SCHOOL AT AL WUKAIR-AL WAKRA

SCHOOL NO. 1 (SECONDARY SCHOOL)

ARCHITECTURE Dept.
JULY 2022
SCHOOL AT AL WUKAIR-AL WAKRA SCHOOL NO. 1 (SECONDARY SCHOOL)
ARCHITECTURE DRAWING LIST
SHEET SHEET REV.
SHEET NAME SCALE REMARKS
SERIAL NO. SIZE NUMBER
GENERAL S.
*A-G-01 PROJECT COVER N.T.S. A0 00
*A-G-02 LIST OF DRAWING N.T.S. A0 00

SERIES-000
*A-001 SITE PLAN AND LOCATION PLAN AS SHOWN A0 00
*A-002 SITE PLAN & GROUND PLAN AS SHOWN A0 00

SERIES-100
*A-101 BASEMENT FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-102 GROUND FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-103 FIRST FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-104 SECOND FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-105 STAIR ROOM FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-106 ROOF FLOOR PLAN - SCHOOL. 1/150 A0 00

SERIES-200
*A-201 FRONT ELEVATION&REAR ELEVATION -SCHOOL 1/100 A0 00
*A-202 RIGHT ELEVATION&LEFT ELEVATION -SCHOOL 1/100 A0 00
*A-203 SECTION A-A 1/100 A0 00
*A-204 RAMP SECTION -SCHOOL 1/100 A1 00
*A-205 SUBSTATION FULL DETAILS 1/100 A1 00
*A-206 WALL SECTION A 1/50 A0 00
*A-207 WALL SECTION B 1/50 A0 00
*A-208 POOL DETAIL 1/50 A0 00
*A-209 SECTION B-B MULTIPURPOSE HALL & SWIMMING POOL 1/100 A0 00
*A-210 BOUNDARY WALL DETAILS. AS SHOWN A0 00 IN PROGRESS

SERIES-300
*A-301 BASEMENT FLOOR Ceiling PLAN 1/150 A0 00
*A-302 GROUND FLOOR Ceiling PLAN 1/150 A0 00
*A-303 FIRST FLOOR Ceiling PLAN 1/150 A0 00
*A-304 SECOND FLOOR Ceiling PLAN 1/150 A0 00
*A-305 STAIR ROOM FLOOR Ceiling PLAN 1/150 A0 00

SERIES-400
*A-401 DOORS SCHEDULES. N.T.S A0 00
*A-402 WINDOWS & CURTAIN WALL SCHEDULES. N.T.S A0 00
*A-403 FINISHING SCHEDULE N.T.S A0 00
91012064
44 A

SERIES-600 WETAREAS DETAILS IN PROGRESS

SERIES-800
*A-801 STAIR DETAILS1-SCHOOL 1/50 A0 00
GAMILA
GAM
G
GAA ILA
*A-802 STAIR DETAILS2-SCHOOL 1/50 A0 00 977

*A-803 STAIR DETAILS-SCHOOL 1/50 A0 00


*A-804 STAIR DETAILS4-SCHOOL 1/50 A0 00 IN PROGRESS
*A-805 STAIR DETAILS5-SCHOOL 1/50 A0 00 IN PROGRESS
*A-806 STAIR DETAILS3-SCHOOL 1/50 A0 00 PROPOSED
SECONDARY SCHOOL (B+G+2)
*A-807 STAIR DETAILS6-SCHOOL 1/50 A0 00 IN PROGRESS
AL-WUKAIR
*A-808 STAIR DETAILS7-SCHOOL 1/50 A0 00 IN PROGRESS
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
SERIES-900 TYPICAL DETAILS IN PROGRESS DRAWING LIST
-SECONDARY SCHOOL

G-02 N.T.S

M.SH. AYMAN RANIA

D30213-2018-ARCH-000 11660 3664

00
N N
ROAD
69000 BOUNDARY
LINE
25755 6000 2800 4400 2800 6000 21245

ENTRANCE EXIT
ROAD
SEC.ROOF

3000

3000
EL ± 0.00 EL +3.20 EL ± 0.00
EL +3.50
ROAD F.F.L ROAD F.F.L
S.S.L T.O.P
RCC CHANNEL WITH D.I HEAVY DUTY GRATING RCC CHANNEL WITH D.I HEAVY DUTY GRATING

FROM BASEMENT FLOOR


TO BASEMENT FLOOR
RAMP DOWN

RAMP UP
SLOPE 10%

ROAD
6985

6985
15000

0%

ROAD
E2

215
O0P%
ESL2
EL +15.10

40
SL
OP

OP
T.O.P

SL
EL +16.00

E2
0%
T.O.P

9900 51500 12475


23000 BOUNDARY ROAD

6600
LINE EL +15.10 EL +15.10
T.O.P T.O.P BOUNDARY

ROOF LINE

9800
EL +16.00
EL +15.10 T.O.P
2160

ROOF. S.S.L
EL +16.00
3665

T.O.P
STAIR ROOF

3100
EL +18.20
EL +18.50 ST.ROOF. S.S.L
T.O.P
EXIT

PLAY GROUND B LOCATION PLAN


A-01 1 : 150
14000

12810
3975 2500 24860 27200 12000 3100 9300 10600 4400 2000

19700
EL +16.00
T.O.P
5500
LANDSCAPE :
SUBSTATION .ROOF
EL +15.10 4.4x8.4

DEIFICATION
8325

T.O.P A S-01
SYMBOL
EL +0.70

8400

8000
F.L
01

PAVEMENT INTERLOCK
39325

EL +4.50
S.S.L

GREEN AREA
EL +16.00

EL +4.80
T.O.P

T.O.P

BOUNDARY ASPHALT
LINE
PROPOSED SECONDARY SCHOOL (B+G+2) PAINTED PARKING BORDER
02 ROOF
EL +16.00

52840
400 3500 3500 T.O.P
EL +15.10
ROOF. S.S.L TENTS
16500

16500

57000

16275

ROAD
10100 72900 17000

STAIR ROOM ROOF


EL +18.50 EL +18.20
T.O.P ST.ROOF. S.S.L EL +15.10
EL ± 0.00
ROAD F.F.L
T.O.P
ROAD

EL +16.00
80700

T.O.P
EL +16.00
T.O.P

10100 20000 12550 3400 12550 24400 17000

ENTRANCE
8300

OPEN TO BELOW

6350
EL +12.60 EL +16.00 EL +16.00
T.O.P GLASS DOOM
T.O.P T.O.P

03
EL +18.00

9400
T.O.P
EL +15.10
EL +22.40 T.O.P
EL +17.00
11305

T.O.P T.O.P
29800
26705

10100 20000 9200 4000 3345 5000 2655 4300 14300 14100 13000

EL +16.00
04
T.O.P

EL +16.00
T.O.P
EL +12.60 EL +16.00
T.O.P T.O.P BOUNDARY
EL +19.50
4195

T.O.P LINE
TENT ROOF
TENT ROOF 91012064
44 A
ENTRANCE

EL +11.70 EL +21.00
T.O.P T.O.P
EL +12.60
T.O.P

WIRE MESH FENCE

EL +13.70 EL +13.70
8000

80
T.O.P T.O.P

247
EL +15.70
8000 FF AREA
T.O.P BUS DROP O
8000 FF AREA
BUS DROP O
19185

01
6000

WIRE MESH FENCE

BUS DR OP OFF AREA 02


GAMILA
GAM
G
GAA ILA
4000

8000 977
FF AREA
EL +13.70 SPEED BUMP

T.O.P 8000 BUS DROP O 03


FF AREA
BUS DROP O
2500

8000
04
AREA FF AREA
BUS DROP O
FF 05 BUS DROP O
FF AREA
BUS DROP O
5000

06
12
FF AREA
BUS DROP O
17985

4000

11

FF AREA
SPEED BUMP

BUS DROP O
FF AREA 10 PROPOSED
BUS DROP O
FF AREA
09
SECONDARY SCHOOL (B+G+2)
BUS DROP O 08 BOUNDARY
07
LINE
AL-WUKAIR
BOUNDARY 66645
LINE
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
14
62 76700
0
21/7/2022 D30213/2018
EXIT
5000 ROAD
SITE PLAN AND LOCATION PLAN
5060

A-01 1:150,1:1500

M.SH. AYMAN RANIA


A SITE PLAN
D30213-2018-ARCH-000 11660 3664
A-01 1 : 150

00
N N
ROAD
69000 BOUNDARY
LINE
25755 6000 2800 4400 2800 6000 21245

ENTRANCE EXIT
ROAD
SEC.ROOF

3000

3000
EL ± 0.00 EL +3.20 EL ± 0.00
EL +3.50
ROAD F.F.L ROAD F.F.L
S.S.L T.O.P
RCC CHANNEL WITH D.I HEAVY DUTY GRATING RCC CHANNEL WITH D.I HEAVY DUTY GRATING

FROM BASEMENT FLOOR


TO BASEMENT FLOOR
RAMP DOWN

RAMP UP
SLOPE
SLOPE10%
10% SLOPE 10%

ROAD
6985

6985
15000

0%

ROAD
E2

215
OP %
O0P%
SL E 20
ESL2

40
SL
SL O P
OP

OP E 2
SL

E 2 0%
0%
PANTRY
2.5x1.25
A G-05

9900 TOILET 12475


23000 BOUNDARY 2.5x1.40
A G-06
GRADE 8-1
ROAD
LINE TEACHERS ROOM
GRADE 8-4 GRADE 8-3 GRADE 8-2 TEACHERS ROOM 3.8x6.3 7.9x6.3 GRADE 7-4
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 A G-09 A G-10 7.9x6.3 BOUNDARY
A G-01 A G-02 A G-03 A G-04 TOILET A G-11
2.5x1.40 LINE
A G-07
PANTRY
2160

2.5x1.25
A G-08
3665

UP
38600 DN

STAIR ROOM-02

2700

2700

2700
EL + 0.15 EL +0.45 2.7mtr.WIDE CORRIDOR EL +0.45 EL + 0.15
5.8X2.7
PV. F.F.L STAIR ROOM-01 G F.F.L
A G-43 G F.F.L A G-12
PV. F.F.L
DN 6.0X2.7 UP
A G-44

LOBBY
FE.TOILET 2.9x1.6 MA.TOILET
4.9x3.7 A G-65 3.7x5.9
29900
EXIT

A G-42 A G-13

PLAY GROUND JANITOR


1.1x1.7
A G-41
HA.TOILET
2.9x2.0
A G-14
B LOCATION PLAN
A-01 1 : 150

10555
PREPAR. ELV.
3.3x2.5 3.0x2.5
A G-40 A G-39
GRADE 7-3

12815
6.5x7.9
3975 2500 24860 A G-15
22325

CHEMISTRY LAB
6.5x9.25
A G-38
3000 1900 3000

LANDSCAPE :

6690
EL +0.45 EL +0.7 T. ROOM
G F.F.L
9400 F.L 4.0x5.1
A S.-01

31400
DEIFICATION
31100

GRADE 7-2
6.5x7.9
SYMBOL
A G-16

8000
EL + 0.15
01 PV. F.F.L PLATFORM
EL -0.80 CONCRETE
PAVEMENT INTERLOCK
39325

UP EL +0.7 F.L
EL +0.45
G F.F.L F.L

T. ROOM
16400
CHEMISTRY LAB
4.0x5.1
A S.-02
GREEN AREA
STORE 6.5x9.25
3.0x3.3 A G-37

10555
A G-64

BOUNDARY ASPHALT
LINE
PROPOSED SECONDARY SCHOOL (B+G+2) GRADE 7-1
6.5x7.9
A G-17
PAINTED PARKING BORDER
PREPARATION
11100

02 3.2x4.1 CAFETERIA
A G-63 16.4x11.1 PREPAR. ELV.

52840
400 3500 3500
A G-62 3.3x2.5
A G-36
3.0x2.5
A G-35
TENTS
EL +0.45
G F.F.L

16270

ROAD
FIRE COMMEND CENTRE

3600
STORE
10100 3.0x3.3 6.5x3.0
7900 TEACHERS ROOM
A G-63 A G-34
6.5x4.2
A G-18

H.WASH&TOI. H.WASH&TOI. ELEC.RM ELEC.RM


2.35x3.2 7500
2.35x3.2 3.3x1.8 3.3x1.8
A G-61 A G-60 A G-56 A G-35
PANTRY TOILET
STORE 3.2x1.5 3.1x1.5
5100

EL ± 0.00 1.8x1.5 A G-20 A G-19


UP DN
ROAD F.F.L A G-59 STAIR ROOM-04
MA.TOILET
ROAD

EL + 0.15 FE.TOILET 6.0X2.7 6200


PV. F.F.L
UP 6.6x4.7 6.6x4.7
A G-66
80700

8260
A G-58 A G-57 DN UP
17000

9700
FE.TOILET
6.5x3.3
1940

A G-21
13200

EL +0.45
MA.TOILET
10100 G F.F.L 6.5x3.3 17000

ENTRANCE
16700
A G-22
8100

6350
DN
28500 STAIR ROOM-03
EL + 0.15
LOBBY PV. F.F.L
6.8X3.1
EL +0.45 4.3x4.7 A G-23
G F.F.L A G-24 UP

9240
EL +0.45
600

EL +0.45 G F.F.L
9200 TOILET
PANTRY G F.F.L
1.6x2.4 CLINIC
3.9x2.4 A G-65
A G-67 6.8x3.1
MEETING DN A G-25
03 9.3x5.0
STAIR ROOM-06 CONTROL ROOM
A G-48
A G-68 4.3x3.0
TOILET A G-26 TOILET

9400
600
3.9x2.4 2.0x1.2
A G-66 UP A G-28
UP UP UP DN DN

FOR SITTING PANTRY


UP TO 1ST FLOOR
6900 7000 1.4x3.7
STORE 1.8mtr.WIDE CORRIDOR A G-30
EL +0.90
25325

2.05x1.8 TOILET
A G-47 G F.F.L MAIN LOBBY LOBBY
A G-48 2.0x1.2
4.8x4.3
26705

13.9x8.1 A G-29
MULTI PURPOSE HALL A G-33 A G-32
10100 19.6x29.6 EL +0.90
RECEPTION 13000
STORE 4.6x8.9
8100

A G-55
7800

3.60x1.9 EL +0.90 G F.F.L A G-27


16600

A G-54' MANAGER G F.F.L


5.5x5.0 SECRETARY RECEPTION
04 A G-52 5.3x5.0 4.1x3.9 ACCOUNTING
A G-46 A G-45 4.6x5.0
A G-31
STAIR ROOM-07
ENTRANCE LOBBY 5.8X3.6
A G-54 A G-23 13900

UP UP
EL +0.45 DN

EL + 0.15
BOUNDARY
G F.F.L
PV. F.F.L LINE
RAMP UP
91012064
44 A
ENTRANCE

EL + 0.15 UP UP UP
PV. F.F.L EL + 0.15
PV. F.F.L
2800 14000 2800 UP UP UP UP
335

EL + 0.15 WIRE MESH FENCE


UP PV. F.F.L
EL + 0.15
8000

80
PV. F.F.L

247
8000 FF AREA
BUS DROP O
8000 FF AREA
19185

BUS DROP O 01
6000

WIRE MESH FENCE

BUS DR OP OFF AREA 02


GAMILA
GAM
G
GAA ILA
4000

8000 977
FF AREA
SPEED BUMP

8000 BUS DROP O 03


FF AREA
BUS DROP O
2500

8000
04
AREA FF AREA
BUS DROP O
FF 05 BUS DROP O
FF AREA
BUS DROP O
5000

06
12
FF AREA
BUS DROP O
17985

4000

11

FF AREA
SPEED BUMP

BUS DROP O
FF AREA 10 PROPOSED
BUS DROP O
FF AREA
09
SECONDARY SCHOOL (B+G+2)
BUS DROP O 08 BOUNDARY
07
LINE
AL-WUKAIR
BOUNDARY 66645
LINE
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
14
62 76700
0
21/7/2022 D30213/2018
EXIT
5000 ROAD
SITE PLAN AND GROUND PLAN
5060

A-01 1:150,1:1500

M.SH. AYMAN RANIA


A SITE PLAN
D30213-2018-ARCH-000 11660 3664
A-01 1 : 150

00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

CONCRETE PAD CONCRETE PAD


79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

7425 7600 4215

2010
FIRE WATER TANK 1 IRRUGATION WATER TANK
4700 7.4x3.3 7.6x2.01 EL -4.05

2650
3345
A B-02 A B-03' TANK BOTTOM
5500 7300 5500
EL -4.05
TANK BOTTOM DOME.PUMP ROOM

DIESEL ENGINE PUMP


FIRE PUMP ROOM DOMESTIC WATER TANK 1

CONTROL PANEL
4.2x8.9

6725
4.7x8.9 7.6x3.0

2990
EL -4.05 A B-04
A B-03

2650
A B-01

8890
FIRE WATER TANK 2 TANK BOTTOM
7.4x3.3

0%

3345
JOCKEY PUMP
A B-02'

E2
EL -4.35

OP
EL -4.05 DOMESTIC WATER TANK 2 S.S.L

SL

1500

SL
TANK BOTTOM 7.6x3.0

2130
ELEC. FIRE PUMP
CONTROL PANEL

OP
A A B-03''
A

E2
EL -4.20

0%
800
B S.S.L
S.1. EL -4.05 S.1.

1190
TANK BOTTOM
745 1800 2155 980 1800 1435

2650
3595

2650
D15 D26 EL -4.20
STORM DRAIN HOLDING TANK 1

2330
STORM DRAIN HOLDINGTANK
TANKBOTTOM
2
EL -4.55

6500

6500
A B-02''
DRAIN PIT BOTTOM A B-01'

2650
2650
EL -4.55
EL -4.20 DRAIN PIT BOTTOM
B F.F.L 5500
EL -4.20
B B

700
TANK BOTTOM

S.1. D09 S.1.

5460
SLOPE 10%
UP

STAIR ROOM-01

4100

0%
2900

2600

2900
E1
6.0X2.5 STAIR ROOM-02

OP
A B-05 6.0X2.6

SL
UP

C A B-06 D09
46 C

305
35
S.1. 4620 6500 4400 2650 2650 3000 2650 2600 S.1.

2650

2650
EL -4.20

2650
3900

3900
B F.F.L

DRIVEWAY

1150
D D

850
EL -4.35

2650

7795
DRIVEWAY
S.1. EL -4.35 B F.F.L S.1.

1650
B F.F.L

2650

2650
200
DRIVEWAY
5500 EL -4.35
B F.F.L D24
5700

5700
685 2650 2650 3475 4600 1795 2650 400 2650 2650 425 2650 2650 425 2650 2650 525

2000
5155 4775

2600
GENERATOR ROOM
6.5x4.0

2650

2650
A B-06''

1650
5500 7300 5500 2300 4600 4000 4000
E 7800 E

700
EL -4.76

200 1000
S.1. S.1.

1825
TANK BOTTOM D26

4500

200
5500

5500

2650
D25
L.V. ROOM
4850

4850
2000
SEPTIC TANK 5.5x4.0

2650
7.8x11.15 A B-06'
A B-07
2500

2650

575
11150

F F

3300
S.1. DRIVEWAY S.1.
EL -4.35 4000

2650
850
B F.F.L SUBSTATION ABOVE.

8000
5650

5650
2650
5500

2650
EL -4.20
TANK BOTTOM
O.T.A

1800
G G

950
S.1. S.1.

8100 2650 2650 1280 2650 2650 3575 4600 1295 2650 1750 2650 2650 650 2650 555 2650 2650 1345 2650 3300 20 CM RETAINING WALL

6500
DRIVEWAY
8100

8100
DRIVEWAY DRIVEWAY
DRIVEWAY
EL -4.35 EL -4.35 EXPANSION JOINT
EL -4.35 EL -4.35 10 CM BLOCK WORK
B F.F.L B F.F.L B F.F.L
B F.F.L
5500 510 4200 390 2650 2650 PROPERTY LIMIT
2510 6000 2510 O.T.A
H

1180
H S.1.

2500
EL -4.20
S.1. B F.F.L UP

2650
77450

77450
D D01 H' B
1000 1000 1000 1000

2650

2980
D03'
3200

D03' D03 D03


ELEC. ROOM TELECOM RM.
A-202 2.9X4.2 2.9X4.2
D01 S.1. A-202
D03' D03 D03' D03 A B-15' A B-15 5500
I I
4200

4200

2200 220
5100

1170
D01
S.1. D03' D03 O.T.A O.T.A S.1.

1200 1000 1000 1200


MA.TOILET D03 ELEC.RM
FEMA.TOILET EL -4.05
2200

D03
7.75x4.3 7.75x4.3 B.F.F.L
2900 2900 6.0x1.8 LIFT LIFT
D03' A B-09 D03 D03' A B-12 D03 A B-20
J 3.0x2.6 2.9x2.6 J

2650
D03 D03 D03 D03
STORAGE LOBBY LOCKERS STAIR ROOM-05 MALE TOILET
LOCKERS
S.1. 5.9X2.7 4.7x7.95 FEMALE TOILET
STAIR ROOM-04 S.1.
900 1000

3.7x2.3 3.85x2.3 D11 3.7x2.3 D11 3.85x2.3 D03 D03 7.95x4.7


UP

4200
D09
2300

A B-14 2700 A B-16 5.8X2.6


2650

2700
A B-08 A B-10 A B-11 A B-13 A B-17
A B-19

1700 1140
2700

3700 3850 3700 3850 3700 5900 5950 200D031400 300 1400 D03 5900 6000
O.T.A UP
D09
K D04 D22
O.T.A RECEPTION K
320

D03 D03
6.2x3.8
S.1. S.1.

