ii) Rain water harvesting for
regulation Provided that the recharge of ground water may
Authority may approve the Rain be done through a bore well
Water Harvesting Structures of around which a pit of 1 meter
specifications different from those width may be excavated up to a
specified here below, subject to the depth of at least 3.00 meter and
minimum capacity of Rain Water refilled with stone aggregate and
Harvesting being ensured in each sand. The filtered rain water may
case. be channeled to the refilled pit
b) The owner / society of every building for recharging the bore well.
mentioned in the (a) above shall iii) An impervious surface/
ensure that the Rain Water underground storage tank of
Harvesting Structure is maintained required capacity may be
in good condition for storage of constructed in the setback or
water for non potable purposes or other open space and the rain
recharge of groundwater, at all water may be channeled to the
times. storage tank. The storage tank
c) The Authority may impose a levy of shall always be provided with
not exceeding Rs.1000/- per annum ventilating covers and shall have
for every 100 sq.mtr. of built up area draw-off taps suitably placed so
for the failure of the owner of any that the rain water may be drawn
building mentioned in the (a) above off for domestic, washing,
to provide or to maintain Rain Water gardening and such other
Harvesting Structures as required purposes. The storage tanks shall
under these byelaws. be provided with an overflow.

15
iv) The surplus rain water after storage g) Perforated concrete slabs shall
may be recharged into ground be provided on the pits/
through percolation pits or trenches.
trenches or combination of pits v) If the open space surrounding the
and trenches. Depending on the building is not paved, to top layer
geomorphologic and upto a sufficient depth shall be
topographical condition, the pits removed and refilled with course
may be of the size of 1.20 m Width sand to allow percolation of rain
x 1.20 m Length x 2.00 m to 2.50 m water into ground.
Depth. The trenches can be or
vi) In case of the plots where the
0.60 m Width x 2.00 to 6.00 m
water table is high i.e. 10 feet less,
Length x 1.50 to 2.00 m Depth.
it is not mandatory to follow the
Terrace water shall be channeled
above provisions.
to pits or trenches. Such pits or
trenches shall be back filed with a) The terrace shall be connected
filter media comprising the to the open well / bore well /
following materials or as per the storage tank / recharge pit / by
prevailing norms amended from means of HDPE / PVC pipes
time to time. through filter media. A valve
system shall be provided to
a) 40 mm stone aggregate as
enable the first washings from
bottom layer upto 50% of the
roof or terrace catchment, as
depth;
they would contain undesirable
b) 20 mm stone aggregate as dirt. The mouths of all pipes and
lower middle layer upto 20% opening shall be covered with
of the depth; mosquito (insects) proof wire
c) Coarse sand as upper middle net. For the efficient discharge
layer upto 20% of the depth; of rain water, there shall be at
least two rain water pipes of
d) A thin layer of fine sand as top
100mm diameter for a roof area
layer.
of 100 sq.m
e) Top 10% of the pits/trenches
b) Rain water harvesting structures
will be empty and a splash is
shall be sited as not to endanger
to be provided in this portion
the stability of building or
in such a way that roof top
earthwork. The structures shall
water falls on the splash pad.
be designed such that no
f) Brick masonry wall is to be dampness is caused in any part
constructed on the exposed of the walls or foundation of
surface of pits/trenches and the building or those of an
the cement mortar plastered. adjacent building.
The depth of wall below c) The water so collected /
ground shall be such that the recharged shall as far as
wall prevents lose soil entering possible be used for non-
into pits/trenches. The drinking and non-cooking
projection of the wall above purpose.
ground shall at least be 15
Provided that when the rain
cms.
water in exceptional
circumstances will be utilized for

16
drinking and / or cooking intending lessee shall be sent to the
purpose, it shall be ensured intending lessee under Registered Post A.D.
that proper filter arrangement on the address given in the application.
and a separate outlet for by The letter shall be deemed to have been
passing the first rain water has received by the intending lessee on or
been provided. before the expiry of 7 days of such dispatch
of the acceptance by RPAD.
d) Provided further that it will be
ensured that for such use,
5. SCHEDULE OF PAYMENT OF AGREED LEASE
proper disinfectants and
PREMIUM.
the water purification
arrangements have been Agreed Lease Premium along with
made. applicable GST amount, after adjusting
GENERAL TERMS AND CONDITIONS PRESCRIBED the Earnest Money Deposit (EMD), shall be
FOR DISPOSAL OF PLOTS BY INVITATION OF payable in two equal monthly installments
APPLICATION in the following manner:

1. APPLICATION OF LAW a. First Installment: Within Forty-five days


The land shall be allocated on lease. The from the receipt of allotment letter
lease shall be governed by the provision issued by the Corporation.
of Section 118 of the Maharashtra b. Second Installment: Within Seventy-
Regional Town Planning Act, 1966 and five days from the receipt of allotment
the Navi Mumbai Disposal of Lands letter issued by the Corporation.
(Amendments) Regulations, 2008 made
there under and as amended from time 6. GRANT OF EXTENSION OF TIME FOR
to time. The development of the land shall MAKING PAYMENT OF FIRST INSTALLMENT
be governed by the provisions of the & SECOND INSTALLMENT.
General Development Control
The Managing Director may, in a deserving
Regulation for Navi Mumbai, 1975 as
case, extend either of the foregoing period
amended from time to time.
in the condition that the Intending Lessee
2. SITE INSPECTION shall pay the Delayed Payment Charges
for such extension at the rates as may be
The intending lessee is advised to visit the prescribed by the Corporation from time
sites and inspect the status of the plot to time in the Navi Mumbai Disposal of
before making application. Land Regulations (NMDLR), 2008 as
amended from time to time.
3. TERMS OF LEASE
Provided that the period of extension for
All lands shall be on lease. The validity of the payment of the first installment of the
the lease shall be for a period of 60 years lease premium shall not exceed Three
from the date of execution of an months.
Agreement to Lease. The Corporation
reserves its right to terminate the lease at Provided further that the period of
any time as per the rules and regulations extension for the payment of the second
of CIDCO Ltd. installment shall not exceed Ten months.

The present rates of interest for extension


4. The intent/allotment letters
of payments are as under:
communicating the acceptance by the
Corporation of the application of the a. Upto 120 working days : 12%

17
b. Beyond 120 working Intending Lessee shall stand forfeited in
days & upto 6 months : 16% full. In addition to the forfeiture of the
Earnest Money Deposit, 25% of the
The above rates are subject to change installment or installments of lease
without notice and the rates shall be premium paid by the Intending Lessee
charged as amended from time to time. shall also stand forfeited to the
Corporation, without prejudice to the
7. GRANT OF “NO OBJECTION CERTIFICATE”
rights of the Corporation to recover
TO ENABLE THE INTENDING LESSEE TO
compensation for loss or damage, if any,
MORTGAGE THE PLOT OF LAND FOR
suffered inconsequence of such default.
BORROWING LOAN
9. PAYMENT OF WATER DISTRIBUTION
The Corporation in Estate Section may
BETTERMENT CHARGES (WDBC)
grant “No Objection Certificate” to
enable the intending lessee to mortgage In addition to the lease premium as
the land to obtain loan. Such No indicated above, Water Distribution
Objection Certificate shall be granted Betterment Charges @ Rs. 310/- per
subject to the following conditions: square meter of area of plot of land shall
be payable along with the payment of
i. The intending lessee shall apply to
second installment.
the Corporation along with a letter
from the Financial Institution 10. PAYMENT OF P S I D C.
promising the intending lessee to
grant him / her loan. The intending lessee shall pay to the
Corporation Annual Lease Rent @ Rs.100/
ii. The Corporation has approved - per plot plus GST for each financial year
financial institutions for obtaining or part thereof irrespective of the size of
loan. The list of approved financial the plot for the period of the lease. Liability
institutions will be made available on to pay such Annual Lease Rent will
the request. commence from the date of execution
of the agreement to Lease. Intending
iii. The “No Objection Certificate” shall
Lessee shall pay to the Assistant Estate
enable the intending lessee to
Officer of the Node or to as such
mortgage the land to said financial
authorized authority of the Corporation
institutions only after the payment of
where the plot of land is situated such
entire lease premium and other
Annual Lease Rent @ Rs.100/- per year on
charges and after execution of
or before 30th April in each financial year.
Agreement.
11. PAYMENT OF DOCUMENTATION CHARGES
8. CONSEQUENCES OF NON-PAYMENT OF
ANY OF THE INSTALLMENT OF LEASE Documentation charges of Rs. 500/- plus
PREMIUM ON DUE DATE GST as applicable shall be payable along
with payment of second installment. In
If there shall be default by the Intending
addition to the payment of
Lessee in the payment of 1st installment
Documentation Charges to the
or the payment of 2nd installment of the
Corporation, the amount on account of
lease premium, the agreement concluded
Stamp Duty and Registration Charges is
between the Corporation and the
also payable in accordance with the
Intending Lessee shall stand determined
Bombay Stamp Act, 1958 to the
and the Earnest Money Deposited by the

