BUILDING SURVEYS
by H. S. StCIveley FRICS, FCIOB, FClArb

Professional Services
The Chartered Institute of Building
Englemere
Kings Ride
Ascot
Berkshire
SL5 7TB
Back copies of this years papers are available for £5.00each on request from the ClOB
Bookshop. Tel: 01 344 63081 0

For information on subscribing to the Construction Information File, please call Sally
Marsh on 01 344 63081 1

O The Chartered Institute of Building 1998

All rights reserved; no part of this publication may be reproduced, stored in any retrieval system, or transm~ttedin any form of by any means, electronic,
mechanical, photocopying, recording, or otherwise without either the prior written permission of the Publishers or a licence permitting restricted copying
in the United Kingdom issued by the Copyright Licensing Agency Ltd, 90 Tottenham Court Road, London W1P 9HE.
Editorial Note PURPOSE OF THE SURVEY which are a l l too often found when
This paper was published originally as inspections are made. Computer-recorded
Maintenance Information Service Paper The primary purpose of a building survey i s information, illustrated where possible,
No15. The author has been responsible for to give an independent professional opinion would be invaluable in this respect.
the necessary updating. on the structural condition of a property.

The wardnuindependent" probably requires CLIENT'S INSTRUCTIONS


further explanation. In the strict sense of the
term the surveyor carrying out the survey is In the first instance the client should provide
Steve Staveley, following war service, acting on behalf of his client, the purchaser, the surveyor with the address and a general
became a building surveyor for the District and therefore cannot be wholly independent description of the property concerned. In
Bank a n d then Devon a n d C o r n w a l l as he serves the purchaser's interests. particular, the type of property, its age, use,
surveyor for H a n d G Simonds l t d a n d However, the main object of such a survey size and the means of access thereto should
senior surveyor for Courage(Western) Ltd. In i s to ensure that an opinion i s given by be noted.
1968 he mbved into wrivate wractice and someone who has no connection with the
for the next 20 years cArried oht capital and
vendor or his agents. In the same vein, the Firm instructions are then obtained from the
maintenance works to hospitals, hotels, and
surveyor acting for a building society cannot client describing the extent of the survey
licenced and industrial premises, as well as
be regarded as wholly independent as of required and its purpose. This should be
undertaking building surveys on all types of
neccessity he or she must look a t the confirmed in writing where time permits.
property. Steve has served on many
government and professional committees. building society's interests before those of a
He has published widely a n d his book prospective purchaser and i s therefore more The client should be advised of the method
'Building Surveys' written jointly with likely to " p l a y safe" i n the opinions b y which the surveyor's fees w i l l b e
P.V.Glover i s now in its second edition. expressed. calculated. Sometimes it is possible to give
an approximate cost if the surveyor has a
Those who are best qualified to carry out knowledge of the property concerned, or if
such a survey will have had considerable the description by the client is sufficient for
experience in the performance of buildings the surveyor to assess the extent of the work
TYPES OF SURVEY and their components as well as their design which will be required. For many years the
The Construction Industry Council has and construction. This would suggest that Royal lnstitution of Chartered Surveyors
produced a highly informative leaflet' the chartered building surveyor, the attempted to compile a scale rate of charges
entitled "Definitions o f Inspections a n d chartered builder or the architect would be for building surveys but this in practice
Surveys o f Buildings" clarifying the best suited to this type of work. Although it proved very difficult. The reasons are
terminology used in conjunction with the is now common for estate agents and manifold but the principal difficulty i s that
various kinds of survey. The introduction valuers to be asked to carry out building more time and trouble can easily be spent
states that "The term 'structural survey' has surveys, i t must be emphasised that on a small two up and two down cottage
come into common use to describe a survey generally their knowledge of construction which is in a bad state of repair, than on a
which covers all visible and accessible parts and building performance is insufficient to large four or five bedroomed dwelling-house
of a building including those which are not enable them to carry out a thorough and set in an acre of land which is of modern
part of the structure such as roof covering, efficient inspection. A structural engineer construction and in good order. The extent
windows and drains. The term should may be called in when matters solely of the fee is not therefore related either to
be avoided since misunderstanding with affecting the structural stability of a building the size, the age o r the value of the
clients has arisen when, for example, a are under consideration. property. Generally, fees are charged on
'structural survey' has concentrated on the an hourly basis at a rate to be agreed
structure alone." In addition to an independent professional between surveyor and client. Sometimes it
opinion on the building, the surveyor also is possible to advise the client of a maximum
Eleven different types of "survey" are includes comment on the siting, environment figure which will not be exceeded without
described and the one which is dealt with and planning of the property and also the further authority of the client.
here is a "building survey" which i s defined reports on finishes, services and on some
as "....an investigation and assessment of major fixtures and fittings. It is also useful to The client must be advised that the surveyor
the construction and condition of a building give observations and recommendations on i s a "General Practitioner" and will not
and will not normally include advice on maintenance costs both immediate and provide specialist reports on drainage,
value. The survey will generally include the future. heating systems or electrical installations. A
structure, fabric, finishes and grounds; the broad opinion usually based on visual
exposure and testing o f services are not Although not accepted as being the prime observation is given in the report but if the
usually covered." purpose of a survey, each survey which i s client requires more detailed information
carried out provides a considerable amount then the surveyor must advise specialist tests
The current differences in survey of important data on the performance of and reports which will involve additional
nomenclature are further set out in "Guide to buildings, their components and elements. cost. Instructions by the client to carry out
Surveys and Inspections of Buildings and At present, there is no means of collating such tests must always be confirme2 in
similar structures'' published b y the this information obtained by surveyors in writing and wherever possible the client
lnstitution of Structural Engineers, "Surveying this w a y and an invaluable source of should be advised of the approximate cost
Buildings" by Malcolm Hollis and Charles information is lost. Consideration should be involved.
