TEMPLATEFORENVIRONMENTALMONITORINGPLAN(EMoP)OFPROPONENT

TEMPLATE OF ENVIRONMENTAL MONITORING PLAN (EMoP) with ENVIRONMENTAL QUALITY PERFORMANCE LEVELS
(EQPLs)1,2,3

Sampling & Measurement Plan EQPL MANAGEMENT SCHEME


Key Environmental Aspects Potential Parameter Annual
per Project Phase Impacts Per to MANAGEMEN
Lead Estimated EQPL RANGE
Envt’l be MEASURE
Method Frequency Location Person Cost ALERT ACTION LIMIT ALERT ACTION L
Sector Monitored
Water Total Grab sampling; weekly Indicate Project P500/sample
Quality: Suspended RA9275 lab coordinates/ PCO •
Siltation Solids (TSS) analysis Description 2 bottles/
method of station station/wk •
52 wks/yr =
P52,000

I. PRE-CONSTRUCT ON
PHASE

EnvironmentalAspect #1

{shown with a sample entry in


succeeding columns)
EnvironmentalAspect #2

II.CONSTRUCTION PHASE
EnvironmentalAspect #1
EnvironmentalAspect #2

III. OPERATION PHASE


EnvironmentalAspect #1
EnvironmentalAspect #2
IV. ABANDONMENT PHASE
EnvironmentalAspect #1
Environmental Aspect #2
1EQPL-EnvironmentalQualityPerformanceLevel
o Alert or Red Flag : early warning
o Action Level : point where management measures must be employed so as not to reach the regulated threshold or limit level, or
reduce deterioration of affected environmental component to pre-impact or optimum environmental quality
o Limit Level : regulated threshold of pollutant (standard that must not be exceeded); point where emergency response measures
must be employed to reduce pollutants to lower than standard limit.
:Sections on EQPLs to be filled out only if EQPLs are willing to be committed by the Proponent at the pre-ECC stage. Otherwise,
2 NOTE

Proponent may opt to have EQPLs established post-ECC and mutually agreed upon among Proponent, EMB and other MMT members.
Otherwise, only the LIMIT Level shall be the reference for regulatory compliance. This means that environmental management measures
are formulated not to exceed this regulated threshold.