130
A B-22
350
2855

O.T.A 1500 1000 1800 4500 2000 3200 900 1350 2000 1000 8800 2001125 800 1225 3695 300 2850 800 4150 1150 2000 900 200 2500 2500 1000200
K' O.T.A

2650
50
S.1. D09

5000
2500
4730

5745

D22
5445

EL -6.10
DRIVEWAY 5555 6300
EXPANSION JOINT EL -4.35 Deep: 2.00m EL -4.20
SHOE RACK PARENT WAITING RM B F.F.L
B F.F.L 4300 12500 2800 FEMALE PRAYER ROOM

800
DRIVEWAY
3.15X8.1 CORRIDOR 3.5x6.1

2650
11.85x8.10
L SHOE RACK L

EL -4.35
A B-25 A B-22'
2.5x6.3

B F.F.L
A B-24 6.1X4.1 DRIVEWAY
A B-32
S.1. A B-23 D09
EL -4.35 S.1.
500

200
UP

STAIR ROOM-03 B F.F.L


3300

3300
6.8X3.0
GYM 1000 A B-21

2650
8.8x15.7 1125 1500 525 3000 8150 4050 250 2000 250 200 2300
15700

M A B-26
D09 M
4975

4975

S.1. S.1.

8695
STORM DRAIN HOLDING TANK 3
O.T.A D04
STORE
D09
UP A B-01''
3300

3300
1.6X2.4

2650
A B-29 EL -4.20
N 6800
D22
TANK BOTTOM N
STAIR ROOM-06
500

S.1. MALE PRAYER ROOM O.T.A S.1.

395
A B-30
15.2x7.4 LIFT 6000
1500

1500
A B-28 1.6x2.4 ENTRANCE EL -4.05 5400
O 4.3x7.4 B.F.F.L O

2650
EL -4.05 A B-31 EL -4.55

360
S.1. B.F.F.L DRAIN PIT BOTTOM S.1.
22500

SWIMMING POOL 5500


4975

4975

EL -4.05
2400

2400
19.6x27.9
A B-34
200 B.F.F.L UP
3600 2000 3200 600 2000 800 800 5500 700 2600 2000 200 4100 1150 2000 1150

2650
P P
S.1. D22 D22 D22 GROUND FLOOR LINE S.1.
2600
500

1250
CORRIDOR 5500
200 2000 150

33.0x4.3 600
D22 A B-32' 5

2650
5200

5200
EL -4.05
4300

5500
B.F.F.L

2650
4875

3600 2000 3500 300 2500 1000 7650 2000 5600 300 4550 200 1900 1300 6000 5500 DRIVEWAY
EL -4.35
B F.F.L
Q D22
Q
2475

D09 D22
S.1. S.1. 91012064
2800

2800
500

O.T.A 44 A
GAME ROOM UP
5300

DRIVEWAY
R 9.2x5.3 STAIR ROOM-07 R

5000
A B-33 5.7X3.6
S.1. EL -4.35
B F.F.L EL -5.10
UP A B-33' EL -4.20 S.1.
B F.F.L
2400

2400
Z
5125

Deep: 1.00m
5375

9200 3555 265


S 0 S.1. S
S.1. 265 7.237°
1000 3000 13100 1775 825 0 S.1.
2550

265
1700

1700
DRIVEWAY 0

7.237°
T 265 T
200

EL -4.35
0 D25' CONCRETE PAD
S.1. B F.F.L S.1.
6300

194 EL -4.35
265 0
O.T.A DRIVEWAY
0 B S.S.L
260
4150

4150
EL -4.35 0
B F.F.L 265
265 0 265
0 0 DOMESTIC WATER TANK GAMILA
GAM
G
GAA ILA
189
0 207
U 265
0 265 0 A B-35 U 977
265 0 EL -4.05
S.1. 0 194 TANK BOTTOM S.1.
181 0 265
5 265 0
265 0 189
0 0
260
0
260
0 194
7.237° 173 0
D25'
0
7.237°

1250 1600 1250


MECHANICAL ROOM
82
.76
3° A B-36
4765
7.237°

Z
PROPOSED
6300

S.1.
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR

7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900 21/7/2022 D30213/2018
BASEMENT FLOOR PLAN
-SCHOOL
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. A-101 1:150

A EXPANSION JOINT
A
A-201 A-203 M.SH. AYMAN RANIA

A BASEMENT FLOOR PLAN-SCHOOL D30213-2018-ARCH-101 11660 3664

A-101 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
800 800 800 800 800 800 50 800 800 800 800 400
20200 2600 1200 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 750 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 800 1500

FROM BASEMENT FLOOR


TO BASEMENT FLOOR
RAMP DOWN

RAMP UP
SLOPE 10% SLOPE 10%

0%
E2

SL
OP

OP
SL
A A

E2
0%
PANTRY

1000 900
S.1. S.1.

800 800 700


2.5x1.25

1500
A G-05

200
D03
TOILET

4100
2.5x1.40

1300 600 1300


A G-06
TEACHERS ROOM GRADE 10-4

2800
6500

6500
6400
GRADE 10-2 TEACHERS ROOM

6900

6300

6300

6300

6300

6300
GRADE 10-5

6310
GRADE 10-1 GRADE 10-3 3.8x6.3 7.9x6.3
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 A G-09 A G-10 7.9x6.3
A G-01 A G-02 A G-03 A G-04 TOILET A G-11
2.5x1.40 D03

3800

225 375800
A G-07

800 1000
1000 1000 1000 1000 PANTRY 1000 1000 1000

1190

800
6800 2.5x1.25
D14150 6650 D14150 6550 D14 200100D14 2250 2400 2600 D14200 6500 D14 200100D14 6700
B A G-08 B

190

500
S.1. 38600 S.1.

1000

1000
D09 D09
UP
STAIR ROOM-02 DN

5.8X2.7
2900

2900
2.7mtr.WIDE CORRIDOR

2600
EL +0.45

2700

2700

2700

2700

2700
EL + 0.15

2600
EL + 0.15 EL +0.45

500
STAIR ROOM-01 A G-43 G F.F.L A G-12 PV. F.F.L
PV. F.F.L G F.F.L

1900
1620 280DN 6.0X2.7 4100

800
D09 2000 2800 1600 2800 1600 2800 1600 2800 3850 50 6900 3000 1900 3000 300 1200 400 UP 6000
C A G-44 C
S.1. D10 LOBBY D10 S.1.
2.9x1.6

1900

1900
FE.TOILET MA.TOILET

3500
4.9x3.7 A G-65 3.7x5.9
29900
3900

3900
A G-42 D10 A G-13

4200

4200
D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03
JANITOR HA.TOILET
2.9x2.0

1700

1700
1.1x1.7
A G-41 A G-14
900 900 900 900 900 900 1900 800 900 900 900 900 900
D D

800 800
S.1. 3300 3000 S.1.

1000

1000
D01 D14 GRADE 10-6
PREPAR. ELV.

10555
6.5x7.9

475
2400
3.3x2.5 3.0x2.5 A G-15
A G-40 A G-39

1700
D14
5700

5700
2800
1800 1000 3700

1000
D14

7900

475
7100

800
E E

475
19700

19700
S.1. CHEMISTRY LAB
S.1.
6.5x9.25

2800
6950
9250
A G-38
3000 1900 3000 6500
4850

4850
1000
D14 GRADE 10-7

475
6.5x7.9

800
A G-16

6690
FIRST FLOOR LINE
F F

475
EL +0.45
G F.F.L
S.1. S.1.

1000 600 1000


6500 D14

2800
7900
BASEMENT LINE

7200
D14
5650

5650
EL + 0.15

475
PV. F.F.L

800
UP

475
EL +0.45
G F.F.L
6400
G G

300

2800
S.1. S.1.

1065

9250

6850
3000 16400 GRADE 10-8

1000
D14
CHEMISTRY LAB 6.5x7.9
STORE 6.5x9.25 A G-17
3300

475
3.0x3.3 A G-37

2000

10555
A G-64 D23

800
PROPERTY LIMIT

475
D04
8100

8100
7900
1000

6900

2800
D14
1400 1000 4100 EXPANSION JOINT
PREPARATION

11100
4100

D14

5235
3.2x4.1 CAFETERIA

1800
A G-63' 16.4x11.1 PREPAR. ELV.

475
3.3x2.5

2400
A G-62 3.0x2.5

2500
A G-36
H

800
A G-35

1000 400 1000


3400 3000 D01 6500
H

475
D04 EL +0.45 S.1.
17190

G F.F.L

200
S.1.

1000
D12 D12
77450

77450
D FIRE COMMEND CENTRE D14
H' B

2800
2000

STORE 6.5x3.0

2980
3800
3300

D23

2780

2780
3200

A-202 3.0x3.3 A G-34 7900 TEACHERS ROOM S.1. A-202

200 400 1380


1680

4200
A G-63 D16 50 D16 6.5x4.2
3000 5700 1100 8900 3675 2000 1525 4950 600 3000 300 300 4900 1600 2000 3350 D05 A G-18
640 400 800300800300800300800200 800

I I

505

2200 220
50

800
S.1. H.WASH&TOI. 3300 2350 2500 3050 S.1.

100 800 900


1100

1000 1000 1100

D03 H.WASH&TOI. D03 6010


ELEC.RM ELEC.RM
2200

2.35x3.2

1770

445
D16
A G-61 D03 D03 2.35x3.2 3.3x1.8 D01 D01 3.3x1.8 LIFT LIFT D03
A G-60 D09 2750 3100 TOILET
A G-56 D09 A G-35 RECEPTION
1100

PANTRY
J D03 D03 D03 D03 D03 D03 3.0x2.7 3.0x2.7 J

1500
3.2x1.5 3.1x1.5

5100

4870

2800
STAIR ROOM-04
S.1. A G-19
S.1.

5070
UP DN
A G-20
6.0X2.7
1100

D03 D03
EL + 0.15 MA.TOILET
2650

2700

2700
2600
FE.TOILET A G-66

1500
PV. F.F.L
UP 6.6x4.7 6.6x4.7 5950 6200 7500 3200 1000 1000 1000 1000 1000 1000
1200

D10
1100

A G-57

475
A G-58 D10 DN UP

K D03 D03 D03 D03 D03 D03 K

800
9700
320

10070
FE.TOILET
50

S.1. S.1.

1700
6.5x3.3

475
1000
D10 A G-21

13200
K'

400
D16

3250
3280
2000

2000

D16

1000

2800
S.1. EL +0.45 D10 MA.TOILET

5000
1700
4730

G F.F.L WAITING 6.5x3.3


A G-22

210
EXPANSION JOINT D03 D03 D03 D03 D03 D03

2200

475
8100

1500

1500
2755

OPEN TO ABOVE OPEN TO ABOVE

2000

800
L D16 L

1100 800
S.1. STAIR ROOM-03 S.1.

1000
6.8X3.1
500

D09

1505
DN
A G-23 EL + 0.15
28500
3300

3300
2900
LOBBY PV. F.F.L

2820
EL +0.45 4.3x4.7

800

2200
G F.F.L A G-24 UP

M D09
M

9240

2800
EL +0.45
4975

1995
700

G F.F.L
S.1. EL +0.45 CLINIC S.1.

400 900
D03 D05
9200 9300 200 2000 100 1300 500 PANTRY G F.F.L 6.8x3.1
TOILET 1.6x2.4 D06 A G-25
3300

3300
15 14 13 12 11 10 9 8 7 6 5 4

3100
A G-65

600 800 1100


D03 3.9x2.4 D10 D03
MEETING
N A G-67 200 900 3200 6800 N

2300
DN
5000

9.3x5.0
STAIR ROOM-06
S.1. S.1.
500

A G-48 CONTROL ROOM

3000
D03 D10 A G-68
4.3x3.0

7000
TOILET TOILET
6400

A G-26
1500

1500
600
3.9x2.4

1200
2.0x1.2

1350
1.6x2.4
O D17
D03
A G-66 UP A G-28 O

2100
UP UP UP DN DN
D03

1800
FOR SITTING D03PANTRY
S.1. S.1.
21800

1000
900
UP TO 1ST FLOOR

1100
D04
2350 2300 800 1150 200 1600 200 4200 1000 700 800 400 2150 6900 7000 1.4x3.7
4975

D03
2400

2400
100 STORE A G-30
1800

TOILET

800 800 600


1.8mtr.WIDE CORRIDOR EL +0.90 D05 LOBBY

1200
2.05x1.8 D05

1750
D03 MAIN LOBBY 2.0x1.2
G F.F.L
P A G-47 4.8x4.3 P

2000

2000
A G-48 13.9x8.1 A G-29
MULTI PURPOSE HALL D03 A G-32
700

A G-33 D16
S.1. 19.6x29.6
STORE
D05 D05 D16
EL +0.90 S.1.
425

900
A G-55 D05
1925

D17 EL +0.90 G F.F.L

7800
3.60x1.9
500

700 1000

4900
D04 G F.F.L

1700
A G-54' MANAGER
SECRETARY RECEPTION PARENT WAITING AREA

3900
5.5x5.0

2800
5.3x5.0 4.1x3.9 4.6x8.9 ACCOUNTING
5200

5200
A G-52
OPEN TO ABOVE A G-46 A G-45 A G-27 4.6x5.0

4300

3900
A G-31
STAIR ROOM-07
4825

ENTRANCE LOBBY 5.8X3.6

800
A G-54 A G-23 5500 5300 13900

2600
Q Q

800
UP UP

400
S.1. EL +0.45 DN
S.1.
5675

EL + 0.15
7175

G F.F.L
91012064
2800

2800
PV. F.F.L
500

RAMP UP
75

3600
R R 44 A
2000

D16
S.1. S.1.
2400

2400
Z
D16 UP UP UP
S EL + 0.15
S.1. S
2000

PV. F.F.L EL + 0.15


3300

S.1. 2800 14000 2800


PV. F.F.L 7.237° S.1.
1700

1700
UP UP UP UP

7.237°
T T
1710

S.1. UP
EL + 0.15
PV. F.F.L S.1.
EL + 0.15
PV. F.F.L
1000 500 1600
4150

4150
350

U U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
600 2800 600 1400 1600 800 4400 800 1600 1400 500 2800 700 800 3500 800 3500 800 600 2600 600 800 800 2800 800 800 800 2800 800 800
600
400 2100
600 100 100
400 600 1500 600 1000 6500
100 100
1000 600 1500 600 4300 800 450 2800 450
800
450 2800 450
800
400 2700
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
GROUND FLOOR PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
A-102 1:150
A EXPANSION JOINT
A
A-201 A-203
M.SH. AYMAN RANIA

A GROUND FLOOR PLAN-SCHOOL D30213-2018-ARCH-102 11660 3664

A-102 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

22600 1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1000

A A
S.1. S.1.

800 800 700


PANTRY

350 1600

1600
100 2500 1800 2600 950 3150 1800 2850 1250 2600 1800 2050 300 1800 1650 50 2.5x1.252400 2400 1400 200 2600 1800 3300 200 700 2600 1800 2600
A F-05

200
TOILET

1375
D03
2.5x1.40

1800
A F-06
TEACHERS ROOM GRADE 11-4

6500

6500
6300

6300

6300

6300

6300
GRADE 11-5

6300
3.8x6.3 7.9x6.3
GRADE 11-1 GRADE 11-2 GRADE 11-3 TEACHERS ROOM 7.9x6.3

1800
A F-10

1700 300 1800 300 1600 350


A F-09
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 TOILET A F-11
A F-01 A F-02 A F-03 A F-04 2.5x1.40

3800
D03
A F-07

1275
PANTRY
150 150 200 1000 1000 200 1000
6800 1000 6650 1000 6550 1000 100 2550 50 2400 2.5x1.25 200 2600 200 6700 1000 100 6700
B D14 D14 D14 D14 A F-08
D14 D14 D14 B

1600
STAIR ROOM-02
S.1. S.1.

550
UP
EL +6.10 5.8X2.7 DN
STAIR ROOM-01 A F-14
2900

2900
2600
2.7mtr.WIDE CORRIDOR

2700
1600
2600
EL +6.10 1ST F.F.L

1275
6.0X2.7 D16
A F-13
A F-12 1ST F.F.L 50 D09
1340 560 700 DN
1800 1600 D09 1100 900 3200 1800 2700 800 3500 1800 2200 800 2650 400 600 6100 2400 600 1900 600 2400 300 1200 400 UP
6000
C C

1200 1000

1800
S.1. D10 LOBBY D10 S.1.

450 1600

1800
2.9x1.6

1900
FE.TOILET MA.TOILET
1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 950 4.9x3.7 D10 A F-15 3.7x5.9

1275
D10
3900

3900
A F-16

4200
A F-73 D03 D03 D03
D03 D03 D03 D03 D03 HA.TOILET JANITOR
HA.TOILET D03 D03 D03
2.9x2.0

1700
1700
2.9x2.0

2000
1.1x1.7
A F-72 A F-17

1800
A F-71

1600
900 900 900 900 900 2100 1000 800 1900 800 900 900 900 900 900

3850
D D

OPEN TO BELOW
S.1. S.1.

500 1600 450


6000 3000

1000

575 1200
D14
PREPAR. ELV. GRADE 11-6

2500

2500
3.8x6.3 3.0x2.5 6.5x7.9

1000 500 1000


A F-70 A F-69 D01 A F-18
D14
5700

5700
1800
3001000 8000

1800
D14

8000

575
GROUND FLOOR LINE

7100
500 1600 500

1600
E E
19700

S.1. S.1.

575
CHEMISTRY LAB
9.2x9.25
A F-68

1805
9250

6850
6500

1800
4850

4850
570
1000
D14

500 1600 500


GRADE 11-7

1600
6.5x7.9
A F-19
F F

575
S.1. S.1.

1000 600 1000


D14

1800
7900
1800
9200 PROPERTY LIMIT

7200
D14

575
5650

5650
1600 500

1600
1600 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1250

575
6400

600
G G

1800
S.1. 3500 1800 2600 1100 3100 1800 2600 1800 1100 1300 1800 2000 600 1800 1700 700 1800 2600 1250 2950 1800 2600 1800 3150 S.1.

9250

6850

1000
D14
GRADE 11-8

OPEN TO BELOW
CHEMISTRY LAB 6.5x7.9

575
PUZ M 60120 D14

PUZ M 60120 D14

PUZ M 60120 D14


9.2x9.25 A F-20
A F-67

1600
5700
COMPUTER LAB

575
COMPUTER LAB COORDINATOR RM.
7600

COMPUTER LAB
8100

8100
9.2x7.9

7900

7900

7900
10.4x7.9 6.35x7.9 9.2x7.9
A F-48 A F-53

1000
A F-56

6900

1800
A F-61 D14
850 1000 7350 EXPANSION JOINT

LIBRARY

1100 800 300


D14 PREPAR. ELV.

575
9.0x16.0 TOILET
A F-43 6.0x2.5 3.0x2.5

3100
2500
3.15x2.0 D03 A F-65 A F-66

1600
10400 D20 9200 D20 2400 A F-55 950 3000 6250 5750 D20 2500 1800 200 4400
6300
H
H D13 D01 S.1.
800

575
100
1600 390
2400
S.1. 8700 1600 7800 1600 5500 1000 10980 1600 170 5100 1000 3500 2400 600 2500 6500

1000
D14
77450

77450
D 50 H' B

1800
D19

2980
2680
D16
3200

3.0mtr.WIDE CORRIDOR

3000
EL +6.10 EL +6.10
S.1.

3230
A-202 TEACHERS ROOM A-202

800 400 1480


A F-57
1ST F.F.L 1ST F.F.L

4200
50 6.5x4.2

575
690
550 1500 3550 800400800 6675 2000 2325 1000 3750 3000 300 3300 1000 2645 1800 3400 A F-21
I I
5400

2200 220
50
D10 D10 300 1800 200

1600
S.1. 2800
LOBBY
1400
D03
2200 2200
D03
1400 300 3200 2350 800 500 D14 4650 3000 4200 D14 500 800 2500 3050 3000 3000 1100 250 6050 3100 5910 S.1.

1570
ELEC.RM ELEC.RM
2200

1770
D19 2.6X1.8 D03
3.3x1.8 D01 D01 3.3x1.8 LIFT LIFT

575
2670
A F-44 TOILET TOILET 2750 3100 TOILET
PANTRY
J D03 D03 A F-49
1.5x1.8 D03 1.5x1.8
A F-63 3.0x2.7 3.0x2.7 J

1500

1500
800 500 800
D04 TEACHERS ROOM TEACHERS ROOM D03 3.2x1.5 3.1x1.5

3270
A F-52 A F-60 D09 STAIR ROOM-04

1800
D09 4.65x4.7 4.65x4.7
S.1. STORE D03MA.TOILET FE.TOILETD03 UP
A F-54 A F-58
DN
6.0X2.7
A F-22 A F-23
S.1.
2.6x2.7 STAIR ROOM-05 PANTRY PANTRY

1500
3.7x4.7 3.7x4.7
2650

2700
A F-62
2600

2600
1.5X2.0 1.5X2.0
2200

A F-45

1500
A F-46 A F-47 6.0X2.7

575
8700 100 2900 200 1400 100
D03 1600 600200600 1600 100
D03 1400 200 5850
A F-50 DN
A F-51 1425 1800 1030 400 700 1600 700 975 1800 1425 A F-59 5950 1250 1000 2200 1000 1200 1200 6300 3100 1000 1000 1000 1000 1000 1000
1500 1500 UP

1000 400 1000 500 700


1000
K MAIN LOBBY D03 D03 D03 D03 D03 D03 K

1600
FE.TOILET
320

13.9x8.1
50

D16
S.1. S.1.
400

400

6.5x3.3

1700

1700
A F-64

5310
400 19200 12550 3000 450 975 1800 9275 D10 A F-24

575
EL +6.10
K' 1ST F.F.L
DN UP

1800
S.1. D10

5000
1700

1700
4730

MA.TOILET
TO G.FLR TO S.FLR 6.5x3.3

FOR SITTING
5000

D03A F-25

1200 575
EXPANSION JOINT DN DN D03 D03 D03 D03

35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20

2000
50
UP UP UP
DN D03

8100

8100

8100

1500

1500
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
OPEN TO BELOW OPEN TO BELOW
7650

L L
S.1. STAIR ROOM-03 S.1.