Gibson and in Chapter 1 of "Building given to means of creating a central bank If the building is in multiple ownership as in
Surveys" by H.S. Staveley and Peter Glover3 of building performance data to which those the case of maisonettes or flats which have
published by Butterworth-Heinemann. In carrying out building surveys could been "sold" on 99 or 999 year leases, then
consequence, the term "building survey" has contribute. This could be done by it will be necessary for the surveyor to carry
been adopted throughout in preference to classifying buildings in terms of age, use out an inspection of all those parts of the
the previous, outmoded "structural survey". and type of construction and detailing the totol premises where maintenance costs are
performance of each b r o a d aspect of shared jointly with the other "owners". In
construction, stressing the recurrent faults ihis case, the repairing covenants of the
details of the agreement with the "managing should taken to bring them to the notice of Outbuildings
company" should be studied and the client the client. Local enquiries should be made if Garages, stables, greenhouses, toolsheds,
advised of the additional cost and work the surveyor has insufficient local knowledge remote stores.
which will be involved. The tenant should of the area.
inform the surveyor of details concerning the Drains
repairing liabilities of leasehold properties In the case of leasehold properties, i t i s Ventilation, gulleys, manholes, drains,
and the arrangements which are made for particularly important to study the repairing interceptors, septic tanks, cesspools, soil
the maintenance a n d repair. This covenants in the lease and in the case of pipes, waste pipes, greasetraps, petrol
information is more often than not obtained freehold properties, any restrictive covenants interceptors.
from the client's solicitors. which may affect the scope of the survey.
Building (Exterior)
The client should be asked to advise the When a surveyor is working outside an area Chimneys, flashings, roof, gutters, rainwater
surveyor whether or not any alterations, of immediate knowledge, i t i s always pipes, bargeboards or gables, main walls,
adaptations or extensions are to be carried advisable to make enquiries regarding the external woodwork, external ironwork,
out to the property so that these matters can subsoil in the locality of the property. There glazing, damp courses, subfloor ventilation,
be taken into consideration when the survey have been many cases in the past where old foundations. Defective elements of
is carried out. mineshafts, wells, clay pockets and such construction, eg. Mundic blocks, asbestos,
physical features have had a considerable etc.
In the case of a dwelling-house less than ten effect on the structure of the property, even if
years old a check should be made on the all may seem well at the time of the survey. Building (Interior)
cover afforded by the NHBC Agreement Roof v o i d including timbers, felting,
before carrying out the survey insulation, water tanks, visual aspect of
INSPECTION electric wiring;

SURVEY PRELIMINARIES The surveyor should take either a clipboard First floor including all sanitary fittings and
or notebook and a portable tape recorder. describing ceilings, friezes, walls, floors,
Contact should first be made through the The other items required are an electric windows, doors, carpentry and ioinery, and
vendor or his agent with the occupier of the torch, bradawl, claw hammer, screwdriver, electric lighting, power and heating;
premises to be surveyed and arrangements manhole lifting irons, spirit level, 3m or 5m
made for the inspection to be carried out at steel tape, plumb bobline, binoculars, Other floors all as above and basements
a convenient time and date. The occupier moisture meter, folding ladder, Polaroid with special reference to waterproofing.
should be informed of what i s involved in the camera, hand mirror and last but not least,
survey and the extent to which he will overalls. Optional equipment for special Electrical
probably be inconvenienced. He must be circumstances could comprise an Wiring, lighting points, power points,
told how long the survey i s to take and how endoscope, steel sensor, sonic measure and lighting fixtures, meters, switches, main
many people are likely to b e present, radon detector. The surveyor may find it switches, fuses, circuit breakers.
particularly if specialists are involved in convenient to use a portable tape recorder
testing and inspecting the services. Whilst from which a rough draft may be typed for Plumbing
the covering clause at the beginning of the subsequent amendment in the ~ f f i c e . Cold water supplies, hot water supplies,
survey usually precludes the lifting of fitted Otherwise, notes may be taken and the final means of heating hot water, hot and cold
carpets and the moving of furniture, it may "copy" dictated into a recorder on return to water storage.
be desirable to ask the occupier to allow the office. It is less likely that the surveyor
some of the furniture to be moved and some will miss anything if dictating direct into the Space heating
floorboards to be lifted, particularly if there recorder. After proctice and with a logical Means of space heating including type of
is any suspicion that there may be dry rot, sequence imprinted in one's mind, it should fires whether electrical, solid fuel, oil-fired,
extensive furniture beetle infestation, rising be possible to dictate the whole of the gas-fired or any other means, central
damp or other such defects as could be survey into the recorder and this will save a heating boilers, separate water heaters, any
concealed by furniture and carpets. great deal of time. It is generally regarded other type of space heater.
nowadays that to take notes and then write
The full permission of the occupier and the out the report in longhand on return to the The surveyor is expected to carry out a
owner should be obtained before any part office is not only extremely laborious but is visual inspection of all parts of the property
of the structure is opened up. Preferably this liable to error. which are reasonably accessible and, as
should b e i n writing, although i t i s stated in the checklist above, this will include
appreciated that time is generally against Each surveyor could write his own checklist all outbuildings, boundaries and pavings.
