JULY 2022
SCHOOL AT AL WUKAIR-AL WAKRA SCHOOL NO. 1 (SECONDARY SCHOOL)
ARCHITECTURE DRAWING LIST
SHEET SHEET REV.
SHEET NAME SCALE REMARKS
SERIAL NO. SIZE NUMBER
GENERAL S.
*A-G-01 PROJECT COVER N.T.S. A0 00
*A-G-02 LIST OF DRAWING N.T.S. A0 00
SERIES-000
*A-001 SITE PLAN AND LOCATION PLAN AS SHOWN A0 00
*A-002 SITE PLAN & GROUND PLAN AS SHOWN A0 00
SERIES-100
*A-101 BASEMENT FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-102 GROUND FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-103 FIRST FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-104 SECOND FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-105 STAIR ROOM FLOOR PLAN - SCHOOL. 1/150 A0 00
*A-106 ROOF FLOOR PLAN - SCHOOL. 1/150 A0 00
SERIES-200
*A-201 FRONT ELEVATION&REAR ELEVATION -SCHOOL 1/100 A0 00
*A-202 RIGHT ELEVATION&LEFT ELEVATION -SCHOOL 1/100 A0 00
*A-203 SECTION A-A 1/100 A0 00
*A-204 RAMP SECTION -SCHOOL 1/100 A1 00
*A-205 SUBSTATION FULL DETAILS 1/100 A1 00
*A-206 WALL SECTION A 1/50 A0 00
*A-207 WALL SECTION B 1/50 A0 00
*A-208 POOL DETAIL 1/50 A0 00
*A-209 SECTION B-B MULTIPURPOSE HALL & SWIMMING POOL 1/100 A0 00
*A-210 BOUNDARY WALL DETAILS. AS SHOWN A0 00 IN PROGRESS
SERIES-300
*A-301 BASEMENT FLOOR Ceiling PLAN 1/150 A0 00
*A-302 GROUND FLOOR Ceiling PLAN 1/150 A0 00
*A-303 FIRST FLOOR Ceiling PLAN 1/150 A0 00
*A-304 SECOND FLOOR Ceiling PLAN 1/150 A0 00
*A-305 STAIR ROOM FLOOR Ceiling PLAN 1/150 A0 00
SERIES-400
*A-401 DOORS SCHEDULES. N.T.S A0 00
*A-402 WINDOWS & CURTAIN WALL SCHEDULES. N.T.S A0 00
*A-403 FINISHING SCHEDULE N.T.S A0 00
91012064
44 A
SERIES-800
*A-801 STAIR DETAILS1-SCHOOL 1/50 A0 00
GAMILA
GAM
G
GAA ILA
*A-802 STAIR DETAILS2-SCHOOL 1/50 A0 00 977
G-02 N.T.S
00
N N
ROAD
69000 BOUNDARY
LINE
25755 6000 2800 4400 2800 6000 21245
ENTRANCE EXIT
ROAD
SEC.ROOF
3000
3000
EL ± 0.00 EL +3.20 EL ± 0.00
EL +3.50
ROAD F.F.L ROAD F.F.L
S.S.L T.O.P
RCC CHANNEL WITH D.I HEAVY DUTY GRATING RCC CHANNEL WITH D.I HEAVY DUTY GRATING
RAMP UP
SLOPE 10%
ROAD
6985
6985
15000
0%
ROAD
E2
215
O0P%
ESL2
EL +15.10
40
SL
OP
OP
T.O.P
SL
EL +16.00
E2
0%
T.O.P
6600
LINE EL +15.10 EL +15.10
T.O.P T.O.P BOUNDARY
ROOF LINE
9800
EL +16.00
EL +15.10 T.O.P
2160
ROOF. S.S.L
EL +16.00
3665
T.O.P
STAIR ROOF
3100
EL +18.20
EL +18.50 ST.ROOF. S.S.L
T.O.P
EXIT
12810
3975 2500 24860 27200 12000 3100 9300 10600 4400 2000
19700
EL +16.00
T.O.P
5500
LANDSCAPE :
SUBSTATION .ROOF
EL +15.10 4.4x8.4
DEIFICATION
8325
T.O.P A S-01
SYMBOL
EL +0.70
8400
8000
F.L
01
PAVEMENT INTERLOCK
39325
EL +4.50
S.S.L
GREEN AREA
EL +16.00
EL +4.80
T.O.P
T.O.P
BOUNDARY ASPHALT
LINE
PROPOSED SECONDARY SCHOOL (B+G+2) PAINTED PARKING BORDER
02 ROOF
EL +16.00
52840
400 3500 3500 T.O.P
EL +15.10
ROOF. S.S.L TENTS
16500
16500
57000
16275
ROAD
10100 72900 17000
EL +16.00
80700
T.O.P
EL +16.00
T.O.P
ENTRANCE
8300
OPEN TO BELOW
6350
EL +12.60 EL +16.00 EL +16.00
T.O.P GLASS DOOM
T.O.P T.O.P
03
EL +18.00
9400
T.O.P
EL +15.10
EL +22.40 T.O.P
EL +17.00
11305
T.O.P T.O.P
29800
26705
10100 20000 9200 4000 3345 5000 2655 4300 14300 14100 13000
EL +16.00
04
T.O.P
EL +16.00
T.O.P
EL +12.60 EL +16.00
T.O.P T.O.P BOUNDARY
EL +19.50
4195
T.O.P LINE
TENT ROOF
TENT ROOF 91012064
44 A
ENTRANCE
EL +11.70 EL +21.00
T.O.P T.O.P
EL +12.60
T.O.P
EL +13.70 EL +13.70
8000
80
T.O.P T.O.P
247
EL +15.70
8000 FF AREA
T.O.P BUS DROP O
8000 FF AREA
BUS DROP O
19185
01
6000
8000 977
FF AREA
EL +13.70 SPEED BUMP
8000
04
AREA FF AREA
BUS DROP O
FF 05 BUS DROP O
FF AREA
BUS DROP O
5000
06
12
FF AREA
BUS DROP O
17985
4000
11
FF AREA
SPEED BUMP
BUS DROP O
FF AREA 10 PROPOSED
BUS DROP O
FF AREA
09
SECONDARY SCHOOL (B+G+2)
BUS DROP O 08 BOUNDARY
07
LINE
AL-WUKAIR
BOUNDARY 66645
LINE
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
14
62 76700
0
21/7/2022 D30213/2018
EXIT
5000 ROAD
SITE PLAN AND LOCATION PLAN
5060
A-01 1:150,1:1500
00
N N
ROAD
69000 BOUNDARY
LINE
25755 6000 2800 4400 2800 6000 21245
ENTRANCE EXIT
ROAD
SEC.ROOF
3000
3000
EL ± 0.00 EL +3.20 EL ± 0.00
EL +3.50
ROAD F.F.L ROAD F.F.L
S.S.L T.O.P
RCC CHANNEL WITH D.I HEAVY DUTY GRATING RCC CHANNEL WITH D.I HEAVY DUTY GRATING
RAMP UP
SLOPE
SLOPE10%
10% SLOPE 10%
ROAD
6985
6985
15000
0%
ROAD
E2
215
OP %
O0P%
SL E 20
ESL2
40
SL
SL O P
OP
OP E 2
SL
E 2 0%
0%
PANTRY
2.5x1.25
A G-05
2.5x1.25
A G-08
3665
UP
38600 DN
STAIR ROOM-02
2700
2700
2700
EL + 0.15 EL +0.45 2.7mtr.WIDE CORRIDOR EL +0.45 EL + 0.15
5.8X2.7
PV. F.F.L STAIR ROOM-01 G F.F.L
A G-43 G F.F.L A G-12
PV. F.F.L
DN 6.0X2.7 UP
A G-44
LOBBY
FE.TOILET 2.9x1.6 MA.TOILET
4.9x3.7 A G-65 3.7x5.9
29900
EXIT
A G-42 A G-13
10555
PREPAR. ELV.
3.3x2.5 3.0x2.5
A G-40 A G-39
GRADE 7-3
12815
6.5x7.9
3975 2500 24860 A G-15
22325
CHEMISTRY LAB
6.5x9.25
A G-38
3000 1900 3000
LANDSCAPE :
6690
EL +0.45 EL +0.7 T. ROOM
G F.F.L
9400 F.L 4.0x5.1
A S.-01
31400
DEIFICATION
31100
GRADE 7-2
6.5x7.9
SYMBOL
A G-16
8000
EL + 0.15
01 PV. F.F.L PLATFORM
EL -0.80 CONCRETE
PAVEMENT INTERLOCK
39325
UP EL +0.7 F.L
EL +0.45
G F.F.L F.L
T. ROOM
16400
CHEMISTRY LAB
4.0x5.1
A S.-02
GREEN AREA
STORE 6.5x9.25
3.0x3.3 A G-37
10555
A G-64
BOUNDARY ASPHALT
LINE
PROPOSED SECONDARY SCHOOL (B+G+2) GRADE 7-1
6.5x7.9
A G-17
PAINTED PARKING BORDER
PREPARATION
11100
02 3.2x4.1 CAFETERIA
A G-63 16.4x11.1 PREPAR. ELV.
52840
400 3500 3500
A G-62 3.3x2.5
A G-36
3.0x2.5
A G-35
TENTS
EL +0.45
G F.F.L
16270
ROAD
FIRE COMMEND CENTRE
3600
STORE
10100 3.0x3.3 6.5x3.0
7900 TEACHERS ROOM
A G-63 A G-34
6.5x4.2
A G-18
8260
A G-58 A G-57 DN UP
17000
9700
FE.TOILET
6.5x3.3
1940
A G-21
13200
EL +0.45
MA.TOILET
10100 G F.F.L 6.5x3.3 17000
ENTRANCE
16700
A G-22
8100
6350
DN
28500 STAIR ROOM-03
EL + 0.15
LOBBY PV. F.F.L
6.8X3.1
EL +0.45 4.3x4.7 A G-23
G F.F.L A G-24 UP
9240
EL +0.45
600
EL +0.45 G F.F.L
9200 TOILET
PANTRY G F.F.L
1.6x2.4 CLINIC
3.9x2.4 A G-65
A G-67 6.8x3.1
MEETING DN A G-25
03 9.3x5.0
STAIR ROOM-06 CONTROL ROOM
A G-48
A G-68 4.3x3.0
TOILET A G-26 TOILET
9400
600
3.9x2.4 2.0x1.2
A G-66 UP A G-28
UP UP UP DN DN
2.05x1.8 TOILET
A G-47 G F.F.L MAIN LOBBY LOBBY
A G-48 2.0x1.2
4.8x4.3
26705
13.9x8.1 A G-29
MULTI PURPOSE HALL A G-33 A G-32
10100 19.6x29.6 EL +0.90
RECEPTION 13000
STORE 4.6x8.9
8100
A G-55
7800
UP UP
EL +0.45 DN
EL + 0.15
BOUNDARY
G F.F.L
PV. F.F.L LINE
RAMP UP
91012064
44 A
ENTRANCE
EL + 0.15 UP UP UP
PV. F.F.L EL + 0.15
PV. F.F.L
2800 14000 2800 UP UP UP UP
335
80
PV. F.F.L
247
8000 FF AREA
BUS DROP O
8000 FF AREA
19185
BUS DROP O 01
6000
8000 977
FF AREA
SPEED BUMP
8000
04
AREA FF AREA
BUS DROP O
FF 05 BUS DROP O
FF AREA
BUS DROP O
5000
06
12
FF AREA
BUS DROP O
17985
4000
11
FF AREA
SPEED BUMP
BUS DROP O
FF AREA 10 PROPOSED
BUS DROP O
FF AREA
09
SECONDARY SCHOOL (B+G+2)
BUS DROP O 08 BOUNDARY
07
LINE
AL-WUKAIR
BOUNDARY 66645
LINE
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
14
62 76700
0
21/7/2022 D30213/2018
EXIT
5000 ROAD
SITE PLAN AND GROUND PLAN
5060
A-01 1:150,1:1500
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
2010
FIRE WATER TANK 1 IRRUGATION WATER TANK
4700 7.4x3.3 7.6x2.01 EL -4.05
2650
3345
A B-02 A B-03' TANK BOTTOM
5500 7300 5500
EL -4.05
TANK BOTTOM DOME.PUMP ROOM
CONTROL PANEL
4.2x8.9
6725
4.7x8.9 7.6x3.0
2990
EL -4.05 A B-04
A B-03
2650
A B-01
8890
FIRE WATER TANK 2 TANK BOTTOM
7.4x3.3
0%
3345
JOCKEY PUMP
A B-02'
E2
EL -4.35
OP
EL -4.05 DOMESTIC WATER TANK 2 S.S.L
SL
1500
SL
TANK BOTTOM 7.6x3.0
2130
ELEC. FIRE PUMP
CONTROL PANEL
OP
A A B-03''
A
E2
EL -4.20
0%
800
B S.S.L
S.1. EL -4.05 S.1.
1190
TANK BOTTOM
745 1800 2155 980 1800 1435
2650
3595
2650
D15 D26 EL -4.20
STORM DRAIN HOLDING TANK 1
2330
STORM DRAIN HOLDINGTANK
TANKBOTTOM
2
EL -4.55
6500
6500
A B-02''
DRAIN PIT BOTTOM A B-01'
2650
2650
EL -4.55
EL -4.20 DRAIN PIT BOTTOM
B F.F.L 5500
EL -4.20
B B
700
TANK BOTTOM
5460
SLOPE 10%
UP
STAIR ROOM-01
4100
0%
2900
2600
2900
E1
6.0X2.5 STAIR ROOM-02
OP
A B-05 6.0X2.6
SL
UP
C A B-06 D09
46 C
305
35
S.1. 4620 6500 4400 2650 2650 3000 2650 2600 S.1.
2650
2650
EL -4.20
2650
3900
3900
B F.F.L
DRIVEWAY
1150
D D
850
EL -4.35
2650
7795
DRIVEWAY
S.1. EL -4.35 B F.F.L S.1.
1650
B F.F.L
2650
2650
200
DRIVEWAY
5500 EL -4.35
B F.F.L D24
5700
5700
685 2650 2650 3475 4600 1795 2650 400 2650 2650 425 2650 2650 425 2650 2650 525
2000
5155 4775
2600
GENERATOR ROOM
6.5x4.0
2650
2650
A B-06''
1650
5500 7300 5500 2300 4600 4000 4000
E 7800 E
700
EL -4.76
200 1000
S.1. S.1.
1825
TANK BOTTOM D26
4500
200
5500
5500
2650
D25
L.V. ROOM
4850
4850
2000
SEPTIC TANK 5.5x4.0
2650
7.8x11.15 A B-06'
A B-07
2500
2650
575
11150
F F
3300
S.1. DRIVEWAY S.1.
EL -4.35 4000
2650
850
B F.F.L SUBSTATION ABOVE.
8000
5650
5650
2650
5500
2650
EL -4.20
TANK BOTTOM
O.T.A
1800
G G
950
S.1. S.1.
8100 2650 2650 1280 2650 2650 3575 4600 1295 2650 1750 2650 2650 650 2650 555 2650 2650 1345 2650 3300 20 CM RETAINING WALL
6500
DRIVEWAY
8100
8100
DRIVEWAY DRIVEWAY
DRIVEWAY
EL -4.35 EL -4.35 EXPANSION JOINT
EL -4.35 EL -4.35 10 CM BLOCK WORK
B F.F.L B F.F.L B F.F.L
B F.F.L
5500 510 4200 390 2650 2650 PROPERTY LIMIT
2510 6000 2510 O.T.A
H
1180
H S.1.
2500
EL -4.20
S.1. B F.F.L UP
2650
77450
77450
D D01 H' B
1000 1000 1000 1000
2650
2980
D03'
3200
4200
2200 220
5100
1170
D01
S.1. D03' D03 O.T.A O.T.A S.1.
D03
7.75x4.3 7.75x4.3 B.F.F.L
2900 2900 6.0x1.8 LIFT LIFT
D03' A B-09 D03 D03' A B-12 D03 A B-20
J 3.0x2.6 2.9x2.6 J
2650
D03 D03 D03 D03
STORAGE LOBBY LOCKERS STAIR ROOM-05 MALE TOILET
LOCKERS
S.1. 5.9X2.7 4.7x7.95 FEMALE TOILET
STAIR ROOM-04 S.1.
900 1000
4200
D09
2300
2700
A B-08 A B-10 A B-11 A B-13 A B-17
A B-19
1700 1140
2700
3700 3850 3700 3850 3700 5900 5950 200D031400 300 1400 D03 5900 6000
O.T.A UP
D09
K D04 D22
O.T.A RECEPTION K
320
D03 D03
6.2x3.8
S.1. S.1.
130
A B-22
350
2855
O.T.A 1500 1000 1800 4500 2000 3200 900 1350 2000 1000 8800 2001125 800 1225 3695 300 2850 800 4150 1150 2000 900 200 2500 2500 1000200
K' O.T.A
2650
50
S.1. D09
5000
2500
4730
5745
D22
5445
EL -6.10
DRIVEWAY 5555 6300
EXPANSION JOINT EL -4.35 Deep: 2.00m EL -4.20
SHOE RACK PARENT WAITING RM B F.F.L
B F.F.L 4300 12500 2800 FEMALE PRAYER ROOM
800
DRIVEWAY
3.15X8.1 CORRIDOR 3.5x6.1
2650
11.85x8.10
L SHOE RACK L
EL -4.35
A B-25 A B-22'
2.5x6.3
B F.F.L
A B-24 6.1X4.1 DRIVEWAY
A B-32
S.1. A B-23 D09
EL -4.35 S.1.
500
200
UP
3300
6.8X3.0
GYM 1000 A B-21
2650
8.8x15.7 1125 1500 525 3000 8150 4050 250 2000 250 200 2300
15700
M A B-26
D09 M
4975
4975
S.1. S.1.
8695
STORM DRAIN HOLDING TANK 3
O.T.A D04
STORE
D09
UP A B-01''
3300
3300
1.6X2.4
2650
A B-29 EL -4.20
N 6800
D22
TANK BOTTOM N
STAIR ROOM-06
500
395
A B-30
15.2x7.4 LIFT 6000
1500
1500
A B-28 1.6x2.4 ENTRANCE EL -4.05 5400
O 4.3x7.4 B.F.F.L O
2650
EL -4.05 A B-31 EL -4.55
360
S.1. B.F.F.L DRAIN PIT BOTTOM S.1.