18
respective Competent Authority in Govt. The land shall be used only for the purpose
as amended from time to time. specified for the plot as indicated in the
invitation of applications and for no other
12. MODE OF PAYMENT purpose. The basic permissible FSI for the
plot is 1.1. The expression FSI shall have the
The payment of installment of the lease
meaning assigned to it under prevailing
premium, water distribution betterment
CIDCO General Development Control
charges, documentation charges, lease
Regulation sanctioned by Govt. of
rent and GST as applicable as per the
Maharashtra as amended from time to
prevalent regulations & shall be paid as
time. In case of technical difficulty if arise
per the instructions of allotment letter.
then the permissible FSI granted may vary.
13. DEMARCATION PLAN
15. APPLICATION OF GENERAL DEVELOPMENT
On the confirmation of payment of full CONTROL REGULATION FOR NAVI
amount of lease premium, GST amount MUMBAI, 1975.
and other charges the plot of land will be
The allotment of land will be governed by
demarcated and such demarcation plan
the prevailing provision contained in the
will be enclosed with the Agreement to
General Development Control
lease. During the course of final
Regulation for Navi Mumbai, 1975. Any
demarcation, the possibility of some
modification to the said Regulation and
variation in the area cannot always be
in particular to the Floor Space Index (FSI)
denied. In case such variation is to the
and change of use of the land shall not
extent of 10% from that indicated with
be made automatically applicable but
offer documentation or 250 square meter,
the intending lessee, if he/she so desires
whichever is more, the same shall have
he/she may apply along with the
to be accepted by the intending lessee.
application of the modified regulation of
If the area has increased the intending
the General Development Control
lessee shall be required to pay for the
Regulation for Navi Mumbai, 1975 to the
difference in area at the original rate
Corporation. The Corporation may at its
appreciated by 18% compound interest
sole discretion, apply the modification of
for the intervening period. However, in
such regulation on payment of (1)
case the area has decreased, the
Development charges, (2) Additional
difference in lease premium shall be
lease premium, if any (3) GST as
refunded without any interest. If the area
applicable and (4) other charges if any
is in excess by more than 10% or by more
as may be decided by the Corporation
than 250 square meter, whichever is more,
from time to time.
the Corporation reserves the right to re-
demarcate and carve out an additional
16. PAYMENT OF TAXES/SERVICE CHARGES
plot which shall be separately disposed
off by the Corporation at its sole discretion. Payment of Taxes/Service charges shall be
In case, the possession of the plot is made to the respective authority as per
delayed by the Corporation for any rule and as applicable from time to time
reason, no compensation in the form of
which is binding. No concession in this
interest or otherwise shall be payable by
regard shall be given what so ever.
the Corporation to the intending lessee.
17. THE PLOT OR ANY PART THEREOF OR ANY
14. TYPE OF USE AND FSI
INTEREST THEREIN SHALL NOT BE
TRANSFERRED:

19
a) The plot with all fixtures and structures encroachment shall be deemed to be a
therein shall be liable to be resumed breach of this agreement.
by the Corporation if it is not used or
19. SUBMISSION OF PLANS & CONSTRUCTION
unable to use for the specific
purpose, if not developed in given I. The intending lessee shall submit plan
period of time or purposes for which
of the intending building to be
it is granted by such date as the
erected on the above plot of land
Corporation may fix in this behalf, or to the Panvel Municipal Corporation
if used for any purpose any other
(PMC) / CIDCO (as the case may be)
than the specific purpose or other
for its approval within a period of six
purposes for which it is granted or if months from the date of execution
required by the Government for its
of the Agreement to lease.
own purpose or for any other public
purpose and that a declaration by II. No work will be undertaken until the
the Managing Director that the land building plans are approved by the
is so required shall be between the concerned applicable Competent
Grantee and the Government, be Authority. The intending lessee shall
conclusive. not commence or carry on any work
on the said land until the building
b) If the land is at any time resumed
plan, elevation, section,
under condition (a) the
specification and details of the
compensation payable therefore
intended building have been so
shall not exceed the amount if any,
approved and thereafter the
paid to the Corporation for the grant
intending lessee shall not make any
together with the cost or value at
alterations or additions thereto unless
the time of resumption (whichever is
such alterations and additions shall
less) of any building or other work
have been in the like manner
authorized erected or executed on
approved.
the land by the Grantee. If a question
arises as to the adequacy of the The construction of the intended
amount of compensation to be paid building is required to be
under this condition, such question commenced within a period of
shall be referred to the Government twelve months from the date of
or to the concerned Competent execution of the Agreement to Lease
Authority for decision. by the intending lessee with the
Corporation. If Lessee fails to do so
18. FENCING DURING CONSTRUCTION revalidation shall be obtained as per
provisions of prevalent GDCR or
The intending lessee shall fence within a
period of two months from the date of applicable regulation.

execution of agreement, to lease by the 20. The Corporation may levy such charges
Corporation. The intending lessee shall not as may be prescribed, before the
encroach upon any adjoining land, road, commencement of construction of the
building, in case the intending lessee fails
pathway or footpath of the Corporation
to submit the building plan for approval
in any manner whatsoever. Any such within the prescribed period of 6 months.

20
Intending lessee will be required to apply The intending lessee is advised to apply to
to the Assistant Estate Officer (AEO) of the Assistant Estate Officer (Head Quarter)
the Node or to the concerned authorized or the concerned authorized authority at
authority where the plot of land is situated CIDCO Bhavan for grant of extension of
for condonation of delay and taking into time and period will be extended on
consideration the situation such delay payment of additional premium provided
may be condoned by the Assistant Estate that intending lessee shall have abided
Officer or by the concerned authorized by all the terms and conditions prescribed
authority on payment of the applicable in the Agreement to Lease or Lease Deed
charges or action may be initiated in as the case may be.
Estate Dept. as per the prevalent
regulations. Provided further that if the construction is
not commenced on the plot up to and
21. The construction work should be in
within 4th year of extension of agreement
accordance with the plans so approved
to lease shall be terminated and the plot
and the intending lessee shall complete
shall be resumed with immediate effect.
erection of the intending building within
a period of 4 years from the date of 23. TIME BEING ESSENCE OF THE CONTRACT
execution of Agreement to Lease (ATL),
failing which the action as per the The time prescribed for making payment
prevalent regulations / policy to of the installment of the agreed premium,
terminate the Agreement to Lease shall submission of plans, commencement of
take place in Estate Dept.. erection of the intended building and
completion of erection of such building
22. EXTENSION OF TIME shall be intended to be essence of the
contract.
If the intending Lessee obtains
development permission and 24. POWER CONNECTION
commences construction
Power connection, consumption deposits
in accordance with the conditions of the and other charges will be paid directly by
agreement to lease made between him the intending lessee to the Maharashtra
/ her and the Corporation but has been State Electricity Distribution Co. Ltd.
unable to complete the construction (MSEDCL) from time to time. The intending
within the time stipulated in the lessee will obtain directly from the MSEDCL
Agreement to Lease for reasons beyond power connection by completing the
his / her control, the Managing Director formalities of the MSEDCL in this behalf.
may permit extension of time for However, for getting temporary power
completion of buildings, on payment of connection during the construction,
additional premium at the rate as may
be determined by the Corporation from Immediately after full and final payment
time to time or as per the prevalent of agreed amount of lease premium and
regulations action may be initiated. other applicable charges, the
Corporation shall call the Intending Lessee
Explanation: Extension of time would be for execution of Agreement to Lease. The
given for 1 year at a time. Intending Lessee shall within a period of
Thirty days from the date of issue of letter

21
thereto, execute with the Corporation the erected thereon for a term of 60 years from
Agreement to Lease and shall obtain the the date of execution of Agreement to
license and authority to enter upon the Lease at the yearly rent of Rs.100/- only.
plot for the purpose of erecting a building
or buildings thereon. 36. PAYMENT OF STAMP DUTY & REGISTRATION
CHARGES
The Managing Director may, on request
of the Intending Lessee, extend the The intending lessee will bear and pay

foregoing period by Three months, on the wholly and exclusively the Stamp Duty and

condition that the Intending Lessee shall the registration charges payable in

pay to the Corporation the Watch and accordance with Bombay Stamp Act,

Ward Charges at the rate of Rs. 5/- or as 1958 on the Agreement to Lease/Lease

prevalent applicable rate per Sq.Mtrs per Deed to be executed between the

calendar month or part thereof or Corporation on one part and the

prevalent rates shall be applicable. Intending Lessee/Leases of the other part.