such a step. It is often the case that should a as a result of his previous experience and
surveyor cut floorboards, damage plaster or this could vary from a very brief list of items Although there is no necessity to follow such a
even indent or fracture timber which has to a comprehensive schedule. W o r d checklist, the survey must be carried out in a
already been affected by dry rot, then the processors are widely used in contemporary methodical manner so that every single part
vendor will claim damages. surveys and these can contain standard of the fabric i s examined properly in a logical
clauses which can be added in or omitted at sequence. As explained previously, every
The surveyor should take steps to be aware will. Briefly, it is perhaps best to deal with surveyor should provide a personal checklist
of any ~ l a n n i n grequirements which may matters in the following order: with its own his own peculiar sequence and
affect either the property which i s to be routine. In time, the sequence of such a
surveyed, the adiaining properties or The Site checklist will become a matter of habit.
anything else in the environment which will Gates, fences, boundary walls, paths, It i s essential that manhole covers should be
affect the property under consideration. It is drives, car parking areas, ~ a v e dareas, site lifted and the condition internally noted,
appreciated that this is not strictly part of a drainage, aspect. Geology - eg. liability to even when a drain test i s not included in the
"survey" but it i s generally expected of the flooding, subsidence, Radon gas etc. survey. T h i s may cause considerable
surveyor as in some cases the structure could difficulty as many manhole covers have been
be affected by such matters and steps buried under soil or concrete pavings for
years, many are rusted into the frames and the case of suspended ground floors? Other equipment - mica flap valves,
it i s necessary very often to tap carefully Special subfloor ventilation in areas affected interceptors, vent pipes, traps.
round the ioint between cover and frame by Radon gas.
with a screwdriver before trying to open the Septic tanks - "working scum", filters,
cover. Most domestic type manholes are Insulation - i f the walls are of cavity outfalls and soakaways, ventilation, general
provided with lifting lugs which usually construction, have they been insulated with condition, environment.
corrode away in a very short space of time cavity fill and is this effective? Is there roof
so that the only method of entry i s to lever insulation? Are water pipes lagged in Cesspools - water-tightness, air-tightness,
up between frame and cover itself. Beware exposed areas? means of emptying and access thereto for
of lifting the frame out of the cement vehicles.
bedding when dealing with a jammed Levels - is the whole of the ground floor or
cover. the damp course a minimum of 150mm This i s only a very brief summary of the
above ground level? Are walls plumb and main points to look for in most types of
One most important factor to be considered floors reasonably level? buildings but an operational checklist could
i s the presence of any nearby trees. The be formed for any building inspection using
position of these in relation to the buildings Foundations - any signs of settlement or this list as a basis.
and their type should be noted and the ground heave?
client should be warned that trees can couse
considerable damage to a structure under REPORT WRITING
certain conditions due not only to the INTERIOR
physical damage caused to walls by their The report i s probably the most important
roots but also from the amount of water Roof void - any damp penetration or part of the building survey and if not written
which a tree extracts from the subsoil wood boring insect infestation? Wet rot in correctly or accurately it can cost the
causing subsoil shrinkoge and foundation valley gutters? Is the roof underfelted? surveyor dear in terms of professional
movement. Presence or absence of insulation between indemnity!
ceiling joists.
The areas which should receive special A scrupulous report writer will ask, in regard
scrutiny in a physical survey for any type of Internal plastering - cracks and whether to every sentence, "What am I trying to
building could be briefly classed as follows: shrinkage or settlement, state of decorations, say? What words will express it?" and
efflorescence, "bubbling", effect of rising "Could I put it more briefly?" One i s not
damp and causes thereof. obliged, however, to go to all this trouble. It
EXTERIOR can be avoided by simply throwing open
Internal woodwork - wood boring insect one's mind and letting the ready-made
Chimney stacks - particularly flaunching infestation, dry rot, wet rot, cellar fungus? phrases come crowding in. They w i l l
to pots, metal flashings and cement fillets. Decorative finishes, shrinkages or other construct the sentences, even think the
defects. thoughts and, if required, perform the
Roof coverings - missing or broken slates important service of partially concealing the
or tiles, sagging timbers, defective flat roof Windows and doors internally - state meaning. This is where care must
coverings. and amount of furniture? Hangings and fit of be taken when using standardised phrases
components. Double glazing? on a word processor.
Gutters and rainwater pipes - leaking
at joints, lack of stopped ends, insufficient Floors - whether solid or suspended, A written report should always be made
fall to gutters. condition of timber and boarding in cases of although it i s often necessary to make a
suspended floors and condition of floor verbal report to the client immediately after
M a i n walls - pointing, condition of covering and substructure in solid floors. the survey, particularly if the client is under
rendering, whether vertical or not, any Whether timbers infested with dry rot, wet pressure to purchase. However, where a
structural cracks or signs of settlement, rot or furniture beetle and whether dry or verbal report i s made, the client must be
weathering of facing materials. damp. Presence or absence of dampproof informed that the written report will take
membrane in solid floors. Additional precedence over whatever has been said
Windows - if steel, whether or not rusting subfloor ventilation in areas subject to over the telephone or in person. When
i f not galvanised; i f of softwood, whether Radon gas. making a verbal report, reference should be
sound or rotten, also condition of glazing made to written notes rather than placing
and window furniture; Upvc, if split or Condensation - presence or absence of reliance on memory.
distorted; if aluminium whether corroded or mould growth indicating condensation,
ill-fitting. degree of ventilation, possibility of rising The report must be precise, free from
damp or general damp conditions causing obscure technical terms and couched in
External doors - security measures and condensation and defect not to be confused language which i s understandable by the
general condition of w o o d w o r k a n d with damp penetration or efflorescence. layman. A client's particular circumstances
glazing, presence a n d condition of Efficacy of double glazing? must also be token into account when
thresholds and steps, including water bars writing a report. For the ordinary lay
and rebates. client, a non-technical report must be used
DRAINS as far O S possible, whereas i f writing a
Damp courses - whether present or not, if report for an organisation where fellow
present, type and whether intact or not; i f of Levels -whether free flowing or not. Check professionals are involved many more
bituminous felt is i t oozing out of the mortar for backfall. technical terms may be employed.
joint and beginning to perish? Positioning
ond effectiveness of vertical dpcs to window Manholes - condition of inspection The description, age and design of the
and door openings. chambers, covers, frames, benching of property must also be given and these
channels at junctions, brickwork rendering. should be related to the cost of the annual
Subfloor ventilation - is this adequate in maintenance.