1600
44400

1000
DN
D09 6.8X3.1
A F-26
3300

3300
2900

800
FOR SITTING

2300
1400 1800 2800 1800 4650 3000 620 12130 4200 UP
6800
M M

1800
4975

100 800 1300 800 100


400

19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
S.1. PANTRY S.1.

1000 1000 900


PANTRY

1150
D03 D03 D03
2.4x1.6 1.9x1.4

800
TOILET A F-36' A F-27
3300

3300
2700
3200

3.9x2.4 TOILET D03

13170
1150
D03 A F-36 D10 D03 LOBBY 5.1x3.1
OFFICE
N N

100 1600
DN A F-31
5000

9.2x5.0 A F-28
STAIR ROOM-06 1500 D03 3000 D03 2000

4800
SITTING AREA

300 1600 300 200


S.1. A F-42
S.1.

1150
9.3x7.0 D10 A F-32

200
D03

300

100
A F-37 TOILET LIFT
1500

1500
1600 500 1600

D21 3.9x2.4 1.6x2.4


O O

1150
D03 A F-35 UP D18

2750

2750
41D 02106 M ZUP

ART STUDIO
S.1. EL +6.10 500 1000 2700 9.4x8.9 S.1.
4975

1ST F.F.L
2400

2400
A F-29
1800

D18 1800 D14

500 1600 250


9200 300 2800 10550 1000 500 1000 450 D09 2250

1200 300 850


P P
600100

CONFERENCE
S.1. 9.2x11.8 D08 D08 S.1.

8900
OFFICE ART -
A F-41 4.1x3.9
LOBBY OFFICE OFFICE TEACHERS ROOM

5300
50
1600

EL +6.10 3.6x2.8 5.5x5.0 5.3x5.0 A F-33 4.3x5.3


1ST F.F.L D18 A F-40 D21 A F-38 A F-34 OPEN TO BELOW A F-30

1800

1800
OPEN TO BELOW
5200

5200
5000

5000

EL +0.90
600

D21
G F.F.L

3820

300 1600 500


1000 1600 1000 5450 5300 3900 13900 4300 9400
11800
4875

1900
OFFICE
3.6x4.8
Q A F-39 Q
4800

S.1. S.1.
2800

2800
3600
R R
S.1. S.1. 91012064
2400

2400
Z 44 A
5325

400 2600 1000 11600 1000 2600 400 1850 1800 2100 1800 1450 200
S S.1. S
S.1. 7.237° S.1.
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
U U
S.1. S.1.
GAMILA
GAM
G
GAA ILA
977

7.237°
7.237°

82
.76

7.237°

Z
S.1.

PROPOSED
700 2800 500 1400 1600 800 4400 800 1600 1400 500 2800 700 1600 250 1800 250 1600 250 1800 250 1600 400 2800 400
200 1600 700 1800 700 1600 700 1800 700 1600 750400 1800 40070050600
100 1500 100
600 1000 6500 1000 600
100 1500 100
600 850 400 1800 400 850 1600 350 1800 350 1600 350 1800 350 1600 300
SECONDARY SCHOOL (B+G+2)
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
AL-WUKAIR
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. FIRST FLOOR PLAN
A A -SCHOOL
EXPANSION JOINT
A-201 A-203
A-103 1:150

M.SH. AYMAN RANIA


A FIRST FLOOR PLAN-SCHOOL D30213-2018-ARCH-103 11660 3664
A-103 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

22600 1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1000

A A

1600 300
S.1. PANTRY S.1.

800 800 700


350 1600
100 2500 1800 2600 950 3150 1800 2850 1250 2600 1800 2050 500 1600 1650 2.5x1.252400 2400 1400 200 2600 1800 3300 200 700 2600 1800 2600
A S-05

200
TOILET

1375
D03
2.5x1.40

1800
A S-06
TEACHERS ROOM GRADE 12-4

6500

6500
6300

6300

6300

6300

6300

6300
3.8x6.3 7.9x6.3 GRADE 12-5
GRADE 12-1 GRADE 12-2 GRADE 12-3 TEACHERS ROOM 7.9x6.3

1800
A S-10

1700 300 1800 300 1600 350


A S-09
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 TOILET A S-11
A S-01 A S-02 A S-03 A S-04 2.5x1.40

3800
D03
A S-07

1275
PANTRY
150 150 200 1000 1000 200 1000
6800 1000 6650 1000 6550 1000 100 2550 50 2400 2.5x1.25 200 2600 200 6700 1000 100 6700
B D14 D14 D14
A S-08 D14 D14 D14 B

1600
S.1. S.1.

550
D14 STAIR ROOM-02
D09 DN
5.8X2.7
STAIR ROOM-01 EL +10.60 2.7mtr.WIDE CORRIDOR EL +10.60
2900

2900
A S-12

2600
2700
1600
2600

1275
6.0X2.7 A S-13 D16
2ND F.F.L 2ND F.F.L
A S-14 DN D09 50
1340 3360 1300 1100 900 3200 1800 2700 800 3500 1800 2200 800 2650 400 600 6100 2400 600 1900 600 2400 300 1200 400 UP
6000
C C

1200 1050

1800
S.1. D10 LOBBY D10 S.1.

450 1600
2.9x1.6

1900

1900
FE.TOILET MA.TOILET
1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 950 4.9x3.7 D10 A S-24 3.7x5.9

1275
3900

3900
D10 A S-25

4200
A S-15 D03 D03 D03
D03 D03 D03 D03 D03 D03 D03 D03
HA.TOILET HA.TOILET

1700
1700
2.9x2.0 JANITOR

2000
A S-16 1.1x1.7 2.9x2.0

1800

1600
900 900 900 900 900 2100 A1000 800 1900
A S-26 800 900 900 900 900 900

3800
S-17
D D

OPEN TO BELOW
S.1. S.1.

500 1600 450


6000 3000

1000

575 1200
D14
PREPAR. ELV. GRADE 12-6

2500

2500
3.8x6.3 3.0x2.5 6.5x7.9

1000 500 1000


A S-18 A S-19 D01 A S-27
D14
5700

5700
1800
3001000 8000

1800
D14

8000

575
7100
500 1600 500

1600
E E
19700

S.1. S.1.

575
CHEMISTRY LAB
9.2x9.25

1805
9250

6850
A S-20 6500

1800
4850

4850
570
1000
D14

500 1600 500


GRADE 12-7

1600
6.5x7.9
EL +10.60 A S-28
F 2ND F.F.L F

575
S.1. S.1.

1000 600 1000


D14
PROPERTY LIMIT

1800
7900
1800

7200
D14

575
5650

5650
1600 500

1600
1600 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1250

575
G G

1800
S.1. S.1.

9050

6850

1000
D14
GRADE 12-8

OPEN TO BELOW
CHEMISTRY LAB
6.5x7.9

575
PUZ M 60120 D14

PUZ M 60120 D14

PUZ M 60120 D14


9.2x9.25 A S-29
A S-21

1600
5700
COMPUTER LAB

575
COMPUTER LAB COORDINATOR RM.
7600

COMPUTER LAB
8100

8100
9.2x7.9

7900

7900

7900
10.4x7.9 6.35x7.9 9.2x7.9
A S-60 A S-61

1000
A S-62

6900

1800
A S-64 D14
1000 1000 7200 EXPANSION JOINT

LIBRARY

1000 800 400


D14 PREPAR. ELV.

575
9.0x16.0 TOILET
A S-59 6.0x2.5 3.0x2.5

3100
3.15x2.0

2500
D03 A S-23
A S-22

1600
10400 D20 9200 D20 2400 A S-63 950 3000 6250 5750 D20 2500 1800 200 4400 H
H D13 D01 S.1.
800

575
S.1. 8600 1600 7800 1600 5550 1000 10950 1600 150 5200 1000 3400 2400 600 1900 600 2400 6500

1000
D14
77450

77450
D H' B

1800
D19

2980
EL +10.60

2780
3200

3000 EL +10.60
D16
S.1.

3230
A-202 3.0mtr.WIDE CORRIDOR TEACHERS ROOM A-202

800 400 1480


2ND F.F.L 2ND F.F.L

4200
A S-25 50 6.5x4.2

575
550 1500 3550 800400800 6800 2000 2300 1000 3650 3000 300 3300 1000 2495 2000 3350 A S-30
I I
5400

2200 220
300 1800 200

D10 D10

1600
S.1. 2800LOBBY 1400
D03
2200 2200
D03
1400 300 3200
ELEC.RM
2350 800 500 D14 4650 3000 4200 D14 500 800 2500 3250 3000 3000 1100 250 6050 3100 15
W5910 S.1.

1570
ELEC.RM
2200

1770
D19 2.6X1.8 3.3x1.8 D03
D01 D01 3.3x1.8 LIFT LIFT

575
A S-58 A S-54 TOILET TOILET 2750 3100 TOILET
PANTRY
J D03 D03 1.5x1.8 D03 1.5x1.8 A S-45 3.0x2.7 3.0x2.7 J

4720

1500

1500
D04

800 500 800


TEACHERS ROOM TEACHERS ROOM D03 3.2x1.5 3.1x1.5

3270
STAIR ROOM-05 A S-52 A S-48 D09

1800
MA.TOILET D09 4.65x4.7 4.65x4.7 STAIR ROOM-04
S.1. STORE
2.6x2.7 D03 3.7x4.7 FE.TOILETD03 6.0X2.7 A S-50 A S-49 DN 6.0X2.7
A S-31 A S-32
S.1.
A S-53 PANTRY PANTRY

1500
3.7x4.7
2650

2700
A S-46
2600

2600
A S-57 A S-56 1.5X2.0 1.5X2.0
2200

1500

575
A S-55
8700 100 2900 200 1400 D03 1600 600 600 1600 D03 1400 200 5850 A S-51 1425 1800 1030 400 700 1600 700 975 1800 1425 A S-47 5950 1000 1000 2200 1000 1200 7500 1000 1000 1000 1000 1000 1000
DN
1500 1500 UP

1000 400 1000 500 700


1000
K MAIN LOBBY D03 D03 D03 D03 D03 D03 K

1600
FE.TOILET
320

1500
13.9x8.1
50

S.1. S.1.
400

400

6.5x3.3

1700

1700
A S-44

550
400 19200 12550 D10 A S-33

575
K' EL +10.60

1800

1800
2ND F.F.L

1800
S.1. D10 MA.TOILET

5000
1700

1700
4730

6725 7175 6.5x3.3


5000

A S-34

1200 575
EXPANSION JOINT D03 D03 D03 D03 D03

2000
D03

2695

2695

8100

1500

1500
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
OPEN TO BELOW OPEN TO BELOW
7650

L L
S.1. STAIR ROOM-03 S.1.
44300

1600
1000
D09
DN
6.8X3.1
600300 1800

1800
A S-35
3300

3300
FOR SITTING

2900

800
9095 3355 300 925 1600 475 12500 6975

2300
4200 6800
M 900 M

1800
4975

1400 100

100 800 1300 800 100


51 52 53 54 55 56 57 58 59 60 61 62 63 64
500

S.1. 9200 3400 1600 2200 PANTRY S.1.

1000 1000 900


D03
D16 11000 EL +10.60 1.9x1.4 D03
STORE

800
1.6x2.4 STAIR ROOM-06 2ND F.F.L A S-36
3300

3300
2700
D03
A S-41
2725

D04 A S-42 LOBBY

600 800
N TOILET N

1600
A S-35

4750
100
1500 D03 3000 5.1x3.1 D03 2000

300 1600 300 200


S.1. A S-37 S.1.

200
300
LIFT TOP

100
0

DN

660
1.6x2.4
1500

1500
1800
DN DN
2275

O EL +11.80 DN
TO F.FLR D18 O

2750
S.S.L

1800
41D 02106 M ZUP

1000 1100 50
ART STUDIO

900 1000 700400


S.1. OPEN TO BELOW
DN 600 1000 2700 9.4x8.9 S.1.
4975

300
2400

2400
A S-38
12200

UP

640
D14
D092001000 2850 D09

1200 300850
P P
2275

100

500 1600
S.1. D08 EL +0.90 S.1.

8900
OFFICE ART -
4.1x3.9 G F.F.L
300

TEACHERS ROOM

5300
17400

A S-40
OPEN TO BELOW 4.3x5.3
A S-39

1800

1800
2445
5200

5200
4400

300 1600 500


900 1600 900 11000 1150 1800 900 500 1500 1000 700 3125 300 3075 600 1100 1500 500 4300 9400
4875

480

1900
Q D16
Q
S.1. STORE S.1.
3600

3.6x3.6
2800

2800
A S-43

3600 91012064
R R
44 A
S.1. S.1.
2400

2400
Z
5325

400 2600 1000 11600 1000 2600 400 9200


S S.1. S
S.1. 7.237° S.1.
1700

1700
7.237°
T T
S.1. S.1.
2000
4150

4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
4000 12000 4000 9550 3650 11350 600400 1800 400750 700 1500 1700 6500 1700 1500 700 850 400 1800 400 850 1600 350 1800 350 1600 350 1800 350 1600 300
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000

79900 SHIEKH ABDULRAHMAN MOHAMED A AL-THANI


21/7/2022 D30213/2018

01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22


SECOND FLOOR PLAN
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-104 1:150
A-201 A-203

M.SH. AYMAN RANIA

A SECOND FLOOR PLAN-SCHOOL D30213-2018-ARCH-104 11660 3664


A-104 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

1200

1200
A A

EL +15.10
S.1. S.1.

EL +16.00
T.O.P

T.O.P
1400 51500 1600

EL +15.10

6500

6500
EL +15.10
T.O.P T.O.P

9400
9800
SMOKE VENT
ROOF EL +15.10
ROOF. S.S.L
EL +16.00
T.O.P
B EL +16.00 B
S.1. T.O.P S.1.
2900 D09 DN

2900
STAIR ROOM-02
5.8X2.7
A R-02
C C
S.1. S.1.

1100
3900

3900
D D
S.1. S.1.

10755
CONC. PAD
CONC. PAD
5700

5700
E E
S.1. CONC. PAD
S.1.

1200 12000 3100 9300 1200


4850

4850
EL +16.00
T.O.P CONC. PAD

F F

6500
S.1. EL +15.10
CONC. PAD
S.1.
T.O.P
5650

5650
1200
G G
S.1. S.1.

EL +16.00
CONC. PAD

T.O.P
CONC. PAD
CONC. PAD CONC. PAD CONC. PAD CONC. PAD CONC. PAD

10755
1200 60500 3100 9300 1200

PROPOSED SECONDARY SCHOOL (B+G+2)


8100

8100
CONC. PAD
CONC. PAD CONC. PAD

EXPANSION JOINT

ROOF
EL +15.10
CONC. PAD ROOF. S.S.L
H
H
16100

16500
EL +16.00
CONC. PAD
S.1.
S.1. T.O.P
77450

77450
D 1200 42300 12800 17800 1200 H' B

2980
3200

A-202 S.1. A-202


CONC. PAD EL +15.10
I D09
T.O.P I

2200 220
CONC. PAD

S.1. S.1.
2200

CONC. PAD SMOKE VENT EL +15.20 LIFT TOP


CONC. PAD F.F.L 6.2x2.7
J EL +16.30 EL +16.00 J
S.S.L
S.1. T.O.P S.1.
EL +16.00
DN
T.O.P STAIR ROOM-04
2650

2700
6.0X2.7

15200
CONC. PAD
A R-01

K MECHANICAL K
320

S.1. CONC. PAD S.1.


K' 1200
S.1. 1200 1200 3398 12550 24400 1200

5000
4730

CONC. PAD
CONC. PAD

EXPANSION JOINT

MECHANICAL OPEN TO BELOW OPEN TO BELOW SMOKE VENT


6900

L CONC. PAD L
S.1. S.1.
EL +12.60

EL +16.00
T.O.P

EL +16.00
T.O.P
3300

3300
T.O.P
SMOKE VENT
M M
S.1. GLASS DOOM S.1.
1900
3300

3300
EL +18.00
N T.O.P N
S.1. S.1.

T.O 22.40
1500

1500
EL +
.P
O CONC. PAD
EL +15.10 O
S.1. T.O.P S.1.

14300
27550
2400

2400
EL +13.70
ROOF. S.S.L
10000

P P
S.1. S.1.

EL +16.00
EL +16.00

T.O.P
5200

5200
T.O.P
EL +12.60

EL +16.00
T.O.P

T.O.P
Q Q
S.1. EL +19.50 S.1.
2800

2800
T.O.P
TENT ROOF 91012064

3250
TENT ROOF
5900

R 21.
00 R 44 A
EL +12.60

EL +O.P
T.O.P

S.1. S.1.
T.
2400

2400
Z

800
20000 9200
S S.1. S
EL +11.70

S.1. 7.237° S.1.


T.O.P
1200
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
EL +13.70
EL +13.70

70
T.O.P

15.
T.O.P

EL +O.P
U T . U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977
EL +13.70
T.O.P

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000

79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR ROOM PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-105 1:150
A-201 A-203

M.SH. AYMAN RANIA

A STAIR ROOM PLAN-SCHOOL D30213-2018-ARCH-105 11660 3664

A-105 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

1200

1200

1200
A A

EL +15.10
S.1. S.1.

EL +16.00
T.O.P

T.O.P
1400 51500 2501350

6600
EL +15.10 EL +15.10

6500

6500
T.O.P T.O.P
ROOF

9400
EL +16.00

9800
T.O.P
SMOKE VENT EL +15.10 SMOKE VENT
ROOF. S.S.L
B EL +16.00 B
S.1. T.O.P S.1.
STAIR ROOF
2900

3100

2900
EL +18.20
EL +18.50 ST.ROOF. S.S.L
C T.O.P C
S.1. S.1.
3900

3900
D D
S.1. S.1.

10755
CONC. PAD
CONC. PAD
1200
5700

5700
1200 12000 3100 9300

E E

19700
S.1. CONC. PAD
S.1.
4850

4850
EL +16.00

6489
T.O.P CONC. PAD

F F
S.1. EL +15.10
CONC. PAD
S.1.
T.O.P
5650

5650
G G
S.1. S.1.

EL +16.00
CONC. PAD

T.O.P
CONC. PAD
CONC. PAD CONC. PAD CONC. PAD CONC. PAD CONC. PAD

1200 60500 3100 9300 1200

10755
PROPOSED SECONDARY SCHOOL (B+G+2)
8100

8100
CONC. PAD
CONC. PAD CONC. PAD

EXPANSION JOINT

ROOF
EL +16.00 EL +15.10
T.O.P CONC. PAD ROOF. S.S.L
H
H

16500
S.1.

57000
CONC. PAD
S.1.
77450

77450
D H' B
1200 42300 5900 6350 17800 1200

2980
3200

A-202 S.1. A-202


CONC. PAD

I I

2200 220
CONC. PAD

S.1. S.1.
STAIR ROOM ROOF
2200

CONC. PAD SMOKE VENT


CONC. PAD
J EL +18.50 EL +18.20
EL +15.10 J
T.O.P ST.ROOF. S.S.L
S.1. T.O.P S.1.
EL +16.00
T.O.P

14400
2650

2700
CONC. PAD
EL +16.00
K T.O.P K
320

S.1. S.1.
1200
SMOKE VENT
K'
S.1.

5000
4730

CONC. PAD
CONC. PAD

EXPANSION JOINT

OPEN TO BELOW OPEN TO BELOW SMOKE VENT


6900

L L
S.1. S.1.
EL +12.60

EL +16.00
T.O.P

EL +16.00
T.O.P
3300

3300
T.O.P
SMOKE VENT
M GLASS DOOM M
S.1. S.1.
3300

3300
N N
S.1. S.1.
EL +18.00
1500

1500
T.O.P
O 0 O
7.0 EL +15.10
+1 CONC. PAD

S.1. EL O.P T.O.P S.1.


T.
2400

2400
EL +22.40

17604
T.O.P
P P
S.1. S.1.
17800

EL +16.00
EL +16.00

T.O.P
5200

5200
1200 20000 2013 5000 2187 4000 3346 5000 1454 1200 3500 15900 13300 T.O.P 1500
EL +12.60

EL +16.00
T.O.P

T.O.P
Q Q
S.1. S.1.

1500
EL +19.50
2800

2800
TENT ROOF T.O.P 91012064
TENT ROOF
R 00 R 44 A
21.
EL +12.60

EL +O.P

746
T.O.P

S.1. S.1.
T.
2400

2400
Z

800
S S.1. S
EL +11.70
1050 150

S.1. 7.237° S.1.


T.O.P
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
EL +13.70
EL +13.70

70
T.O.P

15.
T.O.P

EL +O.P
U T. U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977
EL +13.70
T.O.P

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
ROOF PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

A A A-106 1:150
EXPANSION JOINT
A-201 A-203

M.SH. AYMAN RANIA


A ROOF PLAN-SCHOOL D30213-2018-ARCH-106 11660 3664
A-106 1 : 150
00
1 2
1 2
G G
G G
4400 4400
100 4200 100 100 4200 100
C
C A-107
A-107 E
E A-107
A-107
EL +3.50

100

100
A A
100

100
A A
T.O.P

350600350 900 400


G G
G G
800

EL +3.20
D S.S.L B

2600
2400

2400
2600
EL +0.15 B
2600
2400

2400
2600
1000

A-107 A-107
A-107

D GR. F.F.L
A-107 GUARD ROOM ROOF FINISH (AS PER SPECIFICATION)
75mm (MIN) THK. CONC. SCREED TO SLOPE
800

D G-01 B B

100

100
B B 50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
100

100
G G 1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
G G
100 4200 100 100 4200 100 2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB (R.C.C.) AS PER STRU. DWGS.
1700 1000 1700 4400 20 mm THK. PLASTER.
E
E
A-107 1
A-107
2
A EL +3.50 B
1 2 A D D
G
A-107
A G
G A-107 G T.O.P
EL +3.20

300

300
A GROUND FLOOR PLAN B ROOF FLOOR PLAN ROOF. R.C.C

650
A-107 1 : 25 A-107 1 : 25

2000
2
G
EL +3.50 1
G
1
EL +3.50
2

3500
G G

3050
E05 T.O.P. E05
T.O.P.

2200
EL +0.15
EL +3.20

300
EL +3.20
300

GR F.F.L

1050
E03 ROOF. R.C.C E03 ROOF. R.C.C
E07 EL ± 0.00

150
E02 E02

GR P.V.L

3500
3500

3050
3050

150mm FOOTING (SAND, NYLON FIBERS, SPANDEX FIBERS


COATED IN A POLYMERIC BINDER)
100 mm IMC LAYER (SAND & NYLON
FIBRES)
DRAINAGE SYSTEM 50 mm

EL +0.15 EL ± 0.00 EL +0.15 GROUND SLAB AS PER STRU. DWGS.