37. The intending lessee if required will obtain


Provided that if the Agreement to Lease
exemption as required under the Urban
is not executed and the possession of the Land (Ceiling and Regulation) Act, 1975
plot is not taken within specific period, from the Competent Authority.
the agreement concluded between the
38. PREFERENCE IN EMPLOYMENT OF LABOUR
Corporation and Intending Lessee shall
stand terminated. In the event of In employing skilled and unskilled labour
termination of the concluded the intending lessee shall give preference
agreement, the Earnest Money to the displaced persons, PAP’s of Navi
Deposited along with the 25% of the Mumbai project provided they satisfy the
installments of lease premium paid shall prescribed qualification norms.
be forfeited without prejudice to the rights
of the Corporation to recover 39. POWER OF CORPORATION TO RESUME THE
compensation for loss or damage, if any, LAND
suffered in consequence of such default.
The Corporation shall resume the land in
35. EXECUTION OF LEASE DEED the following circumstances:

a. In case the intending lessee fails to


As soon as PMC or the CIDCO, as the case
submit the plans, elevations, sections,
may be, has certified that the building
specifications and details of the
and works have been erected in
building agreed to be erected on the
accordance with the conditions
land to be leased, to commence
contained in the Agreement to Lease and
erection of the intended building and
if the intending lessee shall have observed
to complete such building within the
all the stipulations and conditions
time prescribed.
contained in the Agreement to Lease to
be executed, the Corporation will grant b. If the intending lessee not proceed
and the intending lessee will accept a with the work with due diligence.
lease (which shall be executed by the c. If the intending lessee fail to observe
Corporation and the intending lessee in any of the conditions of the
duplicate) of the land and the building Agreement of Lease / Lease Deed.

22
d. If the lessee/intending lessee location involved as per the prevalent
surrenders or terminates the lease policies or as decided by the management
before the expiry of the full lease from time to time.
period.
42. FORMAT OF AGREEMENT TO LEASE
e. The Corporation shall revoke license
granted to the intending lessee and Format of Agreement to Lease is available
to restrain the intending lessee, its for inspection in the office of
agents, servants to enter upon the
The Rehabilitation Dept.,
said land and there upon the
CIDCO Ltd. 7th Floor, Tower No.7,
Agreement to Lease/Lease Deed to
CBD Belapur Railway Station
be executed shall cease and
Commercial Complex Bldg.,
terminate and all erections and
CBD-Belapur, Navi Mumbai - 400 614.
materials, plants and things upon this
land agreed to be allotted shall 43. FORMAT OF LEASE DEED
belong to the Corporation without
making any payment to his/her Trust Format of Lease Deed is available for
for refund or repayment of any inspection in the office of
premium paid by him / her. The Manager (Town Services-III),
Estate Dept., 1st Floor, CIDCO Bhavan,

40. INTERPRETATION OF GENERAL TERMS & CBD-Belapur, Navi Mumbai - 400 614.

CONDITIONS FOR DISPOSAL OF PLOTS OF


LAND

In case of dispute as regards with


interpretation of the General Terms and
Conditions of disposal of plots of land and
for the invitation of application or
anything there from, the final decision rests
with Managing Director of CIDCO and
will be binding on all parties as the award
of Arbitrator.

41. TRANSFER OF MANAGEMENT

Over a period of time, management of


Trust may find it necessary to transfer their
assets and liabilities to other institutions/
individuals for various reasons such as
changes in their priorities, collaboration
or mergers. It may be permitted on the
condition that the new Management has
the approval of the Board of CIDCO
through Estate Department. The Board
may decide a fixed standard transfer
charges for Trust on the basis of area and

23
GEOTAG link:

https://www.google.com/maps/d/u/0/edit?mid=13YXvVF_zXVWXrXQzO9VcNMXIb1qL5zQ&usp=sharing

QR Qode:

24
25
NODAL PLAN OF ULWE

26
ULWE, SECTOR NO.19, PLOT NO.94A,
Purpose- Mosque

27
28
APPLICATION FORM

Application No.:________________

1. Name of Applicant Trust : ……………………………………………………………………………………

2. Act under which Trust is registered (Name of Act.) :…………………………………………………..

1) Registration No.: ...........................................