The construction of the property together It i s not necessary to prepare a detailed the application of some tests may be carried
with any defects which exist or are likely to schedule of the accommodation but it i s out by less qualified individuals but matters
arise must b e fully described a n d usually advisable to do so in an older requiring an opinion on the structure must be
elaboration must be made of any defects so property in order to ensure that every single dealt with personally b y a qualified
that the probable cause and the necessary detail of the construction and finishes i s experienced professional who w i l l be
remedies are immediately apparent to the covered. In this connection it i s usual to ultimately responsible for that opinian.
client. point out the goad features of a property as
well as the defects as this will have effect on One further precaution is that the surveyor,
The points on which the surveyor is not able the decision whether or not to purchase. before accepting instructions from the client,
to advise must be set out clearly and positive The report should not, however, be written should check that instructions hove not
recommendations made far further out as a Schedule of Condition. A sketch already been accepted from another client
inspection and reporting by specialists if this plan showing the layout of the property for i n respect of the some property. The
is considered necessary. reference is often helpful. surveyor must also make sure that the sale of
the property is not already being handled by
Approximate estimates of costs of necessary It must be stressed that the survey must not the practice of the surveyor carrying out that
urgent repairs can be made but only in the be written up as if it were a valuation or in survey and that the vendor is not a client of
event of specific instructions being given by the same w a y as a building society that practice.
the client for such information. inspection report. A valuation of the
property should only be included at the Sometimes instructions are received from a
The surveyor's insurance company will express instructions of the client, such a client who decides not to proceed before the
undoubtedly require that any building survey valuation being subject to a separate survey i s carried out. This must b e
report should include a clause required for negotiated fee. confirmed by him in writing before the
professional indemnity insurance. Such an surveyor accepts instructions from new
example could be; clients in respect of the same property.
GENERALLY
"In accordance with your instructions I have The surveyor must ensure that the
attended at the above property and carried In a great many cases, the surveyar will be professional indemnity policy is current and
out a building survey a'nd'hav* to report as asked whether or not he recommends the covers the particular property to b e
follows: purchase of the property by the client. In surveyed. Any conditions attached to the
I have not inspected woodwork or other this case, the client's circumstances insofar indemnity policy must be incorporated as
parts of the structure which are covered. as they affect the question of purchase will soving clauses in the building survey report
unexposed o r inaccessible a n d I am, have to be known by the surveyor and it as necessary.
therefore, unable to report that any such must be remembered that surveys are often
parts of the property are free from defect. used by the client as a "big stick" with which The surveyor must not allow the report to be
to beat a vendor. In many cases, the asking used by persons other than the client without
The report on services w i l l not include price of a property is considerably reduced that client's express permission. The results
electrical wiring test or a test of the woter by the iudicious use of a building survey in of the survey must not be discussed with
a n d drainage pipes unless especially the hands of the prospective purchaser. other parties, in particular the occupier of
required. M y opinion and observation will the property or the vendor. If the client
be based on visual inspection of the services In connection with the above, where an offer decides not to proceed or the property is to
where these are accessible. has been made subiect to survey, the b e re-sold at a later date, i t must be
surveyor may be asked to advise on the recognised that the survey i s the client's
Central heating, space heating a n d hot amount of a reduction in price OS a result of property and that it cannot be "resold" by
woter boilers have been visually examined that survey. T h i s will involve making a the same surveyor. Any further fees which
but no definite opinion can be given that the deduction for the cost of immediate repairs might accrue due to the "re-sale" of the
equipment i s entirely free from defect, or, i f or remedial works and will immediately survey to onother party would be due to that
not operating at the time of inspection, that raise the question as to whether or not o client and not to the surveyor.
they are in good working order. A separate formal valuation would be more desiroble.
test a n d report can b e arranged i f so Bear in mind that the cost of repairs does not The responsibility for any defects which are
required. always have a proportionate effect on the present at the time of the survey and are not
valuation. covered by that survey i s that of the surveyor
This report is based on the condition of the not the vendor. Any claim as a result of
property on the date of inspection and no The surveyor may be asked to indicate such defects would then be mode by the
l i a b i l i t y can b e accepted for a n y possible future expenditure on maintenance purchoser against the surveyor and not
deterioration in the condition of the property and repairs which may be required within against the vendor. This only goes to
after this date." the foreseeable future. If so, it should be emphasise the danger of such surveys being
mode clear that the figures which ore given carried out by the unqualified and the
The report must conclude with a summary of are at today's current prices. The use of a inexperienced.
the principal defects and the general advice discounted cash flow exercise to anticipate
of the surveyor must be given together with future expenditure is over-speculative. A building survey is a very personal service
an opinian on the overall condition of the where knowledge and experience are the
property. The age and construction of the Only fully qualified and very experienced first essentials.
building will have a definite bearing on its professional surveyors should carry out full
condition and the defects which exist must surveys as the liability i s considerable.