22500
4975
EL -4.05
2400
2400
19.6x27.9
A B-34
200 B.F.F.L UP
3600 2000 3200 600 2000 800 800 5500 700 2600 2000 200 4100 1150 2000 1150
2650
P P
S.1. D22 D22 D22 GROUND FLOOR LINE S.1.
2600
500
1250
CORRIDOR 5500
200 2000 150
33.0x4.3 600
D22 A B-32' 5
2650
5200
5200
EL -4.05
4300
5500
B.F.F.L
2650
4875
3600 2000 3500 300 2500 1000 7650 2000 5600 300 4550 200 1900 1300 6000 5500 DRIVEWAY
EL -4.35
B F.F.L
Q D22
Q
2475
D09 D22
S.1. S.1. 91012064
2800
2800
500
O.T.A 44 A
GAME ROOM UP
5300
DRIVEWAY
R 9.2x5.3 STAIR ROOM-07 R
5000
A B-33 5.7X3.6
S.1. EL -4.35
B F.F.L EL -5.10
UP A B-33' EL -4.20 S.1.
B F.F.L
2400
2400
Z
5125
Deep: 1.00m
5375
265
1700
1700
DRIVEWAY 0
7.237°
T 265 T
200
EL -4.35
0 D25' CONCRETE PAD
S.1. B F.F.L S.1.
6300
194 EL -4.35
265 0
O.T.A DRIVEWAY
0 B S.S.L
260
4150
4150
EL -4.35 0
B F.F.L 265
265 0 265
0 0 DOMESTIC WATER TANK GAMILA
GAM
G
GAA ILA
189
0 207
U 265
0 265 0 A B-35 U 977
265 0 EL -4.05
S.1. 0 194 TANK BOTTOM S.1.
181 0 265
5 265 0
265 0 189
0 0
260
0
260
0 194
7.237° 173 0
D25'
0
7.237°
Z
PROPOSED
6300
S.1.
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900 21/7/2022 D30213/2018
BASEMENT FLOOR PLAN
-SCHOOL
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. A-101 1:150
A EXPANSION JOINT
A
A-201 A-203 M.SH. AYMAN RANIA
A-101 1 : 150
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
800 800 800 800 800 800 50 800 800 800 800 400
20200 2600 1200 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 750 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 800 1500
RAMP UP
SLOPE 10% SLOPE 10%
0%
E2
SL
OP
OP
SL
A A
E2
0%
PANTRY
1000 900
S.1. S.1.
1500
A G-05
200
D03
TOILET
4100
2.5x1.40
2800
6500
6500
6400
GRADE 10-2 TEACHERS ROOM
6900
6300
6300
6300
6300
6300
GRADE 10-5
6310
GRADE 10-1 GRADE 10-3 3.8x6.3 7.9x6.3
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 A G-09 A G-10 7.9x6.3
A G-01 A G-02 A G-03 A G-04 TOILET A G-11
2.5x1.40 D03
3800
225 375800
A G-07
800 1000
1000 1000 1000 1000 PANTRY 1000 1000 1000
1190
800
6800 2.5x1.25
D14150 6650 D14150 6550 D14 200100D14 2250 2400 2600 D14200 6500 D14 200100D14 6700
B A G-08 B
190
500
S.1. 38600 S.1.
1000
1000
D09 D09
UP
STAIR ROOM-02 DN
5.8X2.7
2900
2900
2.7mtr.WIDE CORRIDOR
2600
EL +0.45
2700
2700
2700
2700
2700
EL + 0.15
2600
EL + 0.15 EL +0.45
500
STAIR ROOM-01 A G-43 G F.F.L A G-12 PV. F.F.L
PV. F.F.L G F.F.L
1900
1620 280DN 6.0X2.7 4100
800
D09 2000 2800 1600 2800 1600 2800 1600 2800 3850 50 6900 3000 1900 3000 300 1200 400 UP 6000
C A G-44 C
S.1. D10 LOBBY D10 S.1.
2.9x1.6
1900
1900
FE.TOILET MA.TOILET
3500
4.9x3.7 A G-65 3.7x5.9
29900
3900
3900
A G-42 D10 A G-13
4200
4200
D03 D03 D03 D03 D03 D03 D03 D03 D03 D03 D03
JANITOR HA.TOILET
2.9x2.0
1700
1700
1.1x1.7
A G-41 A G-14
900 900 900 900 900 900 1900 800 900 900 900 900 900
D D
800 800
S.1. 3300 3000 S.1.
1000
1000
D01 D14 GRADE 10-6
PREPAR. ELV.
10555
6.5x7.9
475
2400
3.3x2.5 3.0x2.5 A G-15
A G-40 A G-39
1700
D14
5700
5700
2800
1800 1000 3700
1000
D14
7900
475
7100
800
E E
475
19700
19700
S.1. CHEMISTRY LAB
S.1.
6.5x9.25
2800
6950
9250
A G-38
3000 1900 3000 6500
4850
4850
1000
D14 GRADE 10-7
475
6.5x7.9
800
A G-16
6690
FIRST FLOOR LINE
F F
475
EL +0.45
G F.F.L
S.1. S.1.
2800
7900
BASEMENT LINE
7200
D14
5650
5650
EL + 0.15
475
PV. F.F.L
800
UP
475
EL +0.45
G F.F.L
6400
G G
300
2800
S.1. S.1.
1065
9250
6850
3000 16400 GRADE 10-8
1000
D14
CHEMISTRY LAB 6.5x7.9
STORE 6.5x9.25 A G-17
3300
475
3.0x3.3 A G-37
2000
10555
A G-64 D23
800
PROPERTY LIMIT
475
D04
8100
8100
7900
1000
6900
2800
D14
1400 1000 4100 EXPANSION JOINT
PREPARATION
11100
4100
D14
5235
3.2x4.1 CAFETERIA
1800
A G-63' 16.4x11.1 PREPAR. ELV.
475
3.3x2.5
2400
A G-62 3.0x2.5
2500
A G-36
H
800
A G-35
475
D04 EL +0.45 S.1.
17190
G F.F.L
200
S.1.
1000
D12 D12
77450
77450
D FIRE COMMEND CENTRE D14
H' B
2800
2000
STORE 6.5x3.0
2980
3800
3300
D23
2780
2780
3200
4200
A G-63 D16 50 D16 6.5x4.2
3000 5700 1100 8900 3675 2000 1525 4950 600 3000 300 300 4900 1600 2000 3350 D05 A G-18
640 400 800300800300800300800200 800
I I
505
2200 220
50
800
S.1. H.WASH&TOI. 3300 2350 2500 3050 S.1.
2.35x3.2
1770
445
D16
A G-61 D03 D03 2.35x3.2 3.3x1.8 D01 D01 3.3x1.8 LIFT LIFT D03
A G-60 D09 2750 3100 TOILET
A G-56 D09 A G-35 RECEPTION
1100
PANTRY
J D03 D03 D03 D03 D03 D03 3.0x2.7 3.0x2.7 J
1500
3.2x1.5 3.1x1.5
5100
4870
2800
STAIR ROOM-04
S.1. A G-19
S.1.
5070
UP DN
A G-20
6.0X2.7
1100
D03 D03
EL + 0.15 MA.TOILET
2650
2700
2700
2600
FE.TOILET A G-66
1500
PV. F.F.L
UP 6.6x4.7 6.6x4.7 5950 6200 7500 3200 1000 1000 1000 1000 1000 1000
1200
D10
1100
A G-57
475
A G-58 D10 DN UP
800
9700
320
10070
FE.TOILET
50
S.1. S.1.
1700
6.5x3.3
475
1000
D10 A G-21
13200
K'
400
D16
3250
3280
2000
2000
D16
1000
2800
S.1. EL +0.45 D10 MA.TOILET
5000
1700
4730
210
EXPANSION JOINT D03 D03 D03 D03 D03 D03
2200
475
8100
1500
1500
2755
2000
800
L D16 L
1100 800
S.1. STAIR ROOM-03 S.1.
1000
6.8X3.1
500
D09
1505
DN
A G-23 EL + 0.15
28500
3300
3300
2900
LOBBY PV. F.F.L
2820
EL +0.45 4.3x4.7
800
2200
G F.F.L A G-24 UP
M D09
M
9240
2800
EL +0.45
4975
1995
700
G F.F.L
S.1. EL +0.45 CLINIC S.1.
400 900
D03 D05
9200 9300 200 2000 100 1300 500 PANTRY G F.F.L 6.8x3.1
TOILET 1.6x2.4 D06 A G-25
3300
3300
15 14 13 12 11 10 9 8 7 6 5 4
3100
A G-65
2300
DN
5000
9.3x5.0
STAIR ROOM-06
S.1. S.1.
500
3000
D03 D10 A G-68
4.3x3.0
7000
TOILET TOILET
6400
A G-26
1500
1500
600
3.9x2.4
1200
2.0x1.2
1350
1.6x2.4
O D17
D03
A G-66 UP A G-28 O
2100
UP UP UP DN DN
D03
1800
FOR SITTING D03PANTRY
S.1. S.1.
21800
1000
900
UP TO 1ST FLOOR
1100
D04
2350 2300 800 1150 200 1600 200 4200 1000 700 800 400 2150 6900 7000 1.4x3.7
4975
D03
2400
2400
100 STORE A G-30
1800
TOILET
1200
2.05x1.8 D05
1750
D03 MAIN LOBBY 2.0x1.2
G F.F.L
P A G-47 4.8x4.3 P
2000
2000
A G-48 13.9x8.1 A G-29
MULTI PURPOSE HALL D03 A G-32
700
A G-33 D16
S.1. 19.6x29.6
STORE
D05 D05 D16
EL +0.90 S.1.
425
900
A G-55 D05
1925
7800
3.60x1.9
500
700 1000
4900
D04 G F.F.L
1700
A G-54' MANAGER
SECRETARY RECEPTION PARENT WAITING AREA
3900
5.5x5.0
2800
5.3x5.0 4.1x3.9 4.6x8.9 ACCOUNTING
5200
5200
A G-52
OPEN TO ABOVE A G-46 A G-45 A G-27 4.6x5.0
4300
3900
A G-31
STAIR ROOM-07
4825
800
A G-54 A G-23 5500 5300 13900
2600
Q Q
800
UP UP
400
S.1. EL +0.45 DN
S.1.
5675
EL + 0.15
7175
G F.F.L
91012064
2800
2800
PV. F.F.L
500
RAMP UP
75
3600
R R 44 A
2000
D16
S.1. S.1.
2400
2400
Z
D16 UP UP UP
S EL + 0.15
S.1. S
2000
1700
UP UP UP UP
7.237°
T T
1710
S.1. UP
EL + 0.15
PV. F.F.L S.1.
EL + 0.15
PV. F.F.L
1000 500 1600
4150
4150
350
U U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
600 2800 600 1400 1600 800 4400 800 1600 1400 500 2800 700 800 3500 800 3500 800 600 2600 600 800 800 2800 800 800 800 2800 800 800
600
400 2100
600 100 100
400 600 1500 600 1000 6500
100 100
1000 600 1500 600 4300 800 450 2800 450
800
450 2800 450
800
400 2700
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
GROUND FLOOR PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
A-102 1:150
A EXPANSION JOINT
A
A-201 A-203
M.SH. AYMAN RANIA
A-102 1 : 150
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
22600 1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1000
A A
S.1. S.1.
350 1600
1600
100 2500 1800 2600 950 3150 1800 2850 1250 2600 1800 2050 300 1800 1650 50 2.5x1.252400 2400 1400 200 2600 1800 3300 200 700 2600 1800 2600
A F-05
200
TOILET
1375
D03
2.5x1.40
1800
A F-06
TEACHERS ROOM GRADE 11-4
6500
6500
6300
6300
6300
6300
6300
GRADE 11-5
6300
3.8x6.3 7.9x6.3
GRADE 11-1 GRADE 11-2 GRADE 11-3 TEACHERS ROOM 7.9x6.3
1800
A F-10
3800
D03
A F-07
1275
PANTRY
150 150 200 1000 1000 200 1000
6800 1000 6650 1000 6550 1000 100 2550 50 2400 2.5x1.25 200 2600 200 6700 1000 100 6700
B D14 D14 D14 D14 A F-08
D14 D14 D14 B
1600
STAIR ROOM-02
S.1. S.1.
550
UP
EL +6.10 5.8X2.7 DN
STAIR ROOM-01 A F-14
2900
2900
2600
2.7mtr.WIDE CORRIDOR
2700
1600
2600
EL +6.10 1ST F.F.L
1275
6.0X2.7 D16
A F-13
A F-12 1ST F.F.L 50 D09
1340 560 700 DN
1800 1600 D09 1100 900 3200 1800 2700 800 3500 1800 2200 800 2650 400 600 6100 2400 600 1900 600 2400 300 1200 400 UP
6000
C C
1200 1000
1800
S.1. D10 LOBBY D10 S.1.
450 1600
1800
2.9x1.6
1900
FE.TOILET MA.TOILET
1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 950 4.9x3.7 D10 A F-15 3.7x5.9
1275
D10
3900
3900
A F-16
4200
A F-73 D03 D03 D03
D03 D03 D03 D03 D03 HA.TOILET JANITOR
HA.TOILET D03 D03 D03
2.9x2.0
1700
1700
2.9x2.0
2000
1.1x1.7
A F-72 A F-17
1800
A F-71
1600
900 900 900 900 900 2100 1000 800 1900 800 900 900 900 900 900
3850
D D
OPEN TO BELOW
S.1. S.1.
1000
575 1200
D14
PREPAR. ELV. GRADE 11-6
2500
2500
3.8x6.3 3.0x2.5 6.5x7.9
5700
1800
3001000 8000
1800
D14
8000
575
GROUND FLOOR LINE
7100
500 1600 500
1600
E E
19700
S.1. S.1.
575
CHEMISTRY LAB
9.2x9.25
A F-68
1805
9250
6850
6500
1800
4850
4850
570
1000
D14
1600
6.5x7.9
A F-19
F F
575
S.1. S.1.
1800
7900
1800
9200 PROPERTY LIMIT
7200
D14
575
5650
5650
1600 500
1600
1600 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1250
575
6400
600
G G
1800
S.1. 3500 1800 2600 1100 3100 1800 2600 1800 1100 1300 1800 2000 600 1800 1700 700 1800 2600 1250 2950 1800 2600 1800 3150 S.1.
9250
6850
1000
D14
GRADE 11-8
OPEN TO BELOW
CHEMISTRY LAB 6.5x7.9
575
PUZ M 60120 D14
1600
5700
COMPUTER LAB
575
COMPUTER LAB COORDINATOR RM.
7600
COMPUTER LAB
8100
8100
9.2x7.9
7900
7900
7900
10.4x7.9 6.35x7.9 9.2x7.9
A F-48 A F-53
1000
A F-56
6900
1800
A F-61 D14
850 1000 7350 EXPANSION JOINT
LIBRARY
575
9.0x16.0 TOILET
A F-43 6.0x2.5 3.0x2.5
3100
2500
3.15x2.0 D03 A F-65 A F-66
1600
10400 D20 9200 D20 2400 A F-55 950 3000 6250 5750 D20 2500 1800 200 4400
6300
H
H D13 D01 S.1.
800
575
100
1600 390
2400
S.1. 8700 1600 7800 1600 5500 1000 10980 1600 170 5100 1000 3500 2400 600 2500 6500
1000
D14
77450
77450
D 50 H' B
1800
D19
2980
2680
D16
3200
3.0mtr.WIDE CORRIDOR
3000
EL +6.10 EL +6.10
S.1.
3230
A-202 TEACHERS ROOM A-202
4200
50 6.5x4.2
575
690
550 1500 3550 800400800 6675 2000 2325 1000 3750 3000 300 3300 1000 2645 1800 3400 A F-21
I I
5400
2200 220
50
D10 D10 300 1800 200
1600
S.1. 2800
LOBBY
1400
D03
2200 2200
D03
1400 300 3200 2350 800 500 D14 4650 3000 4200 D14 500 800 2500 3050 3000 3000 1100 250 6050 3100 5910 S.1.
1570
ELEC.RM ELEC.RM
2200
1770
D19 2.6X1.8 D03
3.3x1.8 D01 D01 3.3x1.8 LIFT LIFT
575
2670
A F-44 TOILET TOILET 2750 3100 TOILET
PANTRY
J D03 D03 A F-49
1.5x1.8 D03 1.5x1.8
A F-63 3.0x2.7 3.0x2.7 J
1500
1500
800 500 800
D04 TEACHERS ROOM TEACHERS ROOM D03 3.2x1.5 3.1x1.5
3270
A F-52 A F-60 D09 STAIR ROOM-04
1800
D09 4.65x4.7 4.65x4.7
S.1. STORE D03MA.TOILET FE.TOILETD03 UP
A F-54 A F-58
DN
6.0X2.7
A F-22 A F-23
S.1.
2.6x2.7 STAIR ROOM-05 PANTRY PANTRY
1500
3.7x4.7 3.7x4.7
2650
2700
A F-62
2600
2600
1.5X2.0 1.5X2.0
2200
A F-45
1500
A F-46 A F-47 6.0X2.7
575
8700 100 2900 200 1400 100
D03 1600 600200600 1600 100
D03 1400 200 5850
A F-50 DN
A F-51 1425 1800 1030 400 700 1600 700 975 1800 1425 A F-59 5950 1250 1000 2200 1000 1200 1200 6300 3100 1000 1000 1000 1000 1000 1000
1500 1500 UP
1600
FE.TOILET
320
13.9x8.1
50
D16
S.1. S.1.
400
400
6.5x3.3
1700
1700
A F-64
5310
400 19200 12550 3000 450 975 1800 9275 D10 A F-24
575
EL +6.10
K' 1ST F.F.L
DN UP
1800
S.1. D10
5000
1700
1700
4730
MA.TOILET
TO G.FLR TO S.FLR 6.5x3.3
FOR SITTING
5000
D03A F-25
1200 575
EXPANSION JOINT DN DN D03 D03 D03 D03
35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20
2000
50
UP UP UP
DN D03
8100
8100
8100
1500
1500
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
OPEN TO BELOW OPEN TO BELOW
7650
L L
S.1. STAIR ROOM-03 S.1.
1600
44400
1000
DN
D09 6.8X3.1
A F-26
3300
3300
2900
800
FOR SITTING
2300
1400 1800 2800 1800 4650 3000 620 12130 4200 UP
6800
M M
1800
4975
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
S.1. PANTRY S.1.
