Professional Documents
Culture Documents
1 RHS Panel Assly &Details P41-0CF-12727 76.2x6.35 SA210 Gr.A1 54 162 GTAW ER70S-2 NA 250 11 NA
P41(Panel No 1,2,3,&4) Rev-0
Top and Bottom Headers P41-1CF-85834 219.1x40 SA106 Gr.B 2 16 GTAW+SMAW ER70S-2 + 100 250 2 2
Rev-0 E7018
2
ER70S-2 +
End Cap 114.3x28 SA105 3 12 GTAW+SMAW 100 250 NA 3
E7018
Front Panel Assly & Details (Panel 44.45x4.06 SA210 Gr.A1 54 81 GTAW ER70S-2 NA 250 12 NA
No. P42-1 to P42-6) P42-0CF-12850
3
Rev - 0
76.2x4.5 SA210 Gr.A1 54 162 GTAW ER70S-2 NA 250 22 NA
ER70S-2
Rear Bottom Header 219.1x25.4 SA106 Gr.B 1 8 GTAW+SMAW +E7018 100 250 1 1
P45-1CF-87140
7 Rev-0
ER70S-2 +
End Cap 114.3x28 SA105 3 12 GTAW+SMAW E7018 100 250 NA 3
No.Of Process of Electrode Filler Preheat Interpass
Sl. No. Description Drawing No. Size Material Joints Inch Dia welding Wire Temp. Temp. RT PWHT REMARKS
9 SH WING WALL BOTTOM P46-2CF-58603 114.3X28 SA105 4 16 GTAW+SMAW ER70S2+E7018 100 250 NA 4
HEADER -END COVER
DIVISIONAL PANEL
ASSEMBLY( PANEL NO.P47- P47-1CF-82823 76.2X6.35 SA210GR.A1 24 72 GTAW ER70S2 NA 250 5 NA
10 1&P47-2)
DIVISIONAL BOTTOM P47-2CF-57951 114.3x28 SA105 1 4 GTAW+SMAW ER70S2+ E7018 100 250 1 1
HEADER(DIVT & DIVB 1)
PSH &SSH ENCL. PANEL HEADERS P48-0CF-12797 219.1x32 SA106GR.B 2 16 GTAW+SMAW ER70S2+E7018 100 250 2 2 PSH 1 &2
ASSEMBLY & DETAILS side
PSH &SSH ENCL. PANEL P48-0CF-12797 219.1x25.4 SA106GR.B 2 16 GTAW+SMAW ER70S2+E7018 100 250 2 2 SSH side
HEADERS ASSEMBLY & DETAILS
11
HEADER (END COVER) 114.3x28 SA105 6 24 GTAW+SMAW ER70S2+ E7018 100 250 NA 6
U BEAM HOPPER PANEL (PANEL P4A-1CF-86406 63.5X6.35 SA210GR.A1 108 270 GTAW ER70S2 NA 250 22 NA
NO.-P4A-1 TO P4A-6)
18 SSH Coil Assembly PA2-1CF-86804 50.8x6.35 SA213Gr.T22 106 212 GTAW ER90SB3 150 350 106 NA
19 Economiser Coil Assembly PL1-2CF-57584 38.1x4.5 SA210GR.A1 315 472.5 GTAW ER70S2 NA 250 252 NA
20 Attempreter Header Assembly PB1-1CF-88879 273 x 25.4 8 80 GTAW+SMAW ER80SB2 + 120 250 8 8
and Details SA335P11 E8018
ER90SB3 +
250 x 35 SA335M Gr P22 9 90 GTAW + SMAW 200 350 9 9
E9018
ER90SB3 +
178 x19.05 SA182M Gr F22 2 14 GTAW+SMAW 200 350 2 2
E9018
25 x 6.35 SA335M Gr P22 14 14 GTAW ER90SB3 350 0 SW
Integral Piping I (MSL) 50 x 8.74 SA335M Gr P22 2 4 GTAW ER90SB3 350 0 SW
ER90SB3 +
A Z11-1CF-86633 80 x 15.24 SA335M Gr P22 4 12 GTAW+SMAW 200 350 1
E9018
ER90SB3 +
SA182M Gr F22 GTAW+SMAW 200 350
130 x 14.55 1 5 E9018 1 SW
ER90SB3 +
SA182M Gr F22 GTAW+SMAW 200 350
130x18.55 1 5 E9018 0 SW
200 x 18.26 SA106 Gr B 11 88 GTAW+SMAW ER70S2 + E7018 200 350 11 11
Integral Piping I (FWL) 25 x 4.55 SA106 Gr B 2 2 GTAW ER70S2 0 SW
Integral Piping I (FWL) 200 x 23.01 SA106 Gr B 5 40 GTAW+SMAW ER70S2 + E7018 200 350 5 5
25x4.55 SA106 Gr B 61 61 GTAW ER70S2 250 0 SW
B Integral Piping II ( Boiler Z11-1CF-86634
Drains / IBD/ CBD /HP
Dosing ) 40x5.08 SA106 Gr B 4 6 GTAW ER70S2 250 0 SW
E Z11-2CF-59824
Integral Piping- V (Steam 40x5.08 SA106 Gr B 14 22 GTAW ER70S2 250 0
Drum Mounting) 25x4.55 SA106 Gr B 36 36 GTAW ER70S2 250 0
497.5