be coloured by these two factors. In other Every error con cost the surveyor even BUILDING SURVEYS -
words, one would not imagine an old and where covered by a professional indemnity A PERSONAL VIEW
inexpensively constructed building to have policy, since the surveyor would have to pay
the same charocteristics as o more modern a considerable excess on any claim. The Surveyor
building constructed to the latest principles Certain aspects of the survey such as Ideal qualifications would include a long
and where cost is of little obiect. measuring, the taking of photographs and experience of different construction methods
in properties of all ages, uses and designs dictating your report, he threatens to throw
and also a knowledge of how a particular you out of the house and report you to your Characteristics of Buildings
building and its elements will perform in a professional body. This attitude is perhaps The buildings themselves are even more
given environment. N o w h e r e is this the more understandable and he is less varied and sometimes more temperamental
instinctive 'feel' for a building needed more likely to be concealing something. than the occupiers; some inspire love, others
than in surveys of larger and more complex hatred, but they are never dull. A few brief
buildings. In the writer's own experience, UAR notes on typical differing types would not
surveys have been commissioned not only of This one would tell you anything to ensure come amiss.
domestic scale properties which are being the successful sale of his house and to have
considered for acquisition by a Health you out of it as quickly as possible. The Tudor and Elizabethan
Authority but also, for example, of a large answer is to take no notice, carry on as if he Depending upon the part of the country in
Methodist Church and Sunday School in the were not there a n d above a l l never which these buildings are to be found, OKe
West Country, local authority offices in believe what any vendor tells you. can be very badly caught out on occasion
Devon, a whole working hospital complex in by historic mansions and country cottages.
the Reading area, a disused hospital and ABSENT-MINDED
finally a complete drainage system for a "Accidentally" locks you up in the garage Generally, walls are not plumb and vary in
very large hospital in the Bristol area. until after dark. construction from timber lath and plaster via
porous brickwork and eroded freestone to
As well as such ocquired knowledge, it is Female disintegrating cob. Roof timbers are often
essential that the surveyor should have on FEATHERBRAINED AND HELPLESS propped with tree branches from which the
inquisitive nature and be aware of the This one does not understand how anything bark has not yet been stripped. This i s
surroundings. Whatever building is works, not even which way to turn on the indeed fertile ground for furniture beetle
entered, whether for the purpose of carrying tops. She is completely baffled by twmway infestation and, depending upon
out a survey or not, the surveyor should switching, fuses, stoptaps and especially geographical situation, properties of this
instinctively make mental notes on its drains. W h a t is more she i s usually age and type are most prone to this defect.
construction and condition. A sense of ignorant of their whereabouts. As a great deal of oak and hardwood was
humour i s also another useful asset! also used in their construction; they are
VOLUBLE unfortunately liable to death watch beetle
Before undertaking a building survey, the She never stops talking. There is only one infestation as well.
newly-qualified surveyor should spend at answer and that is to go into the roof void
least two years with an experienced and pull up the ladder. There you can It goes without saying that floors which are
surveyor, going on visits and studying continue your report in peace. either laid in stone flags or brickwork on
reports. It may be advisable for the trainee earth are very damp indeed and the walls
to write up his or her own survey notes DECEITFUL are usually prey to rising damp and, in a
and to compare them with the experienced This is the one who places her immobile great many cases, actual damp penetration.
surveyor's report. grandmother in an armchair over the only In the case of cobwalled cottages, however,
part of the floor where the boarding is the cob has to be damp otherwise if too dry,
Cautionary Advice infested with furniture beetle and the ioists the walls will disintegrate into a pile of dust,
Very little is said, and certainly nothing has are suffering from wet rot. She tacks down having then no moisture content to make the
been written, about the occupiers of all carpets immediately before the survey earth filling cohesive. Generally dampness
property where a survey i s about to be and loses the loft ladder. in such walls without a dpc does not rise to
carried out and of their reactions to such on a level of more than 1 metre above
event. The wrong type of occupier can FRAIL adjoining ground level
distract and mislead the surveyor, sometimes When an appointment for o building survey
with calamitous consequences. is made, she immediately moves upright Queen Anne, Georgian and Regency
pianos, wardrobes and Welsh dressers to These are generally attractive in
Broadly, occupiers fall into two main hide damp patches in the wall plaster and appearance but often of flimsy construction.
categories, the first of these being "the dry rot in the skirtings. Solid wolls are frequently not thick enough
Angry Brigade" who consider any criticism to keep the dampness caused by driving
of their premises as a personal affront; the SEDUCTIVE rain out, one example being the 150mm
second are the "ingratiating" who are Fortunately, these are in short supply but thick soft ashlar stonework used in the
anxious to sell the property at all costs. when encountered are prepared to go to external walling of classical terraced
Bear in mind that both these categories almost any lengths to distract the surveyor in housing, particularly in the Bath area. In
invariably have something to hide. These the w a y of fluttering eyelashes, deep these cases, the stonework i s often battened
IWO main classes may then be subdivided plunges ond, in extreme cases, provocative off internally and covered with lath and
into "male" ond "female", each with their attire. They believe that this i s likely to plaster. Sometimes even the lath and plaster
own characteristics: influence the surveyor in the preparation of are omitted and hessian is used instead, or
a favourable report but the consequent perhaps again battened and covered with
Male distraction could often have the reverse hessian and paper to conceal damp pbster.
ENTERTAINING effect.