1150
D03 D03 D03
2.4x1.6 1.9x1.4
800
TOILET A F-36' A F-27
3300
3300
2700
3200
13170
1150
D03 A F-36 D10 D03 LOBBY 5.1x3.1
OFFICE
N N
100 1600
DN A F-31
5000
9.2x5.0 A F-28
STAIR ROOM-06 1500 D03 3000 D03 2000
4800
SITTING AREA
1150
9.3x7.0 D10 A F-32
200
D03
300
100
A F-37 TOILET LIFT
1500
1500
1600 500 1600
1150
D03 A F-35 UP D18
2750
2750
41D 02106 M ZUP
ART STUDIO
S.1. EL +6.10 500 1000 2700 9.4x8.9 S.1.
4975
1ST F.F.L
2400
2400
A F-29
1800
CONFERENCE
S.1. 9.2x11.8 D08 D08 S.1.
8900
OFFICE ART -
A F-41 4.1x3.9
LOBBY OFFICE OFFICE TEACHERS ROOM
5300
50
1600
1800
1800
OPEN TO BELOW
5200
5200
5000
5000
EL +0.90
600
D21
G F.F.L
3820
1900
OFFICE
3.6x4.8
Q A F-39 Q
4800
S.1. S.1.
2800
2800
3600
R R
S.1. S.1. 91012064
2400
2400
Z 44 A
5325
400 2600 1000 11600 1000 2600 400 1850 1800 2100 1800 1450 200
S S.1. S
S.1. 7.237° S.1.
1700
1700
7.237°
T T
S.1. S.1.
4150
4150
U U
S.1. S.1.
GAMILA
GAM
G
GAA ILA
977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
700 2800 500 1400 1600 800 4400 800 1600 1400 500 2800 700 1600 250 1800 250 1600 250 1800 250 1600 400 2800 400
200 1600 700 1800 700 1600 700 1800 700 1600 750400 1800 40070050600
100 1500 100
600 1000 6500 1000 600
100 1500 100
600 850 400 1800 400 850 1600 350 1800 350 1600 350 1800 350 1600 300
SECONDARY SCHOOL (B+G+2)
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
AL-WUKAIR
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. FIRST FLOOR PLAN
A A -SCHOOL
EXPANSION JOINT
A-201 A-203
A-103 1:150
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
22600 1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1000
A A
1600 300
S.1. PANTRY S.1.
200
TOILET
1375
D03
2.5x1.40
1800
A S-06
TEACHERS ROOM GRADE 12-4
6500
6500
6300
6300
6300
6300
6300
6300
3.8x6.3 7.9x6.3 GRADE 12-5
GRADE 12-1 GRADE 12-2 GRADE 12-3 TEACHERS ROOM 7.9x6.3
1800
A S-10
3800
D03
A S-07
1275
PANTRY
150 150 200 1000 1000 200 1000
6800 1000 6650 1000 6550 1000 100 2550 50 2400 2.5x1.25 200 2600 200 6700 1000 100 6700
B D14 D14 D14
A S-08 D14 D14 D14 B
1600
S.1. S.1.
550
D14 STAIR ROOM-02
D09 DN
5.8X2.7
STAIR ROOM-01 EL +10.60 2.7mtr.WIDE CORRIDOR EL +10.60
2900
2900
A S-12
2600
2700
1600
2600
1275
6.0X2.7 A S-13 D16
2ND F.F.L 2ND F.F.L
A S-14 DN D09 50
1340 3360 1300 1100 900 3200 1800 2700 800 3500 1800 2200 800 2650 400 600 6100 2400 600 1900 600 2400 300 1200 400 UP
6000
C C
1200 1050
1800
S.1. D10 LOBBY D10 S.1.
450 1600
2.9x1.6
1900
1900
FE.TOILET MA.TOILET
1000 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 950 4.9x3.7 D10 A S-24 3.7x5.9
1275
3900
3900
D10 A S-25
4200
A S-15 D03 D03 D03
D03 D03 D03 D03 D03 D03 D03 D03
HA.TOILET HA.TOILET
1700
1700
2.9x2.0 JANITOR
2000
A S-16 1.1x1.7 2.9x2.0
1800
1600
900 900 900 900 900 2100 A1000 800 1900
A S-26 800 900 900 900 900 900
3800
S-17
D D
OPEN TO BELOW
S.1. S.1.
1000
575 1200
D14
PREPAR. ELV. GRADE 12-6
2500
2500
3.8x6.3 3.0x2.5 6.5x7.9
5700
1800
3001000 8000
1800
D14
8000
575
7100
500 1600 500
1600
E E
19700
S.1. S.1.
575
CHEMISTRY LAB
9.2x9.25
1805
9250
6850
A S-20 6500
1800
4850
4850
570
1000
D14
1600
6.5x7.9
EL +10.60 A S-28
F 2ND F.F.L F
575
S.1. S.1.
1800
7900
1800
7200
D14
575
5650
5650
1600 500
1600
1600 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 500 1800 500 1600 1250
575
G G
1800
S.1. S.1.
9050
6850
1000
D14
GRADE 12-8
OPEN TO BELOW
CHEMISTRY LAB
6.5x7.9
575
PUZ M 60120 D14
1600
5700
COMPUTER LAB
575
COMPUTER LAB COORDINATOR RM.
7600
COMPUTER LAB
8100
8100
9.2x7.9
7900
7900
7900
10.4x7.9 6.35x7.9 9.2x7.9
A S-60 A S-61
1000
A S-62
6900
1800
A S-64 D14
1000 1000 7200 EXPANSION JOINT
LIBRARY
575
9.0x16.0 TOILET
A S-59 6.0x2.5 3.0x2.5
3100
3.15x2.0
2500
D03 A S-23
A S-22
1600
10400 D20 9200 D20 2400 A S-63 950 3000 6250 5750 D20 2500 1800 200 4400 H
H D13 D01 S.1.
800
575
S.1. 8600 1600 7800 1600 5550 1000 10950 1600 150 5200 1000 3400 2400 600 1900 600 2400 6500
1000
D14
77450
77450
D H' B
1800
D19
2980
EL +10.60
2780
3200
3000 EL +10.60
D16
S.1.
3230
A-202 3.0mtr.WIDE CORRIDOR TEACHERS ROOM A-202
4200
A S-25 50 6.5x4.2
575
550 1500 3550 800400800 6800 2000 2300 1000 3650 3000 300 3300 1000 2495 2000 3350 A S-30
I I
5400
2200 220
300 1800 200
D10 D10
1600
S.1. 2800LOBBY 1400
D03
2200 2200
D03
1400 300 3200
ELEC.RM
2350 800 500 D14 4650 3000 4200 D14 500 800 2500 3250 3000 3000 1100 250 6050 3100 15
W5910 S.1.
1570
ELEC.RM
2200
1770
D19 2.6X1.8 3.3x1.8 D03
D01 D01 3.3x1.8 LIFT LIFT
575
A S-58 A S-54 TOILET TOILET 2750 3100 TOILET
PANTRY
J D03 D03 1.5x1.8 D03 1.5x1.8 A S-45 3.0x2.7 3.0x2.7 J
4720
1500
1500
D04
3270
STAIR ROOM-05 A S-52 A S-48 D09
1800
MA.TOILET D09 4.65x4.7 4.65x4.7 STAIR ROOM-04
S.1. STORE
2.6x2.7 D03 3.7x4.7 FE.TOILETD03 6.0X2.7 A S-50 A S-49 DN 6.0X2.7
A S-31 A S-32
S.1.
A S-53 PANTRY PANTRY
1500
3.7x4.7
2650
2700
A S-46
2600
2600
A S-57 A S-56 1.5X2.0 1.5X2.0
2200
1500
575
A S-55
8700 100 2900 200 1400 D03 1600 600 600 1600 D03 1400 200 5850 A S-51 1425 1800 1030 400 700 1600 700 975 1800 1425 A S-47 5950 1000 1000 2200 1000 1200 7500 1000 1000 1000 1000 1000 1000
DN
1500 1500 UP
1600
FE.TOILET
320
1500
13.9x8.1
50
S.1. S.1.
400
400
6.5x3.3
1700
1700
A S-44
550
400 19200 12550 D10 A S-33
575
K' EL +10.60
1800
1800
2ND F.F.L
1800
S.1. D10 MA.TOILET
5000
1700
1700
4730
A S-34
1200 575
EXPANSION JOINT D03 D03 D03 D03 D03
2000
D03
2695
2695
8100
1500
1500
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
OPEN TO BELOW OPEN TO BELOW
7650
L L
S.1. STAIR ROOM-03 S.1.
44300
1600
1000
D09
DN
6.8X3.1
600300 1800
1800
A S-35
3300
3300
FOR SITTING
2900
800
9095 3355 300 925 1600 475 12500 6975
2300
4200 6800
M 900 M
1800
4975
1400 100
800
1.6x2.4 STAIR ROOM-06 2ND F.F.L A S-36
3300
3300
2700
D03
A S-41
2725
600 800
N TOILET N
1600
A S-35
4750
100
1500 D03 3000 5.1x3.1 D03 2000
200
300
LIFT TOP
100
0
DN
660
1.6x2.4
1500
1500
1800
DN DN
2275
O EL +11.80 DN
TO F.FLR D18 O
2750
S.S.L
1800
41D 02106 M ZUP
1000 1100 50
ART STUDIO
300
2400
2400
A S-38
12200
UP
640
D14
D092001000 2850 D09
1200 300850
P P
2275
100
500 1600
S.1. D08 EL +0.90 S.1.
8900
OFFICE ART -
4.1x3.9 G F.F.L
300
TEACHERS ROOM
5300
17400
A S-40
OPEN TO BELOW 4.3x5.3
A S-39
1800
1800
2445
5200
5200
4400
480
1900
Q D16
Q
S.1. STORE S.1.
3600
3.6x3.6
2800
2800
A S-43
3600 91012064
R R
44 A
S.1. S.1.
2400
2400
Z
5325
1700
7.237°
T T
S.1. S.1.
2000
4150
4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
4000 12000 4000 9550 3650 11350 600400 1800 400750 700 1500 1700 6500 1700 1500 700 850 400 1800 400 850 1600 350 1800 350 1600 350 1800 350 1600 300
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
1200
1200
A A
EL +15.10
S.1. S.1.
EL +16.00
T.O.P
T.O.P
1400 51500 1600
EL +15.10
6500
6500
EL +15.10
T.O.P T.O.P
9400
9800
SMOKE VENT
ROOF EL +15.10
ROOF. S.S.L
EL +16.00
T.O.P
B EL +16.00 B
S.1. T.O.P S.1.
2900 D09 DN
2900
STAIR ROOM-02
5.8X2.7
A R-02
C C
S.1. S.1.
1100
3900
3900
D D
S.1. S.1.
10755
CONC. PAD
CONC. PAD
5700
5700
E E
S.1. CONC. PAD
S.1.
4850
EL +16.00
T.O.P CONC. PAD
F F
6500
S.1. EL +15.10
CONC. PAD
S.1.
T.O.P
5650
5650
1200
G G
S.1. S.1.
EL +16.00
CONC. PAD
T.O.P
CONC. PAD
CONC. PAD CONC. PAD CONC. PAD CONC. PAD CONC. PAD
10755
1200 60500 3100 9300 1200
8100
CONC. PAD
CONC. PAD CONC. PAD
EXPANSION JOINT
ROOF
EL +15.10
CONC. PAD ROOF. S.S.L
H
H
16100
16500
EL +16.00
CONC. PAD
S.1.
S.1. T.O.P
77450
77450
D 1200 42300 12800 17800 1200 H' B
2980
3200
2200 220
CONC. PAD
S.1. S.1.
2200
2700
6.0X2.7
15200
CONC. PAD
A R-01
K MECHANICAL K
320
5000
4730
CONC. PAD
CONC. PAD
EXPANSION JOINT
L CONC. PAD L
S.1. S.1.
EL +12.60
EL +16.00
T.O.P
EL +16.00
T.O.P
3300
3300
T.O.P
SMOKE VENT
M M
S.1. GLASS DOOM S.1.
1900
3300
3300
EL +18.00
N T.O.P N
S.1. S.1.
T.O 22.40
1500
1500
EL +
.P
O CONC. PAD
EL +15.10 O
S.1. T.O.P S.1.
14300
27550
2400
2400
EL +13.70
ROOF. S.S.L
10000
P P
S.1. S.1.
EL +16.00
EL +16.00
T.O.P
5200
5200
T.O.P
EL +12.60
EL +16.00
T.O.P
T.O.P
Q Q
S.1. EL +19.50 S.1.
2800
2800
T.O.P
TENT ROOF 91012064
3250
TENT ROOF
5900
R 21.
00 R 44 A
EL +12.60
EL +O.P
T.O.P
S.1. S.1.
T.
2400
2400
Z
800
20000 9200
S S.1. S
EL +11.70
1700
7.237°
T T
S.1. S.1.
4150
4150
EL +13.70
EL +13.70
70
T.O.P
15.
T.O.P
EL +O.P
U T . U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977
EL +13.70
T.O.P
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR ROOM PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-105 1:150
A-201 A-203
A-105 1 : 150
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
1200
1200
1200
A A
EL +15.10
S.1. S.1.
EL +16.00
T.O.P
T.O.P
1400 51500 2501350
6600
EL +15.10 EL +15.10
6500
6500
T.O.P T.O.P
ROOF
9400
EL +16.00
9800
T.O.P
SMOKE VENT EL +15.10 SMOKE VENT
ROOF. S.S.L
B EL +16.00 B
S.1. T.O.P S.1.
STAIR ROOF
2900
3100
2900
EL +18.20
EL +18.50 ST.ROOF. S.S.L
C T.O.P C
S.1. S.1.
3900
3900
D D
S.1. S.1.
10755
CONC. PAD
CONC. PAD
1200
5700
5700
1200 12000 3100 9300
E E
19700
S.1. CONC. PAD
S.1.
4850
4850
EL +16.00
6489
T.O.P CONC. PAD
F F
S.1. EL +15.10
CONC. PAD
S.1.
T.O.P
5650
5650
G G
S.1. S.1.
EL +16.00
CONC. PAD
T.O.P
CONC. PAD
CONC. PAD CONC. PAD CONC. PAD CONC. PAD CONC. PAD
10755
PROPOSED SECONDARY SCHOOL (B+G+2)
8100
8100
CONC. PAD
CONC. PAD CONC. PAD
EXPANSION JOINT
ROOF
EL +16.00 EL +15.10
T.O.P CONC. PAD ROOF. S.S.L
H
H
16500
S.1.
57000
CONC. PAD
S.1.
77450
77450
D H' B
1200 42300 5900 6350 17800 1200
2980
3200
I I
2200 220
CONC. PAD
S.1. S.1.
STAIR ROOM ROOF
2200
14400
2650
2700
CONC. PAD
EL +16.00
K T.O.P K
320
S.1. S.1.
1200
SMOKE VENT
K'
S.1.
5000
4730
CONC. PAD
CONC. PAD
EXPANSION JOINT
L L
S.1. S.1.
EL +12.60
EL +16.00
T.O.P
EL +16.00
T.O.P
3300
3300
T.O.P
SMOKE VENT
M GLASS DOOM M
S.1. S.1.
3300
3300
N N
S.1. S.1.
EL +18.00
1500
1500
T.O.P
O 0 O
7.0 EL +15.10
+1 CONC. PAD
2400
EL +22.40
17604
T.O.P
P P
S.1. S.1.
17800
EL +16.00
EL +16.00
T.O.P
5200
5200
1200 20000 2013 5000 2187 4000 3346 5000 1454 1200 3500 15900 13300 T.O.P 1500
EL +12.60
EL +16.00
T.O.P
T.O.P
Q Q
S.1. S.1.
1500
EL +19.50
2800
2800
TENT ROOF T.O.P 91012064
TENT ROOF
R 00 R 44 A
21.
EL +12.60
EL +O.P
746
T.O.P
S.1. S.1.
T.
2400
2400
Z
800
S S.1. S
EL +11.70
1050 150
1700
7.237°
T T
S.1. S.1.
4150
4150
EL +13.70
EL +13.70
70
T.O.P
15.
T.O.P
EL +O.P
U T. U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977
EL +13.70
T.O.P
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
ROOF PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
A A A-106 1:150
EXPANSION JOINT
A-201 A-203
100
100
A A
100
100
A A
T.O.P
EL +3.20
D S.S.L B
2600
2400
2400
2600
EL +0.15 B
2600
2400
2400
2600
1000
A-107 A-107
A-107
D GR. F.F.L
A-107 GUARD ROOM ROOF FINISH (AS PER SPECIFICATION)
75mm (MIN) THK. CONC. SCREED TO SLOPE
800
D G-01 B B
100
100
B B 50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
100
100
G G 1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
G G
100 4200 100 100 4200 100 2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB (R.C.C.) AS PER STRU. DWGS.
1700 1000 1700 4400 20 mm THK. PLASTER.
E
E
A-107 1
A-107
2
A EL +3.50 B
1 2 A D D
G
A-107
A G
G A-107 G T.O.P
EL +3.20
300
300
A GROUND FLOOR PLAN B ROOF FLOOR PLAN ROOF. R.C.C
650
A-107 1 : 25 A-107 1 : 25
2000
2
G
EL +3.50 1
G
1
EL +3.50
2
3500
G G
3050
E05 T.O.P. E05
T.O.P.