EL ± 0.00

150
150

GR F.F.L GR P.V.L GR F.F.L 1000 GAUGE POLYETHYLENE AS A SEPARATION LAYER.

GR P.V.L 2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC


2 COAT BITUMINOUS PAINT
C ELEVATION A D ELEVATION C
A-107 1 : 25 A-107 1 : 25 PLAIN CONC.

B A A B 91012064

G G G G 44 A

E05 EL +3.50 E05 EL +3.50


T.O.P. T.O.P. G
A-107
SECTION E
1 : 25

EL +3.20
300

EL +3.20
300

GAMILA
GAM
G
GAA ILA

E03
E02 ROOF. R.C.C E03
E02 ROOF. R.C.C 977

E07
E07
3500
3500

3050
3050

PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018

EL ± 0.00 EL +0.15 EL ± 0.00 EL ± 0.00 EL +0.15 GUARD ROOM


150
150

GR P.V.L GR F.F.L GR P.V.L GR P.V.L GR F.F.L A-107 1:25

W.SH AYMAN RANIA

E ELEVATION B F ELEVATION D D30213-2018-ARCH-100 11660 3664


A-107 1 : 25 A-107 1 : 25
00
EXPANSION JOINT EXPANSION JOINT

01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21


S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +22.40
T.O.P GLASS DOOM
E02

EL +21.00
T.O.P

495 385
EL +19.50
T.O.P EL +19.00
E05 T.O.P EL +18.50 EL +18.50
T.O.P EL +18.00 T.O.P

2120
E05 E05

1500
E05
T.O.P
EL +18.20

200

200

200
EL +17.00 ST.ROOF. S.S.L
T.O.P

2500
1000

1000
E08

900
E08

2300

2300

2300
EL +16.00 EL +16.00 EL +16.00 EL +16.00

2000
EL +15.70

3100
T.O.P T.O.P T.O.P T.O.P

1000

1000

1000
E05 E05 E05 E05 E05 E05
T.O.P

1300

350

550 350
600
200 900

900

900
E05

1100
E05 E05
EL +15.10 EL +15.10

1900

1200

1900

1900

1900

1900
E05

2290
ROOF. S.S.L
2300

EL +13.70 ROOF. S.S.L

2000

1000

1000

1000
E05 E05
T.O.P

3400

3400

350
E05

1950
EL +12.60 EL +12.60

1000

1000

1000

1000
E02

1500

1500

1500
E02 E02 E02 E02 E02
T.O.P T.O.P

1110
1100

E02

4500
2400
4500

5150
F F F F F F F F
F
3100
F
900

900

900

900

900
E05 E05 E05 E05 E05 E05

2200

2200

2200

2200
1700

1700
E05
800

800

800

800

800
F F F F F F F F

1100
EL +10.60 EL +10.60

200

200

200
E02 E02 E02 F F F
2ND F.F.L 2ND F.F.L

1500

1500

1500

1500

1500
E08 E08 E08 E08 E08 E08 E08 E03 E08 E03 E08 E03
1000

8000
1700

1300

1300

1300
F F F

1800
1805

600
F F E02 F F F F
F F F E02
E08 E02 E08 E08 E08 E06

18200
E02 E01 E03 E01 E03 E01 E03 E02 E01 E03 E01 E03 E01 E03 E06 E01 E01 E06 E01

1100
E02 E02 E02 E02 E02 E02 E02 E02
F F F

12650
F F F F F F

4500
4500

4500
E06 E06 E06 E06 E06 E06
E02 E02
F F F F F

2700

3300

3300

3300

3300

3300

3300

3300

3300
2695

F F

3100
15100

F F

12050
F F F F F F
E05 E05 E05 F F F F E05 F F E05 F F E05 F F E05 F F F F F F E05
F F F
EL +6.10 EL +6.10
260 1000 300

255 1000 300


1ST F.F.L 1ST F.F.L
F F F
1000

1000

1000

1000

1000

1000

1000

355 1000

1000

1000

1000
6000
F F F
9000

F F

850

850

850

850
870
E02 E01 E01 E02 E02 E01 E01 E01 E01
E02
E02 E02 E02 E02

F F F F F F
F F

5200
E08 E08
5200

3400

E03 E03 F F F E03 E03 E03 E03 E03 E03 F F F E03 F F F E03 E03 F F F E03 E03 E03 E03 F F F E03 F F F E03

4300

4300
3845
4650

4650
F F

3070

3070

3070

3070
3045
4395
4390

300
E06 E06 E06 E06 E06 E04 E06 E06
F F F F E04
F F F E04 F F
E04
E04 E04 F F F F F F F F
EL +0.45 F E04 F EL +0.45

1800
F F F

2250
GR F.F.L EL +0.90 EL +0.90 GR F.F.L

800 380
1700
450 800

450450
GR F.F.L GR F.F.L
450 450

1180

1180

1180

1180
900

900
800

800
600
450

450

450

450

450
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L

ELEVATION FINISHING CODE SCHEDULE


ITEM
FINISHING MATERIAL
NUMBER
E01 GRC DECORATIVE COLUMN
E02 DOUBLE TEMPERED GLASS.
E03 GROOVE 30mm.
E04 STEEL HANRAIL
A FRONT ELEVATION- SCHOOL E05 GRC DECORATIVE ELEMNTS
A-201 1 : 100
E06 EXTERNAL PAINT
E07 CURTAIN WALL
E08 EXTERNAL PAINT 2

EXPANSION JOINT EXPANSION JOINT

21 20 19 18' 18 17 16 15 14 13 12' 12 11 10 09' 09 08 07 06 05 04 03 02 01


S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +22.40
T.O.P
E02

GLASS DOOM

EL +19.50
T.O.P
4225

EL +19.00
EL +18.50 EL +18.50 E05 T.O.P
T.O.P E05 EL +18.00 T.O.P E05

1500
T.O.P
EL +18.20 EL +18.20
200

E05

ST.ROOF. S.S.L E08


EL +17.00 ST.ROOF. S.S.L
T.O.P
1000

E08 E08
2500

2500

2500

2300

EL +16.00 EL +16.00 EL +16.00 EL +16.00


2000

2000
E08

3100
T.O.P T.O.P T.O.P T.O.P
3100

E05
1000

1000
E05 E05 E05
700 200

E05 E05
900

900

900

900

900
EL +15.10 EL +15.10
1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900

1900
ROOF. S.S.L ROOF. S.S.L
91012064
1000

1000

1000

1000

1000

1000
44 A
200 800

200 800

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000
1050
E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02

4500
4500

E06 E06
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
E03 E03 E03 E03 E03
E01
E06 E03
2200

2200

2200

2200

2200

2200

2200

2200

2200

2200

2200

2200

2200

2200

2200
2150
E01 E06 E03
E06 E06 E01 E01 E06 E03 E03
E01 F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
E06 E06
E06 E03 E03 E03
EL +10.60 E06 E06
EL +10.60
200

E06
E03 E06
2ND F.F.L E03 2ND F.F.L
1500

1500

1500

1500

1500

1500

1500

1500

1500

1500

1500

1500

1500

1500

1500
E06 E03
8000

8000
1250

E06
E01
E03 E06 E06
E01 E01 E01 E01
E01 E01 E01
E03 E01 E01 E06 E01
50

E01

18200
E01
18200

E01
E02 E03 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 02 E02 E02 E02 E02

E03
GAMILA
GAM
G
GAA ILA

4500
4500

977
3250

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300

3300
E05
E05
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F E05
E05 E05 E05 E05
EL +6.10 EL +6.10
1ST F.F.L 1ST F.F.L
1050
1000

600 250 1000

600 250 1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000
E03
850

850

850

850

850

850

850

850

850

E03 E06 E03


E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E08
E03
2150

E06 E06 E06 E03 E03

5200
5200

E03

520
E06 E03 E03 F F F E03 F F F F F F F F F E06 F F F F F F F F F F F F F F F E03 F F F F F F
E03 E06
E08
PROPOSED
3070

3070

3070

3070

3070

3070

3070

3070

3070

3070

3070
5100

5100

5100

5100

5100
E06 E06 E06

SECONDARY SCHOOL (B+G+2)


E06 E03 E03
F E06 F F F E03 F F F F F E06
F F
E06
2500

F F F F F F F F F F F F F F F F F F F F F F
EL +0.45 EL +0.45
GR F.F.L EL +0.90 EL +0.90 GR F.F.L
AL-WUKAIR
800 380

450 800
000
450450
0450
450
GR F.F.L GR F.F.L
450 450

1180

1180

1180

1180

1180

1180

1180

1180

1180

1180

450
450

450
EL ± 0.00 EELL ± 0.00
0.0
..00
0000
ROAD F.F.L ROA
RO
R O D F.F.LL
ROAD
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
FRONT ELEVATION & REAR ELEVATION
-SCHOOL
B REAR ELEVATION- SCHOOL
A-201 1 : 100 A-201 1:100

M.SH. AYMAN RANIA

D30213-2018-ARCH-200 11660 3664

00
EXPANSION JOINT

U T S R Q P O N M L K J I H' H G F E D C B A
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +22.40
T.O.P

GLASS DOOM
EL +21.00 E02

T.O.P

EL +19.50
T.O.P EL +19.00
T.O.P EL +18.50 EL +18.50

3000
EL +18.00 T.O.P E05 T.O.P
E05
T.O.P
E05
EL +18.20 EL +18.20

200

200
ST.ROOF. S.S.L EL +17.00 ST.ROOF. S.S.L
T.O.P E08

1000

1000

1000

1000

1000
E08 E08

2300

2300
EL +16.00 EL +16.00 EL +16.00
EL +15.70

3100
T.O.P T.O.P T.O.P
3100

E08 E08 E05

1000

700 200 1000

1000

1000

1000
T.O.P E05
E05

1200 200 900

900

900

900

900

900

900

900

900
3265
E05
EL +15.10 EL +15.10

1900

1900

1900

1900

1900
ROOF. S.S.L ROOF. S.S.L
2000

1000

1000

1000

1000

1000

1000

1000

1000

1000
E05

1000

1000

1000

1000

1000

1000

1000

1000
E05 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02
1100

1100
E01

4500
4500

E03
2000

F F F F F F F F F F F F F F F F E01 F F F F F F F F F F
E01 E03 E03
900

900
E06

2200

2200

2200

2200

2200

2200

2200

2200
E05 F F E03 F F E03 F F E06 F F F F E06 F F
E06
E06 E03

5350

5350
E06
800

800

800

F F F F F F F F F F F F F F F F F F F F E06 F F F F F F
E06 E03 E03
EL +10.60 E01 E06 E02 E06
E06
E03 E03
E01
E06
EL +10.60
E06
2ND F.F.L E06
E01 2ND F.F.L

1500

1500

1500

1500

1500

1500

1500
E03

8000

8000

8000

8000
E06 E01 E06

1780
E03
F E03 E01
E01 E01
E01
F F E08 E01
E02 F E01 E06 E01 E06
E01

18200
18200

E01
E02 E02 E01 E02 E02 E02 E02 E02 E02 E02 E02 E01 E02 E02 E03
E03 E03

150
F F
4800

4800

4800

E03

4500
4500

E06
E01

3300

3300

3300

3300

3300

3300

3300
3020

2650
2500
E05
F F
E05 F F F F E05
F F F F F F F F F F F F F F F F F F F F
E05
EL +6.10 E05 EL +6.10
1ST F.F.L 1ST F.F.L
1000

1000

1000

1000

1000

250 1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000

1000
E06 E06
E02 E06
E06
850

850

850

850

850

850
E02
E02 E02 E02 E02 E02 E02 E02 E02 E06 E02 E02 E02
E06
E06 F F E06
E06

5200
E06 E06
5200

E06 E03 F F F E06 F F F E06 F F F F F F E03 F F F F F F F F F F F F E03 F F F F F F F F F F F F


4155

4300

4300
E03 E03 E03

4050
3070

3070

3070

3070

3070
5100

5100

5100

5100

5100

5100

5100
E03 E03 E03 E03 E03
E03
F F F F E03 F F F F F E03 F F F F F F E03 F F F F E06 F F F F F F F F

4250
E06 E03
F F F F F F F F F F F F F F F F F F F F F F F
EL +0.45 EL +0.45
GR F.F.L EL +0.90 EL +0.90 GR F.F.L

450450
GR F.F.L GR F.F.L
450 450

1180

1180

1180

1180

1180
945

800

800

800
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L

ELEVATION FINISHING CODE SCHEDULE


ITEM
FINISHING MATERIAL
NUMBER
E01 GRC DECORATIVE COLUMN
A RIGHT ELEVATION- SCHOOL E02 DOUBLE TEMPERED GLASS.
A-202 1 : 100
E03 GROOVE 30mm.
E04 STEEL HANRAIL
E05 GRC DECORATIVE ELEMNTS
E06 EXTERNAL PAINT
E07 CURTAIN WALL
E08 EXTERNAL PAINT 2

EXPANSION JOINT

A B C D E F G H H' I J K L M N O P Q R S T U
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +22.40
T.O.P
E02

GLASS DOOM

EL +19.50

4400
T.O.P EL +19.00
EL +18.50 EL +18.50 E05 T.O.P

500
T.O.P E05 T.O.P EL +18.00
T.O.P

1000
EL +18.20 EL +18.20
ST.ROOF. S.S.L E08
EL +17.00 ST.ROOF. S.S.L

1535
T.O.P

1035

1035
E08
2500

E08
EL +16.00 EL +16.00 EL +16.00
EL +15.70

3100
T.O.P T.O.P T.O.P
3100

E05 E05 E05


T.O.P

E05
900

3265

3265

3265

3265
EL +15.10 EL +15.10
1900

1900

1900

E05 E05
ROOF. S.S.L ROOF. S.S.L
91012064

2000
1000

2900

E05
E05 44 A
1000

1000

E02 E02 E02 E02 E02 E02

1100

1100

1100

4500
4500

F F F F F F F F F F F F
E06 E06
2800

2800
E06

900

900

900
2200

2200

2200

E01
F F F F F F E01
E03
E05 E05

800

800

800
F F F F E03 F F F F F F F F
E03
EL +10.60 EL +10.60
E06
2ND F.F.L 2ND F.F.L
1500

1500

1500

E08 E03
8000

8000

E06 E01 E06 E01


E03 E03
E08
E01 E08
E01

18200
18200

E06
E03 E02 E01 E02 E01 E02 E02 E02 E02
E01
E01
4800

4800

4800

4800

4800
E03
GAMILA
GAM
G
GAA ILA

4500
4500

E06 E01
977
3300

3300

3300

E06

F F F F F F F F F F F F
E05
EL +6.10 E05
E05 EL +6.10
1ST F.F.L 1ST F.F.L
1000

1000

1000

1000

1000

1000

1000

1000

1000

1000
E06
850

850

E02 E02 E02 E02


1650

1650
E03 E02
2900

5200
E03
5200

F F F F F F F F F F F F F
PROPOSED
E08
4100

4100
E03 E03 E03 E03
3070
5100

5100

5100
3800

2200

2200
F F F F F F F F F
SECONDARY SCHOOL (B+G+2)
E06
E06 F E06 E06
F F F F F F E06 F F F
EL +0.45 EELL +0.45
+0.
+0
+ 00.4455
2200

GR F.F.L EL +0.90 EELL +0.90


+0.
+0
+0 90
90 GR
G R F.
FF.F.L
F
F.L
AL-WUKAIR
450 800

450 800

4450450
450
GR F.F.L GR F.F.LL
GR
450 450

1180

1000

1000

450 4
450

EL ± 0.00 EL ± 0.00
.00
..0
0000
ROAD F.F.L ROA
OAD FF.F
OA
ROAD ..FF..LL
F.F.L
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
RIGHT ELEVATION & LEFT ELEVATION
B LEFT ELEVATION- SCHOOL -SCHOOL
A-202 1 : 100
A-202 1:100

M.SH. AYMAN RANIA

D30213-2018-ARCH-200 11660 3664

00
A B C D E F G H H' I J K L M N O P Q R S T U
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +22.40 GLASS DOOM


T.O.P

FLOOR FINISH (AS PER SPECIFICATION) EL +21.00


75mm THK. CEMENT/SAND SCREED. T.O.P
C
GROUND SLAB AS PER STRU. DWGS. L
1000 GAUGE POLYETHYLENE AS A SEPARATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC
EL +18.50 2 COAT BITUMINOUS PAINT EL +18.50 EL +18.50
T.O.P T.O.P T.O.P EL +18.00 EL +18.20
50 mmTHK. PLAIN CONC. ST.ROOF. S.S.L
T.O.P
WELL COMPACTED EARTH FILL.

300
EL +16.00 EL +16.00 EL +16.00 EL +16.00

3100
T.O.P T.O.P T.O.P T.O.P
EL +15.10
ROOF. S.S.L

900
ROOF ROOF ROOF ROOF
600

600

600

600
4500

4500
PANTRY TOILET TOILET PANTRY CORRIDOR HA.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. CORRIDOR MAIN LOBBY
EL +10.60
2ND F.F.L
64
63
62
61
600

600

600

600
60
59
58
57

18500
56
55
54
53
52
51
50
4500

4500
49
48
PANTRY TOILET TOILET PANTRY CORRIDOR HA.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. CORRIDOR MAIN LOBBY 46
47
45
44
43
41
42 EL +6.10
40
38
39 1ST F.F.L
37
36
34
33
32
31
600

600

600

600
30
29
28
27
26
25
24
23
22
21
20

5200
19
18
5650

17
16
15
14
13
12
11
PANTRY TOILET TOILET PANTRY CORRIDOR FE.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. OFFICE LIFT WAITING 10
9
MAIN LOBBY
8 EL +0.90
7
6
5
GR F.F.L EL +0.45
4
2
3 GR F.F.L
1

450450
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L
4650

4350
DRIVEWAY RECEPTION DRIVEWAY EL -4.35
B F.F.L

91012064
44 A
ROOF FINISH (AS PER SPECIFICATION)
75mm (MIN) THK. CONC. SCREED TO SLOPE
50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB AS PER STRU. DWGS.
20 mm THK. PLASTER.

GAMILA
GAM
G
GAA ILA
977

A SECTION A-A- SCHOOL


A-203 1 : 100

PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
SECTION A-A -SCHOOL,SUBSTATION
&SECURITY ROOM

A-203 1:100

M.SH. AYMAN RANIA

D30213-2018-ARCH-200 11660 3664

00
SLOPE 10% SLOPE 10%

5000
EL ± 0.00 EL ± 0.00
2200 3000 ROAD F.F.L ROAD F.F.L
3000 2000
1 1

2 2
41

13
0%
1

80
E2
FIRE PUMP ROOM FIRE WATER TANK

SL
8
OP

OP
SL
500

E2
0

0%
1800

2802
5000
SLOPE 10%
3000

0
10%
300
PE
EL -4.35

SLO
B F.F.L
R
EL -4.35
TO AMP
RAMP DN B F.F.L G. UP
FROM G. FLOOR FL
OO
R

2 2
A RAMP 1 PARTIAL PLAN B RAMP 2 PARTIAL PLAN
A-204 1 : 100 A-204 1 : 100

EL +0.00 EL +0.00
ASP. R.F.L ASP. R.F.L
PE 10% L=3000 SLO
L=3000 SLO START START PE 10%
300

300
SLOP 20% SLOP 20%
E 20%
C C L=178
0 SLOP 50 SLO
5 PE 20%
L=178
A-204 A-204
2400

2400
91012064
--- PARTIAL SECTION 1 --- PARTIAL SECTION 1 44 A
A-204 1 : 100 A-204 1 : 100

EL +0.00 EL +0.00
600

250 600
ASP. R.F.L ASP. R.F.L
250

250

250
GAMILA
3800

3800
4350
4050

4050
4350
20% L=178 977
50 SLOPE 50 SLO
PE 20%
L=178
EL -4.35 EL -4.35
B R.C.C B R.C.C
END OPE 10% L=3000 SL END
L=3000 SL OPE 10%
300

300
SLOP 20% SLOP 20%

C C
A-204 A-204

--- PARTIAL SECTION 2 --- PARTIAL SECTION 2


A-204 1 : 100 A-204 1 : 100
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
PLASTIC COVER GRILL
21/7/2022 D30213/2018
S STEEL GRATE FRAME GRATE SECURING BAR
SET SCREW
FIBERGLASS CHANNEL RAMP DETAILS
CEMENT MORTAR BED
-SCHOOL

A-204 1:100, 1:20

0 5 10 M.SH. AYMAN RANIA


CEMENT MORTAR GROUT
SCALE 1:100 METERS
C GUTTER DETAIL A INNER PAINTING WATER
PROOFING MEMBRANE 0 0.5 1 1.5 2
D30213-2018-ARCH-200 11660 3664
A-204 1 : 20
SCALE 1:20 METERS 00
390
D
S.1.
L.V. ROOM
5.5x4.0

5500
A B-06'

5700
4000
EL +0.70
F.L EL +0.70
T. ROOM F.L
F 5100 F
4.0x5.1
E A S.-01 S.1. S.1.
S.1.
GENERATOR ROOM
6.5x4.0

5650

5650
8400
6500

4850
A B-06''
EL +0.70
PLATFORM
F.L
CONCRETE

EL -0.80

4000 F F.L
G G
T. ROOM
S.1. 4.0x5.1 S.1. S.1.
A S.-02

--- BASEMENT FLOOR PLAN --- GROUND FLOOR PLAN --- ROOF FLOOR PLAN
A-205 1 : 100 A-205 1 : 100 A-205 1 : 100

G F
S.1. S.1.
1100

1100
4700

4700
91012064
2900

2900
44 A
700

700
--- ELEVATION B --- ELEVATION C
A-205 1 : 100 A-205 1 : 100 GAMILA
977

F G
S.1. S.1.
1100

1100

PROPOSED
SECONDARY SCHOOL (B+G+2)
4700

4700
2900

2900

AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
700

700

21/7/2022 D30213/2018
SUBSTATION DETAILS
-SCHOOL

A-205 1:100

M.SH. AYMAN RANIA

D30213-2018-ARCH-200
--- ELEVATION D --- ELEVATION A 0 5 10
11660 3664

A-205 1 : 100 A-205 1 : 100 SCALE 1:100 METERS 00


18 18' EL +16.20 19 20 21 22
S.1. S.1. T.O.P S.1. S.1. S.1. S.1.
Loose laid cement tiles where exists with gravel
G 20 mm th. Cement mortar
S.1. Polypropylene separation (protection board)
Rigid thermal insulation (extruded polystyrene)
2Layers Water proofing membrane
EL +15.10
Screed laid to fall ROOF T.O.S
Reinforsed concrete slab

2000
GRADE 12-8

800
14MM THK. PAINTED PLAIN GYPSUM CEILING 300 mm THK CMU WALL (TYP.)
WATER BASE CURTAIN COVE
PAINT

4500
14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.
GRC DECORATIVE ELEMENT
DRIVEWAY
A S-29

3400
8100
FLOOR FINISH (AS PER SPECIFICATION) CONCRETE LINTEL

2200
2200
20 mm th. Cement Mortar
200 mm THK CMU WALL (TYP.)
45 mm th. Sand
20 mm th. Cement Screed GLASS WINDOW
Reinforsed Concrete Slab FLOOR FINISH

EL +10.60

300
2ND F.F.L

510 4200 390 2650 2650 GRC DECORATIVE ELEMENT

1500
BEAMS AND SLABS REF.TO ST. DWGS

14MM THK. PAINTED PLAIN GYPSUM CEILING


GRADE 11-8 WATER BASE
PAINT CURTAIN COVE
GRC DECORATIVE ELEMENT

CONCRETE LINTEL

4500
H

2400
2400
A F-20
14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.

