Clash avoidance
BIM co-ordinator.
Building Information Modelling (BIM) is a very broad term that describes the process of creating a digital model of a built BIM execution plan.
asset.
BIM Protocol.
Building information models are likely to comprise a series of federated models prepared by different design teams, including Clash.
model files, documents and structured data files containing non geometric information about the facility, floors, spaces,
Collaborative practices.
systems and components. Together these create a digital replica of the built asset that starts by representing design intent,
Design coordination.
but by handover, reflects what has actually been built and installed.
Employer's Information Requirements.
One of the benefits of adopting BIM is the potential for better avoidance of clashes, that is, it can help ensure there is spatial
co-ordination between the different components that make up the asset.

For example, avoiding situations on site such as the route for pipework running through a steel beam (sometimes described
as a 'hard clash'), which can be very difficult, disruptive and costly to rectify. Clashes can also occur as a result of
construction tolerances, too little space to install or maintain a component of the building, the installation of insulation,
proximity clashes, health and safety requirements, or from too many workers being programmed to carry out works in the
same space at the same time. These are sometimes described as 'soft clashes'.

Clashes can be a particular issue where multiple disciplines are working on different aspects of the same project. Whilst in
theory, BIM should reduce clashes by bringing together the entire design team to work on one collaborative, co-ordinated
building model, BIM Level 2, allows disciplines to work on separate 'federated' models that are only brought together to
create a single, complete model of the building at key stages. The building information model may also be broken down into
volumes to allow more than one person to work on project models simultaneously, or to ensure that file sizes are
manageable. This increases the likelihood of poor spatial co-ordination.

Clash avoidance and clash detection must therefore be carried out as an integral part of the entire design and construction
process, from defining standard methods and procedures and establishing a BIM volume strategy, through specialist design
and the creation of a virtual construction model and should continue during the construction phase itself as models are
updated with as-constructed information. This requires that models are updated quickly so that the impact of changes on
subsequent works can be checked.

Procedures for co-ordination and clash detection should be required from suppliers by the employer's information
requirements (EIR) which form part of the contract documents for the project, and suppliers should respond to this in their
BIM execution plan. During the design and construction process, interface managers within each design team should assess
design decisions and clashes to see if they can resolve them internally, and where this cannot be done, separate models
may be combined for review by the lead designer.

Clash detection software can identify clashes between different discipline's BIM data and generate clash reports. However,
this should not be relied upon as a fail-safe check, and should not be used to justify poor design co-ordination processes.

Where there is poor interoperability between the building information produced by different teams, clash renditions can be
BIM Directory
performed on native format models using an agreed viewing tool.

Building Information
Modelling (BIM)
Related articles on Designing Buildings Wiki

Information Requirements
BIM.
BIM co-ordinator.
Employer's Information Requirements (EIR)
BIM execution plan.
BIM Protocol.
Organisational Information Requirements (OIR)
Clash.
Collaborative practices.
Design coordination. Asset Information Requirements (AIR)
Employer's Information Requirements.
Federated building information model. BIM Execution Plan (BEP)
Information manager.
PAS 1192-2.
Shop drawings. Information Models
Tolerances.
Uniclass. Project Information Model (PIM)

Asset Information Model (AIM)


Comments Collaborative Practices

Common Data Environment (CDE)


Hello. I didn't understand the meaning of clash rendition yet. Could anyone explain in another words? I have only found this
definition in everywhere which I believe is from BSI PAS 1192-2:2013 as follows: Interoperability

"Rendition of the native format model file to be used specifically for spatial coordination processes." Industry Foundation Classes (IFC)

What does it mean by RENDITION OF A NATIVE FORMAT MODEL? Could anyone use synonyms or similar expressions? I COBie

appreciate if I get an answer :)


Uniclass 2015

Collaborative Practices

Standards

BIM Standards

ISO 19650

BS 1192

Levels of BIM

BIM Level 2

BIM Level 3

BIM Dimensions

Glossary

Glossary of BIM Terms

Guide to BIM Level 2

Guide to Using BIM Level 2 on Projects

© Designing Buildings Ltd. 2023 Cookie Preferences Privacy Policy Terms and Conditions

You might also like