2) Date & Place: ...............................................

3) Place of Registration: ...................................

3. Registered Office Address: 4. Address for Communication:


Flat No./Floor No. : ........................................... Flat No./Floor No. : .....................................
Building No./Name : .......................................... Building No./Name : .....................................
Plot No : ........................................................... Plot No : .......................................................
Street name / Sector No. : ................................. Street name / Sector No.: ............................
Node : .............................................................. Node : ..........................................................
City : ................................................................. City : .............................................................
State : ............................................................... State : ..........................................................
Pin Code : ........................................................ Pin Code : ...................................................

5 Telephone Nos.:
Office : ............................................................. Mobile No. : .................................................
Fax No. : ........................................................... Email : ..........................................................

6. PAN No. : .......................................................... 7 TAN No. : ......................................................

8 Application
I/we desire and hereby make an application for 60 years lease of the following plot for Religious
Facility plot at the prevalent rate as mentioned in the Scheme Booklet with the terms and conditions
specified in the application documents and at the general terms and conditions prescribed by the
Corporation in the application document for disposal of plot which shall be deemed to form of the
application, as if the same were specifically incorporated herein.

Sr. Node Sector Plot Area approx. Purpose


No. No. No. (in Sq.mtr.)

1 Ulwe 19 94A 300.00 Mosque

29
9. Details of Cost of EMD

EMD Amt.Rs. UTR No. Date

Terms and Conditions of application:-

I/ We shall keep this application valid for minimum 180 days or till such time the final decision about
allotment of plot is arrived at on completion of the required formalities as per the prevalent policies/
regulations, as amended from time to time from the date of opening of application and will not revoke
it before the expiry for 180 days from the date of opening and in the event of my/our failure to keep the
application open 180 days from the date of opening of application, the EMD paid by me/us under this
application shall be absolutely forfeited to the Corporation. I am aware that if the validity period is
extended for further period of time then under such circumstances separate intimation shall not be sent
to our Trust by the Corporation. I am aware about the fact that no interest shall be paid on the EMD paid
by the Trust during the period of completion of the Scheme.

Signature & Seal of the Authorized

30
Details of Authorized Signatory

Name of Authorized Signatory : ........................................................


(Trustee of Trust)
PHOTO

Signature : .......................................................................................

Designation in Trust : ..............................................................

First Name of Attesting Authority in Trust: Mr. .............................

Middle Name : .................................................................................

Last Name : ......................................................................................

Place:

Date:

Signature of Attesting Authority with seal of the Trust:

31
32
Undertaking
(To be typed on Rs. 200/- Stamp Paper & Notarized)

This Undertaking is executed by


Authorized
………………………….. Signatory
Photo
…………………………..

In favour of the
The Vice-Chairman & Managing Director,
In favour of the

The Vice-Chairman & Managing Director,


City and Industrial Development Corporation Limited (CIDCO)

1. With reference to your Scheme No. RHB/01/REL/2023-24 I/we, having examined the document and
understood its contents, hereby undertake that our Application is unconditional.

2. I/We acknowledge that the Authority will be relying on the information provided by us in the
Application and the documents accompanying such Application, and we certify that all information
provided in the Application is true and correct; nothing has been omitted/added/altered which
renders such information misleading; and all documents accompanying such Application are true
copies of their respective originals.

3. I/We acknowledge the right of the Authority to reject our Application without assigning any reason
or otherwise and hereby waive to the fullest extent permitted by applicable law, our right to
challenge the same on any account whatsoever.

4. I/We hereby certify that we have taken steps to ensure that in conformity with the provisions of the
Scheme Booklet, no person acting/representing for us or on our behalf have engaged or will
engage in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or
restrictive practice.

5. I/We further certify that in regard to matters relating to security and integrity of the country, we or
any of our associates have not been charge-sheeted by any agency of the Government or
convicted by any Court of Law.