S.1. GLASS WINDOW

3400
FLOOR FINISH (AS PER SPECIFICATION)
1100 5600 1400 1800 4000 200 mm THK CMU WALL (TYP.) 20 mm th. Cement Mortar
45 mm th. Sand

13900 20 mm th. Cement Screed


Reinforsed Concrete Slab FLOOR FINISH

900
900
100 mm THK CMU WALL (TYP.)
EL +6.10
18 18' 19 20 21 22 1ST F.F.L
S.1. S.1. S.1. S.1. S.1. S.1.

19450
EL +4.80

1850
A BASEMENT FLOOR PLAN GRC DECORATIVE ELEMENT

A-206 1 : 50

GRADE 10-8

5200
CURTAIN COVE CONCRETE LINTEL
WATER BASE
14MM THK. PAINTED PLAIN GYPSUM CEILING
6400 PAINT
WATER BASE
G

3070
GLASS WINDOW PAINT

A G-17
G 14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.

2570
S.1.
1475 150

S.1.

3400
FLOOR FINISH (AS PER SPECIFICATION)

GRADE 10-8 D14 20 mm th. Cement Mortar


D14 GRADE 12-8 200 mm THK CMU WALL (TYP.)
45 mm th. Sand PLANTING SOIL.
6.5x7.9 6.5x7.9
20 mm th. Cement Screed
Reinforsed Concrete Slab FLOOR FINISH
300 mm THK CMU WALL (TYP.) 3LAYERS COLD APPLIED WATER PROOFING MEMBRANE.
400 MICRON HDPE WATERPROOFING MEMBRANE. EL +0.90
A G-17 A S-29

730
730
GR F.F.L

450
375 1000 375

EL +0.45
GR F.F.L

450
450
EL +0.00
ROAD F.L

7900

8100
7900

8100

4200
4200
4500
FLOOR FINISH (AS PER SPECIFICATION) WATER BASE
2800

PAINT

3700
3850
75mm THK. CEMENT/SAND SCREED.
GROUND SLAB AS PER STRU. DWGS.
1000 GAUGE POLYETHYLENE AS A SEPARATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC
2 COAT BITUMINOUS PAINT
D R I V E W A Y 6 M WIDTH
PLAIN CONC. EPOXY FINISH
175 1000 375

EL -4.20

150
BAS. F.F.L
F WALL SECTION EL -4.35
A-206 1 : 50 BAS. R.L.
6500
375

H
H
1100 5600 S.1. H G
S.1. S.1. S.1.
1100 5600 6700
6700
18 18' 19

200
18 18' 19 S.1. S.1. S.1.

900

900

900

900

900
700
S.1. S.1. S.1. EL +15.10

1900
1900
ROOF T.O.S
B GROUND FLOOR PLAN D SECOND FLOOR PLAN

1000
1000

1000

1000
A-206 1 : 50 A-206 1 : 50

1000
800
E02 E02

4500
F F F F
6400

2400

2200
G G E06 F F
S.1. S.1. E03 91012064
F F F F 44 A
D14
GRADE 11-8

200
EL +10.60

6905

6905
E03
6.5x7.9 2ND F.F.L

1500
8000
E06

1150
E01

8000
E01
A F-20 E08

1050
E02 E02

GAMILA
GAM
G
GAA ILA

4500
977
8100
7900

3300
8100

15100
2400
F F F F

1090

1090
EL +6.10
.10
1ST F.F.L
.F.L
PROPOSED
1000

1000
1000

1000

1000

1000
E06
SECONDARY SCHOOL (B+G+2)

250

850
AL-WUKAIR

650
6300 E02
E06
E02

H SHIEKH ABDULRAHMAN MOHAMED A AL-THANI


H
S.1. D30213/2018

5200
21/7/2022
S.1. 1100 5600 F F F F F F
1100 5600
4300
4300

4300

4300
6700 E03
WALL SECTION A

3070
6700
2970

F F E03 F F
18 18' 19 18 18' 19 A-206 1:50
S.1. S.1. S.1. S.1. S.1. S.1. F F F F
W.SH AYMAN RANIA
330

C FIRST FLOOR PLAN E ROOF FLOOR PLAN


EL +0.90
.90
G WALL SECTION ELEVATION GR F.F.L
F.L D30213-2018-ARCH-206
1180

11660 3664

450
A-206 1 : 50 EL +0.45
.45
900

1 : 50
800

800

800
A-206 GR F.F.L
A-206 1 : 50

500
EL +0.00 00
ROAD F.L
P Q R S P Q R S
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

10400 10400
5200 2800 2400 5200 2800 2400

4.
A
TEACH
D14
17 17
S.1.

1500 500
S.1.

265 1250 2650

4700
4700

600 1100
6000

16 16 P Q R S
20 mm th. Cement mortar
S.1. S.1.
14 15 16 17 S.1. S.1. S.1. S.1.

3075

11400
Polypropylene separation (protection board)

11400

OPEN TO BELOW

2400
S.1. S.1. S.1. S.1.

2400
Rigid thermal insulation (extruded polystyrene)

EL +0.90
2Layers Water proofing membrane

G F.F.L
1300

15

300
15 Reinforsed concrete slab
S.1. EL +22.40
S.1.
E02 EL +22.40 ROOF T.O.D
ROOF T.O.D DOUBLE GLAZED REFLECTIVE OUTSIDE,

1400
200 1900

EL +21.00

3125
CLEAR LAMINATED INSIDE, DOME SHAPED

4300
4300
SKYLIGHT ON POWDER COATED
ALUMINUM FRAMES T.O.P
26

450384
1000 700

3900
495 385
14 14

3900
S.1. S.1.
4550

4400
500 1500

2166
FROSTED CLEAR GLASS EL +18.00

2120
WITH LEAD CHANNEL INLAY
300

D09
T.O.P

900
1000
EL +18.50

300
E05 EL +18.50 ST.ROOF S.S.L

300
A BASEMENT FLOOR PLAN D SECOND FLOOR PLAN ST.ROOF S.S.L

EL +18.20
A-207 1 : 100 A-207 1 : 100 EL +18.20 ST.ROOF S.S.L

1000

1000
ST.ROOF S.S.L

900

2000
SLAB & BEAM REF. TO SE DWGS

2000

3100
3100
1000

1000

1000
E05
P Q R S
P Q R S
S.1. S.1. S.1. S.1. GRC PREFABRICATED DECORATIVE
S.1. S.1. S.1. S.1.
CORNICE
10400

1100
10400

600

900
200 900

1100
5200 2800 2400 5200 2800 2400 EL +15.10
ROOF S.S.L
E
4

EL +15.10
PV.
U
EL

ROOF S.S.L

1000
17
17
D16

S.1.
S.1.

1950
GRC COLUMN
2000 4300 746

800
E02 RAIL
4700

4500
4700
E02

4500
5150
1760 800
F

2600
EL +22.40

16
16
S.1.
S.1.
11400

11400
T.O.P
2400

1.0
UP

22404
2400
E O.P

7800
+2
T.
13900

15900

15 EL +10.60
L
UP

15
F F F

100
S.1. EL +10.60 2ND F.F.L
MAIN LOBBY

EL +0.90

S.1.
13.9x8.1

2ND F.F.L
G-33

G F.F.L

UP

600
A

EL + 0.15

4300
PV. F.F.L

4300

26750
1100

12650
F F F

4500
12650
14
14
S.1.

4500
4500
S.1.

E02
D05

12050
3900

F F F E
EL +6.10
EL +6.10 1ST F.F.L
1ST F.F.L

1000
6000
E ROOF FLOOR PLAN F F F
F
B GROUND FLOOR PLAN A-207 1 : 100
A-207 1 : 100 E01 E01 E01 E01

5200
F

5200
E

4200
F F
MAIN LOBBY

200
300
E

1150
EL +0.90
P Q R S GR F.F.L
1800

S.1. S.1. S.1. S.1.


EL +0.45

2250
EL +0.90
10400 GR F.F.L

450450
GR F.F.L
5200 2800 2400

900
450450
EL ± 0.15 EL +0.45
GR F.F.L

900
P.V
900
A

4.
A
TEACH

EL ± 0.00
450
D14

ROAD F.F.L
EL ± 0.15
P.V 91012064
17
S.1. EL ± 0.00 44 A
ROAD F.F.L
4700

4350
16
S.1.

DRIVEWAY
11400
OPEN TO BELOW

2400

GAMILA
GAM
G
GAA ILA
EL +0.90

977
13900
G F.F.L

15
S.1. EL -4.35
B F.F.L
4300

14
S.1. PROPOSED
G WALL SECTION ELEVATION SECONDARY SCHOOL (B+G+2)
F WALL SECTION
50 3820 A-207 1 : 50 A-207 1 : 50 AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
0

21/7/2022 D30213/2018
WALL SECTION B

A-207 AS SHOWN

W.SH AYMAN RANIA


C FIRST FLOOR PLAN
D30213-2018-ARCH-207
A-207 1 : 100 11660 3664

00
B
22500
A-208

EL +0.45
715 6000 9000 G F.F.L 7500 715

715

715
A SWIMMING POOL A
A-208
25.00x12.50 A-208

A B-34

12500

12500
EL +0.45
G F.F.L

EL -5.05
Deep: 1.00m EL -6.05
Deep: 2.00m

715

715
715 6000 9000 7500 715
22500
A POOL PLAN
A-208 1 : 50 B
A-208

CERAMIC TILES COLOR


STANLESS STEEL TUBE
& SIZE AS PER SPECS.
EL -4.05 EL -4.05
EL -4.05 W/MIRROR FINISH Ø30MM (TYP.)
22500 F.F.L F.F.L
F.F.L 600
600 6000 9000 7500 600 600 12500
SLOPE WATER LEVEL SLOPE
SLOPE SLOPE

EL -5.05 EL -5.05

1000
250
250 1000

T.F.L T.F.L

2000
250 250

2000
250 EL -6.05
EL -6.05

1000
T.F.L T.F.L

250

250
250

FINISHING TILES AS PPER SPECS


CEMENT SAND MORTAR FINISHING TILES AS PPER SPECS
70mm SCREED CEMENT SAND MORTAR
W.P.M 4mm THK. 70mm SCREED
2 COATS OF BITUMEN W.P.M 4mm THK.
100mm PLAIN CONCRETE 2 COATS OF BITUMEN
1000 GAUGE POLYTEHENE SHEETS 100mm PLAIN CONCRETE
WELL COMPACTED SOIL 1000 GAUGE POLYTEHENE SHEETS
WELL COMPACTED SOIL

B POOL SECTION 1
A-208 1 : 50
C POOL SECTION 2
A-208 1 : 50
91012064
44 A

STANLESS STEEL PLATE 100X100X3mm


FIXED TO CONCRETE BY ANCHORS
STANLESS STEEL TUBE STANLESS STEEL LADDER Ø50mm
W/MIRROR FINISH Ø30mm. FIXED TO CONCRETE
GAMILA
GAM
G
GAA ILA
600

STANLESS STEEL LADDER Ø50mm STANLESS STEEL TUBE


W/MIRROR FINISH Ø30mm. 977
FIXED TO CONCRETE 625

CERAMIC TILES COLOR


W/MIRROR FINISH Ø30mm. & SIZE AS PER SPECS.
FIXED TO CONCRETE STANLESS STEEL PLATE 100X100X3mm
STONE TILES 500X360 MM FIXED TO CONCRETE BY ANCHORS
STANLESS STEEL TUBE
STANLESS STEEL LADDER Ø50mm
1000

STONE TILES 500X440MM


707

STONE TILES 500X180MM


CONCRETE EDGE LINE PROPOSED
250

350

SECONDARY SCHOOL (B+G+2)


SLOPE
WATER LEVEL
250

250

STONE COVER GRILL AL-WUKAIR


250

250
2000

200 300 200 60

SAME SURROUNDING
250

250

R.C STRUCTURAL SLAB POOL STONE TYPE SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
250

250

GUTTER
21/7/2022 D30213/2018
SWIMMING POOL
PLAN, SECTIONS & DETAILS

A-208 1:50

LADDER SIDE DETAIL LADDER FRONT & BACK DETAIL WATER GUTTER DETAIL GRILL DETAIL W.SH AYMAN RANIA

D ENLARGED DETAILS D30213-2018-ARCH-208 11660 3664


A-208 SCALE AS SHOWN
00
U T S R Q P O N M L K J I H' H G F E D C
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

EL +18.20 EL +18.20
ST.ROOF. S.S.L EL +17.00 ST.ROOF. S.S.L
T.O.P
1200

2200
EL +16.00
EL +15.70
3100

3100
T.O.P
1300

1300

T.O.P

1900

900

900

900
3300

3300

3300
EL +15.10 EL +15.10
ROOF. S.S.L EL +13.70 ROOF. S.S.L
2000

2000

1400
S.S.L

4600
2300
STORE LOBBY WIDE CORRIDOR
4500

4500
COMPUTER LAB

4600
2000

2.6X2.7 2.6X1.8 3.0mtr.


A S-58 A S-58 A S-25 10.4X7.9
EL +10.85 A S-60

2200
S.S.L
1100

7907
EL +10.60 EL +10.60
2ND F.F.L 2ND F.F.L

2300

4500
LOBBY LOBBY WIDE CORRIDOR
4500

4500
3.0mtr.

4500
2.6X2.7 2.6X1.8 COMPUTER LAB
A F-45 A F-44 A F-57
10.4X7.9
A F-56

2200
13250

13250
13350

13350

13350
22550

22550
1092
EL +06.10 EL +06.10
1ST F.F.L 1ST F.F.L

1000
10250

3450
MULTIPURPOSE HALL H.WASH&TOI. H.WASH&TOI.
19.6X29.6 2.35X3.3 16.4X11.1
5200

5200
5650

5650
A G-55 A G-60 A G-62

4750
EL + 0.90 EL + 0.90

2200
G F.F.L G F.F.L
EL + 0.45 EL + 0.45
G F.F.L G F.F.L
150 450

150 450
EL + 0.15 EL + 0.15
300

300
PV. F.F.L PV. F.F.L
EL ± 0.00 EL ± 0.00
ROAD F.F.L LOBBY FEMA.TOILET ROAD F.F.L
SWIMMING POOL 3.7x2.3 7.75x4.3
19.6x27.9
4500

4500
4600

A B-11
4500

4500

4500

4500
A B-12

4700
4800

4800
4350

4350
A B-34

EL -4.05 EL -4.05
F.F.L F.F.L

EL -4.35 EL -5.05 EL -4.35


300

B F.F.L B F.F.L
900

T.F.L
2000

1920

EL -6.05
T.F.L

91012064
44 A

GAMILA
GAM
G
GAA ILA

A SECTION B-B- SCHOOL 977

A-209 1 : 100

PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
SECTION B-B -SCHOOL,MULTIPURPOSE HALL
&SWIMMING POOL

A-209 1:100

W.SH AYMAN RANIA

D30213-2018-ARCH-209 11660 3664

00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

FIRE WATER TANK 1 IRRUGATION WATER TANK


4700 7.4x3.3 7.6x2.01
A B-02 A B-03'

DOME.PUMP ROOM

DIESEL ENGINE PUMP


FIRE PUMP ROOM DOMESTIC WATER TANK 1

CONTROL PANEL
4.2x8.9
4.7x8.9 7.6x3.0 A B-04
A B-01 A B-03
FIRE WATER TANK 2
7.4x3.3

0%

JOCKEY PUMP
A B-02'

E2
OP
DOMESTIC WATER TANK 2

SL

SL
7.6x3.0

ELEC. FIRE PUMP


CONTROL PANEL

OP
A A B-03''
A

E2
0%
S.1. S.1.
4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
D15 STORM DRAIN HOLDING TANK 1 D26 5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.
STORM DRAIN HOLDING TANK 2
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

6500

6500
A B-02''
A B-01' 4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
./+25+/+.#4612*+.+25%4$25&9.+2Z
.'&514#22418'&'37#.

&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.
B B &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

S.1. S.1.
4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
D09 *175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/

SLOPE 10%
UP 126+%(4156'&21.;%#4$10#6'126+%#.%18'49
STAIR ROOM-01 ./+25+/+.#4612*+.+252*+.+25&0$&

0%
2900

2900
Z.'&514#22418'&'37#.

E1
6.0X2.5 STAIR ROOM-02 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

OP
A B-05 6.0X2.6 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)

SL
UP

C A B-06
C
21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
D09 ./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
S.1. S.1. 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$
Z.'&5%490$14#22418'&'37#.
3900

3900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
DRIVEWAY /'6*#%4;.#6'126+%#.%18'49./5+/+.#4

D D
612*+.+25266:.'&5%499$14#22418'&
'37#.
DRIVEWAY &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

S.1. S.1. 4'%'55'&.'&.+0'#4:56''.*175+0)


21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
DRIVEWAY 9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.
D24
5700

5700
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
GENERATOR ROOM 56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
6.5x4.0 574(#%'.'&.+0'#456#0.'5556''.*175+0)
6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
A B-06'' %18'49./+25+/+.#4612*+.+255/%
21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

E E 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2

S.1. D26 S.1. 5+/+.#4612*+.+2596%.Z.'&514


&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
#22418'&'37#.

574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
D25
L.V. ROOM #22418'&'37#.
4850

4850
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
SEPTIC TANK 5.5x4.0
7.8x11.15 A B-06'
574(#%'.'&&190.+)*6%#56#.7/+07/
219&'4Ä%1#6'&%;.+0&'4
A B-07 9./+25+/+.#461'4%15-+/
574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

F F *+)*$#;.'&#.7/+07+/*175+0)%.'#4
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
S.1. DRIVEWAY S.1. #22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.
5650

5650
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
2416'%6+1095+/+.#461
2*+.+2539<0+.'%*41/'

&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

G G
S.1. S.1.

.')'0&
DRIVEWAY PAINTED PLAIN GYPSUM CEILING.
8100

8100
DRIVEWAY DRIVEWAY
DRIVEWAY
EXPANSION JOINT
PAINTED 600 X 600 GYPSUM TILES CEILING.

PAINT AND PLASTER.


H
H S.1.
UP WATER RESISTANT GYPSUM CEILING
S.1.
FOR WET AREAS.
77450

77450
D 1500 2075 2075 1500 1500 D03' 2075 2075 1700 D01 H' B

2980
1000 1000 1000 1000

1000
3200

D03' D03 D03


ELEC. ROOM TELECOM RM.
A-202 2.9X4.2 2.9X4.2
D01 S.1. A-202 PERFORATED GYPSUM TILES
D03' A B-15' A B-15 600X600 AS INDICATED.
900 1000 1100

D03' EL +2.5 EL +2.5 D03 EL +2.5 EL +2.5 D03


I FROM F.F.L FROM F.F.L FROM F.F.L
I
4300

FROM F.F.L

2200 220
D01
S.1. D03' D03 S.1.

800
600mm X 600mm ACCESS PANEL.

800
MA.TOILET D03 ELEC.RM
FEMA.TOILET
2200

7.75x4.3 5150 D031400 1400 5450 6.0x1.8


7.75x4.3 1000 1000 LIFT LIFT
D03' A B-09 D03 D03' A B-12 D03 A B-20
J D03 D03 D03 D03 3.0x2.6 2.9x2.6 J
STORAGE LOBBY LOCKERS STAIR ROOM-05 MALE TOILET
LOCKERS
S.1. FEMALE TOILET S.1.