2200
EL +0.15
EL +3.20
300
EL +3.20
300
GR F.F.L
1050
E03 ROOF. R.C.C E03 ROOF. R.C.C
E07 EL ± 0.00
150
E02 E02
GR P.V.L
3500
3500
3050
3050
150
150
B A A B 91012064
G G G G 44 A
EL +3.20
300
EL +3.20
300
GAMILA
GAM
G
GAA ILA
E03
E02 ROOF. R.C.C E03
E02 ROOF. R.C.C 977
E07
E07
3500
3500
3050
3050
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
EL +22.40
T.O.P GLASS DOOM
E02
EL +21.00
T.O.P
495 385
EL +19.50
T.O.P EL +19.00
E05 T.O.P EL +18.50 EL +18.50
T.O.P EL +18.00 T.O.P
2120
E05 E05
1500
E05
T.O.P
EL +18.20
200
200
200
EL +17.00 ST.ROOF. S.S.L
T.O.P
2500
1000
1000
E08
900
E08
2300
2300
2300
EL +16.00 EL +16.00 EL +16.00 EL +16.00
2000
EL +15.70
3100
T.O.P T.O.P T.O.P T.O.P
1000
1000
1000
E05 E05 E05 E05 E05 E05
T.O.P
1300
350
550 350
600
200 900
900
900
E05
1100
E05 E05
EL +15.10 EL +15.10
1900
1200
1900
1900
1900
1900
E05
2290
ROOF. S.S.L
2300
2000
1000
1000
1000
E05 E05
T.O.P
3400
3400
350
E05
1950
EL +12.60 EL +12.60
1000
1000
1000
1000
E02
1500
1500
1500
E02 E02 E02 E02 E02
T.O.P T.O.P
1110
1100
E02
4500
2400
4500
5150
F F F F F F F F
F
3100
F
900
900
900
900
900
E05 E05 E05 E05 E05 E05
2200
2200
2200
2200
1700
1700
E05
800
800
800
800
800
F F F F F F F F
1100
EL +10.60 EL +10.60
200
200
200
E02 E02 E02 F F F
2ND F.F.L 2ND F.F.L
1500
1500
1500
1500
1500
E08 E08 E08 E08 E08 E08 E08 E03 E08 E03 E08 E03
1000
8000
1700
1300
1300
1300
F F F
1800
1805
600
F F E02 F F F F
F F F E02
E08 E02 E08 E08 E08 E06
18200
E02 E01 E03 E01 E03 E01 E03 E02 E01 E03 E01 E03 E01 E03 E06 E01 E01 E06 E01
1100
E02 E02 E02 E02 E02 E02 E02 E02
F F F
12650
F F F F F F
4500
4500
4500
E06 E06 E06 E06 E06 E06
E02 E02
F F F F F
2700
3300
3300
3300
3300
3300
3300
3300
3300
2695
F F
3100
15100
F F
12050
F F F F F F
E05 E05 E05 F F F F E05 F F E05 F F E05 F F E05 F F F F F F E05
F F F
EL +6.10 EL +6.10
260 1000 300
1000
1000
1000
1000
1000
1000
355 1000
1000
1000
1000
6000
F F F
9000
F F
850
850
850
850
870
E02 E01 E01 E02 E02 E01 E01 E01 E01
E02
E02 E02 E02 E02
F F F F F F
F F
5200
E08 E08
5200
3400
E03 E03 F F F E03 E03 E03 E03 E03 E03 F F F E03 F F F E03 E03 F F F E03 E03 E03 E03 F F F E03 F F F E03
4300
4300
3845
4650
4650
F F
3070
3070
3070
3070
3045
4395
4390
300
E06 E06 E06 E06 E06 E04 E06 E06
F F F F E04
F F F E04 F F
E04
E04 E04 F F F F F F F F
EL +0.45 F E04 F EL +0.45
1800
F F F
2250
GR F.F.L EL +0.90 EL +0.90 GR F.F.L
800 380
1700
450 800
450450
GR F.F.L GR F.F.L
450 450
1180
1180
1180
1180
900
900
800
800
600
450
450
450
450
450
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L
EL +22.40
T.O.P
E02
GLASS DOOM
EL +19.50
T.O.P
4225
EL +19.00
EL +18.50 EL +18.50 E05 T.O.P
T.O.P E05 EL +18.00 T.O.P E05
1500
T.O.P
EL +18.20 EL +18.20
200
E05
E08 E08
2500
2500
2500
2300
2000
E08
3100
T.O.P T.O.P T.O.P T.O.P
3100
E05
1000
1000
E05 E05 E05
700 200
E05 E05
900
900
900
900
900
EL +15.10 EL +15.10
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
ROOF. S.S.L ROOF. S.S.L
91012064
1000
1000
1000
1000
1000
1000
44 A
200 800
200 800
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1050
E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02
4500
4500
E06 E06
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
E03 E03 E03 E03 E03
E01
E06 E03
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
2150
E01 E06 E03
E06 E06 E01 E01 E06 E03 E03
E01 F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
E06 E06
E06 E03 E03 E03
EL +10.60 E06 E06
EL +10.60
200
E06
E03 E06
2ND F.F.L E03 2ND F.F.L
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
E06 E03
8000
8000
1250
E06
E01
E03 E06 E06
E01 E01 E01 E01
E01 E01 E01
E03 E01 E01 E06 E01
50
E01
18200
E01
18200
E01
E02 E03 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 02 E02 E02 E02 E02
E03
GAMILA
GAM
G
GAA ILA
4500
4500
977
3250
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
E05
E05
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F E05
E05 E05 E05 E05
EL +6.10 EL +6.10
1ST F.F.L 1ST F.F.L
1050
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
E03
850
850
850
850
850
850
850
850
850
5200
5200
E03
520
E06 E03 E03 F F F E03 F F F F F F F F F E06 F F F F F F F F F F F F F F F E03 F F F F F F
E03 E06
E08
PROPOSED
3070
3070
3070
3070
3070
3070
3070
3070
3070
3070
3070
5100
5100
5100
5100
5100
E06 E06 E06
F F F F F F F F F F F F F F F F F F F F F F
EL +0.45 EL +0.45
GR F.F.L EL +0.90 EL +0.90 GR F.F.L
AL-WUKAIR
800 380
450 800
000
450450
0450
450
GR F.F.L GR F.F.L
450 450
1180
1180
1180
1180
1180
1180
1180
1180
1180
1180
450
450
450
EL ± 0.00 EELL ± 0.00
0.0
..00
0000
ROAD F.F.L ROA
RO
R O D F.F.LL
ROAD
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
FRONT ELEVATION & REAR ELEVATION
-SCHOOL
B REAR ELEVATION- SCHOOL
A-201 1 : 100 A-201 1:100
00
EXPANSION JOINT
U T S R Q P O N M L K J I H' H G F E D C B A
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
EL +22.40
T.O.P
GLASS DOOM
EL +21.00 E02
T.O.P
EL +19.50
T.O.P EL +19.00
T.O.P EL +18.50 EL +18.50
3000
EL +18.00 T.O.P E05 T.O.P
E05
T.O.P
E05
EL +18.20 EL +18.20
200
200
ST.ROOF. S.S.L EL +17.00 ST.ROOF. S.S.L
T.O.P E08
1000
1000
1000
1000
1000
E08 E08
2300
2300
EL +16.00 EL +16.00 EL +16.00
EL +15.70
3100
T.O.P T.O.P T.O.P
3100
1000
1000
1000
1000
T.O.P E05
E05
900
900
900
900
900
900
900
900
3265
E05
EL +15.10 EL +15.10
1900
1900
1900
1900
1900
ROOF. S.S.L ROOF. S.S.L
2000
1000
1000
1000
1000
1000
1000
1000
1000
1000
E05
1000
1000
1000
1000
1000
1000
1000
1000
E05 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02 E02
1100
1100
E01
4500
4500
E03
2000
F F F F F F F F F F F F F F F F E01 F F F F F F F F F F
E01 E03 E03
900
900
E06
2200
2200
2200
2200
2200
2200
2200
2200
E05 F F E03 F F E03 F F E06 F F F F E06 F F
E06
E06 E03
5350
5350
E06
800
800
800
F F F F F F F F F F F F F F F F F F F F E06 F F F F F F
E06 E03 E03
EL +10.60 E01 E06 E02 E06
E06
E03 E03
E01
E06
EL +10.60
E06
2ND F.F.L E06
E01 2ND F.F.L
1500
1500
1500
1500
1500
1500
1500
E03
8000
8000
8000
8000
E06 E01 E06
1780
E03
F E03 E01
E01 E01
E01
F F E08 E01
E02 F E01 E06 E01 E06
E01
18200
18200
E01
E02 E02 E01 E02 E02 E02 E02 E02 E02 E02 E02 E01 E02 E02 E03
E03 E03
150
F F
4800
4800
4800
E03
4500
4500
E06
E01
3300
3300
3300
3300
3300
3300
3300
3020
2650
2500
E05
F F
E05 F F F F E05
F F F F F F F F F F F F F F F F F F F F
E05
EL +6.10 E05 EL +6.10
1ST F.F.L 1ST F.F.L
1000
1000
1000
1000
1000
250 1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
E06 E06
E02 E06
E06
850
850
850
850
850
850
E02
E02 E02 E02 E02 E02 E02 E02 E02 E06 E02 E02 E02
E06
E06 F F E06
E06
5200
E06 E06
5200
4300
4300
E03 E03 E03
4050
3070
3070
3070
3070
3070
5100
5100
5100
5100
5100
5100
5100
E03 E03 E03 E03 E03
E03
F F F F E03 F F F F F E03 F F F F F F E03 F F F F E06 F F F F F F F F
4250
E06 E03
F F F F F F F F F F F F F F F F F F F F F F F
EL +0.45 EL +0.45
GR F.F.L EL +0.90 EL +0.90 GR F.F.L
450450
GR F.F.L GR F.F.L
450 450
1180
1180
1180
1180
1180
945
800
800
800
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L
EXPANSION JOINT
A B C D E F G H H' I J K L M N O P Q R S T U
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
EL +22.40
T.O.P
E02
GLASS DOOM
EL +19.50
4400
T.O.P EL +19.00
EL +18.50 EL +18.50 E05 T.O.P
500
T.O.P E05 T.O.P EL +18.00
T.O.P
1000
EL +18.20 EL +18.20
ST.ROOF. S.S.L E08
EL +17.00 ST.ROOF. S.S.L
1535
T.O.P
1035
1035
E08
2500
E08
EL +16.00 EL +16.00 EL +16.00
EL +15.70
3100
T.O.P T.O.P T.O.P
3100
E05
900
3265
3265
3265
3265
EL +15.10 EL +15.10
1900
1900
1900
E05 E05
ROOF. S.S.L ROOF. S.S.L
91012064
2000
1000
2900
E05
E05 44 A
1000
1000
1100
1100
1100
4500
4500
F F F F F F F F F F F F
E06 E06
2800
2800
E06
900
900
900
2200
2200
2200
E01
F F F F F F E01
E03
E05 E05
800
800
800
F F F F E03 F F F F F F F F
E03
EL +10.60 EL +10.60
E06
2ND F.F.L 2ND F.F.L
1500
1500
1500
E08 E03
8000
8000
18200
18200
E06
E03 E02 E01 E02 E01 E02 E02 E02 E02
E01
E01
4800
4800
4800
4800
4800
E03
GAMILA
GAM
G
GAA ILA
4500
4500
E06 E01
977
3300
3300
3300
E06
F F F F F F F F F F F F
E05
EL +6.10 E05
E05 EL +6.10
1ST F.F.L 1ST F.F.L
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
E06
850
850
1650
E03 E02
2900
5200
E03
5200
F F F F F F F F F F F F F
PROPOSED
E08
4100
4100
E03 E03 E03 E03
3070
5100
5100
5100
3800
2200
2200
F F F F F F F F F
SECONDARY SCHOOL (B+G+2)
E06
E06 F E06 E06
F F F F F F E06 F F F
EL +0.45 EELL +0.45
+0.
+0
+ 00.4455
2200
450 800
4450450
450
GR F.F.L GR F.F.LL
GR
450 450
1180
1000
1000
450 4
450
EL ± 0.00 EL ± 0.00
.00
..0
0000
ROAD F.F.L ROA
OAD FF.F
OA
ROAD ..FF..LL
F.F.L
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
RIGHT ELEVATION & LEFT ELEVATION
B LEFT ELEVATION- SCHOOL -SCHOOL
A-202 1 : 100
A-202 1:100
00
A B C D E F G H H' I J K L M N O P Q R S T U
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
300
EL +16.00 EL +16.00 EL +16.00 EL +16.00
3100
T.O.P T.O.P T.O.P T.O.P
EL +15.10
ROOF. S.S.L
900
ROOF ROOF ROOF ROOF
600
600
600
600
4500
4500
PANTRY TOILET TOILET PANTRY CORRIDOR HA.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. CORRIDOR MAIN LOBBY
EL +10.60
2ND F.F.L
64
63
62
61
600
600
600
600
60
59
58
57
18500
56
55
54
53
52
51
50
4500
4500
49
48
PANTRY TOILET TOILET PANTRY CORRIDOR HA.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. CORRIDOR MAIN LOBBY 46
47
45
44
43
41
42 EL +6.10
40
38
39 1ST F.F.L
37
36
34
33
32
31
600
600
600
600
30
29
28
27
26
25
24
23
22
21
20
5200
19
18
5650
17
16
15
14
13
12
11
PANTRY TOILET TOILET PANTRY CORRIDOR FE.TOILET PREPAR. CHEMISTRY LAB CHEMISTRY LAB PREPAR. OFFICE LIFT WAITING 10
9
MAIN LOBBY
8 EL +0.90
7
6
5
GR F.F.L EL +0.45
4
2
3 GR F.F.L
1
450450
EL ± 0.00 EL ± 0.00
ROAD F.F.L ROAD F.F.L
4650
4350
DRIVEWAY RECEPTION DRIVEWAY EL -4.35
B F.F.L
91012064
44 A
ROOF FINISH (AS PER SPECIFICATION)
75mm (MIN) THK. CONC. SCREED TO SLOPE
50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB AS PER STRU. DWGS.
20 mm THK. PLASTER.
GAMILA
GAM
G
GAA ILA
977
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
SECTION A-A -SCHOOL,SUBSTATION
&SECURITY ROOM
A-203 1:100
00
SLOPE 10% SLOPE 10%
5000
EL ± 0.00 EL ± 0.00
2200 3000 ROAD F.F.L ROAD F.F.L
3000 2000
1 1
2 2
41
13
0%
1
80
E2
FIRE PUMP ROOM FIRE WATER TANK
SL
8
OP
OP
SL
500
E2
0
0%
1800
2802
5000
SLOPE 10%
3000
0
10%
300
PE
EL -4.35
SLO
B F.F.L
R
EL -4.35
TO AMP
RAMP DN B F.F.L G. UP
FROM G. FLOOR FL
OO
R
2 2
A RAMP 1 PARTIAL PLAN B RAMP 2 PARTIAL PLAN
A-204 1 : 100 A-204 1 : 100
EL +0.00 EL +0.00
ASP. R.F.L ASP. R.F.L
PE 10% L=3000 SLO
L=3000 SLO START START PE 10%
300
300
SLOP 20% SLOP 20%
E 20%
C C L=178
0 SLOP 50 SLO
5 PE 20%
L=178
A-204 A-204
2400
2400
91012064
--- PARTIAL SECTION 1 --- PARTIAL SECTION 1 44 A
A-204 1 : 100 A-204 1 : 100
EL +0.00 EL +0.00
600
250 600
ASP. R.F.L ASP. R.F.L
250
250
250
GAMILA
3800
3800
4350
4050
4050
4350
20% L=178 977
50 SLOPE 50 SLO
PE 20%
L=178
EL -4.35 EL -4.35
B R.C.C B R.C.C
END OPE 10% L=3000 SL END
L=3000 SL OPE 10%
300
300
SLOP 20% SLOP 20%
C C
A-204 A-204
5500
A B-06'
5700
4000
EL +0.70
F.L EL +0.70
T. ROOM F.L
F 5100 F
4.0x5.1
E A S.-01 S.1. S.1.
S.1.
GENERATOR ROOM
6.5x4.0
5650
5650
8400
6500
4850
A B-06''
EL +0.70
PLATFORM
F.L
CONCRETE
EL -0.80
4000 F F.L
G G
T. ROOM
S.1. 4.0x5.1 S.1. S.1.
A S.-02
--- BASEMENT FLOOR PLAN --- GROUND FLOOR PLAN --- ROOF FLOOR PLAN
A-205 1 : 100 A-205 1 : 100 A-205 1 : 100
G F
S.1. S.1.
1100
1100
4700
4700
91012064
2900
2900
44 A
700
700
--- ELEVATION B --- ELEVATION C
A-205 1 : 100 A-205 1 : 100 GAMILA
977
F G
S.1. S.1.
1100
1100
PROPOSED
SECONDARY SCHOOL (B+G+2)
4700
4700
2900
2900
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
700
700
21/7/2022 D30213/2018
SUBSTATION DETAILS
-SCHOOL
A-205 1:100
D30213-2018-ARCH-200
--- ELEVATION D --- ELEVATION A 0 5 10
11660 3664
2000
GRADE 12-8
800
14MM THK. PAINTED PLAIN GYPSUM CEILING 300 mm THK CMU WALL (TYP.)
WATER BASE CURTAIN COVE
PAINT
4500
14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.
GRC DECORATIVE ELEMENT
DRIVEWAY
A S-29
3400
8100
FLOOR FINISH (AS PER SPECIFICATION) CONCRETE LINTEL
2200
2200
20 mm th. Cement Mortar
200 mm THK CMU WALL (TYP.)
45 mm th. Sand
20 mm th. Cement Screed GLASS WINDOW
Reinforsed Concrete Slab FLOOR FINISH
EL +10.60
300
2ND F.F.L
1500
BEAMS AND SLABS REF.TO ST. DWGS
CONCRETE LINTEL
4500
H
2400
2400
A F-20
14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.
3400
FLOOR FINISH (AS PER SPECIFICATION)
1100 5600 1400 1800 4000 200 mm THK CMU WALL (TYP.) 20 mm th. Cement Mortar
45 mm th. Sand
900
900
100 mm THK CMU WALL (TYP.)
EL +6.10
18 18' 19 20 21 22 1ST F.F.L
S.1. S.1. S.1. S.1. S.1. S.1.
19450
EL +4.80
1850
A BASEMENT FLOOR PLAN GRC DECORATIVE ELEMENT
A-206 1 : 50
GRADE 10-8
5200
CURTAIN COVE CONCRETE LINTEL
WATER BASE
14MM THK. PAINTED PLAIN GYPSUM CEILING
6400 PAINT
WATER BASE
G
3070
GLASS WINDOW PAINT
A G-17
G 14MM THK. PAINTED 600 X 600 GYPSUM TILES CEILING.
2570
S.1.
1475 150
S.1.
3400
FLOOR FINISH (AS PER SPECIFICATION)
730
730
GR F.F.L
450
375 1000 375
EL +0.45
GR F.F.L
450
450
EL +0.00
ROAD F.L
7900
8100
7900
8100
4200
4200
4500
FLOOR FINISH (AS PER SPECIFICATION) WATER BASE
2800
PAINT
3700
3850
75mm THK. CEMENT/SAND SCREED.
