(Services proportion) A B C A B C
contract) (In Rs)
Labour 35% 100 35.00 288 345 347.33 354 22.92 2.61 1.92 8.02 0.91 0.67
Other
35% 100 35.00 117.30 124.20 132.70 135.90 15.86 9.42 2.41 5.55 3.3 0.84
materials
Fuel &
15% 100 15.00 99.00 91.30 110.60 116.00 17.17 27.05 4.88 2.58 4.06 0.73
lubricants
SEPT-20
NOV-19
DEC-20
DEC-21
(Services proportion) A1 B1 C1 A1 B1 C1
contract) (In Rs)
Labour 35% 100 35.00 328 342.14 339.84 359.71 9.67 5.14 5.85 3.38 1.8 2.05
Other
35% 100 35.00 122.30 125.40 122.90 139.10 13.74 10.93 13.18 4.81 3.83 4.61
materials
Fuel &
15% 100 15.00 101.30 96.90 91.90 124.70 23.1 28.69 35.69 3.47 4.3 5.35
lubricants
JUNE-19
JUNE-22
DEC-21
APR-22
(Services proportion) A1 B1 C1 A1 B1 C1
contract) (In Rs)
Labour 35% 100 35.00 316 361.00 0.00 367.78 16.39 1.88 0 5.74 0.66 0
Other
35% 100 35.00 121.50 143.30 0.00 152.30 25.35 6.28 0 8.87 2.2 0
materials
Fuel &
15% 100 15.00 102.20 133.80 0.00 151.20 47.95 13 0 7.19 1.95 0
lubricants
Labour 35% 100 35.00 309.00 288.00 354.00 14.56 22.92 5.1 8.02
Other materials 35% 100 35.00 119.90 116.40 135.90 13.34 16.75 4.67 5.86
Fuel & lubricants 15% 100 15.00 102.50 94.60 116.00 13.17 22.62 1.98 3.39
Labour 35% 100 35.00 361.00 289.00 360.29 -0.2 24.67 -0.07 8.63
Other materials 35% 100 35.00 143.30 118.30 142.90 -0.28 20.79 -0.1 7.28
Fuel & lubricants 15% 100 15.00 133.80 102.40 133.20 -0.45 30.08 -0.07 4.51
Labour 20% 100 20.00 301.00 330.00 362.02 20.27 9.7 4.05 1.94
Other materials 20% 100 20.00 120.90 117.50 142.90 18.2 21.62 3.64 4.32
Fuel & lubricants 15% 100 15.00 107.80 80.30 131.70 22.17 64.01 3.33 9.6
Labour 20% 100 20.00 301.00 328.00 307.00 322.00 322.00 330.00 354.00 17.61 7.93 15.31 9.94 9.94 7.27 3.52 1.59 3.06 1.99 1.99 1.45
Other materials 20% 100 20.00 120.90 120.40 119.50 121.30 121.30 123.00 136.00 12.49 12.96 13.81 12.12 12.12 10.57 2.5 2.59 2.76 2.42 2.42 2.11
Fuel & lubricants 15% 100 15.00 107.80 99.50 100.50 100.60 100.60 103.20 114.70 6.4 15.28 14.13 14.02 14.02 11.14 0.96 2.29 2.12 2.1 2.1 1.67
Fixed 15% 100 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0
100.00 44.3 42.35 50.76 41.7 41.7 35.44 9.32 8.32 10.19 8.20 8.20 7.17
Schedule-C
Escalated amount during
LARs issued in the month % of escalation during
% of Basic value of Tender the intervening period on
of the intervening period
components as Basic value Sch-B opening (In Rs)
Components per PVC of Sch-B (Component wise
month
B A
formula (Other proportion)
works contract) (In Rs) (In Rs) LAR-B LAR-A LAR-B LAR-A
Sept.2018 May-20 Dec-21
Other
materials 100% 100 100.00 120.9 117.50 142.9 18.2 21.62 18.2 21.62
% of Basic value of LARs issued in the month of Tender % of escalation during the intervening period Escalated amount during the intervening period on (In Rs)
