Class 2 surge protection NOTES - GENERAL
THE CONTRACTOR SHALL ALLOW FOR THE SAFE DISCONNECTION, REMOVAL AND DISPOSAL OF ALL
REDUNDANT EQUIPMENT ASSOCIATED WITH THE WORKS.
THE SYSTEM OF WIRING FOR ALL FINAL CIRCUITS SHALL BE SINGLE CORE LSZH CABLE DRAWN INTO
RECESSED GALVANISED STEEL CONDUIT AND GALVANISED STEEL TRUNKING UNLESS OTHERWISE
STATED.
NOTES - LIGHTING INSTALLATION THE CONTRACTOR SHALL CO-ORDINATE THE INSTALLATION, REFERENCE BEING MADE TO ALL
TYPICAL ARRANGEMENT FOR OUTSIDE LIGHTING
ARCHITECTURAL PLANS, SECTIONS & ELEVATIONS, CIVIL, STRUCTURAL & MECHANICAL SERVICES
THE COMPLETE ELECTRICAL ENGINEERING SERVICES INSTALLATION SHALL BE CARRIED OUT IN DRAWINGS. ALL FINAL POSITIONS TO BE AGREED ONSITE.
ACCORDANCE WITH THE REQUIREMENTS FOR ELECTRICAL INSTALLATIONS BS7671 (THE IET WIRING
REGULATIONS 18TH EDITION) INCORPORATING ALL CURRENT AMENDMENTS. TECHNICAL SUBMITTALS, DATA SHEETS AND SAMPLES OF ALL ACCESSORIES AND EQUIPMENT SHOULD
E5 E5 SR3 E5 SR1
BE PROVIDED TO THE DESIGN ENGINEER FOR APPROVAL PRIOR TO INSTALLATION.
ALL LIGHTING CIRCUITS ARE TO BE WIRED UTILISING LSOH CABLES OF THE FOLLOWING SIZES;
-
u
LB1-7-L2
J1 J1 J1 SR1 H THE CONTRACTOR WILL BE DEEMED TO HAVE VISITED SITE TO ASCERTAIN EXACT CABLE ROUTES,
6 AMP TYPE B RCBO - 1.5MM² LENGTHS AND FAMILIARIZE HIMSELF WITH THE FULL EXTENT OF THE WORKS DETAILED WITHIN
E3 A1 10 AMP TYPE B RCBO - 2.5MM² SPECIFICATION AND ON ACCOMPANYING DRAWINGS. NO MONIES WILL BE PAID DUE TO LACK OF
E2 5 CORE 2.5MM KNOWLEDGE
XLPE ALL CABLING TO BE INSTALLED IN CLASS 4 GALVANISED CONDUIT/TRUNKING.
F2 THE CONTRACTOR SHALL INCLUDE FOR ANYTHING NECESSARY TO COMPLETE THE PROJECT AS
PC REFER TO SPECIFICATION FOR SCHEDULE OF LUMINAIRES AND SENSORS.
DETAILED ON THE DRAWINGS.
A2 E3 LB1-6-L3 TIMECLOCK EXACT POSITIONS OF ALL LUMINAIRES TO BE AGREED ON SITE
D D THE CONTRACTOR SHALL REFER TO THE ASBESTOS REPORT SPECIFICALLY PREPARED FOR THIS SITE
+ AREA OF WORKS PRIOR TO ANY WORK COMMENCING ON SITE.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CO-ORDINATE ALL ELECTRICAL
E4 SERVICES WITH OTHER DISCIPLINES
6AMP ALL CABLE ROUTES PASSING THROUGH FLOORS AND FIRE COMPARTMENTS SHALL BE ADEQUATELY
CONTROL FIRE STOPPED.
SR2 DALI DISTRIBUTION UNITS AND SUB-CIRCUIT ISOLATORS MUST HAVE A PERMANENT LIVE FEED FROM
CIRCUIT
SR2
A2
D D
THE SAME CIRCUIT AS THAT FEEDING THE LUMINAIRES WITHIN ITS FIELD OF INFLUENCE.