This type has a fund of humorous stories; In the above periods, one has to watch out
you will discover many mutual In cases such as this, on no account for lead flats, parapet gutters and valley
acquaintances and he invariably produces retreat into the roof void where you will be gutters which, i f nor properly maintained,
the gin bottle which, it is hoped, will soften immediately cornered. Instead, make an are often found to be l a i d on rotted
the blow once you have found out about excuse to fetch further equipment from your boarding. Roofs are generally slated, low-
that are0 of dry rot infected floorboarding car and return to the office with all speed. pitched, not underfelted but have possibly
and ioists under the hall carpet. The solution is then to make either a new been parged in the past, the parging by
appointment when the husband is sure to be now having entirely dropped off leaving the
ANGRY present or alternatively to hire a female roof covering liable to penetration by
Upon overhearing a critical comment when surveyor. driving rain and snow.
Again, no damp courses are present and walls should be inspected, where possible, The 1 9 7 0 s
therefore rising damp i s likely to b e with an endoscope. Both design and construction appear to be
encountered and, unlike earlier properties, a improving very gradually over this period.
very good chance that dry rot may be found Unseasoned roof timber was occasionally More effective dampproofing arrangements
in the timbers, ventilation usually being used which resulted i n warping a n d have been employed, the use of vapour
inadequate. However, one bright spot i s distortion plus the possibility of furniture barriers and the problems generated by
that roof timbers are usually good and beetle infestation as roof timbers were not condensation are better understood, energy
sound with king or queenpost roof trusses, generally treoted and there was a high conservation is fully considered and thermal
although again liable to furniture beetle proportion of sapwood present. insulation requirements are higher. The
infestation depending upon geographical message concerning the false economy of
location. The 1 9 5 0 s using flat roofs oppears to have been driven
Buildings erected during this period were home and some pitched roofs are now
More often than not, floor joists are laid generally simple, solid, unattractive on the being employed on oll types of buildings.
directly on to the earth and almost always whole, built to a budget but reasonably
subfloors remain insufficiently ventilated. soundly constructed. There were, however, It is worth mentioning that an architect
felt damp-proof courses which, as stated acquaintance of the writer had notices
Later Victorian and Edwardian above, have a limited life, there was no printed which stated baldly, "All flot roofs
These are usually well-found, ugly, solid cavity insulation to the walls, most ground leak". He made each one of his assistants
buildings but often, particularly in the case floors were of concrete because of pin a copy of this notice up over his drawing
of buildings having stone facings, having restrictions on the use of timber and many of board, a primitive but effective method of
too much fussy detail which collects pollution these h a d inodequate damp-proof performance feedback.
of all kinds, creates maintenance problems membranes. Floor coverings often consisted
and very often weathers badly. Later of magnesite composition, early In this country, the obiect of a roof should
buildings in this category may have slate thermoplastic tiles or woodblocks. not be to hold water but to obtain the
damp-proof courses in the walls but the Mognesite composition has a very limited swiftest run-off possible and, to this end,
normal troubles found in construction carried life and will disintegrate after o few years of perhaps the steeper pitched tiled or slated
out during this p e r i o d are d r y rot, heavy use; the early tiles were brittle and roofs are the best answer.
particularly in cellars and furniture beetle broke easily, particularly across the corners;
infestation in roof and floor timbers. Once woodblocks, a g a i n often of largely The 1 9 8 0 s
again, walls were built solid during this unseasoned hardwoods, are liable to attack A continual improvement in more practical
period but generally more substantial than in by vorious forms of rot. Flat roofs were the design and construction. One could almost
earlier properties. This, in some cases, can fashion and if constructed of timber, very term it the decade of the orchitects' decline
create damp penetration problems due to often by this time w i l l have h a d their in the sense that the more innovative and
lack of a cavity, particularly if the exterior problems. M a n y flat roofs were then "way-out" members of that profession were
rendering, a p p l i e d o r i g i n a l l y O S o covered with asphalt which was unvented. no longer able to persuade the general
waterproofer, has passed its useful life and Interstitial condensation problems were not public to accept experimental, impractical
become off-key and porous as if often the considered important at that time due to designs. They were increasingly influenced
case in the West Country. lower internal heating requirements and by the building contractor, particularly in the
therefore by now problems w i l l have upsurge of design-build schemes. Flat roofs,
The 1 9 2 0 s occurred in timber roofs covered with curtoin walling, prefobricated system-built
These are generally good sound buildings b o a r d i n g a n d asphalt which are not construction became increasingly unpopular
with cavity walls, dampproof courses (often ventilated and which contain no vapour and the number of pitched, tiled and slated
slate) and well constructed pitched roofs of barriers. roofs and brick or stone-faced walling
good quality slate or clay tiles. Generally, instead of rendering continued to increase
there is very little trouble experienced from The 1 9 6 0 s with more thought being given to the
buildings erected during this p e r i o d During this period, "experiment", often elimination of maintenance-intensive design.
provided they hove been well-maintained wasteful of resources, was the order of the There was a phenomenal increase in the
during their lifetime. However, flot roofs doy. New and untried designs, methods number of regulotions governing design and
were often covered in asphalt which by now and materials were being used. There construction of buildings and their services
i s sure to have passed its useful life spon in seemed to be o strange lack of knowledge and many older members of the professions
spite of maintenance, ond ties in covity walls about the principles of building construction were beginning to long for fhe pre-1965
may have corroded to the point of omongst designers and many of the new days of local authority Building By-Laws! A
disintegration. methods which were not tested by time have greatly increased - indeed almost universal -
since failed, sometimes quite ropidly and use of UPVC for gutters, rainwater pipes and
The 1 9 3 0 s with disastrous results. This particularly windows with milled or anodised aluminium
On the domestic scale, houses built during applied to the various novel forms of roof used for the better quality windows.