components as Basic value Sch-C opening
of Sch-C month
Components per PVC (Component wise A B C D E F
formula (Other proportion)
(In Rs) LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F
works contract) (In Rs) Sept.2018 May-20 Feb-19 Sep-19 Sep-19 Dec-19 Sep-21
Other
materials 100% 100 100.00 120.9 117.50 119.5 121.30 121.30 123.00 136 12.49 15.74 13.81 12.12 12.12 10.57 12.49 15.74 13.81 12.12 12.12 10.57
100.00 12.49 15.74 13.81 12.12 12.12 10.57 12.49 15.74 13.81 12.12 12.12 10.57
ScheduleA
Tender
opening % of escalation during the intervening Escalated amount during the
LARs issued in the month of month period intervening period on (In Rs)
% of components as Basic value of Sch-
per PVC formula Basic value of A A B E LAR-4
Components (Other works Sch-A (Component wise
contract) (In Rs) proportion) (In Rs) Jjul21
A B E A B E
13.05.2021 08.02.2017 26.03.2021
346
Labour 35% 100 35.00 347.33 274.00 344.00 -0.38 26.28 0.58 #REF! -0.13 9.2 0.2
132.9
Other materials 35% 100 35.00 132.70 113.00 127.30 0.15 17.61 4.4 #REF! 0.05 6.16 1.54
109.8
Fuel & lubricants 15% 100 15.00 110.60 94.50 104.20 -0.72 16.19 5.37 #REF! -0.11 2.43 0.81
0
Fixed 15% 100 15.00 0 0.00 0 0 0 0 0 0 0 0
Labour 20% 100 20.00 322.00 328.00 301.00 330.00 325.00 314.00 287.00 307.00 288.00 343.00 287.00 359.71 11.71 9.67 19.5 9 10.68 14.56 25.33 17.17 24.9 4.87 25.33 2.34 1.93 3.9 1.8 2.14 2.91 5.07 3.43 4.98 0.97 5.07
Other materials 20% 100 20.00 121.30 122.30 120.90 117.50 122.00 121.60 115.60 119.50 117.30 128.10 116.30 139.10 14.67 13.74 15.05 18.38 14.02 14.39 20.33 16.4 18.58 8.59 19.6 2.93 2.75 3.01 3.68 2.8 2.88 4.07 3.28 3.72 1.72 3.92
Fuel & lubricants 15% 100 15.00 100.60 101.30 107.80 80.30 102.30 104.40 93.80 100.50 99.00 105.70 98.00 124.70 23.96 23.1 15.68 55.29 21.9 19.44 32.94 24.08 25.96 17.98 27.24 3.59 3.47 2.35 8.29 3.29 2.92 4.94 3.61 3.89 2.7 4.09
Fixed 15% 100 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
100.00 56.41 53.34 58.2 89.4 53.52 55.12 89.15 65.34 78.89 35.95 81.82 10.68 10.20 11.65 15.79 10.31 10.73 17.25 12.63 15.43 6.74 15.98
ScheduleA
Tender
opening
% of components as Basic value of Sch- month
per PVC formula Basic value of A B A C
Components (Other works Sch-A (Component wise
(In Rs) Dec-21
contract) proportion) (In Rs) LAR-B LAR-A LAR-C LAR-B LAR-A LAR-C
Sep-18 May-20 Oct-21
Labour 20% 100 20.00 301.00 330.00 359.71 362.02 20.27 9.7 0.64 4.05 1.94 0.13
Other materials 20% 100 20.00 120.90 117.50 139.10 142.90 18.2 21.62 2.73 3.64 4.32 0.55
Fuel & lubricants 15% 100 15.00 107.80 80.30 124.70 131.70 22.17 64.01 5.61 3.33 9.6 0.84
Other #REF!
materials 100% 100 100.00 120.90 117.50 139.10 142.9 18.2 21.62 2.73 18.2 21.62 2.73
#REF!