-
ALL SOCKET RING CIRCUITS SHALL BE PROTECTED BY A 30mA RCBO DEVICE AND WIRED IN 2.5MM LSZH
SINGLES; EACH RING CIRCUIT SHALL HAVE NO MORE THAN 8NO. TWIN SOCKETS OUTLETS ON A
DB-GLP1 THE CONTRACTOR IS TO ENSURE ALL ASPECTS OF THE WORK HAVE BEEN INCLUDED AND MUST CIRCUIT.
XPS E3 1L11L21L3 2L12L22L3 VISIT SITE TO ASCERTAIN THE FULL EXTENT OF THESE WORKS. NO CLAIM DUE TO LACK OF
KNOWLEDGE WILL BE ENTERTAINED. THE CONTRACTOR SHALL INSTALL A SEPARATE 16MM EARTH FROM THE MAIN EARTH BAR LOCATED
nee
WITHIN THE SWITCHROOM TO EACH COMMS CABINET LOCATION, WHERE IT SHALL BE CONNECTED TO
un
C4 ANY EXISTING KEY SWITCHES NEED TO BE REMOVED OR BLANKED OFF. THE EARTH BUS BAR ON EACH COMMS CABINET
D D
ALL LIGHTING TO BE DALI DIMMABLE.
nee
ALL EXTRANEOUS AND CONDUCTIVE METAL PARTS SHALL BE BONDED IN ACCORDANCE TO THE
A2 1L11L21L3 2L12L22L3 CURRENT WIRING REGULATIONS AND THE RELEVANT HTM'S.
LB1-6-L2
CONTACTORS
L HOA
SWITCH
nee
ALL NEW ETHERNET CABLING SHALL BE CAT 6 UTP AS APPROVED. STRUCTURED CABLING NETWORK
TERMINATIONS SHALL BE CARRIED OUT AND TESTED BY A SPECIALIST INSTALLER.
A2 SR2 ALL POWER SWITCHES / ISOLATORS TO BE LABELED WITH INDIVIDUAL CIRCUIT REFERENCES AND
mine
SR1 LIGHTING SENSOR REFER TO SPECIFICATION ENGRAVED WITH THE NAME OF THE ITEM OF PLANT THEY SERVE. CIRCUIT REFERENCING SHALL BE
E3
E4 CONFIRMED WITH THE TRUST PRIOR TO COMPLETION.
BS2
SR2 SR2 LIGHTING SENSOR REFER TO SPECIFICATION
TO EMG. LIGHTS
e
PROVISION SHALL BE MADE UNDER THIS CONTRACT TO CONNECT WHITEGOODS AS INDICATED WITHIN
THE WORKS INFORMATION.
OUTSIDE LIGHTING
C4 C4 SR4 LIGHTING SENSOR REFER TO SPECIFICATION
ne
BUILDING SERVICES SYSTEMS TO BE DESIGNED, INSTALLED AND COMMISSIONED FOR THE PURPOSES
A2 OF CONSERVATION OF FUEL AND POWER AND HANDED OVER IN EFFICIENT WORKING ORDER. ALL
LB1-7-L1
XPS CASAMBI COMPATIBLE SCENE SETTING INTERFACE FIXED SERVICES SYSTEMS TO BE COMMISSIONED IN ACCORDANCE WITH THE PROCEDURE GIVEN IN
Xref Z:\00-FMK DWGS\23015 - MET Healthcare\Consultants\03 Structural\23015 - xrsteel.dwg
CIBSE.
-
E1
-
BS2 KINETIC SWITCH DOUBLE ROCKER
E1 BS2 COMMISSIONING OF FIXED BUILDING SERVICES TO BE IN ACCORDANCE WITH CIBSE COMMISSIONING
SR2 C/W CASAMBI CBU - ASD + CBU - BOX
-
CODE M 2022: COMMISSIONING MANAGEMENT.
B B SR2 B
LB1-7-L3 E3
PC PHOTOCELL IP65 C/W WIRE GUARD THE SWITCHES OR CONTROL FACE PLATES MUST BE DISTINGUISHABLE THROUGH SUITABLE VISUAL
E3 CONTRAST FROM THE ADJACENT SURFACE IN WHICH THEY ARE SET .