GROUND SLAB AS PER STRU. DWGS.
1000 GAUGE POLYETHYLENE AS A SEPARATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC
2 COAT BITUMINOUS PAINT
D R I V E W A Y 6 M WIDTH
PLAIN CONC. EPOXY FINISH
175 1000 375
EL -4.20
150
BAS. F.F.L
F WALL SECTION EL -4.35
A-206 1 : 50 BAS. R.L.
6500
375
H
H
1100 5600 S.1. H G
S.1. S.1. S.1.
1100 5600 6700
6700
18 18' 19
200
18 18' 19 S.1. S.1. S.1.
900
900
900
900
900
700
S.1. S.1. S.1. EL +15.10
1900
1900
ROOF T.O.S
B GROUND FLOOR PLAN D SECOND FLOOR PLAN
1000
1000
1000
1000
A-206 1 : 50 A-206 1 : 50
1000
800
E02 E02
4500
F F F F
6400
2400
2200
G G E06 F F
S.1. S.1. E03 91012064
F F F F 44 A
D14
GRADE 11-8
200
EL +10.60
6905
6905
E03
6.5x7.9 2ND F.F.L
1500
8000
E06
1150
E01
8000
E01
A F-20 E08
1050
E02 E02
GAMILA
GAM
G
GAA ILA
4500
977
8100
7900
3300
8100
15100
2400
F F F F
1090
1090
EL +6.10
.10
1ST F.F.L
.F.L
PROPOSED
1000
1000
1000
1000
1000
1000
E06
SECONDARY SCHOOL (B+G+2)
250
850
AL-WUKAIR
650
6300 E02
E06
E02
5200
21/7/2022
S.1. 1100 5600 F F F F F F
1100 5600
4300
4300
4300
4300
6700 E03
WALL SECTION A
3070
6700
2970
F F E03 F F
18 18' 19 18 18' 19 A-206 1:50
S.1. S.1. S.1. S.1. S.1. S.1. F F F F
W.SH AYMAN RANIA
330
11660 3664
450
A-206 1 : 50 EL +0.45
.45
900
1 : 50
800
800
800
A-206 GR F.F.L
A-206 1 : 50
500
EL +0.00 00
ROAD F.L
P Q R S P Q R S
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
10400 10400
5200 2800 2400 5200 2800 2400
4.
A
TEACH
D14
17 17
S.1.
1500 500
S.1.
4700
4700
600 1100
6000
16 16 P Q R S
20 mm th. Cement mortar
S.1. S.1.
14 15 16 17 S.1. S.1. S.1. S.1.
3075
11400
Polypropylene separation (protection board)
11400
OPEN TO BELOW
2400
S.1. S.1. S.1. S.1.
2400
Rigid thermal insulation (extruded polystyrene)
EL +0.90
2Layers Water proofing membrane
G F.F.L
1300
15
300
15 Reinforsed concrete slab
S.1. EL +22.40
S.1.
E02 EL +22.40 ROOF T.O.D
ROOF T.O.D DOUBLE GLAZED REFLECTIVE OUTSIDE,
1400
200 1900
EL +21.00
3125
CLEAR LAMINATED INSIDE, DOME SHAPED
4300
4300
SKYLIGHT ON POWDER COATED
ALUMINUM FRAMES T.O.P
26
450384
1000 700
3900
495 385
14 14
3900
S.1. S.1.
4550
4400
500 1500
2166
FROSTED CLEAR GLASS EL +18.00
2120
WITH LEAD CHANNEL INLAY
300
D09
T.O.P
900
1000
EL +18.50
300
E05 EL +18.50 ST.ROOF S.S.L
300
A BASEMENT FLOOR PLAN D SECOND FLOOR PLAN ST.ROOF S.S.L
EL +18.20
A-207 1 : 100 A-207 1 : 100 EL +18.20 ST.ROOF S.S.L
1000
1000
ST.ROOF S.S.L
900
2000
SLAB & BEAM REF. TO SE DWGS
2000
3100
3100
1000
1000
1000
E05
P Q R S
P Q R S
S.1. S.1. S.1. S.1. GRC PREFABRICATED DECORATIVE
S.1. S.1. S.1. S.1.
CORNICE
10400
1100
10400
600
900
200 900
1100
5200 2800 2400 5200 2800 2400 EL +15.10
ROOF S.S.L
E
4
EL +15.10
PV.
U
EL
ROOF S.S.L
1000
17
17
D16
S.1.
S.1.
1950
GRC COLUMN
2000 4300 746
800
E02 RAIL
4700
4500
4700
E02
4500
5150
1760 800
F
2600
EL +22.40
16
16
S.1.
S.1.
11400
11400
T.O.P
2400
1.0
UP
22404
2400
E O.P
7800
+2
T.
13900
15900
15 EL +10.60
L
UP
15
F F F
100
S.1. EL +10.60 2ND F.F.L
MAIN LOBBY
EL +0.90
S.1.
13.9x8.1
2ND F.F.L
G-33
G F.F.L
UP
600
A
EL + 0.15
4300
PV. F.F.L
4300
26750
1100
12650
F F F
4500
12650
14
14
S.1.
4500
4500
S.1.
E02
D05
12050
3900
F F F E
EL +6.10
EL +6.10 1ST F.F.L
1ST F.F.L
1000
6000
E ROOF FLOOR PLAN F F F
F
B GROUND FLOOR PLAN A-207 1 : 100
A-207 1 : 100 E01 E01 E01 E01
5200
F
5200
E
4200
F F
MAIN LOBBY
200
300
E
1150
EL +0.90
P Q R S GR F.F.L
1800
2250
EL +0.90
10400 GR F.F.L
450450
GR F.F.L
5200 2800 2400
900
450450
EL ± 0.15 EL +0.45
GR F.F.L
900
P.V
900
A
4.
A
TEACH
EL ± 0.00
450
D14
ROAD F.F.L
EL ± 0.15
P.V 91012064
17
S.1. EL ± 0.00 44 A
ROAD F.F.L
4700
4350
16
S.1.
DRIVEWAY
11400
OPEN TO BELOW
2400
GAMILA
GAM
G
GAA ILA
EL +0.90
977
13900
G F.F.L
15
S.1. EL -4.35
B F.F.L
4300
14
S.1. PROPOSED
G WALL SECTION ELEVATION SECONDARY SCHOOL (B+G+2)
F WALL SECTION
50 3820 A-207 1 : 50 A-207 1 : 50 AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
0
21/7/2022 D30213/2018
WALL SECTION B
A-207 AS SHOWN
00
B
22500
A-208
EL +0.45
715 6000 9000 G F.F.L 7500 715
715
715
A SWIMMING POOL A
A-208
25.00x12.50 A-208
A B-34
12500
12500
EL +0.45
G F.F.L
EL -5.05
Deep: 1.00m EL -6.05
Deep: 2.00m
715
715
715 6000 9000 7500 715
22500
A POOL PLAN
A-208 1 : 50 B
A-208
EL -5.05 EL -5.05
1000
250
250 1000
T.F.L T.F.L
2000
250 250
2000
250 EL -6.05
EL -6.05
1000
T.F.L T.F.L
250
250
250
B POOL SECTION 1
A-208 1 : 50
C POOL SECTION 2
A-208 1 : 50
91012064
44 A
350
250
250
2000
SAME SURROUNDING
250
250
R.C STRUCTURAL SLAB POOL STONE TYPE SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
250
250
GUTTER
21/7/2022 D30213/2018
SWIMMING POOL
PLAN, SECTIONS & DETAILS
A-208 1:50
LADDER SIDE DETAIL LADDER FRONT & BACK DETAIL WATER GUTTER DETAIL GRILL DETAIL W.SH AYMAN RANIA
EL +18.20 EL +18.20
ST.ROOF. S.S.L EL +17.00 ST.ROOF. S.S.L
T.O.P
1200
2200
EL +16.00
EL +15.70
3100
3100
T.O.P
1300
1300
T.O.P
1900
900
900
900
3300
3300
3300
EL +15.10 EL +15.10
ROOF. S.S.L EL +13.70 ROOF. S.S.L
2000
2000
1400
S.S.L
4600
2300
STORE LOBBY WIDE CORRIDOR
4500
4500
COMPUTER LAB
4600
2000
2200
S.S.L
1100
7907
EL +10.60 EL +10.60
2ND F.F.L 2ND F.F.L
2300
4500
LOBBY LOBBY WIDE CORRIDOR
4500
4500
3.0mtr.
4500
2.6X2.7 2.6X1.8 COMPUTER LAB
A F-45 A F-44 A F-57
10.4X7.9
A F-56
2200
13250
13250
13350
13350
13350
22550
22550
1092
EL +06.10 EL +06.10
1ST F.F.L 1ST F.F.L
1000
10250
3450
MULTIPURPOSE HALL H.WASH&TOI. H.WASH&TOI.
19.6X29.6 2.35X3.3 16.4X11.1
5200
5200
5650
5650
A G-55 A G-60 A G-62
4750
EL + 0.90 EL + 0.90
2200
G F.F.L G F.F.L
EL + 0.45 EL + 0.45
G F.F.L G F.F.L
150 450
150 450
EL + 0.15 EL + 0.15
300
300
PV. F.F.L PV. F.F.L
EL ± 0.00 EL ± 0.00
ROAD F.F.L LOBBY FEMA.TOILET ROAD F.F.L
SWIMMING POOL 3.7x2.3 7.75x4.3
19.6x27.9
4500
4500
4600
A B-11
4500
4500
4500
4500
A B-12
4700
4800
4800
4350
4350
A B-34
EL -4.05 EL -4.05
F.F.L F.F.L
B F.F.L B F.F.L
900
T.F.L
2000
1920
EL -6.05
T.F.L
91012064
44 A
GAMILA
GAM
G
GAA ILA
A-209 1 : 100
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
SECTION B-B -SCHOOL,MULTIPURPOSE HALL
&SWIMMING POOL
A-209 1:100
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
DOME.PUMP ROOM
CONTROL PANEL
4.2x8.9
4.7x8.9 7.6x3.0 A B-04
A B-01 A B-03
FIRE WATER TANK 2
7.4x3.3
0%
JOCKEY PUMP
A B-02'
E2
OP
DOMESTIC WATER TANK 2
SL
SL
7.6x3.0
OP
A A B-03''
A
E2
0%
S.1. S.1.
4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
D15 STORM DRAIN HOLDING TANK 1 D26 5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.
STORM DRAIN HOLDING TANK 2
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
6500
6500
A B-02''
A B-01' 4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
./+25+/+.#4612*+.+25%4$25&9.+2Z
.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.
B B &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
S.1. S.1.
4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
D09 *175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
SLOPE 10%
UP 126+%(4156'&21.;%#4$10#6'126+%#.%18'49
STAIR ROOM-01 ./+25+/+.#4612*+.+252*+.+25&0$&
0%
2900
2900
Z.'&514#22418'&'37#.
E1
6.0X2.5 STAIR ROOM-02 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
OP
A B-05 6.0X2.6 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
SL
UP
C A B-06
C
21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
D09 ./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
S.1. S.1. 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$
Z.'&5%490$14#22418'&'37#.
3900
3900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
DRIVEWAY /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
D D
612*+.+25266:.'&5%499$14#22418'&
'37#.
DRIVEWAY &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
5700
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
GENERATOR ROOM 56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
6.5x4.0 574(#%'.'&.+0'#456#0.'5556''.*175+0)
6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
A B-06'' %18'49./+25+/+.#4612*+.+255/%
21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
E E 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
D25
L.V. ROOM #22418'&'37#.
4850
4850
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
SEPTIC TANK 5.5x4.0
7.8x11.15 A B-06'
574(#%'.'&&190.+)*6%#56#.7/+07/
219&'4Ä%1#6'&%;.+0&'4
A B-07 9./+25+/+.#461'4%15-+/
574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
F F *+)*$#;.'&#.7/+07+/*175+0)%.'#4
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
S.1. DRIVEWAY S.1. #22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.
5650
5650
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
2416'%6+1095+/+.#461
2*+.+2539<0+.'%*41/'
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
G G
S.1. S.1.
.')'0&
DRIVEWAY PAINTED PLAIN GYPSUM CEILING.
8100
8100
DRIVEWAY DRIVEWAY
DRIVEWAY
EXPANSION JOINT
PAINTED 600 X 600 GYPSUM TILES CEILING.
77450
D 1500 2075 2075 1500 1500 D03' 2075 2075 1700 D01 H' B
2980
1000 1000 1000 1000
1000
3200
FROM F.F.L
2200 220
D01
S.1. D03' D03 S.1.
800
600mm X 600mm ACCESS PANEL.
800
MA.TOILET D03 ELEC.RM
FEMA.TOILET
2200
3900
4.7x7.95
3870
3.7x2.3 3.85x2.3 D11 3.7x2.3 D11 3.85x2.3 5.9X2.7 D03 D03 7.95x4.7
UP
STAIR ROOM-04
D09 A B-16
2300
A B-14 5.8X2.6
2650
2700
A B-08 A B-10 A B-11 A B-13 A B-17
1150
EL +2.5 EL +3.3
EL +2.5 A B-19 FROM F.F.L
3700 FROM F.F.L
D03 D03 FROM F.F.L
EL +3.3
UP
D09
K D04 FROM F.F.L
D22
RECEPTION K
320
D03 D03
6.2x3.8
S.1. EL +3.3 EL +3.3 EL +3.3
S.1.
740
800
200 1800
19600 900 7200 700 3155 825 10200 825 3780 1000 4200 1000
K'
S.1. D09
5000
4730
D22
EL -6.10
7800
DRIVEWAY
EXPANSION JOINT Deep: 2.00m
SHOE RACK PARENT WAITING RM
8080
6600
FEMALE PRAYER ROOM
6600
EL +3.4
DRIVEWAY
FROM F.F.L 3.15X8.1 CORRIDOR
EL +3.4
3.5x6.1
11.85x8.10
L A B-25
A B-24
SHOE RACK
6.1X4.1
2.5x6.3
FROM F.F.L
A B-22' L
6100
A B-32 DRIVEWAY
S.1. EL +3.3
FROM F.F.L
EL +3.4
FROM F.F.L
A B-23
UP
D09 S.1.
EL +3.3
FROM F.F.L STAIR ROOM-03
3300
3300
6.8X3.0
GYM A B-21
8.8x15.7
700 1150
1000 740
M A B-26
M
900
D09
200
200
S.1. EL +3.3 D04 D09
EL +3.3
FROM F.F.L
STORM DRAIN HOLDING TANK 3 S.1.
FROM F.F.L
STORE
UP A B-01''
3300
3300
1.6X2.4
A B-29
D22
N
6000
N EL +3.4
FROM F.F.L
STAIR ROOM-06
S.1. EL +3.4
MALE PRAYER ROOM EL +3.4 EL +3.4 S.1.
6600
1500
A B-28 1.6x2.4 ENTRANCE
O 4.3x7.4
A B-31
O
S.1. SWIMMING POOL 200 S.1.
900 7200 700 870 5400 1465 6600 870200 1600 650 3000 650
2400
2400
19.6x27.9
UP
2200
A B-34 EL +3.3
FROM F.F.L
P P
650 1000
EL +3.3
650 800
650 700
FROM F.F.L
S.1. S.1.
200
200
200
D22 D22 EL +3.3
D22
FROM F.F.L
CORRIDOR
33.0x4.3
D22 A B-32'
5200
5200
3000
3000
3000
EL +3.4
FROM F.F.L
650
650
Q D22
Q
200
EL +3.3
FROM F.F.L D09 D22
S.1. S.1. 91012064
2800
2800
EL +3.4
FROM F.F.L 44 A
DRIVEWAY GAME ROOM UP
4200
2400
Deep: 1.00m Z
S S.1. S
550
1700
DRIVEWAY
7.237°
T T
D25'
S.1. S.1.
DRIVEWAY
4150
4150
DOMESTIC WATER TANK GAMILA
GAM
G
GAA ILA
U A B-35 U 977
S.1. S.1.
D25'
7.237°
7.237°
MECHANICAL ROOM
82
.76
3° A B-36
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900 21/7/2022 D30213/2018
BASEMENT FLOOR CEILING PLAN
-SCHOOL
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. A-301 1:150
A EXPANSION JOINT
A
A-201 A-203 M.SH. AYMAN RANIA
A-301 1 : 150
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
800 800 800 800 800 800 50 800 800 800 800 400
20200 2600 1200 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 400 750 400 2800 400 400 2800 400 400 2800 400 400 2800 400 400 2800 800 1500
RAMP UP
SLOPE 10% SLOPE 10%
0%
E2
SL
OP
OP
SL
A A
E2
0%
EL +2.5
PANTRY
1000 900
S.1. S.1.
450
450
450
450
450
450
FROM F.F.L
1500
1500
A G-05
2500
200
700 6600 700 650 6600 650 600 6600 600 2400 710
D03
TOILET
2500 700 2400 700 650 6600 650 650 6600 650
4100
2.5x1.40
1300
690
EL +3.40 EL +3.40 EL +3.40 EL +3.40
A G-06 +0&114.+)*6+0)(+:674'5%*'&7.'
FROM F.F.L FROM F.F.L TEACHERS ROOM GRADE 10-4
FROM F.F.L FROM F.F.L
2800
6500
6500
6400
GRADE 10-2 TEACHERS ROOM
6900
6300
6300
6300
6300
6300
GRADE 10-5
6310
GRADE 10-1 GRADE 10-3 EL +2.5 EL +3.40
7.9x6.3
5400
5400
5400
5400
5400
5400
5400
EL +3.40
FROM F.F.L 3.8x6.3
FROM F.F.L
8.0x6.3 7.9x6.3
EL +3.40 7.8x6.3 3.8x6.3
FROM F.F.L
A G-09 A G-10 7.9x6.3 4'%'55'&.'&:#.7/+07/*175+0)12#.
A G-01 A G-02
FROM F.F.L A G-03 A G-04 TOILET A G-11 21.;%#4$10#6'126+%#.%18'49./+2
2.5x1.40 D03
3800
5+/+.#4612*+.+254%89.
225 375800
Z.'&51%14#22418'&'37#.
A G-07
800 1000
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
450
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
1190
800
6800 2.5x1.25
2400 EL +2.5 126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
D14150 6650 D14150 6550 D14 200100D14 2250 2600EL +3.3 D14200 6500EL +3.3 D14 200100D14 6700
B EL +3.3 EL +3.3 EL +3.3 EL +3.3 EL +3.3
B ./+25+/+.#4612*+.+25%4$25&9.+2Z
450 450
450
450 450
450
450
A FROM F.F.L
G-08
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L .'&514#22418'&'37#.