6. I/We further certify that no investigation by a regulatory authority is pending either against us or
against our associates or against our Trust or any of our directors/ trustees / managers / members
/ employees.

7. I/We undertake that in case due to any change in facts or circumstances during the selection
process, we are attracted by the provisions of disqualification in terms of the provisions of the
Scheme Booklet. We shall intimate the Authority of the same immediately.

8. I/We understand that the selected Trust shall set up a Religious Facility for which the Trust has
submitted the application as a trust registered under the Bombay Public Trusts Act, 1950.

9. I/We understand that the validity of our application submitted under scheme is for 180 days or till
such time the final decision is arrived at under the applicable policy/regulations and which may
likely to be extended for further period of time for which no separate intimation shall be sent or for
the such extended period no interest shall be paid by the Corporation on the EMD amount deposited
by Trust.

10. I/We understand that the CIDCO may add/delete/amend any of the conditions mentioned in
the Scheme Booklet at the time of issue of allotment letter and/or execution of Agreement to lease.

33
11. I/We hereby irrevocably waive any right or remedy which we may have at any stage at law or
howsoever otherwise arising to challenge or question any decision taken by the Authority in
connection with the selection of Applicants, selection other Trust or in connection with the selection
process itself, in respect of the above mentioned scheme and the terms and implementation
thereof.

Place: Signature &


Seal of the

Authorized
Signatory of Trust

Date: Name:

Designation in the Trust:

Address for Correspondence:

Contact Telephone number:

Mobile No.:

E-mail ID:

34
Annexure I

Information of Existing Religious Facility if any run by Trust for which application is submitted

Sr. Name of the Date of Address in detail Whether run in Details of supporting
No. Facility Establishment from where the rental premises/ Documents
activities are own land Attached
conducted

Signature of Authorized signatory along


with the seal of Trust

Enclose the following documents:

a) Annual Activity Reports for the 1 year or number of years experience claimed by the applicant Trust.

b) Leave & Licensee Agreement or Land Ownership documents issued by the Competent authority.

c) Brief project report about the praposed religious project in Ulwe, Navi Mumbai.

35
Annexure II

Information about Year wise expenditure incurred on Religious Activity if any for which application is
submitted
Sr. Name of the Address from Year Year wise annual expenditure Attached
No. Religious activity where the activity incurred as per Audited Documents –
conducted Statement of Accounts on Audited
Religious activity in Rs. Statement of
A/c (Yes/no)

2021-22

2020-21

2019-20

2018-19

2017-18

2016-17

2015-16

2014-15

2013-14

2012-13

2011-12

Signature of Authorized
Signatory along with the seal
of the Trust

Countersigned
Signature & seal of the Statutory Auditor
( C.A. Firm)

Enclose the following Documents :

1) Self Declaration/Affidavit by the Trust regarding activities undertaken by the Trust.

2) If any Trust claims to have experience of conducting Religious activities for more than one year
in such cases number of Audited Statement of Accounts may be submitted.

36
Annexure III
Financial Status as on 31.03.2023

Sr. Type of available Finance Name of Bank Amount Certificate


No. (F.D./T.D./Investment/ attached (Yes/No)
Bank Balance)

Total

Signature of Authorized
Signatory along with the seal
of the Trust

Countersigned

Signature & seal of the Statutory Auditor

( C.A. Firm)
Enclose the following Documents :

a) Latest Bank Balance certificates of Applicant Trust.

b) Copies of Fixed Deposit (F.D.), Term Deposit (T.D.), Investment, etc. of the Applicant
Trust.

c) Audited Statement of Accounts of the Applicant Trust for the financial year ended
2022-23.

d) Certificate in prescribed format from Chartered Accountant (C.A.) of the of Applicant


Trust stating that the Accounts of Applicant Trust are maintained properly as per
requirement of applicable regulations.

e) Income Tax Return filled for the year 2022-23 acknowledgement copy.

f) Copy of PAN card of the Applicant Trust.

g) Copy of TAN card of the Applicant Trust. (if available)

37
Annexure IV
Information of Trustees

Sr. Name Designation Address Contact Profession/ Educational Experience Any Signature
No. of the in the (Residential) Numbers Occupation Qualification in the other of the
present Trust Office, field of Informa- Trustee
Trustee Mobile No. Religious tion
/ Welfare
Activities,
if any