LAR-A/B
Components per PVC formula
LAR-N
LAR-G
LAR-H
LAR-D
(In (Compone
LAR-K
LAR-C
LAR-E
LAR-F
LAR-J
LAR-I
(Other works
Rs) nt wise
contract)
Aug-21
Mar-20
Mar-22
Sep-21
Dec-19
Mar-21
Sep-20
Jun-21
Apr-22
Oct-21
Jul-19
Jul-22
proportion
) (In Rs)
Labour 20% 100 20.00 359.7 326.0 350.5 354.0 363.00 355.1 319.0 330.0 367.77 344.45 340.00 372.10 3.44 14.14 6.16 5.11 2.51 4.79 16.65 12.76 1.18 8.03 9.44 0.69 2.83 1.23 1.02 0.50 0.96 3.33 2.55 0.24 1.61 1.89
Other materials 20% 100 20.00 140.7 120.4 134.0 136.2 148.9 137.4 121.3 123.0 152.3 129.9 122.9 154.0 9.45 27.91 14.93 13.07 3.43 12.08 26.96 25.20 1.12 18.55 25.31 1.89 5.58 2.99 2.61 0.69 2.42 5.39 5.04 0.22 3.71 5.06
Fuel & lubricants 15% 100 15.00 126.0 99.5 110.7 117.9 143.9 119.0 100.6 103.2 151.2 109.2 91.9 155.4 23.33 56.18 40.38 31.81 7.99 30.59 54.47 50.58 2.78 42.31 69.10 3.50 8.43 6.06 4.77 1.20 4.59 8.17 7.59 0.42 6.35 10.36
100.00 7.15 19.86 12.06 9.74 2.87 8.96 19.94 18.29 0.97 13.88 20.22
Tender % of escalation during the
opening intervening period
month
Basic
% of
value of A/G B C D J H I A/G B C D J H I
components Basic
Sch-A
as per PVC value of
LAR-A/G
Components formula Sch-A
LAR-H
LAR-D
LAR-B
LAR-C
LAR-J
LAR-I
(Compone
(Other
nt wise
Mar-21
Mar-22
Sep-21
Sep-20
Jun-21
Jan-22
Oct-21
Jul-20
works (In Rs)
proportion
contract)
) (In Rs)
Labour 20% 100 20.00 355.1 359.71 340.0 336.0 353.66 344.45 360.29 363.00 2.22 0.91 6.76 8.04 2.64 5.39 0.75 0.44 0.18 1.35 1.61 0.53 1.08 0.15
Other materials 20% 100 20.00 137.4 140.7 122.9 120.6 135.0 129.9 143.8 148.8 8.30 5.76 21.07 23.38 10.22 14.55 3.48 1.66 1.15 4.21 4.68 2.04 2.91 0.70
Plant,
machinery & 30% 100 30.00 120.7 120.4 113.7 112.9 119.2 116.1 121.6 122.3 1.33 1.58 7.56 8.33 2.60 5.34 0.58 0.40 0.47 2.27 2.50 0.78 1.60 0.17
spares
Fuel &
15% 100 15.00 119.0 126.0 91.9 90.7 115.2 109.2 135.3 146.9 23.45 16.59 59.85 61.96 27.52 34.52 8.57 3.52 2.49 8.98 9.29 4.13 5.18 1.29
lubricants
% of Basic value of LARs issued in the month of Tender % of escalation during the intervening period Escalated amount during the intervening period on (In Rs)
Basic value opening
components as of Sch-A Sch-A month
Components per PVC (Component wise A &C B D E F H M X Z R L
formula (Other proportion)
works contract) (In Rs) (In Rs) LAR-A &C LAR-B LAR-D LAR-E LAR-F LAR-H LAR-M LAR-X LAR-Z LAR-R LAR-L LAR-A & C LAR-B LAR-D LAR-E LAR-F LAR-H LAR-M LAR-X LAR-Z LAR-R LAR-L
13.09.2019 11.11.2019 18.09.2018 04.05.2020 21.10.2019 30.05.2019 03.10.2017 Apr-21 Dec-20 26.03.2018 Jan-20 Nov-21
Other
materials 100% 100 100.00 121.3 122.30 120.90 117.50 122.00 121.60 115.60 131.70 124.50 116.30 124.50 139.1 14.67 13.74 15.05 18.38 14.02 14.39 20.33 5.62 11.73 19.6 11.73 14.67 13.74 15.05 18.38 14.02 14.39 20.33 5.62 11.73 19.6 11.73
#REF!