3900
4.7x7.95

3870
3.7x2.3 3.85x2.3 D11 3.7x2.3 D11 3.85x2.3 5.9X2.7 D03 D03 7.95x4.7
UP
STAIR ROOM-04
D09 A B-16
2300

A B-14 5.8X2.6
2650

2700
A B-08 A B-10 A B-11 A B-13 A B-17

1150
EL +2.5 EL +3.3
EL +2.5 A B-19 FROM F.F.L
3700 FROM F.F.L
D03 D03 FROM F.F.L
EL +3.3
UP
D09
K D04 FROM F.F.L
D22
RECEPTION K
320

D03 D03
6.2x3.8
S.1. EL +3.3 EL +3.3 EL +3.3
S.1.

740
800

200 FROM F.F.L 200 200 FROM F.F.L


200 FROM F.F.L A B-22

200 1800
19600 900 7200 700 3155 825 10200 825 3780 1000 4200 1000
K'
S.1. D09

5000
4730

D22
EL -6.10

7800
DRIVEWAY
EXPANSION JOINT Deep: 2.00m
SHOE RACK PARENT WAITING RM
8080

6600
FEMALE PRAYER ROOM
6600

EL +3.4

DRIVEWAY
FROM F.F.L 3.15X8.1 CORRIDOR
EL +3.4
3.5x6.1
11.85x8.10
L A B-25
A B-24
SHOE RACK
6.1X4.1
2.5x6.3
FROM F.F.L
A B-22' L

6100
A B-32 DRIVEWAY
S.1. EL +3.3
FROM F.F.L
EL +3.4
FROM F.F.L
A B-23
UP
D09 S.1.
EL +3.3
FROM F.F.L STAIR ROOM-03
3300

3300
6.8X3.0
GYM A B-21
8.8x15.7

700 1150
1000 740

M A B-26
M
900

D09
200

200
S.1. EL +3.3 D04 D09
EL +3.3
FROM F.F.L
STORM DRAIN HOLDING TANK 3 S.1.
FROM F.F.L
STORE
UP A B-01''
3300

3300
1.6X2.4
A B-29
D22
N

6000
N EL +3.4
FROM F.F.L
STAIR ROOM-06
S.1. EL +3.4
MALE PRAYER ROOM EL +3.4 EL +3.4 S.1.
6600

FROM F.F.L FROM F.F.L A B-30 FROM F.F.L


15.2x7.4 LIFT
5400
1500

1500
A B-28 1.6x2.4 ENTRANCE
O 4.3x7.4
A B-31
O
S.1. SWIMMING POOL 200 S.1.
900 7200 700 870 5400 1465 6600 870200 1600 650 3000 650
2400

2400
19.6x27.9
UP

2200
A B-34 EL +3.3
FROM F.F.L
P P
650 1000

EL +3.3
650 800

650 700
FROM F.F.L
S.1. S.1.
200

200

200
D22 D22 EL +3.3
D22
FROM F.F.L
CORRIDOR
33.0x4.3
D22 A B-32'
5200

5200
3000

3000

3000
EL +3.4
FROM F.F.L

900 31200 900 DRIVEWAY


550 650

650

650
Q D22
Q
200

EL +3.3
FROM F.F.L D09 D22
S.1. S.1. 91012064
2800

2800
EL +3.4
FROM F.F.L 44 A
DRIVEWAY GAME ROOM UP
4200

R 9.2x5.3 STAIR ROOM-07 R


A B-33 5.7X3.6
S.1. EL -5.10 700 7800 700
UP A B-33' S.1.
2400

2400
Deep: 1.00m Z
S S.1. S
550

S.1. 7.237° S.1.


1700

1700
DRIVEWAY

7.237°
T T
D25'
S.1. S.1.
DRIVEWAY
4150

4150
DOMESTIC WATER TANK GAMILA
GAM
G
GAA ILA
U A B-35 U 977
S.1. S.1.

D25'
7.237°
7.237°

MECHANICAL ROOM
82
.76
3° A B-36
7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR

7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900 21/7/2022 D30213/2018
BASEMENT FLOOR CEILING PLAN
-SCHOOL
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. A-301 1:150

A EXPANSION JOINT
A
A-201 A-203 M.SH. AYMAN RANIA

A BASEMENT FLOOR PLAN-SCHOOL D30213-2018-ARCH-301 11660 3664

A-301 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
800 800 800 800 800 800 50 800 800 800 800 400
20200 2600 1200 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 750 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 800 1500

FROM BASEMENT FLOOR


TO BASEMENT FLOOR
RAMP DOWN

RAMP UP
SLOPE 10% SLOPE 10%

0%
E2

SL
OP

OP
SL
A A

E2
0%
EL +2.5
PANTRY

1000 900
S.1. S.1.

450

450

450

450

450

450
FROM F.F.L

800 800 700


2.5x1.25

1500

1500
A G-05
2500

200
700 6600 700 650 6600 650 600 6600 600 2400 710
D03
TOILET
2500 700 2400 700 650 6600 650 650 6600 650

4100
2.5x1.40

1300 600 1300

1300
690
EL +3.40 EL +3.40 EL +3.40 EL +3.40
A G-06 +0&114.+)*6+0)(+:674'5%*'&7.'
FROM F.F.L FROM F.F.L TEACHERS ROOM GRADE 10-4
FROM F.F.L FROM F.F.L

2800
6500

6500
6400
GRADE 10-2 TEACHERS ROOM

6900

6300

6300

6300

6300

6300
GRADE 10-5

6310
GRADE 10-1 GRADE 10-3 EL +2.5 EL +3.40
7.9x6.3

5400

5400

5400

5400

5400

5400

5400
EL +3.40
FROM F.F.L 3.8x6.3
FROM F.F.L
8.0x6.3 7.9x6.3
EL +3.40 7.8x6.3 3.8x6.3
FROM F.F.L
A G-09 A G-10 7.9x6.3 4'%'55'&.'&:#.7/+07/*175+0)12#.
A G-01 A G-02
FROM F.F.L A G-03 A G-04 TOILET A G-11 21.;%#4$10#6'126+%#.%18'49./+2
2.5x1.40 D03

3800
5+/+.#4612*+.+254%89.

225 375800
Z.'&51%14#22418'&'37#.
A G-07

800 1000
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

1000 1000 1000 1000 PANTRY 1000 1000 1000

450
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'

1190

800
6800 2.5x1.25
2400 EL +2.5 126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
D14150 6650 D14150 6550 D14 200100D14 2250 2600EL +3.3 D14200 6500EL +3.3 D14 200100D14 6700
B EL +3.3 EL +3.3 EL +3.3 EL +3.3 EL +3.3
B ./+25+/+.#4612*+.+25%4$25&9.+2Z

450 450

450

450 450

450

450
A FROM F.F.L
G-08
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L .'&514#22418'&'37#.

190

500
S.1. S.1.

450
FINISH @ B.O.S &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
38600

1000

1000
D09 FINISH @ B.O.S UP
700 37200 700 D09 STAIR ROOM-02 DN
4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
5.8X2.7
2900

2900
2.7mtr.WIDE CORRIDOR

2600
EL +0.45

2700

2700

2700

2700

2700
EL + 0.15

2600

1800

1800

1800
EL + 0.15 EL +0.45 ./+25+/+.#4612*+.+25%4$9.

500
EL +3.40 A G-12 Z.'&#%Ä/.114#22418'&'37#.
PV. F.F.L STAIR ROOM-01 G F.F.L
A G-43
FROM F.F.L G F.F.L PV. F.F.L

1900
1620 280DN 6.0X2.7 4100
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

800
D09 2000 2800 1600 2800 1600 2800 1600
EL +3.3 2800 3850 50 6900 3000 1900 3000 300 1200 400 UP 6000
C A G-44 C 4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'

450

450
FROM F.F.L

550

550
*175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
126+%(4156'&21.;%#4$10#6'126+%#.%18'49
EL +3.3
S.1. 600 4900 D10 FROM F.F.L LOBBY D10 EL +2.5
S.1. ./+25+/+.#4612*+.+252*+.+25&0$&
Z.'&514#22418'&'37#.
2.9x1.6

1900

1900
FE.TOILET 1500 MA.TOILET

1900

1900

1900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +2.5 FROM F.F.L
2800 4900

3500
4.9x3.7
FROM F.F.L A G-65
EL +3.3 3.7x5.9 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
29900
3900

3900
A G-42 FROM
D10 F.F.L A G-13 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49

4200

4200
D03 600 1200 600 600 1200 600 2800 ./+25+/+.#4612*+.+25&0$
D03 D03 D03 D03 D03 HA.TOILET D03 D03 D03 D03 D03 Z.'&5%14#22418'&'37#.
JANITOR

1300
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2.9x2.0

1700

1700
1.1x1.7

1700

1700

1700
A G-41 A G-14 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
900 900 900 900 900 1000 900 900 900 900 900 4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
900 900 900 900 900 900 EL1900 800 900 900 900 900 900
D D

700
+2.5

800 800
9./+25+/+.#4612*+.+2545$
FROM F.F.L Z.'&5%490$14#22418'&'37#.

S.1. S.1.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

650
3300 FINISH3000
@ B.O.S

1000

1000
D01 D14 GRADE 10-6
PREPAR. ELV. 5752'0&'&.'&#.7/+07+/*175+0)

10555
6.5x7.9

475
2400
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.

2500
3.3x2.5 3.0x2.5 A G-15 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
2100 1200 3000 612*+.+25266:.'&5%499$14#22418'&
A G-40 A G-39

1700
550 5400 550 '37#.
EL +3.3
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
FROM F.F.L D14
5700

5700
2800
1800 1000
EL +3.3 3700 4'%'55'&.'&.+0'#4:56''.*175+0)

725

1000
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
FROM F.F.L EL +3.40
D14 FROM F.F.L
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&

7900
6600
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.

475
7100
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)

800
21.;%#4$10#6'126+%/#6'4+#.6':674'&

E E 21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55

475
56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
19700

19700
S.1. CHEMISTRY LAB
S.1. 574(#%'.'&.+0'#456#0.'5556''.*175+0)
6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
%18'49./+25+/+.#4612*+.+255/%
EL 6.5x9.25
+3.40 21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

2800
6950
FROM
A F.F.L

9250
G-38

7800
3000 1900 3000 EL6500
+3.3 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.

650
EL +3.40 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
4850

FROM F.F.L

4850
FROM F.F.L %18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

650
#22418'&'37#.

1000
EL +3.40 D14 GRADE 10-7

475
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L
6.5x7.9 4'(.'%6146':674'&21.;%#4$10#6'126+%#.

800
%18'49+6*56#+0.'5556''.(+:#6+109./+2
A G-16

6690
5+/+.#4612*+.+2596%.Z.'&514
FIRST FLOOR LINE EL +3.40
F F
#22418'&'37#.

475
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +0.45
FROM F.F.L

G F.F.L 550 5400 550 574(#%'.'&&190.+)*6%#56#.7/+07/

S.1. S.1.

30000

30000
219&'4Ä%1#6'&%;.+0&'4

1000 600 1000


9./+25+/+.#461'4%15-+/
6500 D14 EL +3.40 574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'

725

2800
FROM F.F.L 14#22418'&'37#.

7900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

6600
EL +3.3
BASEMENT LINE *+)*$#;.'&#.7/+07+/*175+0)%.'#4

725

7200
FROM F.F.L 21.;%#4$10#6'126+%#.%18'49./+2
D14 5+/+.#4612*+.+25$;2)Z.'&59$14
5650

5650
EL + 0.15 #22418'&'37#.

475
PV. F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

800
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
UP

475
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
EL +0.45 #22418'&'37#.
G F.F.L
6400
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

G G

650
FROM F.F.L

300

2800
9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä

S.1. S.1. 2416'%6+1095+/+.#461

650
750

1065

9250

6850
3000
EL +3.3 16400 GRADE 10-8

7800

1000
2*+.+2539<0+.'%*41/'
FROM F.F.L FINISH @ B.O.S EL +3.40 D14
CHEMISTRY
FROM F.F.L LAB 6.5x7.9 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

STORE 6.5x9.25 A G-17


3300

3300

475
3.0x3.3 A G-37

2000

10555
D23 550 5400 550 600 1200 600 600 1200 600 550 5400 550
A3000
G-64

800
PROPERTY LIMIT
.')'0&

475
EL +3.40
D04 FROM F.F.L
8100

8100
7900
6600
1000

6900

2800
D14
1400 1000 4100 EXPANSION JOINT

725
3200
PREPARATION 700 4210
EL +3.40 1200 4190 1200 4200 700 PAINTED PLAIN GYPSUM CEILING.

11100
4100

FROM F.F.L
4100

9600

EL +3.3 D14

5235
3.2x4.1 CAFETERIA

1800
FROM F.F.L
EL A
+2.5G-63' 16.4x11.1 PREPAR. ELV.

475
FROM F.F.L EL +3.40
3.3x2.5

2400
A G-62 3.0x2.5

2500
PAINTED 600 X 600 GYPSUM TILES CEILING.

2500

2500
FROM F.F.L
A G-36
H

800
EL +3.40
A G-35

1000 400 1000


2250 3000
FROM F.F.L 3400 3000 D01 EL 6500
+3.3
H

475
650
D04 EL +0.45 FROM F.F.L S.1. PAINT AND PLASTER.

1000
17190

G F.F.L

200
S.1.

1000
D12 D12
77450

77450
D
3000 FIRE COMMEND CENTRE EL +3.40
D14
H' B

2800
WATER RESISTANT GYPSUM CEILING

1200
2000

STORE 6.5x3.0

2980
3800
EL +3.40
3300

D23 FROM F.F.L

2780

2780
3200

3300

6500 600 1200 600 700 1200 600


A-202 3.0x3.3 A FROM F.F.L
G-34 7900
3000 TEACHERS ROOM S.1. A-202 FOR WET AREAS.

200 400 1380


1680

4200
A G-63 D16 50 D16 EL +3.3 6.5x4.2
EL +3.40

1080

1080

1300
EL +3.3 FROM F.F.L
3000
EL +3.3 5700 1100 8900 3675 2000 1525 4950 600 3000 300 300 4900 1600 2000 3350 D05 FROM F.F.L A G-18
PERFORATED GYPSUM TILES
640 400 800300800300800300800200 800

I I
750

FROM F.F.L

505
FROM F.F.L

2200 220
50
600X600 AS INDICATED.

800
FINISH @ B.O.S EL +3.3
S.1. 3300
FINISH @ B.O.S 2350 EL2500
+3.3 3050 S.1.

620
H.WASH&TOI.

100 800 900


1100

1000 1000 1100

1400 1700 1680 1400 2350 1300 H.WASH&TOI.


2350 1400 1700 1700 1400 3300 2350 EL6010
1100

1100

1100

FROM F.F.L FROM F.F.L


D03 D03 ELEC.RM ELEC.RM +3.3
1600

1600

1600
2200

2.35x3.2

1770

445
D16
1800

EL +3.3D03 2.35x3.2

1900
FROM F.F.L
A G-61 D03 FROM F.F.L A G-60 3.3x1.8 D01 EL +3.3 D01 3.3x1.8 LIFT LIFT 2750 3100 TOILET
D03 600mm X 600mm ACCESS PANEL.
2900

FROM F.F.LD09 D09 EL +2.5


A G-56 A G-35 RECEPTION
1100

EL +2.5 PANTRY
J J
1000

1000

3.0x2.7 3.0x2.7
1100

D03 D03 D03 D03 D03 D03 FROM F.F.L

1500
FROM F.F.L3.2x1.5 3.1x1.5

5100
4700

4870

2800
EL +2.5
STAIR
FINISH @ROOM-04
1500

1500

1500

1500

S.1. A G-19
S.1.

5070
EL +2.5 FINISH @ B.O.S B.O.S A G-20
FROM F.F.L FROM F.F.L
1000

1000

UP DN
6.0X2.7
1100

D03 1000 1000 1800 1000 1000 D03 1400


1100

EL + 0.15 MA.TOILET 1000 1000 1000 1000 1000 1000


2650

2700

2700
2600
FE.TOILET A G-66
2700

1500
PV. F.F.L 6.6x4.7

1500
1300 3570
6.6x4.7 2830 3400 2800 3600 1400 5850 5950 6200 7500 3200 1000 1000 1000 1000 1000 1000
1800

UP EL +3.40
1200
1200

1200

D10
1100

A G-57
1200

475
1100

A G-58 D10 EL +3.3 FINISH @ B.O.S DN UP FROM F.F.L


K FROM F.F.L D03 D03 D03 D03 D03 D03 K

800
9700
5800
320

8400
10070
1000 4200 1000 200 850 5800 850 700 1800 700 6500
FE.TOILET
50

1100
S.1. S.1.

1700
6.5x3.3

475
EL +3.40 EL +2.5

1000
FROM F.F.L D10 A FROM F.F.L
G-21

600
EL +3.40

13200
K'

400
D16

3250
3280
FROM F.F.L
2000

2000

EL +3.3
D16

600
FROM F.F.L

1000

2800
EL +2.5
S.1. EL +0.45 D10 MA.TOILET

5000
1700
4730

FROM F.F.L
G F.F.L WAITING 6.5x3.3

1100
A G-22

630
210
EXPANSION JOINT D03 D03 D03 D03 D03 D03

2200

475
8100

1500

1500
2755

1500
OPEN TO ABOVE OPEN TO ABOVE

2000

800
1000 1000 1000 1000 1000
L 1000
L

650
FINISH @ B.O.S
D16

1100 800
S.1. EL +3.3 STAIR ROOM-03 S.1.

850

1000
6.8X3.1
500

FROM F.F.L D09

1505
DN
A G-23 EL + 0.15
28500
3300

3300
2900
LOBBY PV. F.F.L

2820
3000
EL +0.45 4.3x4.7

800

2200
3000
G F.F.L A G-24 UP
FINISH @ B.O.S
M M
D09 FINISH @ B.O.S EL +3.40

9240

2800
EL +0.45
FROM F.F.L
4975

1995
FINISH @ B.O.S

10040
700

EL +2.5
G F.F.L
S.1. EL +0.45 S.1.

650
800
FROM F.F.L CLINIC

400 900
1150
D03 D05
9200 9300 200 2000
2000 100 1300
1800 500 PANTRY
1600 G F.F.L 6.8x3.1
900

850
1.6x2.4

2400
TOILET D06 A EL +3.40
G-25
3300

3300
15 14 13 12 11 10 9 8 7 6 5 4

3100
1800
A G-65

600 800 1100


FROM F.F.L
550 8200 550 D03 3.9x2.4 D10

1150
MEETING D03 EL +2.5 4300 650 5400 750
N A G-67 200 900 3200 6800 N

4500

2300
DN
FROM F.F.L
5000

9.3x5.0 EL +3.3
3400

FROM F.F.L STAIR ROOM-06 EL +3.3


S.1.

650
S.1.
500

A G-48 CONTROL ROOM

3000
FROM F.F.L

3800

3000
A G-68

1150
EL +3.40 D03 D10
4.3x3.0

7000
FROM F.F.L TOILET TOILET
6400

AEL +3.3
G-26
1500

1500
600

755
EL +2.5
3.9x2.4

1200
2000 1800 2.0x1.2

1350
1.6x2.4 FROM F.F.L
O O
D17 A G-66 FROM F.F.L

1150
EL +3.3 D03 UP A G-28

2100
800

DN DN
EL +2.5 1050 1100 UP UP UP
FROM F.F.L D03 EL +2.5

1800
FOR SITTING D03PANTRY
FROM F.F.L EL +3.3
S.1. S.1.
21800

1000
600

900
UP TO 1ST FLOOR

1100
D04 FROM F.F.L FROM F.F.L
1400 6400 1400 2350
2350 2300
2300 8002050
1150 200 1600
2000 200 4200 1000 700 800 400 2150 6900 7000 1.4x3.7
4975

400 600 600 600


D03
2400

2400
2500
100 STORE 2300 A G-30
850 5400 EL +3.40 895
1800

TOILET
1800

1800

1800

1800

800 800 600


EL +2.5 1.8mtr.WIDE CORRIDOR ELF.F.L
+0.90 650 LOBBY
3000 650 835 2965 800

1200
2.05x1.8 FROM D05 D05

1750
EL +2.5 D03 FROM F.F.L EL +3.3
EL +3.3 MAIN LOBBY 2.0x1.2
G F.F.L
P A G-47 4.8x4.3 P

2000

2000
A G-48 FROM F.F.L
FROM F.F.L
D03 FROM F.F.L 13.9x8.1 A G-29
MULTI PURPOSE HALL A G-32
EL +3.40

3600
700

A G-33 D16
S.1. D16
S.1.

450
19.6x29.6 D05 D05 FROM F.F.L
700

EL +0.90

7200
EL +3.3 STORE
425

900
A G-55 EL +3.40 D05
1925

FROM F.F.L D17 EL +0.90 G F.F.L


1925

7800
EL +3.3 3.60x1.9 FROM F.F.L
500

3600 650 4200 650 550 4200 550 550 3000 550
700 1000

4900
D04
14800

G F.F.L

1700
FROM F.F.L A G-54' MANAGER
EL +3.40
SECRETARY RECEPTION
EL +3.40 PARENT WAITING AREA

3900
EL +3.40
5.5x5.0

3000
FROM F.F.L

2800
FROM F.F.L 4.6x8.9 ACCOUNTING

600
FROM F.F.L
5.3x5.0 4.1x3.9
5200

5200
AEL +3.40
G-52 4200
3600

OPEN TO ABOVE A G-46 A G-45 A G-27 4.6x5.0

4300
FROM F.F.L

3900
A EL +3.40
G-31
FROM F.F.L
STAIR ROOM-07 EL +3.3
4825

450
ENTRANCE LOBBY 5.8X3.6 FROM F.F.L

800
3600
A G-54 A G-23 5500 5300 13900

2600
EL +3.3 EL +3.3 EL +3.3

845
Q Q
700

EL +3.3

800
FROM F.F.L
400

FROM F.F.L FROM F.F.L


5675

FROM F.F.L
UP UP

400
S.1. EL +0.45 DN
S.1.
5675

EL + 0.15
7175

G F.F.L FINISH @ B.O.S


91012064
2800

2800
PV. F.F.L
500

RAMP UP
75

3600
R R 44 A
2000

D16
S.1. S.1.
2400

2400
Z
800

D16 UP UP UP
S EL + 0.15
S.1. S
2000

PV. F.F.L EL + 0.15


3300

S.1. 2800 14000 2800


PV. F.F.L 7.237° S.1.
1700

1700
UP UP UP UP

7.237°
T T
1710

S.1. UP
EL + 0.15
PV. F.F.L S.1.
EL + 0.15
PV. F.F.L
1000 500 1600
4150

4150
350

U U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
600 2800 600 1400 1600 800 4400 800 1600 1400 500 2800 700 800 3500 800 3500 800 600 2600 600 800 800 2800 800 800 800 2800 800 800
600
400 2100
600 100 100
400 600 1500 600 1000 6500
100 100
1000 600 1500 600 4300 800 450 2800 450
800
450 2800 450
800
400 2700
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
GROUND FLOOR CEILING PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
A-302 1:150
A EXPANSION JOINT
A
A-201 A-203
W.SH AYMAN RANIA

A GROUND FLOOR PLAN-SCHOOL D30213-2018-ARCH-100 11660 3664

A-302 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

A A
EL +3.3 EL +3.3 EL +3.3 EL +3.3 EL +3.3
S.1. S.1.

