Title
Standard Amine Plants Promote Faster Delivery, Less Cost and Better Quality

Stream
Technical

Topic
Processing & Liquefaction

Abstract

Standard amine plants for acid gas removal have been very popular in Midstream industry in
the last decade. With pre-engineered and pre-designed, even pre-built concept, standard
amine plants can be delivered in much shorter lead time with less cost and better quality. The
equipment for standard amine plants is pre-selected. The physical dimensions of towers and
vessels, and the surface area of heat exchangers are fixed. A rating software is written to
predict the CO2 and H2S content in the sweet gas with the pre-selected equipment. With the
acid gas flow, pressure, temperature and compositions, the rating software predicts the sweet
gas flow, pressure, temperature and compositions. If the results are satisfying, the standard
plants are ready to build or ready to ship if in stock. A standard 400 GPM amine plant has an
activated amine aMDEA circulation flow of 400 gpm (91 m3/h) in the regeneration system and
it can process natural gas from 30 (0.21 MTPA) to 120 MMSCFD (0.84 MTPA), depending on
acid gas concentration. 120 MMSCFD natural gas is equivalent to 0.84 million metric ton per
annual (MTPA) LNG. The gas absorption side has two configurations. One is to process 120
MMSCFD flow (0.84 MTPA, max CO2 concentration of 2.25%) with a contactor diameter of 72
inch (1800 mm). The other one is to process 60 MMSCFD flow (0.42 MTPA, max CO2
concentration of 4.9%) with a contactor diameter of 54 inch (1350 mm). The gas loop uses
https://cfp.gastechevent.com/abstract/1194/preview 1/2
1/23/2020 Gastech-CFP

ASME 600# class flange design. The regeneration side is on one skid, except the ship loose
regenerator tower, reboiler, flash drum and lean amine cooler. The plot area is about 50 feet
(15 meters) wide and 120 feet (37 meters) long. The overall delivery is about 22 weeks after
receiving the purchase order. Skid mounted standard amine plants are game changers in the
LNG industry. Instead of stick-built plant onsite that might take years, the standard amine plant
is pre-built in a quality-controlled fabrication shop less than half of a year. Once the skids are
shipped onsite, the installation only requires tightening up nuts and bolts on flanges and the
standard plant is ready to remove acid gas.

Permissions
Yes

Submitted Elsewhere?
No

Previously published ?
No

Author / Presenter

Guofu Chen
Enerflex
Submitter Author Presenter