100.00 14.67 13.74 15.05 18.38 14.02 14.39 20.33 5.62 11.73 19.6 11.73 14.67 13.74 15.05 18.38 14.02 14.39 20.33 5.62 11.73 19.60 11.73
ScheduleA
Tender
LARs issued in the month of opening % of escalation during the intervening period Escalated amount during the intervening period on (In Rs)
% of components as Basic value of Basic value of Sch- month
per PVC formula A A B C D E F H M N O Q R
Components (Other works Sch-A (Component wise
(In Rs) May-21
contract) proportion) (In Rs) LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-M LAR-N LAR-O LAR-Q LAR-R LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-M LAR-N LAR-O LAR-Q LAR-R
Sep-19 Nov-19 Sep-19 Sep-18 May-20 Oct-19 May-19 Oct-17 Feb-19 Apr-18 Feb-21 Mar-18
Labour 20% 100 20.00 322.00 328.00 322.00 301.00 330.00 325.00 314.00 287.00 307.00 288.00 343.00 287.00 347.33 7.87 5.89 7.87 15.39 5.25 6.87 10.61 21.02 13.14 20.6 1.26 21.02 1.57 1.18 1.57 3.08 1.05 1.37 2.12 4.2 2.63 4.12 0.25 4.2
Other materials 20% 100 20.00 121.30 122.30 121.30 120.90 117.50 122.00 121.60 115.60 119.50 117.30 128.10 116.30 132.90 9.56 8.67 9.56 9.93 13.11 8.93 9.29 14.97 11.21 13.3 3.75 14.27 1.91 1.73 1.91 1.99 2.62 1.79 1.86 2.99 2.24 2.66 0.75 2.85
Plant, machinery & 30% 100 30.00 113.60 112.80 113.60 111.60 112.90 112.70 112.90 109.00 111.90 110.10 115.30 109.90 117.00 2.99 3.72 2.99 4.84 3.63 3.82 3.63 7.34 4.56 6.27 1.47 6.46 0.9 1.12 0.9 1.45 1.09 1.15 1.09 2.2 1.37 1.88 0.44 1.94
spares
Fuel & lubricants 15% 100 15.00 100.60 101.30 100.60 107.80 80.30 102.30 104.40 93.80 100.50 99.00 105.70 98.00 109.80 9.15 8.39 9.15 1.86 36.74 7.33 5.17 17.06 9.25 10.91 3.88 12.04 1.37 1.26 1.37 0.28 5.51 1.1 0.78 2.56 1.39 1.64 0.58 1.81
Fixed 15% 100 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
100.00 29.57 26.67 29.57 32.02 58.73 26.95 28.7 60.39 38.16 51.08 10.36 53.79 5.75 5.29 5.75 6.80 10.27 5.41 5.85 11.95 7.63 10.30 2.02 10.80
ScheduleA
% of Basic value of LARs issued in the month of Tender % of escalation during the intervening period Escalated amount during the intervening period on (In Rs)
Basic value opening
components as of Sch-A Sch-A month
Components per PVC (Component wise A B C D E F H J M N O P Q R S
formula (Other proportion)
(In Rs) LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-J LAR-M LAR-N LAR-O LAR-P LAR-Q LAR-R LAR-S LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-J LAR-M LAR-N LAR-O LAR-P LAR-Q LAR-R LAR-S
works contract) (In Rs) 13.09.2019 11.11.2019 13.09.2019 18.09.2018 04.05.2020 21.10.2019 30.05.2019 Dec-19 03.10.2017 25.02.2019 13.04.2018 25.07.19 24.02.2021 26.03.2018 Mar-21 Nov-21