450

450

450

450

450
FROM F.F.L FROM F.F.L FROM F.F.L EL +3.3 PANTRYEL +2.5 EL +3.3 FROM F.F.L FROM F.F.L

1250
FROM F.F.L FROM F.F.L FROM F.F.L
2.5x1.25
A F-05
700 6600 700 650 6600 650 600 6600 600 500190 2400 690 D03 TOILET
2500 700 2400 700 650 6600 650 650 6600 650

1400
EL +3.4
2.5x1.40EL +2.5
EL +3.4 EL +3.4 EL +3.4 FROM F.F.L
A F-06
FROM F.F.L FROM F.F.L FROM F.F.L
FROM F.F.L
TEACHERS ROOM GRADE 11-4

6500

6500
7.9x6.3 GRADE 11-5

5400

5400

5400

5400

5400

5400
GRADE 11-1 GRADE 11-2 GRADE 11-3 TEACHERS ROOM 3.8x6.3
A F-09 A F-10 7.9x6.3
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 EL +2.5
TOILET EL +3.4 EL +3.4 AEL +3.4
F-11
FROM F.F.L

1400
A F-01 A F-02 A F-03 A F-04 2.5x1.40 FROM F.F.L FROM F.F.L FROM F.F.L +0&114.+)*6+0)(+:674'5%*'&7.'
D03
A F-07
PANTRY
EL +2.5
4'%'55'&.'&:#.7/+07/*175+0)12#.

1250
2.5x1.25
FROM F.F.L
21.;%#4$10#6'126+%#.%18'49./+2
B B

450

450

450

450

450 450

450
D14 D14 D14 D14 A F-08 D14 D14
5+/+.#4612*+.+254%89.
D14 Z.'&51%14#22418'&'37#.

STAIR ROOM-02
S.1. EL +3.3
S.1.

450
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
FROM F.F.L FROM F.F.L
5.8X2.7
FINISH @ B.O.S 4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
STAIR
6000 ROOM-01 A F-14
2900

2900
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
800 EL +3.4 27000 2.7mtr.WIDE CORRIDOR 800 700 EL +3.4 8400 700 6000

2700

1800

1800

2700
6.0X2.7 FROM F.F.L
D16 FROM F.F.L
./+25+/+.#4612*+.+25%4$25&9.+2Z
A F-13 .'&514#22418'&'37#.
A F-12 D09
D09 EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

C C
FINISH @ B.O.S

350
450

550
FROM F.F.L 4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49

S.1. EL +2.5
D10 LOBBY EL +3.3
D10
EL +2.5
S.1. ./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.

1600
FROM F.F.L EL +3.3 FROM F.F.L FROM F.F.L
FE.TOILET 2.9x1.6 MA.TOILET

1900
1880
FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

4.9x3.74900 D10 4200 600 1200 600 600 1200 600


D10
A 2900
F-15 4900
3.7x5.9 4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
3900

3900
*175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
A F-73 EL +2.5 ELD03
+2.5
A F-16 126+%(4156'&21.;%#4$10#6'126+%#.%18'49
D03 D03 D03 D03 D03 HA.TOILET D03 D03 D03 D03 D03
HA.TOILET
FROM F.F.L JANITOR
FROM F.F.L 2000 900 900 900 900 900 ./+25+/+.#4612*+.+252*+.+25&0$&
2.9x2.0 1.1x1.7 2.9x2.0 Z.'&514#22418'&'37#.

2000

2000
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

1700

1700
A F-72 A F-71 A F-17
EL +2.5 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
900 900 895 900 900 2100 1000
D FROM F.F.L D 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49

OPEN TO BELOW
./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
S.1. EL +3.3
S.1.

650
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

2500
D14

1300
FROM F.F.L FROM F.F.L
3400 2600 3000 GRADE 11-6 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
PREPAR. ELV. 4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4

3.8x6.3 3.0x2.5 6.5x7.9 9./+25+/+.#4612*+.+2545$


Z.'&5%490$14#22418'&'37#.
A F-69 A F-18

1200
A F-70 D01 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
D14
5700

5700
5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.

725
EL +3.3 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
FROM F.F.L D14 612*+.+25266:.'&5%499$14#22418'&
'37#.
EL +3.4

6600
GROUND FLOOR LINE FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%

E E /#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%

S.1. CHEMISTRY LAB S.1. &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;


14#22418'&'37#.

9.2x9.25 EL +3.3
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&

845
A F-68 FROM F.F.L 21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55

7800
56''.(+:#6+109./+25+/+.#4612*+.+25

650
..:Z.'&5#14#22418'&'37#.
4850

4850
EL +3.4 574(#%'.'&.+0'#456#0.'5556''.*175+0)
FROM F.F.L 6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
EL +3.3 %18'49./+25+/+.#4612*+.+255/%

650

650
700 7800 700 600 1200 600 3000 700 1200 600 FROM F.F.L 21'9.Z.'&514#22418'&'37#.
D14 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4 EL +3.4 GRADE 11-7 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L FROM F.F.L
6.5x7.9 4'(.'%6146':674'&21.;%#4$10#6'126+%#.

27600

27600
EL +3.4 %18'49+6*56#+0.'5556''.(+:#6+109./+2
A F-19
F FROM F.F.L
F 5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
#22418'&'37#.

S.1. S.1.
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
D14 5+/+.#4612*+.+2596%.Z.'&514

725
#22418'&'37#.
EL +3.4 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

6600

6600
FROM F.F.L
PROPERTY LIMIT 574(#%'.'&&190.+)*6%#56#.7/+07/

725
EL +3.3 219&'4Ä%1#6'&%;.+0&'4
FROM F.F.L D14 9./+25+/+.#461'4%15-+/
5650

5650
600 1200 600 850 4800 850 574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

*+)*$#;.'&#.7/+07+/*175+0)%.'#4
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

G G

650

650
EL +3.4
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
S.1. EL +3.3 EL +3.3 EL +3.3 EL +3.3 FROM F.F.L EL +3.3
S.1.

650

650

650

650
EL +3.3 5+/+.#461(#)'4*7.62')#575Z6%Ä6914

750
800

7800
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L #22418'&'37#.
FROM F.F.L D14
GRADE 11-8

OPEN TO BELOW
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
CHEMISTRY LAB 6.5x7.9
9.2x9.25 A F-20 9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
A F-67 850 4800 850 2416'%6+1095+/+.#461
2*+.+2539<0+.'%*41/'
900 7200 900 700 9000 700 700 7800 700 1075 4200 1075 565 11400 565 700 7800 700 600 1200 600

4200
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4
FROM F.F.L
COMPUTER LAB COMPUTER LAB
COORDINATOR RM. COMPUTER LAB
8100

8100
10.4x7.9 9.2x7.9 EL +3.4

6600

6600

6600

6600

6600

6600
6.35x7.9
6600

A F-53 9.2x7.9 FROM F.F.L


A F-48

.')'0&
EL +3.4 A F-56 A F-61 D14
EL +3.4 EL +3.4 EXPANSION JOINT

725
FROM F.F.L
FROM F.F.L FROM F.F.L
EL +3.4

750
LIBRARY FROM F.F.L EL +3.3
9.0x16.0
D14 PREPAR.
FROM F.F.L ELV.
TOILET

2500
6.0x2.5 3.0x2.5

2950
A F-43
3.15x2.0 D03

2500
3150 A F-65 A F-66
H PAINTED PLAIN GYPSUM CEILING.

1995
D20 D20 A F-55 D20 3700 3000
EL +2.5
H
650

650

650

650
EL +3.3 FROM F.F.L D13 D01 EL +3.3
S.1.
1200

1300
FROM F.F.L FROM F.F.L
EL +3.3
S.1. PAINTED 600 X 600 GYPSUM TILES CEILING.
600

600
1100
FROM F.F.L
D14
77450

77450
D D19 EL +3.4
EL +3.4
FROM F.F.L
EL +3.3
FROM F.F.L H' B

2980
D16
3200

3.0mtr.WIDE
FROMCORRIDOR

2800
900 7200 900 600 37680 F.F.L 600 650 16200 650
S.1.
1800

1800
1000 800 3000 1695
A-202 TEACHERS ROOM A-202 PAINT AND PLASTER.

1205
A F-57

1200
6.5x4.2

3000
EL +3.4
EL +3.3 A FROM
F-21F.F.L

380
EL +3.3
I I
600

EL +3.4 FROM F.F.L


WATER RESISTANT GYPSUM CEILING

2200 220
FROM F.F.L

1250
FROM F.F.L

1900
D10 D10 EL +3.3

630
EL +3.3
S.1. S.1.

1400
FINISH @ B.O.S EL +2.5
D14 EL +3.3 EL +3.3 D14 EL +3.3 FINISH @ B.O.S FROM F.F.L FOR WET AREAS.

800
EL +3.3

850

850
FROM F.F.L
1100

1100
6600

LOBBY D03 D03 FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L

600
ELEC.RM FROM F.F.L ELEC.RM
1600
2200

1800

1800

1800
D19 EL +2.5
2.6X1.8 D03
AEL +3.3
F-44 EL +2.5
EL +2.5 3.3x1.8
3300 D01 2500 1000 500
TOILET TOILET
FROM F.F.L 2500 D01 3.3x1.8 LIFT LIFT PERFORATED GYPSUM TILES
EL +3.4 EL +3.4
PANTRY TOILET
J A F-49 A F-63
J
1000

1000

1800

1800

1800
FROM F.F.L 3.0x2.7 3.0x2.7 3100

1500
FROM F.F.L D03 FROM F.F.L D03 1.5x1.8 D03 FROM F.F.L FROM F.F.L 1.5x1.8 600X600 AS INDICATED.

1500
D04 TEACHERS ROOM TEACHERS ROOM D03 3.2x1.5 3.1x1.5
A F-52 A F-60 EL +2.5
4700

4700

3000

3600

3000

3000
EL +3.3 D09 4.65x4.7 4.65x4.7 D09 STAIR5980
ROOM-04 EL +2.5
S.1. STORE
FROM F.F.L 1400 1600
D03MA.TOILET
600 2200
FE.TOILETD03
1400 6000 1500 825 3000 825 600 1800 600 765 3000 765 1500 FROM F.F.L
A F-22 AFROM
F-23
F.F.L S.1.
1000

1000

PANTRY A F-54 A F-58 PANTRY 6.0X2.7


2.6x2.7 3.7x4.7 3.7x4.7 STAIR ROOM-05 EL +3.4 EL +3.3 EL +3.4 1000 1000 1000 1000 1000 1000 600mm X 600mm ACCESS PANEL.
2650

2700
A F-62

630
2700

2700
A F-45 6.0X2.7 1.5X2.0 FROM F.F.L 1.5X2.0 FROM F.F.L FROM F.F.L

1500
A F-46 A F-47

2000
A F-51 A F-59 940 6600 1135 4200 825 1800
1000

1000

D03 D03

7200
EL +3.3
A F-50
EL +2.5
K K

850

850
EL +2.5 FINISH @ B.O.S
FROM F.F.L FINISH @ B.O.S FROM F.F.L MAIN LOBBY D03 D03 D03 6500 D03 D03 D03

8400
FROM F.F.L
FE.TOILET
320

13.9x8.1

1100
D16
S.1. EL +3.4 A F-64 EL +3.4
1065 1700 6.5x3.3 3730 S.1.

4200
FROM F.F.L FROM F.F.L
D10 A F-24 EL +2.5

600
6600 1135 4200 1025 FROM F.F.L
K' 940 EL +2.5

600
FROM F.F.L
S.1. D10 1065 1700 3730

5000
4730

MA.TOILET

1100
6500
EL +3.3 6.5x3.3

730
FROM F.F.L D03 D03 D03 A F-25 D03 D03
EXPANSION JOINT 1000 1000 1000 1000 1000 1000
D03
OPEN TO BELOW OPEN TO BELOW

1500

1500
EL +3.4

650
FROM F.F.L
L L
S.1. STAIR ROOM-03 S.1.

850
EL +3.3
FROM F.F.L
D09 6.8X3.1
A F-26
3300

3300
3100
950 2400 950 6800
FINISH @ B.O.S

M M
FINISH @ B.O.S
S.1. EL +3.3 EL +3.3 EL +2.5
PANTRY PANTRY S.1.
1005

1500 1900 3100

900
D03 FROM F.F.L D03

1400
FROM F.F.L FROM F.F.L D03
2.4x1.6 1.9x1.4
TOILET EL +2.5

7200
A F-36' A F.F.L
F-27
3300

3300
FROM

1000
3.9x2.4 TOILET D03

3100
D03 A LOBBY EL +2.5
OFFICE F-36 D10 D03 EL +2.5 FROM F.F.L 5.1x3.1
N A F-31 N

1600
FROM F.F.L 1900 A 1000
F-28 2000
9.2x5.0
3000

1000
EL +3.4 D03
SITTING AREA STAIR ROOM-06 D03
S.1. A
EL +3.4
F-42
9.3x7.0
EL +2.5
D03 FROM F.F.LD10 A F-32
FROM F.F.L
S.1.
FROM F.F.L A F-37 TOILET LIFT EL +3.3
1500

1500
850
D21 EL +3.4 3.9x2.4 1.6x2.4 FROM F.F.L

O FROM F.F.L
D03 A F-35 D18 O
995

ART STUDIO
S.1. S.1.

850
EL +3.3
FINISH @ B.O.S 9.4x8.9
2400

2400
A F-29
1200

FROM F.F.L EL +3.3 EL +3.3


D18

550
FROM F.F.L D14 FROM F.F.L
D09
P CONFERENCE
EL +3.4
FROM F.F.L
P
S.1. 9.2x11.8
EL +3.3 EL +3.3 D08 D08 S.1.
700

700

755
EL +3.3 650 3000 650 900 6600 1200 700
OFFICE

7200
FROM F.F.L
A F-41 FROM F.F.L
FROM F.F.L ART -
LOBBY OFFICE OFFICE 4.1x3.9 TEACHERS ROOM

4200
1200 7010 990 3600 650 4200 650 550 4200 550 535 A 3000 535
2800

3.6x2.8 5.5x5.0 5.3x5.0 F-33 4.3x5.3


A F-38 A F-34 OPEN TO BELOW

2400
D18 A F-40 D21 A F-30
OPEN TO BELOW
5200

5200
EL +3.4
3600

3600

EL +3.4
D21 FROM F.F.L FROM F.F.L
EL +3.4 EL +3.4
EL +3.4
FROM F.F.L FROM F.F.L
600

FROM F.F.L EL +3.3

750

550
FROM F.F.L
9405

OFFICE
600 2400
3.6x4.8 600
Q Q
700

700

A F-39
3600

S.1. EL +3.4
S.1.
FROM F.F.L
2800

2800
EL +3.3
R R
600

FROM F.F.L

S.1. S.1. 91012064


2400

2400
Z 44 A
1195

S S.1. S
S.1. 7.237° S.1.
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
U U
S.1. S.1.
GAMILA
GAM
G
GAA ILA
977

7.237°
7.237°

82
.76

7.237°

Z
S.1.

PROPOSED
SECONDARY SCHOOL (B+G+2)
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
AL-WUKAIR
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. FIRST FLOOR CEILING PLAN
A A -SCHOOL
EXPANSION JOINT
A-201 A-203
A-303 1:150

W.SH AYMAN RANIA


A FIRST FLOOR PLAN-SCHOOL D30213-2018-ARCH-100 11660 3664
A-303 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

GRADE 12-1 GRADE 12-2 GRADE 12-3 TEACHERS ROOM PANTRY TEACHERS ROOM GRADE 12-4 GRADE 12-5
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 2.5x1.25 3.8x6.3 7.9x6.3 7.9x6.3
A S-01 A S-02 A S-03 A S-04 A S-05 A S-09 A S-10 A S-11

A EL +3.3
A
EL +3.3 EL +3.3 EL +3.3 EL +3.3
S.1. S.1.
EL +3.3

450

450

450

450

450
EL +2.5 EL +3.3

750
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L

1250
FROM F.F.L FROM F.F.L
2500 700 2400 700 650 6600 650 650 6600 650

TOILETEL +2.5
FROM F.F.L

1400
2.5x1.40
EL +3.4 EL +3.4 EL +3.4 EL +3.4 A S-06
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L EL +3.4

6500

6500
EL +3.4
FROM F.F.L

5400

5400

5400

5400

4800

5400

5400
+0&114.+)*6+0)(+:674'5%*'&7.'
FROM F.F.L
EL +2.5
TOILET
FROM F.F.L EL +3.4
700 6600 700 650 6600 650 600 6600 600 690 2400 690

1400
2.5x1.40 FROM F.F.L 4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
A S-07 5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.
PANTRY STAIR ROOM-02

1250
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2.5x1.25 5.8X2.7
B B

750
EL +2.5

450

450 450

450

450

450
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
A S-08
FROM F.F.L A S-12 126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
EL +3.3 ./+25+/+.#4612*+.+25%4$25&9.+2Z

S.1. S.1.

450

450
EL +3.3 .'&514#22418'&'37#.
FROM F.F.L
FROM F.F.L FINISH @ B.O.S
700 8400 700 6000 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
STAIR ROOM-01
2900

2900
EL +3.4 2.7mtr.WIDE CORRIDOR EL +3.4

2700

2700
1800

1800

1800
6000 800 27000 800 4'%'55'&.'&:56''.*175+0)#.7/+07+/
FINISH @ B.O.S 6.0X2.7 FROM F.F.L A S-13 FROM F.F.L 4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
A S-14 ./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.
EL +3.3
C C

450

450
550
FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
MA.TOILET
4900 4200 3.7x5.9 4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'

S.1. EL +2.5
LOBBY EL +3.3
FROM F.F.L
EL +2.5
FROM F.F.L A S-25 S.1. *175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
126+%(4156'&21.;%#4$10#6'126+%#.%18'49

1600

1600
2.9x1.6 ./+25+/+.#4612*+.+252*+.+25&0$&

1900
FROM F.F.L FE.TOILET

1880
EL +3.3 2900 4900 Z.'&514#22418'&'37#.
4.9x3.7 FROM F.F.L A S-24 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
3900

3900
EL +2.5 2000
A S-15 EL +2.5 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
FROM F.F.L

2000
HA.TOILET FROM F.F.L
HA.TOILET 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
./+25+/+.#4612*+.+25&0$
2.9x2.0 JANITOR

2000

2000
2.9x2.0

1700
Z.'&5%14#22418'&'37#.

1700
A S-16 1.1x1.7 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
900 900 900 900 900 2100 A S-17 EL A+2.5S-26 900 900 900 900 900
D 1000 FROM F.F.L D 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$
S.1. EL +3.3
S.1.

650
EL +3.3 FINISH @ B.O.S Z.'&5%490$14#22418'&'37#.

1300

1300
FROM F.F.L FROM F.F.L
2600 3000 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
PREPAR. ELV. GRADE 12-6
3.8x6.3 3.0x2.5 6.5x7.9 5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.

2500
A S-19 A S-27

1200
A S-18 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
612*+.+25266:.'&5%499$14#22418'&
'37#.
5700

5700
850 4800 850 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

725

725
EL +3.3
FROM F.F.L 4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
EL +3.4

6600
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
FROM F.F.L 9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.
700 7800 700

E E 4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
S.1. CHEMISTRY LAB
S.1. 56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
574(#%'.'&.+0'#456#0.'5556''.*175+0)
9.2x9.25 EL +3.3 6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.

845
%18'49./+25+/+.#4612*+.+255/%
A S-20 FROM F.F.L

7800

7800
21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

650
4850

4850
EL +3.4 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
EL +3.3

650
%18'49+6*56#+0.'5556''.(+:#6+109./+2
600 3000 700 FROM F.F.L 5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4
EL +3.4
EL +3.4 GRADE 12-7 #22418'&'37#.
FROM F.F.L FROM F.F.L
FROM F.F.L 6.5x7.9 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.

27600

27600
4800
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
A S-28
F F
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

S.1. 850 4800 850


S.1. 574(#%'.'&&190.+)*6%#56#.7/+07/
219&'4Ä%1#6'&%;.+0&'4
PROPERTY LIMIT

725

725
9./+25+/+.#461'4%15-+/
EL +3.4 574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'

6600
FROM F.F.L 14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

725
EL +3.3

845
FROM F.F.L *+)*$#;.'&#.7/+07+/*175+0)%.'#4
5650

5650
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
700 7800 700

9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.