10

Date :
Place :
Signature of Authorized

Signatory along with the seal

of the Trust

Enclose the following Documents:

a) Bio-data of all Trustees with KYC documents towards address & photo ID proof as annexed format.
(Annexure-IV)

b) Latest Public Trust Register (PTR) copy of the applicant Trust indicating names of present
Trustees issued by the office of Charity Commissioner. (Annexure-IV)

c) Affidavit on Rs.500/- Stamp Paper stating that in any criminal case the present trustees are/were not
convicted by any Court of law which invokes moral turpitude or other criminal cases.
(Annexure-IV)

38
AnnexureV

LIST OF 200 OR MORE FOLLOWER FAMILIES WITH KYC DOCUMENTS.


Sr. Complete Name & address of No. of members in Contact No. KYC documents of
No. the head of family member family Head of family
submitted (Photo
Identity & address
proof)

Signature of Authorized

Signatory along with the seal

of the Trust

Enclosed the following Documents:

1. List of member families along with KYC documents along with Photo ID & Address proof.

a) Photo identity of head of family i.e. Voter ID card, Driving License, PAN card, Passport, Govt.
employee ID card, Aadhar card etc. all Trustees indicating the address proof & photo
identity.
b) Address proof - Electricity Bill, Water Bill, Telephone Bill of MTNL, Agreement copy of the flat
owner, Property Tax demand letter, etc.

39
Annexure VI

CHARTERED ACCOUNTANT CERTIFICATE

I ____________________________ Aged _____________ Occupation


______________________ resident of _______________________________
registered with CAII registration No._______________ hereby declare
that I have prepared the Audited Statement of Accounts of M/s.
_____________________ for the past _____________ years further I state
that Trust has incurred expenditures on conducting the religious activities
during the past ___________ years. The Audited Statement of Accounts
prepared & certified by me are as per the applicable regulations of
the Competent Authority & Trust has regularly filed their Income Tax
Returns with I.T.Dept.

Signature of Authorized

Signatory along with the seal

of the Trust

Signature & seal of the Statutory


Auditor

40
UNDERTAKING- 2

Self-Declaration
(On the letterhead of the Trust)

Authorized
Signatory
Photo

I ____________________________ Son/Daughter of ______________________ Aged _____________,


occupation ______________________ resident of _______________________________ bearing Aadhar
Card (UID) No. ___________________________________ hereby declare that the information provided in
the application is true and correct to the best of my knowledge, information and belief. I fully
understand the consequences of giving false information. If the information is found to be false, I shall
be liable for prosecution and punishment under Indian Penal Code and/or any other law applicable
thereto.

Authorized Applicant’s Name, Signature

and seal of the Trust

Place :

Date :

41
UNDERTAKING- 3

Self-Declaration
(On the letter head of the Trust)

Authorized
Signatory
Photo

I ____________________________ Son/Daughter of ______________________ Aged _____________, occupation


______________________ resident of _______________________________ bearing Aadhar Card (UID) No.
___________________________________ hereby declare that the copies attested by me are true copies of
original documents. I am well aware of the fact that if the copies are found to be false, I shall be liable
for prosecution and punishment under Indian Penal Code and/or any other law applicable thereto.

Authorized Applicant’s Name, Signature

and seal of the Trust

Place :

Date :

42
Affidavit-Cum Declaration
(As per Stamp Act applicable to the respective state)

I, ————————————— aged —————an Indian inhabitant, presently residing at ————————


———————— do hereby solemnly affirmed and state as under:

I state that I am the trustee of the ___________________(Name of Trust).The names of trustees are as follows
and I state that I am an authorized signatory on behalf of the said trust.

I state & declare that no trustees are convicted in any criminal nature of offence which involves moral
turpitude or other criminal cases.

I state & declare that information provided in Application for _____________________( Name of the
Project) is true and correct to the best of my knowledge.

I state & declare that whatever stated herein above is true & correct as per my knowledge & belief.

I hereby verify, solemnly affirmed & signed at________on _____day of __________,2023.

DEPONENT

VERIFICATION

Verified_____day of__________,2023 that the contents of the above mentioned Affidavit Cum
Declaration are true & correct to the best of my knowledge.

Solemnly affirmed on )

At________by__________ )

) DEPONENT

Identified by BEFORE ME

43
44

You might also like