190
500
S.1. S.1.
450
FINISH @ B.O.S &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
38600
1000
1000
D09 FINISH @ B.O.S UP
700 37200 700 D09 STAIR ROOM-02 DN
4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
5.8X2.7
2900
2900
2.7mtr.WIDE CORRIDOR
2600
EL +0.45
2700
2700
2700
2700
2700
EL + 0.15
2600
1800
1800
1800
EL + 0.15 EL +0.45 ./+25+/+.#4612*+.+25%4$9.
500
EL +3.40 A G-12 Z.'&#%Ä/.114#22418'&'37#.
PV. F.F.L STAIR ROOM-01 G F.F.L
A G-43
FROM F.F.L G F.F.L PV. F.F.L
1900
1620 280DN 6.0X2.7 4100
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
800
D09 2000 2800 1600 2800 1600 2800 1600
EL +3.3 2800 3850 50 6900 3000 1900 3000 300 1200 400 UP 6000
C A G-44 C 4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
450
450
FROM F.F.L
550
550
*175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
126+%(4156'&21.;%#4$10#6'126+%#.%18'49
EL +3.3
S.1. 600 4900 D10 FROM F.F.L LOBBY D10 EL +2.5
S.1. ./+25+/+.#4612*+.+252*+.+25&0$&
Z.'&514#22418'&'37#.
2.9x1.6
1900
1900
FE.TOILET 1500 MA.TOILET
1900
1900
1900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +2.5 FROM F.F.L
2800 4900
3500
4.9x3.7
FROM F.F.L A G-65
EL +3.3 3.7x5.9 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
29900
3900
3900
A G-42 FROM
D10 F.F.L A G-13 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
4200
4200
D03 600 1200 600 600 1200 600 2800 ./+25+/+.#4612*+.+25&0$
D03 D03 D03 D03 D03 HA.TOILET D03 D03 D03 D03 D03 Z.'&5%14#22418'&'37#.
JANITOR
1300
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2.9x2.0
1700
1700
1.1x1.7
1700
1700
1700
A G-41 A G-14 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
900 900 900 900 900 1000 900 900 900 900 900 4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
900 900 900 900 900 900 EL1900 800 900 900 900 900 900
D D
700
+2.5
800 800
9./+25+/+.#4612*+.+2545$
FROM F.F.L Z.'&5%490$14#22418'&'37#.
S.1. S.1.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
650
3300 FINISH3000
@ B.O.S
1000
1000
D01 D14 GRADE 10-6
PREPAR. ELV. 5752'0&'&.'&#.7/+07+/*175+0)
10555
6.5x7.9
475
2400
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
2500
3.3x2.5 3.0x2.5 A G-15 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
2100 1200 3000 612*+.+25266:.'&5%499$14#22418'&
A G-40 A G-39
1700
550 5400 550 '37#.
EL +3.3
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
FROM F.F.L D14
5700
5700
2800
1800 1000
EL +3.3 3700 4'%'55'&.'&.+0'#4:56''.*175+0)
725
1000
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
FROM F.F.L EL +3.40
D14 FROM F.F.L
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&
7900
6600
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.
475
7100
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
800
21.;%#4$10#6'126+%/#6'4+#.6':674'&
E E 21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
475
56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
19700
19700
S.1. CHEMISTRY LAB
S.1. 574(#%'.'&.+0'#456#0.'5556''.*175+0)
6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
%18'49./+25+/+.#4612*+.+255/%
EL 6.5x9.25
+3.40 21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2800
6950
FROM
A F.F.L
9250
G-38
7800
3000 1900 3000 EL6500
+3.3 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
650
EL +3.40 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
4850
FROM F.F.L
4850
FROM F.F.L %18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
650
#22418'&'37#.
1000
EL +3.40 D14 GRADE 10-7
475
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L
6.5x7.9 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
800
%18'49+6*56#+0.'5556''.(+:#6+109./+2
A G-16
6690
5+/+.#4612*+.+2596%.Z.'&514
FIRST FLOOR LINE EL +3.40
F F
#22418'&'37#.
475
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +0.45
FROM F.F.L
S.1. S.1.
30000
30000
219&'4Ä%1#6'&%;.+0&'4
725
2800
FROM F.F.L 14#22418'&'37#.
7900
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
6600
EL +3.3
BASEMENT LINE *+)*$#;.'&#.7/+07+/*175+0)%.'#4
725
7200
FROM F.F.L 21.;%#4$10#6'126+%#.%18'49./+2
D14 5+/+.#4612*+.+25$;2)Z.'&59$14
5650
5650
EL + 0.15 #22418'&'37#.
475
PV. F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
800
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
UP
475
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
EL +0.45 #22418'&'37#.
G F.F.L
6400
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
G G
650
FROM F.F.L
300
2800
9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
650
750
1065
9250
6850
3000
EL +3.3 16400 GRADE 10-8
7800
1000
2*+.+2539<0+.'%*41/'
FROM F.F.L FINISH @ B.O.S EL +3.40 D14
CHEMISTRY
FROM F.F.L LAB 6.5x7.9 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
3300
475
3.0x3.3 A G-37
2000
10555
D23 550 5400 550 600 1200 600 600 1200 600 550 5400 550
A3000
G-64
800
PROPERTY LIMIT
.')'0&
475
EL +3.40
D04 FROM F.F.L
8100
8100
7900
6600
1000
6900
2800
D14
1400 1000 4100 EXPANSION JOINT
725
3200
PREPARATION 700 4210
EL +3.40 1200 4190 1200 4200 700 PAINTED PLAIN GYPSUM CEILING.
11100
4100
FROM F.F.L
4100
9600
EL +3.3 D14
5235
3.2x4.1 CAFETERIA
1800
FROM F.F.L
EL A
+2.5G-63' 16.4x11.1 PREPAR. ELV.
475
FROM F.F.L EL +3.40
3.3x2.5
2400
A G-62 3.0x2.5
2500
PAINTED 600 X 600 GYPSUM TILES CEILING.
2500
2500
FROM F.F.L
A G-36
H
800
EL +3.40
A G-35
475
650
D04 EL +0.45 FROM F.F.L S.1. PAINT AND PLASTER.
1000
17190
G F.F.L
200
S.1.
1000
D12 D12
77450
77450
D
3000 FIRE COMMEND CENTRE EL +3.40
D14
H' B
2800
WATER RESISTANT GYPSUM CEILING
1200
2000
STORE 6.5x3.0
2980
3800
EL +3.40
3300
2780
2780
3200
3300
4200
A G-63 D16 50 D16 EL +3.3 6.5x4.2
EL +3.40
1080
1080
1300
EL +3.3 FROM F.F.L
3000
EL +3.3 5700 1100 8900 3675 2000 1525 4950 600 3000 300 300 4900 1600 2000 3350 D05 FROM F.F.L A G-18
PERFORATED GYPSUM TILES
640 400 800300800300800300800200 800
I I
750
FROM F.F.L
505
FROM F.F.L
2200 220
50
600X600 AS INDICATED.
800
FINISH @ B.O.S EL +3.3
S.1. 3300
FINISH @ B.O.S 2350 EL2500
+3.3 3050 S.1.
620
H.WASH&TOI.
1100
1100
1600
1600
2200
2.35x3.2
1770
445
D16
1800
EL +3.3D03 2.35x3.2
1900
FROM F.F.L
A G-61 D03 FROM F.F.L A G-60 3.3x1.8 D01 EL +3.3 D01 3.3x1.8 LIFT LIFT 2750 3100 TOILET
D03 600mm X 600mm ACCESS PANEL.
2900
EL +2.5 PANTRY
J J
1000
1000
3.0x2.7 3.0x2.7
1100
1500
FROM F.F.L3.2x1.5 3.1x1.5
5100
4700
4870
2800
EL +2.5
STAIR
FINISH @ROOM-04
1500
1500
1500
1500
S.1. A G-19
S.1.
5070
EL +2.5 FINISH @ B.O.S B.O.S A G-20
FROM F.F.L FROM F.F.L
1000
1000
UP DN
6.0X2.7
1100
2700
2700
2600
FE.TOILET A G-66
2700
1500
PV. F.F.L 6.6x4.7
1500
1300 3570
6.6x4.7 2830 3400 2800 3600 1400 5850 5950 6200 7500 3200 1000 1000 1000 1000 1000 1000
1800
UP EL +3.40
1200
1200
1200
D10
1100
A G-57
1200
475
1100
800
9700
5800
320
8400
10070
1000 4200 1000 200 850 5800 850 700 1800 700 6500
FE.TOILET
50
1100
S.1. S.1.
1700
6.5x3.3
475
EL +3.40 EL +2.5
1000
FROM F.F.L D10 A FROM F.F.L
G-21
600
EL +3.40
13200
K'
400
D16
3250
3280
FROM F.F.L
2000
2000
EL +3.3
D16
600
FROM F.F.L
1000
2800
EL +2.5
S.1. EL +0.45 D10 MA.TOILET
5000
1700
4730
FROM F.F.L
G F.F.L WAITING 6.5x3.3
1100
A G-22
630
210
EXPANSION JOINT D03 D03 D03 D03 D03 D03
2200
475
8100
1500
1500
2755
1500
OPEN TO ABOVE OPEN TO ABOVE
2000
800
1000 1000 1000 1000 1000
L 1000
L
650
FINISH @ B.O.S
D16
1100 800
S.1. EL +3.3 STAIR ROOM-03 S.1.
850
1000
6.8X3.1
500
1505
DN
A G-23 EL + 0.15
28500
3300
3300
2900
LOBBY PV. F.F.L
2820
3000
EL +0.45 4.3x4.7
800
2200
3000
G F.F.L A G-24 UP
FINISH @ B.O.S
M M
D09 FINISH @ B.O.S EL +3.40
9240
2800
EL +0.45
FROM F.F.L
4975
1995
FINISH @ B.O.S
10040
700
EL +2.5
G F.F.L
S.1. EL +0.45 S.1.
650
800
FROM F.F.L CLINIC
400 900
1150
D03 D05
9200 9300 200 2000
2000 100 1300
1800 500 PANTRY
1600 G F.F.L 6.8x3.1
900
850
1.6x2.4
2400
TOILET D06 A EL +3.40
G-25
3300
3300
15 14 13 12 11 10 9 8 7 6 5 4
3100
1800
A G-65
1150
MEETING D03 EL +2.5 4300 650 5400 750
N A G-67 200 900 3200 6800 N
4500
2300
DN
FROM F.F.L
5000
9.3x5.0 EL +3.3
3400
650
S.1.
500
3000
FROM F.F.L
3800
3000
A G-68
1150
EL +3.40 D03 D10
4.3x3.0
7000
FROM F.F.L TOILET TOILET
6400
AEL +3.3
G-26
1500
1500
600
755
EL +2.5
3.9x2.4
1200
2000 1800 2.0x1.2
1350
1.6x2.4 FROM F.F.L
O O
D17 A G-66 FROM F.F.L
1150
EL +3.3 D03 UP A G-28
2100
800
DN DN
EL +2.5 1050 1100 UP UP UP
FROM F.F.L D03 EL +2.5
1800
FOR SITTING D03PANTRY
FROM F.F.L EL +3.3
S.1. S.1.
21800
1000
600
900
UP TO 1ST FLOOR
1100
D04 FROM F.F.L FROM F.F.L
1400 6400 1400 2350
2350 2300
2300 8002050
1150 200 1600
2000 200 4200 1000 700 800 400 2150 6900 7000 1.4x3.7
4975
2400
2500
100 STORE 2300 A G-30
850 5400 EL +3.40 895
1800
TOILET
1800
1800
1800
1800
1200
2.05x1.8 FROM D05 D05
1750
EL +2.5 D03 FROM F.F.L EL +3.3
EL +3.3 MAIN LOBBY 2.0x1.2
G F.F.L
P A G-47 4.8x4.3 P
2000
2000
A G-48 FROM F.F.L
FROM F.F.L
D03 FROM F.F.L 13.9x8.1 A G-29
MULTI PURPOSE HALL A G-32
EL +3.40
3600
700
A G-33 D16
S.1. D16
S.1.
450
19.6x29.6 D05 D05 FROM F.F.L
700
EL +0.90
7200
EL +3.3 STORE
425
900
A G-55 EL +3.40 D05
1925
7800
EL +3.3 3.60x1.9 FROM F.F.L
500
3600 650 4200 650 550 4200 550 550 3000 550
700 1000
4900
D04
14800
G F.F.L
1700
FROM F.F.L A G-54' MANAGER
EL +3.40
SECRETARY RECEPTION
EL +3.40 PARENT WAITING AREA
3900
EL +3.40
5.5x5.0
3000
FROM F.F.L
2800
FROM F.F.L 4.6x8.9 ACCOUNTING
600
FROM F.F.L
5.3x5.0 4.1x3.9
5200
5200
AEL +3.40
G-52 4200
3600
4300
FROM F.F.L
3900
A EL +3.40
G-31
FROM F.F.L
STAIR ROOM-07 EL +3.3
4825
450
ENTRANCE LOBBY 5.8X3.6 FROM F.F.L
800
3600
A G-54 A G-23 5500 5300 13900
2600
EL +3.3 EL +3.3 EL +3.3
845
Q Q
700
EL +3.3
800
FROM F.F.L
400
FROM F.F.L
UP UP
400
S.1. EL +0.45 DN
S.1.
5675
EL + 0.15
7175
2800
PV. F.F.L
500
RAMP UP
75
3600
R R 44 A
2000
D16
S.1. S.1.
2400
2400
Z
800
D16 UP UP UP
S EL + 0.15
S.1. S
2000
1700
UP UP UP UP
7.237°
T T
1710
S.1. UP
EL + 0.15
PV. F.F.L S.1.
EL + 0.15
PV. F.F.L
1000 500 1600
4150
4150
350
U U GAMILA
GAM
G
GAA ILA
S.1. S.1. 977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
600 2800 600 1400 1600 800 4400 800 1600 1400 500 2800 700 800 3500 800 3500 800 600 2600 600 800 800 2800 800 800 800 2800 800 800
600
400 2100
600 100 100
400 600 1500 600 1000 6500
100 100
1000 600 1500 600 4300 800 450 2800 450
800
450 2800 450
800
400 2700
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
79900
21/7/2022 D30213/2018
GROUND FLOOR CEILING PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22 -SCHOOL
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
A-302 1:150
A EXPANSION JOINT
A
A-201 A-203
W.SH AYMAN RANIA
A-302 1 : 150
00
A-201
C EXPANSION JOINT A
A-203
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
A A
EL +3.3 EL +3.3 EL +3.3 EL +3.3 EL +3.3
S.1. S.1.
450
450
450
450
450
FROM F.F.L FROM F.F.L FROM F.F.L EL +3.3 PANTRYEL +2.5 EL +3.3 FROM F.F.L FROM F.F.L
1250
FROM F.F.L FROM F.F.L FROM F.F.L
2.5x1.25
A F-05
700 6600 700 650 6600 650 600 6600 600 500190 2400 690 D03 TOILET
2500 700 2400 700 650 6600 650 650 6600 650
1400
EL +3.4
2.5x1.40EL +2.5
EL +3.4 EL +3.4 EL +3.4 FROM F.F.L
A F-06
FROM F.F.L FROM F.F.L FROM F.F.L
FROM F.F.L
TEACHERS ROOM GRADE 11-4
6500
6500
7.9x6.3 GRADE 11-5
5400
5400
5400
5400
5400
5400
GRADE 11-1 GRADE 11-2 GRADE 11-3 TEACHERS ROOM 3.8x6.3
A F-09 A F-10 7.9x6.3
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 EL +2.5
TOILET EL +3.4 EL +3.4 AEL +3.4
F-11
FROM F.F.L
1400
A F-01 A F-02 A F-03 A F-04 2.5x1.40 FROM F.F.L FROM F.F.L FROM F.F.L +0&114.+)*6+0)(+:674'5%*'&7.'
D03
A F-07
PANTRY
EL +2.5
4'%'55'&.'&:#.7/+07/*175+0)12#.
1250
2.5x1.25
FROM F.F.L
21.;%#4$10#6'126+%#.%18'49./+2
B B
450
450
450
450
450 450
450
D14 D14 D14 D14 A F-08 D14 D14
5+/+.#4612*+.+254%89.
D14 Z.'&51%14#22418'&'37#.
STAIR ROOM-02
S.1. EL +3.3
S.1.
450
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
FROM F.F.L FROM F.F.L
5.8X2.7
FINISH @ B.O.S 4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
STAIR
6000 ROOM-01 A F-14
2900
2900
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
800 EL +3.4 27000 2.7mtr.WIDE CORRIDOR 800 700 EL +3.4 8400 700 6000
2700
1800
1800
2700
6.0X2.7 FROM F.F.L
D16 FROM F.F.L
./+25+/+.#4612*+.+25%4$25&9.+2Z
A F-13 .'&514#22418'&'37#.
A F-12 D09
D09 EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
C C
FINISH @ B.O.S
350
450
550
FROM F.F.L 4'%'55'&.'&:56''.*175+0)#.7/+07+/
4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
S.1. EL +2.5
D10 LOBBY EL +3.3
D10
EL +2.5
S.1. ./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.
1600
FROM F.F.L EL +3.3 FROM F.F.L FROM F.F.L
FE.TOILET 2.9x1.6 MA.TOILET
1900
1880
FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
3900
*175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
A F-73 EL +2.5 ELD03
+2.5
A F-16 126+%(4156'&21.;%#4$10#6'126+%#.%18'49
D03 D03 D03 D03 D03 HA.TOILET D03 D03 D03 D03 D03
HA.TOILET
FROM F.F.L JANITOR
FROM F.F.L 2000 900 900 900 900 900 ./+25+/+.#4612*+.+252*+.+25&0$&
2.9x2.0 1.1x1.7 2.9x2.0 Z.'&514#22418'&'37#.
2000
2000
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
1700
1700
A F-72 A F-71 A F-17
EL +2.5 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
900 900 895 900 900 2100 1000
D FROM F.F.L D 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
OPEN TO BELOW
./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
S.1. EL +3.3
S.1.