SR1
·or
E3 E3 HAND/OFF/AUTO GRID SWITCH
zah
LB1-6-L1 HOA
C3 C3 BUILDING CONTROL NOTES
J2 J2
O
LB1-5-L3
B B B ON COMPLETION OF THE WORKS THE CONTRACTOR SHALL CONFIRM THAT ALL FIXED SERVICES HAVE
&
TIMECLOCK BEEN PROPERLY COMMISSIONED, CONFIRMING THAT A COMMISSIONING PLAN HAS BEEN FOLLOWED
AND TEST RESULTS CONFIRMING THE PERFORMANCE IS REASONABLE, SHALL BE PROVIDED, SIGNED
BY A SUITABLY QUALIFIED PERSON AND A COPY GIVEN TO THE BUILDING OWNER AND THE LOCAL
COUNCIL.
Contactors
A NOTICE IN WRITING WILL BE GIVEN TO THE BUILDING OWNER NOT MORE THAN 5 DAYS AFTER
COMPLETION STATING THE FIXED BUILDING SERVICES HAVE BEEN PROPERLY COMMISSIONED AND
SIGNED BY A SUITABLY QUALIFIED PERSON.
lac
PARAGRAPH 2.86 OF BUILDING CONTROL TECHNICAL BOOKLET F2.
A NOTICE WILL BE IN WRITING WILL BE GIVEN TO THE BUILDING OWNER NOT MORE THAN 5 DAYS
AFTER THE COMPLETION OF THE WORK, GIVING SUFFICIENT INFORMATION ON THE OPERATIONAL AND
MAINTENANCE REQUIREMENTS OF THE FIXED BUILDING SERVICES.
EX1
BS2
E8
E1
LB1-5-L2
EX1
LB1-5-L1
EX1 E8
E2
EX1
.
Des A NOTICE IN WRITING WILL BE GIVEN TO BUILDING CONTROL STATING THE REQUIREMENTS OF
PARAGRAPH 2.90 OF BUILDING CONTROL TECHNICAL BOOKLET F2.
u
A2 LB1-4-L2 ENABLE THE BUILDING AND ITS FIXED SERVICES TO BE USED IN AN ENERGY EFFICIENT MANNER.
LB1-4-L3 E3 SR1 H E7 J1
(Fusion Panel
quantities and positions
to be confirmed)
FSN1 A1 A BUILDING LOG BOOK IS TO BE PROVIDED FOR THE BUILDING OWNER IN THE FORMAT GIVEN IN CIBSE
SR1 SR1 TM 31.
E3 SR4 E6 SR4 E6
SR1 A1
SR2 SR2 GLB1-1-L2 G G BUILDING SERVICES SYSTEMS TO BE DESIGNED, INSTALLED AND COMMISSIONED FOR THE PURPOSES
H E4 E4 OF CONSERVATION OF FUEL AND POWER AND HANDED OVER IN EFFICIENT WORKING ORDER.
A2 A2 A2 A2 A2
LB1-3-L3 A2
E1 E3
LB1-3-L2 SR2
D D D LB1-4-L1 D LB1-1-L1
A2 E1
A2 A2
E3 E3
H
BS2
D D D D
E4 E6 E6
SR1 E3
A2 G G G
SR2
D D D D
BS2
E3 E3 SR2
LB1-3-L1 A2
H
D D D D
F1
SR4
SR4
C2 rev by details date
LB1-2-L3
A2 E3 E6 E6
G G G
z
E3 E4
C2
drawing status
SR2 SR2
INFORMATION
A2
C2
BS2
BS2
" E1
E3
SR2
BS2 Switches
BS2 for
Warehouse Beattie Flanigan 40 Montgomery Road, BELFAST, BT6 9HL
tel :
email :
028 90 794411
info@beattieflanigan.com
Consulting Engineers
Switches for A2
Corridors
BS2
SR2 BS2 A1 A1 A1 A1 A1 web : www.beattieflanigan.com
E3 SR4
E6 client date
E3 SR1 E3
!
SR1
E3
G MET Health Care
LB1-2-L2 LB1-2-L1
June 2023
C1 C1 C1
A1 A1 A1 A1 A1
LB1-1-L3
E1 E1
architect scale
E8 E8
EX1 EX1 EX1 EX1 FmK Architecture Ltd &
1:100
FmK ECOHomes
project drawn checked
title drawing no