this period were very often flimsy, "jerry- construction which were used. Many of
built" and, being the age of the speculative such buildings are now, approaching the The 1 9 9 0 s
house, a quick turnover for large profits and millennium, being demolished and replaced In the first half of the decade many of the
very often poor construction were the order at considerable expense. late 1950s, 1 9 6 0 s a n d early 1 9 7 0 s
of the day. During this period, bituminous architectural innovations had become worn
felt damp courses were used and now, 5 0 Once agoin, domestic construction was out and only fit for demolition: so-called
years later, these are often found to have becoming "jerry-built" and flimsy as in the "concrete cancer" was taking its toll, a
perished a n d broken down. On 1930s and the use of felt and chippings to legacy of the 1 9 6 0 / 7 0 s "short cuts".
investigation, it i s sometimes found that the flat roofs was probably at its zenith. The Building and structures 20-30 years old
early metal ties in the cavity walls hove motto during this period appeared to be were being demolished, the much vaunted
rusted through by not being properly "Live now - pay later" as those who still have city centres of Crawley, Birmingham and
galvanised. Walls are then left in the state to live with high-rise and curtain walling Plymouth were for large-scale
of two separate unconnected leaves of reolise only too well! demolition a n d rebuilding. Even the
brickwork, often unstable. Cavities in such excellent modern, multi-storey hospital in
Exeter has had to be demolished due to fierce heat of the sun. inconvenient places and suddenly return to
design and construction problems and earth, in whole or in part, but which is
rebuilt as a range of low-rise, pitched-roof As a contrast, on inspecting a dwelling- extremely effective in preventing driving rain
structures. This was a tragedy because, in h-ouse in ~ u ; k ean
~ the shores of the from entering the roofing in these very
the case of a hospitol such as this, the value Bosphorus, the writer found that this exposed areas.
of the services which had to be scrapped property, which was some 120 years old
could have almost equalled the value of the and four storeys in height, was entirely In central Cornwall, the local stone which is
building. A prime example of services constructed of 225mm brickwork clad on used, often unrendered, i s of a soft slatey
outlasting the structure which houses them! the outside with cedar weather-boarding. variety which i s often laid on the wrong
The roof was of simple itched
and gabled bed. In more than one property the writer
Lessons now seem to have been learned construction and covered with red clay has been able to scoop stone out of the
and coupled with new and comprehensive pantiles having very deep overhanging surface of such walls with forefinger and
regulations governing buildings and their eaves which protected the wall surfaces very often the only solution to prevent the
services, construction i s becoming more below from the wet winter weather. Joinery wall from disappearing altogether i s to
traditional and more thought i s being given to doors and windows was also in cedar but cover it with expanded metal, render and
to designing for practical occupation and of a harder and more durable variety than it roughcast - a favourite treatment for
ease of maintenance. M o s t modern i s normal to use in the UK. None of the decaying cob walls as well. The writer
materials are now subject to rigorous testing woodwork was painted. recently noted that one wall which had been
and certification before they are allowed to given this treatment 4 0 years ago showed
be used in new construction. This makes a In spite of this property's repulsive no signs of any subsequent deterioration.
survey of o 1990s building somewhat safer appearance a n d seemingly flimsy
for the surveyor than at any other time in the construction, it had stood the rigours of the Devon
post-war era. last 120 years very well indeed and showed West Devon walls, particularly i n the
no signs of any insect infestation, rot or Plymouth area, are usually of local stone
Local characteristics structural or settlement faults, in spite of the (limestone in the case of Plymouth) which
When carrying out building surveys, one fact that one side of the building was has been rendered and painted externally.
can often learn a great deal about how literally in the water and the basement These walls rely on the integrity of the
design and construction should fit in with the contained a boat house from which one rendering and external ~aintworkfor their
local environment from both the could step comfortably directly into the weather-proofing qualities. Rising damp is
geographical and climatic point of view. kitchen under cover. generally prevalent and if the building
For example, in the "Big Apple Restaurant" happens to catch fire, the limestone i s
which occupied the 1 10th floor of the World The lesson from these examples is that calcined and the load-bearing walls may
Trade Centre in Manhattan, the author's should one see a building constructed of have to be demolished. Roofs are generally
attention was drawn to the fact that the materials which are not indigenous to that of grey Delabole slating or similar, but laid
management were very worried about particular location and of a design which is in even courses.
cracks which had appeared in the plastered not traditional then one must begin to look
internal finishes to walls and ceilings. very seriously for potential defects. In East Devon, the traditional construction i s
Buildings of traditional construction using cob and thatch. These cob walls vary in
Structural failure was suspected by the local materials are very often the product of width, sometimes being almost a metre thick
occupiers but the inference should be up to 3 0 0 or 400 years of experience in in ~ l a c e s . Such walls again rely on the
obvious - do not use plastered finishes near ~erformanceof such designs and materials integrity of the external rendering as if this i s
the top of a 400m high building. The for o particular locality. In such cases, allowed to crack or disintegrate then the
amount of "sway" on this building is bound ~ r a c t i c a feedback
l on performance has weather penetrates the cob which very soon
to make any plastered or rendered finish probably been handed down over the turns to mud. Be warned - some such walls
break down sooner or later. generations. taper in thickness throughout their length!