G G

650
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4

S.1. S.1.
EL +3.3 EL +3.3 EL +3.3 EL +3.3 FROM F.F.L EL +3.3

650

650
EL +3.3
800

7800
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L 9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
FROM F.F.L
GRADE 12-8 2416'%6+1095+/+.#461
CHEMISTRY LAB 2*+.+2539<0+.'%*41/'
6.5x7.9
9.2x9.25 A S-29 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
A S-21
600 1200 600 850 4800 850
7200 900 700 9000 700 700 7800 700 1075 4200 1075 565 11400 565 700 7800 700 600 1200 600
EL +3.4
FROM F.F.L

.')'0&
COMPUTER LAB COMPUTER LAB
COORDINATOR RM. COMPUTER LAB
8100

8100
10.4x7.9 9.2x7.9 EL +3.4

6600

6600
6.35x7.9
6600

A S-61 9.2x7.9 FROM F.F.L


A S-60 A S-62
EL +3.4 A S-64
EL +3.4 EL +3.4 EXPANSION JOINT

725
FROM F.F.L FROM F.F.L FROM F.F.L
EL +3.4
LIBRARY FROM F.F.L EL +3.3
9.0x16.0 EL +2.5 FROM F.F.L
FINISH @ B.O.S PAINTED PLAIN GYPSUM CEILING.
A S-59 FROM F.F.L PREPAR. ELV.
TOILET

2500

2500
6.0x2.5 3.0x2.5
3.15x2.0 A S-22 A
3000
S-23 H PAINTED 600 X 600 GYPSUM TILES CEILING.
A S-63
H 3700

650

650
EL +3.3
TEACHERS ROOM S.1.
1200

1490

1490
FROM F.F.L EL +3.3
EL +3.3
S.1. 6.5x4.2

600

600
FROM F.F.L
FROM F.F.L
PAINT AND PLASTER.
77450

77450
D EL +3.4
EL +3.3
FROM F.F.L
A S-30
H' B

2980
3200

EL +3.4

1200
FROM F.F.L

1800
A-202 900 7200 900 600 37800
3.0mtr.WIDE CORRIDOR 480 650 16200 FROM F.F.L 650 1000 800
EL +3.4
3000 1700
S.1. A-202 WATER RESISTANT GYPSUM CEILING

3000
A S-25 EL +3.3 FROM F.F.L
FOR WET AREAS.

790

990
EL +3.4 EL +3.3
I I
FROM F.F.L

600
FROM F.F.L

2200 220
FROM F.F.L TOILET
EL +3.3
3.1x1.5 PERFORATED GYPSUM TILES

650
EL +3.3
S.1. S.1.
2600 1400 2200 FINISH @ B.O.S
LOBBY EL +3.3 EL +3.3
FROM F.F.L
EL +3.3
500 1000 2500
FINISH @ B.O.S FROM F.F.L
W 15
6600

ELEC.RM FROM F.F.L FROM F.F.L ELEC.RM A S-32 600X600 AS INDICATED.

600
FROM F.F.L
2200

EL +2.5
2.6X1.8 3.3x1.8 FROM F.F.L
EL +2.5
3.3x1.8 EL +2.5
FROM F.F.L

1800
EL +3.3
AEL +3.3
S-58 A S-54 TOILET EL +3.4 TOILET FROM F.F.L A S-45 FROM F.F.L EL +2.5
PANTRY
J J
1000

FROM F.F.L FROM F.F.L


FROM F.F.L EL +2.5 1.5x1.8 1.5x1.8 600mm X 600mm ACCESS PANEL.

1500

1500
EL +2.5 EL +3.4
2600 FROM F.F.L FROM F.F.L A S-52
TEACHERS ROOM FROM F.F.L
TEACHERS ROOM A S-48 2600 3.2x1.5 3100 FE.TOILET
S.1. FINISH @ B.O.S 4.65x4.7 4.65x4.7 FINISH @ B.O.S A S-31 6.5x3.3 S.1.
MA.TOILET FE.TOILET
1000

PANTRY A S-50 A S-49 PANTRY


STORE 3.7x4.7 3.7x4.7 STAIR ROOM-05 EL +3.4 STAIR ROOM-04 825 4200 825 700 1800 700 1000 1000 1000 1000 1000 1000 A S-33
2650

2700
630
EL +3.3
2.6x2.7 6.0X2.7 1.5X2.0 FROM F.F.L 1.5X2.0 6.0X2.7 FROM F.F.L

1500
A S-56 A S-55 EL +3.4
A S-51 A S-47
1000

A S-57 A S-53 A S-46 MAIN LOBBY FROM F.F.L


EL +3.3 EL +3.3 EL +2.5
K K
800

FROM F.F.L FROM F.F.L FROM F.F.L


EL +2.5 13.9x8.1

8400
FROM F.F.L
320

A S-44
S.1. 940 EL +3.4 6600 1135 1025 EL +3.4 EL +2.5 S.1.

4200
FROM F.F.L FROM F.F.L FROM F.F.L

MA.TOILET
K' 6.5x3.3
EL +2.5
S.1. A S-34

5000
4730

FROM F.F.L
600 1800 600

630
EXPANSION JOINT

36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
EL +3.4

650
L FROM F.F.L
EL +3.3
STAIR ROOM-03
6.8X3.1
L
S.1. FROM F.F.L EL +3.3
FROM F.F.L
A S-35 S.1.
650 3000 650 6800
3300

3300
3100
1085
EL +3.3 FINISH @ B.O.S
M FROM F.F.L
EL +6.0
M

51 52 53 54 55 56 57 58 59 60 61 62 63 64
1900 3100
S.1. 1600 FROM F.F.L PANTRY S.1.

900
1400
FINISH @ B.O.S
FINISH @ B.O.S
STORE 1.9x1.4
EL +2.5

7800
2400
AFROM
S-36
F.F.L 1000 2000
3300

3300
1.6x2.4

1000
5200
A S-42 LOBBY EL +2.5

600
2300

2100
N A S-35 TOILET
FROM F.F.L
N

1600
5.1x3.1

1000

1000
5665
EL +3.4
STAIR ROOM-06
S.1. A S-41
FROM F.F.L A S-37 S.1.
FINISH @ B.O.S EL +3.3
1500

1500
850
FROM F.F.L

O 3400 O
1285 5665 5665 1285 6600 900 ART STUDIO
S.1. 9.4x8.9 S.1.

550
11300
2400

2400
A S-38

3600

3600
EL +3.3

1800

550
FROM F.F.L

P 650 3000 650 900 7800


P
S.1. S.1.

750

4200
EL +3.4

7200
ART - FROM F.F.L 1200 700
OFFICE TEACHERS ROOM

5665

4200
4.1x3.9 4.3x5.3
550 A S-40
3000 535 A S-39
5200

5200
3600
2400
EL +3.4
EL +3.4
FROM F.F.L
FROM F.F.L
EL +3.3

750

550
FROM F.F.L

1085

850
Q 3600
Q
S.1. EL +2.5
FROM F.F.L S.1.
STORE
3600
2800

2800
3.6x3.6
A S-43 91012064
R R
44 A
S.1. S.1.
2400

2400
Z
S S.1. S
S.1. 7.237° S.1.
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000

79900 SHIEKH ABDULRAHMAN MOHAMED A AL-THANI


21/7/2022 D30213/2018

01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22


SECOND FLOOR CEILING PLAN
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-304 1:150
A-201 A-203

W.SH AYMAN RANIA

A SECOND FLOOR PLAN-SCHOOL D30213-2018-ARCH-100 11660 3664


A-304 1 : 150
00
A-201
C EXPANSION JOINT A
A-203

01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.

79900

7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000

A A
S.1. S.1.

6500

6500
+0&114.+)*6+0)(+:674'5%*'&7.'

4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.

&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

B B
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
./+25+/+.#4612*+.+25%4$25&9.+2Z

S.1. 2900 D09 DN


FINISH @ B.O.S S.1. .'&514#22418'&'37#.

&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

2900
4'%'55'&.'&:56''.*175+0)#.7/+07+/
STAIR ROOM-02 4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
./+25+/+.#4612*+.+25%4$9.
5.8X2.7 Z.'&#%Ä/.114#22418'&'37#.
A R-02
C C &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'

S.1. S.1. *175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/


126+%(4156'&21.;%#4$10#6'126+%#.%18'49
./+25+/+.#4612*+.+252*+.+25&0$&
Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
3900

3900
4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

D D 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$

S.1. S.1. Z.'&5%490$14#22418'&'37#.


&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
/'6*#%4;.#6'126+%#.%18'49./5+/+.#4
CONC. PAD 612*+.+25266:.'&5%499$14#22418'&
CONC. PAD '37#.
5700

5700
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.

E E 4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55

S.1. CONC. PAD


S.1. 56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
574(#%'.'&.+0'#456#0.'5556''.*175+0)
6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
%18'49./+25+/+.#4612*+.+255/%
21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4850

4850
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
#22418'&'37#.

574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
CONC. PAD 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
F F 5+/+.#4612*+.+2596%.Z.'&514
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

S.1. CONC. PAD


S.1. 574(#%'.'&&190.+)*6%#56#.7/+07/
219&'4Ä%1#6'&%;.+0&'4
9./+25+/+.#461'4%15-+/
574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

*+)*$#;.'&#.7/+07+/*175+0)%.'#4
5650

5650
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.

G G &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

S.1. CONC. PAD


S.1. 9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
2416'%6+1095+/+.#461
CONC. PAD 2*+.+2539<0+.'%*41/'
CONC. PAD CONC. PAD CONC. PAD CONC. PAD CONC. PAD
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;

.')'0&
8100

8100
CONC. PAD
CONC. PAD CONC. PAD

EXPANSION JOINT

PAINTED PLAIN GYPSUM CEILING.

CONC. PAD
H PAINTED 600 X 600 GYPSUM TILES CEILING.
H CONC. PAD
S.1.
S.1. PAINT AND PLASTER.
77450

77450
D H' B

2980
3200

A-202 S.1. A-202 WATER RESISTANT GYPSUM CEILING


CONC. PAD FOR WET AREAS.
I D09
I

2200 220
CONC. PAD
PERFORATED GYPSUM TILES
S.1. S.1. 600X600 AS INDICATED.
2200

CONC. PAD
LIFT TOP
CONC. PAD 6.2x2.7
J FINISH @ B.O.S
J 600mm X 600mm ACCESS PANEL.
S.1. DN
FINISH @ B.O.S
S.1.
STAIR ROOM-04
2650

2700
CONC. PAD
6.0X2.7
A R-01

K MECHANICAL K
320

S.1. CONC. PAD S.1.


K'
S.1.

5000
4730

CONC. PAD
CONC. PAD

EXPANSION JOINT

MECHANICAL OPEN TO BELOW OPEN TO BELOW


L CONC. PAD L
S.1. S.1.
3300

3300
M M
S.1. S.1.
3300

3300
N N
S.1. S.1.
1500

1500
O CONC. PAD
O
S.1. S.1.
2400

2400
P P
S.1. S.1.
5200

5200
Q Q
S.1. S.1.
2800

2800
91012064
R R 44 A
S.1. S.1.
2400

2400
Z
S S.1. S
S.1. 7.237° S.1.
1700

1700
7.237°
T T
S.1. S.1.
4150

4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977

7.237°
7.237°

82
.76

7.237°

Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000

79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR ROOM CEILING PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-305 1:150
A-201 A-203

M.SH. AYMAN RANIA

A STAIR ROOM PLAN-SCHOOL D30213-2018-ARCH-100 11660 3664

A-305 1 : 150
00
05 06 07 05 06 07
S.1. S.1. S.1. S.1. S.1. S.1.

B B
S.1. S.1. SMOKE VENT

STAIR ROOM-01 EL +15.10


A B-05
ROOF. S.S.L

EL -4.20 01 02 03 04 05 06 07
A B F.F.L A
A-801 A-801
UP

C C
S.1. S.1.

A BASEMENT FLOOR PLAN E STAIR ROOM FLOOR PLAN


A-801 1 : 50 A-801 1 : 50

05 06 07
S.1. S.1. S.1.

05 06 07
S.1. S.1. S.1.

B SMOKE VENT
S.1.

UP
EL +15.10
STAIR ROOM-01
A G-44 25 24 23 22 21 34 33 32 31 30 29 28 ROOF. S.S.L
EL + 0.15
PV. F.F.L 26 27 EL + 0.45
A G F.F.L
A-801
DN

C
S.1.

B GROUND FLOOR PLAN STAIR ROOM-01


A S-14
A-801 1 : 50 EL +10.60
2ND F.F.L HAND RAIL

Granite Finish

05 06 07
S.1. S.1. S.1.

STAIR ROOM-01
A F-12

B EL +06.10
S.1.
1ST F.F.L
UP
STAIR ROOM-01
A F-12
61 60 59 58 57 71 70 69 68 67 66 65

62 63 64 EL +06.10 HAND RAIL


A 1ST F.F.L
A-801
DN Granite Finish

C
S.1.

91012064
44 A
STAIR ROOM-01
EL + 0.45
FIRST FLOOR PLAN
A G-44
C
A-801 1 : 50
G F.F.L

EL + 0.15
PV. F.F.L
EL ± 0.00
GAMILA
GAM
G
GAA ILA
ROAD F.F.L
05 06 07 977
S.1. S.1. S.1. STAIR ROOM-01
A B-05
HAND RAIL

Granite Finish

B PROPOSED
S.1. EL -4.20 SECONDARY SCHOOL (B+G+2)
B F.F.L
STAIR ROOM-01
AL-WUKAIR
A S-14
EL +10.60
77 76 75 74 73 72 71 70 69 68 67 66 65 2ND F.F.L

78 79 80 81 82 83 84 85 86 87 88 89 90 91
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
A
A-801 DN
21/07/2022 D30213/2018

C STAIR ROOM-01 DETAILS


S.1. -SCHOOL

A-801 1:50

M.SH. AYMAN RANIA

D SECOND FLOOR PLAN F STAIR ROOM-01 SECTION D30213-2018-ARCH-100 11660 3664

A-801 1 : 50 A-801 1 : 50
00
19 20 19 20
S.1. S.1. S.1. S.1.

B B
S.1. S.1.

A UP A DN
A-802 A-802
07 06 05 04 03 02 01 STAIR ROOM-02
A B-06 EL +15.10 118 117 116 115 114 113 112 111 110 109 108 107 106 105
ROOF. S.S.L STAIR ROOM-02
A R-02
92 93 94 95 96 97 98 99 100 101 102 103 104
EL -4.20
B F.F.L

C C
S.1. S.1.

A BASEMENT FLOOR PLAN E STAIR ROOM FLOOR PLAN


A-802 1 : 50 A-802 1 : 50

19 20
S.1. S.1. 20 19
S.1. S.1.
EL +18.50
T.O.P
SMOKE VENT

EL +18.20
B ST.ROOF. S.S.L
S.1.

A DN
A-802 STAIR ROOM-02 EL + 0.45
A G-12 G F.F.L 27 26
EL + 0.15
28 29 30 31 32 33 34 21 22 23 24 25 PV. F.F.L

STAIR ROOM-02
UP A R-02

EL +15.10
C ROOF. S.S.L HAND RAIL
S.1.

Granite Finish

B GROUND FLOOR PLAN


A-802 1 : 50

STAIR ROOM-02
A S-14

EL +10.60
19 20 2ND F.F.L HAND RAIL
S.1. S.1.
Granite Finish

B
S.1.

STAIR ROOM-02
A DN A F-14
A-802 STAIR ROOM-02 EL +06.10
A F-14 1ST F.F.L 64 63 62
65 66 67 68 69 70 71 57 58 59 60 61 EL +06.10
1ST F.F.L
UP

C
S.1.
HAND RAIL

Granite Finish 91012064


44 A

C FIRST FLOOR PLAN


A-802 1 : 50

STAIR ROOM-02
EL + 0.45 A G-12

G F.F.L
GAMILA
GAM
G
GAA ILA

19 20 EL + 0.15 977
S.1. S.1.
PV. F.F.L
EL ± 0.00
ROAD F.F.L
STAIR ROOM-02
A B-06
HAND RAIL

B Granite Finish
PROPOSED
S.1.
SECONDARY SCHOOL (B+G+2)
A DN
A-802 AL-WUKAIR
EL +10.60 91 90 89 88 87 86 85 84 83 82 81 80 79 78
2ND F.F.L
STAIR ROOM-02 92 93 94 95 96 69 70 71 72 73 74 75 76 SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
A S-14
EL -4.20 21/07/2022 D30213/2018
UP B F.F.L
C STAIR ROOM-02 DETAILS
S.1. -SCHOOL

A-802 1:50

M.SH. AYMAN RANIA

D SECOND FLOOR PLAN F STAIR ROOM-02 SECTION D30213-2018-ARCH-100 11660 3664

A-802 1 : 50 A-802 1 : 50
00
L M N O P
S.1. S.1. S.1. S.1. S.1.

3300 3300 1500 2400


10500

D16
600

DN
WAITING

L M N O P
S.1. S.1. S.1. S.1. S.1.
16
S.1. FLOOR FINISH (AS PER SPECIFICATION)

DN
EL +0.45 EL +0.90 75mm THK. CEMENT/SAND SCREED.
G F.F.L

2400
G F.F.L
1 2 3 GROUND SLAB AS PER STRU. DWGS.
50 mmTHK. PLAIN CONC.
15
S.1. WELL COMPACTED EARTH FILL.

MAIN LOBBY
UP TO 1ST FLOOR

13.9x8.1
G-33
UP
32x280=9240
MAIN LOBBY

1500
UP
15 14 13 12 11 10 9 8 7 6 5 4

1100

1100

1100
EL +10.60

400
64
63 2ND F.F.L
62

1000
61
60
59
A GROUND FLOOR STAIR PLAN 57
58
A-803 1 : 50 56
55

1100
54

3400
53
52
MAIN LOBBY 50
51

4500
4400
49
48
47
46
L M N O P 45
44
43
S.1. S.1. S.1. S.1. S.1. 42
41
40

1100
39

3900
38

8600
37
36 EL +6.10
34
3300 3300 1500 2400 33
32 1ST F.F.L
31

10600
30
29
28
27

2700
10500 26
25
16 24
23
TO S.FLR

1100
S.1. 22
1075 50 1125

21
20
UP

5200
19
OPEN TO BELOW
18
EL +6.10

5650
17

2400
29x280=8120 16
15
1ST F.F.L 14
UP

13
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 12
11
WAITING MAIN LOBBY

2500
15 10

3050
500

9 EL +0.90
S.1. 8
7

1100
6 GR F.F.L
TO G.FLR

EL +0.90
1125

5
DN

4
3
G F.F.L 2

450450
1 EL +0.45
32x280=9240
GR F.F.L
1175
DN

35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
EL ± 0.00
ROOF FINISH (AS PER SPECIFICATION)
ROAD F.F.L
75mm (MIN) THK. CONC. SCREED TO SLOPE
B FIRST FLOOR STAIR PLAN 50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
A-803 1 : 50
1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB AS PER STRU. DWGS.
20 mm THK. PLASTER.
L M N O P 91012064
44 A
S.1. S.1. S.1. S.1. S.1.

3300 3300 1500 2400

10500
16 GAMILA
GAM
G
GAA ILA
29x280=8120
TO F.FLR

S.1.
1075 50 1125

977
EL +6.10
DN

OPEN TO BELOW
DN

1ST F.F.L
2400
DN

36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
15
500

S.1. PROPOSED
EL +10.60 SECONDARY SCHOOL (B+G+2)
2ND F.F.L AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR DETAILS

D STAIR DETAIL PLAN A-803 1:50

C SECOND FLOOR STAIR PLAN A-803 1 : 50


W.SH AYMAN RANIA
A-803 1 : 50
D30213-2018-ARCH-200 11660 3664

00
18 19 20 18 19 20
S.1. S.1. S.1. S.1. S.1. S.1.

L L
S.1. S.1. SMOKE VENT

UP
A A
A-806 A-806
07 06 05 04 03 02 01
STAIR ROOM-03
A B-21

EL -4.20
B F.F.L

EL +15.10
ROOF. S.S.L

M M
S.1. S.1.

A BASEMENT FLOOR PLAN E STAIR ROOM FLOOR PLAN


A-806 1 : 50 A-806 1 : 50

18 19 20
S.1. S.1. S.1.

20 19 18
S.1. S.1. S.1.

L SMOKE VENT
S.1.

STAIR ROOM-03
A G-23
A
A-806 EL + 0.45
DN
EL +15.10
G F.F.L 27 26 ROOF. S.S.L
EL + 0.15
28 29 30 31 32 33 34 21 22 23 24 25
PV. F.F.L

UP

M
S.1.

B GROUND FLOOR PLAN STAIR ROOM-03


A S-14
A-806 1 : 50 EL +10.60
2ND F.F.L HAND RAIL

Granite Finish

18 19 20
S.1. S.1. S.1.

STAIR ROOM-03
A F-12

L EL +06.10
S.1.
1ST F.F.L
STAIR ROOM-03 DN
A A F-26
A-806 EL +06.10
1ST F.F.L 64 63 62

65 66 67 68 69 70 71 57 58 59 60 61 HAND RAIL

UP Granite Finish

M
S.1.

91012064
44 A
STAIR ROOM-03
EL + 0.45
FIRST FLOOR PLAN
A G-23
C
A-806 1 : 50
G F.F.L

EL + 0.15
PV. F.F.L
EL ± 0.00
GAMILA
ROAD F.F.L
18 19 20 977
S.1. S.1. S.1.
STAIR ROOM-03
A B-21
HAND RAIL

Granite Finish

L
S.1. PROPOSED
EL -4.20 SECONDARY SCHOOL (B+G+2)
A
DN B F.F.L
A-806 AL-WUKAIR
STAIR ROOM-03 91 90 89 88 87 86 85 84 83 82 81 80 79 78
A S-35
EL +10.60 92 93 94 95 96 69 70 71 72 73 74 75 76
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
2ND F.F.L
21/7/2022 D30213/2018
STAIR ROOM-03 DETAILS
M -SCHOOL
S.1.

A-806 1:50

M.SH. AYMAN RANIA

D SECOND FLOOR PLAN F STAIR ROOM-03 SECTION D30213-2018-ARCH-100 11660 3664

A-806 1 : 50 A-806 1 : 50
00