650
EL +3.3 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2500
D14
1300
FROM F.F.L FROM F.F.L
3400 2600 3000 GRADE 11-6 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
PREPAR. ELV. 4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
1200
A F-70 D01 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
D14
5700
5700
5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
725
EL +3.3 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
FROM F.F.L D14 612*+.+25266:.'&5%499$14#22418'&
'37#.
EL +3.4
6600
GROUND FLOOR LINE FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
E E /#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
9.2x9.25 EL +3.3
4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
845
A F-68 FROM F.F.L 21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
7800
56''.(+:#6+109./+25+/+.#4612*+.+25
650
..:Z.'&5#14#22418'&'37#.
4850
4850
EL +3.4 574(#%'.'&.+0'#456#0.'5556''.*175+0)
FROM F.F.L 6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
EL +3.3 %18'49./+25+/+.#4612*+.+255/%
650
650
700 7800 700 600 1200 600 3000 700 1200 600 FROM F.F.L 21'9.Z.'&514#22418'&'37#.
D14 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4 EL +3.4 GRADE 11-7 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L FROM F.F.L
6.5x7.9 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
27600
27600
EL +3.4 %18'49+6*56#+0.'5556''.(+:#6+109./+2
A F-19
F FROM F.F.L
F 5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
#22418'&'37#.
S.1. S.1.
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
D14 5+/+.#4612*+.+2596%.Z.'&514
725
#22418'&'37#.
EL +3.4 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
6600
6600
FROM F.F.L
PROPERTY LIMIT 574(#%'.'&&190.+)*6%#56#.7/+07/
725
EL +3.3 219&'4Ä%1#6'&%;.+0&'4
FROM F.F.L D14 9./+25+/+.#461'4%15-+/
5650
5650
600 1200 600 850 4800 850 574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
*+)*$#;.'&#.7/+07+/*175+0)%.'#4
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
G G
650
650
EL +3.4
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
S.1. EL +3.3 EL +3.3 EL +3.3 EL +3.3 FROM F.F.L EL +3.3
S.1.
650
650
650
650
EL +3.3 5+/+.#461(#)'4*7.62')#575Z6%Ä6914
750
800
7800
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L #22418'&'37#.
FROM F.F.L D14
GRADE 11-8
OPEN TO BELOW
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
CHEMISTRY LAB 6.5x7.9
9.2x9.25 A F-20 9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
A F-67 850 4800 850 2416'%6+1095+/+.#461
2*+.+2539<0+.'%*41/'
900 7200 900 700 9000 700 700 7800 700 1075 4200 1075 565 11400 565 700 7800 700 600 1200 600
4200
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4
FROM F.F.L
COMPUTER LAB COMPUTER LAB
COORDINATOR RM. COMPUTER LAB
8100
8100
10.4x7.9 9.2x7.9 EL +3.4
6600
6600
6600
6600
6600
6600
6.35x7.9
6600
.')'0&
EL +3.4 A F-56 A F-61 D14
EL +3.4 EL +3.4 EXPANSION JOINT
725
FROM F.F.L
FROM F.F.L FROM F.F.L
EL +3.4
750
LIBRARY FROM F.F.L EL +3.3
9.0x16.0
D14 PREPAR.
FROM F.F.L ELV.
TOILET
2500
6.0x2.5 3.0x2.5
2950
A F-43
3.15x2.0 D03
2500
3150 A F-65 A F-66
H PAINTED PLAIN GYPSUM CEILING.
1995
D20 D20 A F-55 D20 3700 3000
EL +2.5
H
650
650
650
650
EL +3.3 FROM F.F.L D13 D01 EL +3.3
S.1.
1200
1300
FROM F.F.L FROM F.F.L
EL +3.3
S.1. PAINTED 600 X 600 GYPSUM TILES CEILING.
600
600
1100
FROM F.F.L
D14
77450
77450
D D19 EL +3.4
EL +3.4
FROM F.F.L
EL +3.3
FROM F.F.L H' B
2980
D16
3200
3.0mtr.WIDE
FROMCORRIDOR
2800
900 7200 900 600 37680 F.F.L 600 650 16200 650
S.1.
1800
1800
1000 800 3000 1695
A-202 TEACHERS ROOM A-202 PAINT AND PLASTER.
1205
A F-57
1200
6.5x4.2
3000
EL +3.4
EL +3.3 A FROM
F-21F.F.L
380
EL +3.3
I I
600
2200 220
FROM F.F.L
1250
FROM F.F.L
1900
D10 D10 EL +3.3
630
EL +3.3
S.1. S.1.
1400
FINISH @ B.O.S EL +2.5
D14 EL +3.3 EL +3.3 D14 EL +3.3 FINISH @ B.O.S FROM F.F.L FOR WET AREAS.
800
EL +3.3
850
850
FROM F.F.L
1100
1100
6600
LOBBY D03 D03 FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L
600
ELEC.RM FROM F.F.L ELEC.RM
1600
2200
1800
1800
1800
D19 EL +2.5
2.6X1.8 D03
AEL +3.3
F-44 EL +2.5
EL +2.5 3.3x1.8
3300 D01 2500 1000 500
TOILET TOILET
FROM F.F.L 2500 D01 3.3x1.8 LIFT LIFT PERFORATED GYPSUM TILES
EL +3.4 EL +3.4
PANTRY TOILET
J A F-49 A F-63
J
1000
1000
1800
1800
1800
FROM F.F.L 3.0x2.7 3.0x2.7 3100
1500
FROM F.F.L D03 FROM F.F.L D03 1.5x1.8 D03 FROM F.F.L FROM F.F.L 1.5x1.8 600X600 AS INDICATED.
1500
D04 TEACHERS ROOM TEACHERS ROOM D03 3.2x1.5 3.1x1.5
A F-52 A F-60 EL +2.5
4700
4700
3000
3600
3000
3000
EL +3.3 D09 4.65x4.7 4.65x4.7 D09 STAIR5980
ROOM-04 EL +2.5
S.1. STORE
FROM F.F.L 1400 1600
D03MA.TOILET
600 2200
FE.TOILETD03
1400 6000 1500 825 3000 825 600 1800 600 765 3000 765 1500 FROM F.F.L
A F-22 AFROM
F-23
F.F.L S.1.
1000
1000
2700
A F-62
630
2700
2700
A F-45 6.0X2.7 1.5X2.0 FROM F.F.L 1.5X2.0 FROM F.F.L FROM F.F.L
1500
A F-46 A F-47
2000
A F-51 A F-59 940 6600 1135 4200 825 1800
1000
1000
D03 D03
7200
EL +3.3
A F-50
EL +2.5
K K
850
850
EL +2.5 FINISH @ B.O.S
FROM F.F.L FINISH @ B.O.S FROM F.F.L MAIN LOBBY D03 D03 D03 6500 D03 D03 D03
8400
FROM F.F.L
FE.TOILET
320
13.9x8.1
1100
D16
S.1. EL +3.4 A F-64 EL +3.4
1065 1700 6.5x3.3 3730 S.1.
4200
FROM F.F.L FROM F.F.L
D10 A F-24 EL +2.5
600
6600 1135 4200 1025 FROM F.F.L
K' 940 EL +2.5
600
FROM F.F.L
S.1. D10 1065 1700 3730
5000
4730
MA.TOILET
1100
6500
EL +3.3 6.5x3.3
730
FROM F.F.L D03 D03 D03 A F-25 D03 D03
EXPANSION JOINT 1000 1000 1000 1000 1000 1000
D03
OPEN TO BELOW OPEN TO BELOW
1500
1500
EL +3.4
650
FROM F.F.L
L L
S.1. STAIR ROOM-03 S.1.
850
EL +3.3
FROM F.F.L
D09 6.8X3.1
A F-26
3300
3300
3100
950 2400 950 6800
FINISH @ B.O.S
M M
FINISH @ B.O.S
S.1. EL +3.3 EL +3.3 EL +2.5
PANTRY PANTRY S.1.
1005
900
D03 FROM F.F.L D03
1400
FROM F.F.L FROM F.F.L D03
2.4x1.6 1.9x1.4
TOILET EL +2.5
7200
A F-36' A F.F.L
F-27
3300
3300
FROM
1000
3.9x2.4 TOILET D03
3100
D03 A LOBBY EL +2.5
OFFICE F-36 D10 D03 EL +2.5 FROM F.F.L 5.1x3.1
N A F-31 N
1600
FROM F.F.L 1900 A 1000
F-28 2000
9.2x5.0
3000
1000
EL +3.4 D03
SITTING AREA STAIR ROOM-06 D03
S.1. A
EL +3.4
F-42
9.3x7.0
EL +2.5
D03 FROM F.F.LD10 A F-32
FROM F.F.L
S.1.
FROM F.F.L A F-37 TOILET LIFT EL +3.3
1500
1500
850
D21 EL +3.4 3.9x2.4 1.6x2.4 FROM F.F.L
O FROM F.F.L
D03 A F-35 D18 O
995
ART STUDIO
S.1. S.1.
850
EL +3.3
FINISH @ B.O.S 9.4x8.9
2400
2400
A F-29
1200
550
FROM F.F.L D14 FROM F.F.L
D09
P CONFERENCE
EL +3.4
FROM F.F.L
P
S.1. 9.2x11.8
EL +3.3 EL +3.3 D08 D08 S.1.
700
700
755
EL +3.3 650 3000 650 900 6600 1200 700
OFFICE
7200
FROM F.F.L
A F-41 FROM F.F.L
FROM F.F.L ART -
LOBBY OFFICE OFFICE 4.1x3.9 TEACHERS ROOM
4200
1200 7010 990 3600 650 4200 650 550 4200 550 535 A 3000 535
2800
2400
D18 A F-40 D21 A F-30
OPEN TO BELOW
5200
5200
EL +3.4
3600
3600
EL +3.4
D21 FROM F.F.L FROM F.F.L
EL +3.4 EL +3.4
EL +3.4
FROM F.F.L FROM F.F.L
600
750
550
FROM F.F.L
9405
OFFICE
600 2400
3.6x4.8 600
Q Q
700
700
A F-39
3600
S.1. EL +3.4
S.1.
FROM F.F.L
2800
2800
EL +3.3
R R
600
FROM F.F.L
2400
Z 44 A
1195
S S.1. S
S.1. 7.237° S.1.
1700
1700
7.237°
T T
S.1. S.1.
4150
4150
U U
S.1. S.1.
GAMILA
GAM
G
GAA ILA
977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
AL-WUKAIR
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. FIRST FLOOR CEILING PLAN
A A -SCHOOL
EXPANSION JOINT
A-201 A-203
A-303 1:150
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
GRADE 12-1 GRADE 12-2 GRADE 12-3 TEACHERS ROOM PANTRY TEACHERS ROOM GRADE 12-4 GRADE 12-5
8.0x6.3 7.9x6.3 7.8x6.3 3.8x6.3 2.5x1.25 3.8x6.3 7.9x6.3 7.9x6.3
A S-01 A S-02 A S-03 A S-04 A S-05 A S-09 A S-10 A S-11
A EL +3.3
A
EL +3.3 EL +3.3 EL +3.3 EL +3.3
S.1. S.1.
EL +3.3
450
450
450
450
450
EL +2.5 EL +3.3
750
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L
1250
FROM F.F.L FROM F.F.L
2500 700 2400 700 650 6600 650 650 6600 650
TOILETEL +2.5
FROM F.F.L
1400
2.5x1.40
EL +3.4 EL +3.4 EL +3.4 EL +3.4 A S-06
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L EL +3.4
6500
6500
EL +3.4
FROM F.F.L
5400
5400
5400
5400
4800
5400
5400
+0&114.+)*6+0)(+:674'5%*'&7.'
FROM F.F.L
EL +2.5
TOILET
FROM F.F.L EL +3.4
700 6600 700 650 6600 650 600 6600 600 690 2400 690
1400
2.5x1.40 FROM F.F.L 4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
A S-07 5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.
PANTRY STAIR ROOM-02
1250
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2.5x1.25 5.8X2.7
B B
750
EL +2.5
450
450 450
450
450
450
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
A S-08
FROM F.F.L A S-12 126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
EL +3.3 ./+25+/+.#4612*+.+25%4$25&9.+2Z
S.1. S.1.
450
450
EL +3.3 .'&514#22418'&'37#.
FROM F.F.L
FROM F.F.L FINISH @ B.O.S
700 8400 700 6000 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
STAIR ROOM-01
2900
2900
EL +3.4 2.7mtr.WIDE CORRIDOR EL +3.4
2700
2700
1800
1800
1800
6000 800 27000 800 4'%'55'&.'&:56''.*175+0)#.7/+07+/
FINISH @ B.O.S 6.0X2.7 FROM F.F.L A S-13 FROM F.F.L 4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
A S-14 ./+25+/+.#4612*+.+25%4$9.
Z.'&#%Ä/.114#22418'&'37#.
EL +3.3
C C
450
450
550
FROM F.F.L &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
MA.TOILET
4900 4200 3.7x5.9 4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
S.1. EL +2.5
LOBBY EL +3.3
FROM F.F.L
EL +2.5
FROM F.F.L A S-25 S.1. *175+0)21.;%#4$10#6'4'(.'%614#.7/+07+/
126+%(4156'&21.;%#4$10#6'126+%#.%18'49
1600
1600
2.9x1.6 ./+25+/+.#4612*+.+252*+.+25&0$&
1900
FROM F.F.L FE.TOILET
1880
EL +3.3 2900 4900 Z.'&514#22418'&'37#.
4.9x3.7 FROM F.F.L A S-24 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
3900
3900
EL +2.5 2000
A S-15 EL +2.5 4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
FROM F.F.L
2000
HA.TOILET FROM F.F.L
HA.TOILET 21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
./+25+/+.#4612*+.+25&0$
2.9x2.0 JANITOR
2000
2000
2.9x2.0
1700
Z.'&5%14#22418'&'37#.
1700
A S-16 1.1x1.7 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
900 900 900 900 900 2100 A S-17 EL A+2.5S-26 900 900 900 900 900
D 1000 FROM F.F.L D 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$
S.1. EL +3.3
S.1.
650
EL +3.3 FINISH @ B.O.S Z.'&5%490$14#22418'&'37#.
1300
1300
FROM F.F.L FROM F.F.L
2600 3000 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
PREPAR. ELV. GRADE 12-6
3.8x6.3 3.0x2.5 6.5x7.9 5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
2500
A S-19 A S-27
1200
A S-18 /'6*#%4;.#6'126+%#.%18'49./5+/+.#4
612*+.+25266:.'&5%499$14#22418'&
'37#.
5700
5700
850 4800 850 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
725
725
EL +3.3
FROM F.F.L 4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
EL +3.4
6600
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
FROM F.F.L 9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.
700 7800 700
E E 4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
S.1. CHEMISTRY LAB
S.1. 56''.(+:#6+109./+25+/+.#4612*+.+25
..:Z.'&5#14#22418'&'37#.
574(#%'.'&.+0'#456#0.'5556''.*175+0)
9.2x9.25 EL +3.3 6':674'&21.;/'6*;./'6*#%4;.#6'126+%#.
845
%18'49./+25+/+.#4612*+.+255/%
A S-20 FROM F.F.L
7800
7800
21'9.Z.'&514#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
650
4850
4850
EL +3.4 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
FROM F.F.L 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
EL +3.3
650
%18'49+6*56#+0.'5556''.(+:#6+109./+2
600 3000 700 FROM F.F.L 5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4
EL +3.4
EL +3.4 GRADE 12-7 #22418'&'37#.
FROM F.F.L FROM F.F.L
FROM F.F.L 6.5x7.9 574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
27600
27600
4800
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
A S-28
F F
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
725
725
9./+25+/+.#461'4%15-+/
EL +3.4 574(#%'Ä/1706'&&190.+)*6Z.'&0'764#.9*+6'
6600
FROM F.F.L 14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
725
EL +3.3
845
FROM F.F.L *+)*$#;.'&#.7/+07+/*175+0)%.'#4
5650
5650
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
700 7800 700
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.
G G
650
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
EL +3.4
S.1. S.1.
EL +3.3 EL +3.3 EL +3.3 EL +3.3 FROM F.F.L EL +3.3
650
650
EL +3.3
800
7800
FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L FROM F.F.L 9#../1706'&/+4414.+)*6(+:674'9+6*+2Ä
FROM F.F.L
GRADE 12-8 2416'%6+1095+/+.#461
CHEMISTRY LAB 2*+.+2539<0+.'%*41/'
6.5x7.9
9.2x9.25 A S-29 &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
A S-21
600 1200 600 850 4800 850
7200 900 700 9000 700 700 7800 700 1075 4200 1075 565 11400 565 700 7800 700 600 1200 600
EL +3.4
FROM F.F.L
.')'0&
COMPUTER LAB COMPUTER LAB
COORDINATOR RM. COMPUTER LAB
8100
8100
10.4x7.9 9.2x7.9 EL +3.4
6600
6600
6.35x7.9
6600
725
FROM F.F.L FROM F.F.L FROM F.F.L
EL +3.4
LIBRARY FROM F.F.L EL +3.3
9.0x16.0 EL +2.5 FROM F.F.L
FINISH @ B.O.S PAINTED PLAIN GYPSUM CEILING.
A S-59 FROM F.F.L PREPAR. ELV.
TOILET
2500
2500
6.0x2.5 3.0x2.5
3.15x2.0 A S-22 A
3000
S-23 H PAINTED 600 X 600 GYPSUM TILES CEILING.
A S-63
H 3700
650
650
EL +3.3
TEACHERS ROOM S.1.
1200
1490
1490
FROM F.F.L EL +3.3
EL +3.3
S.1. 6.5x4.2
600
600
FROM F.F.L
FROM F.F.L
PAINT AND PLASTER.
77450
77450
D EL +3.4
EL +3.3
FROM F.F.L
A S-30
H' B
2980
3200
EL +3.4
1200
FROM F.F.L
1800
A-202 900 7200 900 600 37800
3.0mtr.WIDE CORRIDOR 480 650 16200 FROM F.F.L 650 1000 800
EL +3.4
3000 1700
S.1. A-202 WATER RESISTANT GYPSUM CEILING
3000
A S-25 EL +3.3 FROM F.F.L
FOR WET AREAS.
790
990
EL +3.4 EL +3.3
I I
FROM F.F.L
600
FROM F.F.L
2200 220
FROM F.F.L TOILET
EL +3.3
3.1x1.5 PERFORATED GYPSUM TILES
650
EL +3.3
S.1. S.1.