Again, the writer visited a textile factory in To take a few examples from this country: Conversely, if one attempts to insert a damp
an exposed situation some 6,000 ft. up in roof course of any kind into a cob wall,
the Colombian Andes where complaints had Cornwall there is a tendency for the cob to dry out
been made about water seepage through In West Cornwall what appear to be solid which means that one could be left in the
the concrete flat roof over the singlestorey granite walls in large blocks often consist of long term with a ~ i l eof dust rather than a
office block. This had resulted in much two thick slabs of granite laid on edge and wall! Excellent from a thermal insulation
efflorescence and also in small stalactites with a dry earth filling rammed down the point of view, however, and curiously
hanging from the ceilings in many of the centre. Although the granite slabs may not enough, not much trouble from rising damp,
rooms. O n further investigation, it was be more than 150mm thick, the total wall rot or other like ailments. The thatched roofs
found that the 225mm thick reinforced thickness i s then ~ e r h a p supwards of seldom have gutters but have a generous
concrete roof had no means of built-in 600mm which i s excellent both from a eaves overhang, the thatch slowing down
water-proofing whatsoever, neither had it thermal insulation point of view and for a the "run-off" of rainwater and the eaves
any waterproof covering. The rainfall, heat measure of protection from damp overhang throwing it well clear of the cob
and humidity in the Andes being whot it is, penetration, but absolute hell if one wished walls. One must not be alarmed by the
these penetration problems came as no to make an opening in the woll as one lumpy and out of plumb appearance of most
surprise. In addition, the lack of thermal could easily be left with two granite skins cob walls but beware of externol cracks.
insulation gave the office occupants a hard and no filling! Cob i s generally laid on o local stone plinth
time under the equatorial sunshine and the The roofs ore often of random "peggy" up to 1 metre in height which usually
answer was finally achieved b y slates which ore the cast-offs from the prevents rising domp problems but keeps the
superimposing a low-pitched, deep-eaved, Delabole or other local quarries, fixed with cob in a cohesive state. The practice of
corrugated sheeted roof over the concrete oak pegs and over the years subsequently covering thatch with chicken wire should be
flat, so shedding the water rapidly owoy covered with layers of cement slurry which condemned since it hampers firemen in
from the b u i l d i n g a n d ~ r o v i d i na~ eventually causes the roof to become a tackling roof fires effectively.
satisfactory degree of insulation from the homogenous slab liable to crack in
Somerset gaunt, begrimed stone buildings; Aberdeen price by negotiation.
Somerset is the county of tiled roofs - usually with its durable granite; North Wales with
pantiles, double Roman tiles or the its slate - the list is inexhaustible. Cumbria In conclusion, remember that responsibility
"Bridgwater" interlocking variety. These are has the very sensible system of constructing for any defects which should have been
sometimes replaced by concrete tiles of slate stone walling with an outward slope to apparent at the time of the survey but which
various forms. Generally these are laid to a all joints in the stonework. were not detected by the surveyor is that of
reasonable pitch of around 40" and shed the surveyor alone - not the vendor.
the water very quickly but one must beware Once again it must be stressed that the
of pantiled roofs. Very often these are not surveyor should be very aware of traditional All this may lead the reader to believe that a
underfelted, are ill-fitting and one can find materials a n d traditional methods of living which is largely dependent upon
some alarming timber structures supporting construction for that particular locality in b u i l d i n g surveys i s too hazardous to
these Somerset roofs, very often heavily which the survey is being carried out. This contemplate. However, if one has a good
infested with Anobium Punctatum. awareness can only be obtained through working knowledge of design o n d
.experience. It is the surveyor's task to study construction, sticks to facts in the report,
Walls vary from local brick to local stone historical building methods perhaps more ignores hearsay and does not venture too
and there are some particularly attractive than new forms of design and construction many opinions, then building surveys con
stones used such as Bath, Doulting and as i t is more often thon not the older help to make a rewarding career for the
Ham, all with rich colours but ohen rather properties which demand attention and on surveyor. Every single building is different,
friable and with poor weathering qualities in which most time will be spent. each has its own individual atmosphere and
some cases. These stones are easily worked character ond there i s no better woy of
and are very often used for the ornamental Conclusions appreciating the love and craftsmanship
dressings in some of the buildings, the more The surveyor should point out good points in which has over the years gone into so much
local limestone random rubble being used a property as well as the bad. of our architectural heritage.
for the general walling with freestone
dressings to windows and door openings. Remedial measures should be proposed for
There is a particularly hard stone in South defects a n d the immediate measures REFERENCES
Gloucestershire / North Somerset known as required for emergency works identified
"Pennant" which is often used for paving with a possible priority for future repairs. 1 CONSTRUCTION INDUSTRY COUNCIL
slabs but can also be used for walling but An indicotion of costs at present-day prices (1997) Definitions of inspections and
beware of internal wet spots in such cases may also be useful. surveys of buildings. RICS.
as some Pennant stone walls may be porous 2 INSTITUTION OF STRUCTURAL
in places, in spite of its hardness. The surveyor carrying out a building survey ENGINEERS (1991) Guide to surveys
shoulders a very heavy responsibility ond and inspections of buildings and
In General any error can cost heavily both in terms of similar structures.
One could ponder on traditional methods of reputation and damage to the professional 3 HOLLIS,M A N D GIBSON,C ( 1 9 9 1 )
construction in various parts of the country indemnity policy! Only describe what con Surveying buildings. 3 r d ed.
for a considerable time. For example, the be actually seen. Take no one else's word Surveyors Publications.
traditional Lancashire construction of solid for anything and do not venture opinions - 4 STAVELEY, H.S. AND GLOVER, P (1990)
millstone walls with millstone flagged stick to facts. Building surveys. 2nd ed. Butterworth
pitched roofs; traditional Cheshire Heinemann.
construction of half-timbering with timber Remember that it i s often possible for o
lath and plaster infilling painted outside and purchaser to put a survey to a very
again flagged roofs; Berkshire and the use by reducing the vendor's asking price.
Home Counties, ohen hand-made brickwork Very often, the cost of necessary repairs to o
with solid brick walls a n d some half- property,advertised as being in good
timbering with tiled roofs; Edinburgh with its condition, can be deducted from the asking

You might also like