2600 1400 2200 FINISH @ B.O.S
LOBBY EL +3.3 EL +3.3
FROM F.F.L
EL +3.3
500 1000 2500
FINISH @ B.O.S FROM F.F.L
W 15
6600
600
FROM F.F.L
2200
EL +2.5
2.6X1.8 3.3x1.8 FROM F.F.L
EL +2.5
3.3x1.8 EL +2.5
FROM F.F.L
1800
EL +3.3
AEL +3.3
S-58 A S-54 TOILET EL +3.4 TOILET FROM F.F.L A S-45 FROM F.F.L EL +2.5
PANTRY
J J
1000
1500
1500
EL +2.5 EL +3.4
2600 FROM F.F.L FROM F.F.L A S-52
TEACHERS ROOM FROM F.F.L
TEACHERS ROOM A S-48 2600 3.2x1.5 3100 FE.TOILET
S.1. FINISH @ B.O.S 4.65x4.7 4.65x4.7 FINISH @ B.O.S A S-31 6.5x3.3 S.1.
MA.TOILET FE.TOILET
1000
2700
630
EL +3.3
2.6x2.7 6.0X2.7 1.5X2.0 FROM F.F.L 1.5X2.0 6.0X2.7 FROM F.F.L
1500
A S-56 A S-55 EL +3.4
A S-51 A S-47
1000
8400
FROM F.F.L
320
A S-44
S.1. 940 EL +3.4 6600 1135 1025 EL +3.4 EL +2.5 S.1.
4200
FROM F.F.L FROM F.F.L FROM F.F.L
MA.TOILET
K' 6.5x3.3
EL +2.5
S.1. A S-34
5000
4730
FROM F.F.L
600 1800 600
630
EXPANSION JOINT
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
EL +3.4
650
L FROM F.F.L
EL +3.3
STAIR ROOM-03
6.8X3.1
L
S.1. FROM F.F.L EL +3.3
FROM F.F.L
A S-35 S.1.
650 3000 650 6800
3300
3300
3100
1085
EL +3.3 FINISH @ B.O.S
M FROM F.F.L
EL +6.0
M
51 52 53 54 55 56 57 58 59 60 61 62 63 64
1900 3100
S.1. 1600 FROM F.F.L PANTRY S.1.
900
1400
FINISH @ B.O.S
FINISH @ B.O.S
STORE 1.9x1.4
EL +2.5
7800
2400
AFROM
S-36
F.F.L 1000 2000
3300
3300
1.6x2.4
1000
5200
A S-42 LOBBY EL +2.5
600
2300
2100
N A S-35 TOILET
FROM F.F.L
N
1600
5.1x3.1
1000
1000
5665
EL +3.4
STAIR ROOM-06
S.1. A S-41
FROM F.F.L A S-37 S.1.
FINISH @ B.O.S EL +3.3
1500
1500
850
FROM F.F.L
O 3400 O
1285 5665 5665 1285 6600 900 ART STUDIO
S.1. 9.4x8.9 S.1.
550
11300
2400
2400
A S-38
3600
3600
EL +3.3
1800
550
FROM F.F.L
750
4200
EL +3.4
7200
ART - FROM F.F.L 1200 700
OFFICE TEACHERS ROOM
5665
4200
4.1x3.9 4.3x5.3
550 A S-40
3000 535 A S-39
5200
5200
3600
2400
EL +3.4
EL +3.4
FROM F.F.L
FROM F.F.L
EL +3.3
750
550
FROM F.F.L
1085
850
Q 3600
Q
S.1. EL +2.5
FROM F.F.L S.1.
STORE
3600
2800
2800
3.6x3.6
A S-43 91012064
R R
44 A
S.1. S.1.
2400
2400
Z
S S.1. S
S.1. 7.237° S.1.
1700
1700
7.237°
T T
S.1. S.1.
4150
4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
01 02 03 04 05 06 07 08 09 10 11 12 13 14' 14 15 16 17 18 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1.
79900
7000 7700 5100 3100 3100 3200 3250 3350 2900 3600 1900 4300 2480 220 4300 2400 4700 3400 6700 1400 1800 4000
A A
S.1. S.1.
6500
6500
+0&114.+)*6+0)(+:674'5%*'&7.'
4'%'55'&.'&:#.7/+07/*175+0)12#.
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+254%89.
Z.'&51%14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
B B
4'%'55'&.'&:56''.*175+0)12#.21.;56;4'0'
126+%#.%18'49+6*5#6+0.'5556''.(+:#6+109
./+25+/+.#4612*+.+25%4$25&9.+2Z
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
2900
4'%'55'&.'&:56''.*175+0)#.7/+07+/
STAIR ROOM-02 4'(.'%6146':674'&#%4;.#6'126+%#.%18'49
./+25+/+.#4612*+.+25%4$9.
5.8X2.7 Z.'&#%Ä/.114#22418'&'37#.
A R-02
C C &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4'%'55'&574(#%'.'&&190.+)*621.;%#4$10#6'
3900
4'%'55'&574(#%'.'&&190.+)*6#.7//+07/*175+0)
21.;%#4$10#6'#.7/+07+/%1#6'&126+%#.%18'49
./+25+/+.#4612*+.+25&0$
Z.'&5%14#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
D D 4'%'55'&.'&5216.+)*6#.7/+07+/*175+0)5+.8'4
4'(.'%614(4156'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+2545$
5752'0&'&.'&#.7/+07+/*175+0)
21.;%#4$10#6'#.7/+07/%1#6'&21.;/'6*;.
/'6*#%4;.#6'126+%#.%18'49./5+/+.#4
CONC. PAD 612*+.+25266:.'&5%499$14#22418'&
CONC. PAD '37#.
5700
5700
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
4'%'55'&.'&.+0'#4:56''.*175+0)
21.;%#4$10#6'4'(.'%61421.;%#4$10#6'126+%
/#6'4+#.6':674'&21.;%#4$10#6'126+%#.%18'4
9./+25+/+.#4612*+.+254%$25&
9.Z.'&51%
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
14#22418'&'37#.
E E 4'%'55'&.'&.+0'.+)*656#+0.'5556''.*175+0)
21.;%#4$10#6'126+%/#6'4+#.6':674'&
21.;%#4$10#6'126+%#.%18'49+6*56#+0.'55
4850
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
5+/+.#4612*+.+2596%.Z.'&514
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
#22418'&'37#.
574(#%'.'&.+0'#421.;%#4$10#6'*175+0)56''.
CONC. PAD 4'(.'%6146':674'&21.;%#4$10#6'126+%#.
%18'49+6*56#+0.'5556''.(+:#6+109./+2
F F 5+/+.#4612*+.+2596%.Z.'&514
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
*+)*$#;.'&#.7/+07+/*175+0)%.'#4
5650
5650
21.;%#4$10#6'126+%#.%18'49./+2
5+/+.#4612*+.+25$;2)Z.'&59$14
#22418'&'37#.
&+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
9#../1706'&.+)*6(+:674'9+6*+2Ä2416'%6+10
5+/+.#461(#)'4*7.62')#575Z6%Ä6914
#22418'&'37#.
G G &+661#5#$18'$76%100'%6'&61'/'4)'0%;5722.;
.')'0&
8100
8100
CONC. PAD
CONC. PAD CONC. PAD
EXPANSION JOINT
CONC. PAD
H PAINTED 600 X 600 GYPSUM TILES CEILING.
H CONC. PAD
S.1.
S.1. PAINT AND PLASTER.
77450
77450
D H' B
2980
3200
2200 220
CONC. PAD
PERFORATED GYPSUM TILES
S.1. S.1. 600X600 AS INDICATED.
2200
CONC. PAD
LIFT TOP
CONC. PAD 6.2x2.7
J FINISH @ B.O.S
J 600mm X 600mm ACCESS PANEL.
S.1. DN
FINISH @ B.O.S
S.1.
STAIR ROOM-04
2650
2700
CONC. PAD
6.0X2.7
A R-01
K MECHANICAL K
320
5000
4730
CONC. PAD
CONC. PAD
EXPANSION JOINT
3300
M M
S.1. S.1.
3300
3300
N N
S.1. S.1.
1500
1500
O CONC. PAD
O
S.1. S.1.
2400
2400
P P
S.1. S.1.
5200
5200
Q Q
S.1. S.1.
2800
2800
91012064
R R 44 A
S.1. S.1.
2400
2400
Z
S S.1. S
S.1. 7.237° S.1.
1700
1700
7.237°
T T
S.1. S.1.
4150
4150
U U
GAMILA
GAM
G
GAA ILA
S.1. S.1.
977
7.237°
7.237°
82
.76
3°
7.237°
Z
S.1.
PROPOSED
SECONDARY SCHOOL (B+G+2)
AL-WUKAIR
7000 7700 5100 3100 3100 3200 3250 3350 320 2580 3600 1900 4080 220 2700 4300 2400 4700 3400 1100 5600 1400 1800 4000
79900
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR ROOM CEILING PLAN
01 02 03 04 05 06 07 08 09 09' 10 11 12 12' 13 14 15 16 17 18 18' 19 20 21 22
S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. S.1. -SCHOOL
A EXPANSION JOINT
A A-305 1:150
A-201 A-203
A-305 1 : 150
00
05 06 07 05 06 07
S.1. S.1. S.1. S.1. S.1. S.1.
B B
S.1. S.1. SMOKE VENT
EL -4.20 01 02 03 04 05 06 07
A B F.F.L A
A-801 A-801
UP
C C
S.1. S.1.
05 06 07
S.1. S.1. S.1.
05 06 07
S.1. S.1. S.1.
B SMOKE VENT
S.1.
UP
EL +15.10
STAIR ROOM-01
A G-44 25 24 23 22 21 34 33 32 31 30 29 28 ROOF. S.S.L
EL + 0.15
PV. F.F.L 26 27 EL + 0.45
A G F.F.L
A-801
DN
C
S.1.
Granite Finish
05 06 07
S.1. S.1. S.1.
STAIR ROOM-01
A F-12
B EL +06.10
S.1.
1ST F.F.L
UP
STAIR ROOM-01
A F-12
61 60 59 58 57 71 70 69 68 67 66 65
C
S.1.
91012064
44 A
STAIR ROOM-01
EL + 0.45
FIRST FLOOR PLAN
A G-44
C
A-801 1 : 50
G F.F.L
EL + 0.15
PV. F.F.L
EL ± 0.00
GAMILA
GAM
G
GAA ILA
ROAD F.F.L
05 06 07 977
S.1. S.1. S.1. STAIR ROOM-01
A B-05
HAND RAIL
Granite Finish
B PROPOSED
S.1. EL -4.20 SECONDARY SCHOOL (B+G+2)
B F.F.L
STAIR ROOM-01
AL-WUKAIR
A S-14
EL +10.60
77 76 75 74 73 72 71 70 69 68 67 66 65 2ND F.F.L
78 79 80 81 82 83 84 85 86 87 88 89 90 91
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
A
A-801 DN
21/07/2022 D30213/2018
A-801 1:50
A-801 1 : 50 A-801 1 : 50
00
19 20 19 20
S.1. S.1. S.1. S.1.
B B
S.1. S.1.
A UP A DN
A-802 A-802
07 06 05 04 03 02 01 STAIR ROOM-02
A B-06 EL +15.10 118 117 116 115 114 113 112 111 110 109 108 107 106 105
ROOF. S.S.L STAIR ROOM-02
A R-02
92 93 94 95 96 97 98 99 100 101 102 103 104
EL -4.20
B F.F.L
C C
S.1. S.1.
19 20
S.1. S.1. 20 19
S.1. S.1.
EL +18.50
T.O.P
SMOKE VENT
EL +18.20
B ST.ROOF. S.S.L
S.1.
A DN
A-802 STAIR ROOM-02 EL + 0.45
A G-12 G F.F.L 27 26
EL + 0.15
28 29 30 31 32 33 34 21 22 23 24 25 PV. F.F.L
STAIR ROOM-02
UP A R-02
EL +15.10
C ROOF. S.S.L HAND RAIL
S.1.
Granite Finish
STAIR ROOM-02
A S-14
EL +10.60
19 20 2ND F.F.L HAND RAIL
S.1. S.1.
Granite Finish
B
S.1.
STAIR ROOM-02
A DN A F-14
A-802 STAIR ROOM-02 EL +06.10
A F-14 1ST F.F.L 64 63 62
65 66 67 68 69 70 71 57 58 59 60 61 EL +06.10
1ST F.F.L
UP
C
S.1.
HAND RAIL
STAIR ROOM-02
EL + 0.45 A G-12
G F.F.L
GAMILA
GAM
G
GAA ILA
19 20 EL + 0.15 977
S.1. S.1.
PV. F.F.L
EL ± 0.00
ROAD F.F.L
STAIR ROOM-02
A B-06
HAND RAIL
B Granite Finish
PROPOSED
S.1.
SECONDARY SCHOOL (B+G+2)
A DN
A-802 AL-WUKAIR
EL +10.60 91 90 89 88 87 86 85 84 83 82 81 80 79 78
2ND F.F.L
STAIR ROOM-02 92 93 94 95 96 69 70 71 72 73 74 75 76 SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
A S-14
EL -4.20 21/07/2022 D30213/2018
UP B F.F.L
C STAIR ROOM-02 DETAILS
S.1. -SCHOOL
A-802 1:50
A-802 1 : 50 A-802 1 : 50
00
L M N O P
S.1. S.1. S.1. S.1. S.1.
D16
600
DN
WAITING
L M N O P
S.1. S.1. S.1. S.1. S.1.
16
S.1. FLOOR FINISH (AS PER SPECIFICATION)
DN
EL +0.45 EL +0.90 75mm THK. CEMENT/SAND SCREED.
G F.F.L
2400
G F.F.L
1 2 3 GROUND SLAB AS PER STRU. DWGS.
50 mmTHK. PLAIN CONC.
15
S.1. WELL COMPACTED EARTH FILL.
MAIN LOBBY
UP TO 1ST FLOOR
13.9x8.1
G-33
UP
32x280=9240
MAIN LOBBY
1500
UP
15 14 13 12 11 10 9 8 7 6 5 4
1100
1100
1100
EL +10.60
400
64
63 2ND F.F.L
62
1000
61
60
59
A GROUND FLOOR STAIR PLAN 57
58
A-803 1 : 50 56
55
1100
54
3400
53
52
MAIN LOBBY 50
51
4500
4400
49
48
47
46
L M N O P 45
44
43
S.1. S.1. S.1. S.1. S.1. 42
41
40
1100
39
3900
38
8600
37
36 EL +6.10
34
3300 3300 1500 2400 33
32 1ST F.F.L
31
10600
30
29
28
27
2700
10500 26
25
16 24
23
TO S.FLR
1100
S.1. 22
1075 50 1125
21
20
UP
5200
19
OPEN TO BELOW
18
EL +6.10
5650
17
2400
29x280=8120 16
15
1ST F.F.L 14
UP
13
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 12
11
WAITING MAIN LOBBY
2500
15 10
3050
500
9 EL +0.90
S.1. 8
7
1100
6 GR F.F.L
TO G.FLR
EL +0.90
1125
5
DN
4
3
G F.F.L 2
450450
1 EL +0.45
32x280=9240
GR F.F.L
1175
DN
35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
EL ± 0.00
ROOF FINISH (AS PER SPECIFICATION)
ROAD F.F.L
75mm (MIN) THK. CONC. SCREED TO SLOPE
B FIRST FLOOR STAIR PLAN 50mm THK. ROOFMATE EXTRUDED POLYESTRENE 32kg/M3
A-803 1 : 50
1000GAUGE POLYTHELENE AS A SEPERATION LAYER.
2 LAYER W.P.M. 4mm THK.FOR EACH AS PER SPEC.
ROOF SLAB AS PER STRU. DWGS.
20 mm THK. PLASTER.
L M N O P 91012064
44 A
S.1. S.1. S.1. S.1. S.1.
10500
16 GAMILA
GAM
G
GAA ILA
29x280=8120
TO F.FLR
S.1.
1075 50 1125
977
EL +6.10
DN
OPEN TO BELOW
DN
1ST F.F.L
2400
DN
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
15
500
S.1. PROPOSED
EL +10.60 SECONDARY SCHOOL (B+G+2)
2ND F.F.L AL-WUKAIR
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
21/7/2022 D30213/2018
STAIR DETAILS
00
18 19 20 18 19 20
S.1. S.1. S.1. S.1. S.1. S.1.
L L
S.1. S.1. SMOKE VENT
UP
A A
A-806 A-806
07 06 05 04 03 02 01
STAIR ROOM-03
A B-21
EL -4.20
B F.F.L
EL +15.10
ROOF. S.S.L
M M
S.1. S.1.
18 19 20
S.1. S.1. S.1.
20 19 18
S.1. S.1. S.1.
L SMOKE VENT
S.1.
STAIR ROOM-03
A G-23
A
A-806 EL + 0.45
DN
EL +15.10
G F.F.L 27 26 ROOF. S.S.L
EL + 0.15
28 29 30 31 32 33 34 21 22 23 24 25
PV. F.F.L
UP
M
S.1.
Granite Finish
18 19 20
S.1. S.1. S.1.
STAIR ROOM-03
A F-12
L EL +06.10
S.1.
1ST F.F.L
STAIR ROOM-03 DN
A A F-26
A-806 EL +06.10
1ST F.F.L 64 63 62
65 66 67 68 69 70 71 57 58 59 60 61 HAND RAIL
UP Granite Finish
M
S.1.
91012064
44 A
STAIR ROOM-03
EL + 0.45
FIRST FLOOR PLAN
A G-23
C
A-806 1 : 50
G F.F.L
EL + 0.15
PV. F.F.L
EL ± 0.00
GAMILA
ROAD F.F.L
18 19 20 977
S.1. S.1. S.1.
STAIR ROOM-03
A B-21
HAND RAIL
Granite Finish
L
S.1. PROPOSED
EL -4.20 SECONDARY SCHOOL (B+G+2)
A
DN B F.F.L
A-806 AL-WUKAIR
STAIR ROOM-03 91 90 89 88 87 86 85 84 83 82 81 80 79 78
A S-35
EL +10.60 92 93 94 95 96 69 70 71 72 73 74 75 76
SHIEKH ABDULRAHMAN MOHAMED A AL-THANI
2ND F.F.L
21/7/2022 D30213/2018
STAIR ROOM-03 DETAILS
M -SCHOOL
S.1.
A-806 1:50
A-806 1 : 50 A-806 1 : 50