Other
materials 100% 100 100.00 121.3 122.30 121.3 120.90 117.50 122.00 121.60 123.00 115.60 119.50 117.30 121.30 128.10 116.30 129.30 123.4 1.73 0.9 1.73 2.07 5.02 1.15 1.48 0.40 6.75 3.26 5.2 2.10 -3.67 6.1 -5.9 1.73 0.9 1.73 2.07 5.02 1.15 1.48 0.40 6.75 3.26 5.2 2.10 -3.67 6.1 -5.9
100.00 1.73 0.9 1.73 2.07 5.02 1.15 1.48 0.4 6.75 3.26 5.2 2.10 -3.67 6.1 -5.9 1.73 0.90 1.73 2.07 5.02 1.15 1.48 0.40 6.75 3.26 5.20 2.10 -3.67 6.10 -5.90
ScheduleB
Tender % of escalation during the intervening
LARs issued in the month of opening Escalated amount during the intervening period on (In Rs)
period
month
Basic
value of M B C F G H I J M B C F G H I J
% of Sch-A
components as Basic value
of Sch-A
Components per PVC formula
LAR-M
LAR-H
LAR-G
(In (Compone
LAR-B
LAR-C
LAR-F
LAR-J
LAR-I
(Other works Rs)
contract) nt wise
Nov-19
Sep-19
Dec-19
Sep-21
Mar-21
Mar-20
Feb-22
Jun-21
Oct-21
proportion
) (In Rs)
ALL COM 100% 100 100.00 122.3 121.3 123.0 133.7 139.10 136.0 129.3 120.4 142.90 16.84 17.81 16.18 6.88 2.73 5.07 10.52 18.69 16.844 17.81 16.18 6.8811 2.7318 5.0735 10.5182 18.69
LAR-M
LAR-H
LAR-G
(In (Compone
LAR-B
LAR-C
LAR-F
LAR-J
LAR-I
(Other works
contract) Rs) nt wise
Nov-19
Mar-21
Mar-20
Sep-19
Dec-19
Sep-21
Feb-22
Jun-21
Oct-21
proportion
) (In Rs)
Labour 20% 100 20.00 322.0 330.0 328.0 350.5 359.71 355.1 344.0 326.0 360.29 11.89 9.18 9.84 2.79 0.16 1.46 4.74 10.52 2.37826 1.83576 1.9689 0.5586 0.0322 0.2923 0.94709 2.103681
Other materials 20% 100 20.00 121.3 123 122.3 133.7 139.1 136 129 120.4 142.9 17.81 16.18 16.84 6.88 2.73 5.07 10.52 18.69 3.56142 3.23577 3.36877 1.3762 0.5464 1.0147 2.10363 3.737542
Fuel & lubricants 15% 100 15.00 100.6 103.2 101.3 113.7 124.7 114.7 109.7 99.5 133.2 32.41 29.07 31.49 17.15 6.82 16.13 21.42 33.87 4.86083 4.36047 4.72359 2.5726 1.0225 2.4194 3.21331 5.080402
LAR-A/B
nt wise
LAR-E/G
contract)
LAR-D
LAR-C
LAR-F
proportion
May-22
Nov-21
Aug-21
Aug-22
Jun-21
Oct-21
) (In Rs)
Labour 20% 100 20.00 359.7 354.0 350.5 371.5 362.02 374.98 4.25 5.93 6.98 0.93 3.58 0.84902 1.18531 1.39686 0.1863 0.716
Other materials 20% 100 20.00 140.7 136.2 133.7 155.0 143.7 153.1 8.81 12.41 14.51 -1.23 6.54 1.76262 2.48164 2.90202 -0.25 1.3083
Fuel & lubricants 15% 100 15.00 126.0 117.9 110.7 163.60 136.0 157.6 25.08 33.67 42.37 -3.67 15.88 3.7619 5.05089 6.35501 -0.55 2.3824
LAR-A/B
bg per PVC formula
LAR-H
(In (Compone
(Other works
contract) Rs) nt wise
Aug-21
Mar-22
Oct-21
proportion
) (In Rs)
Labour 20% 100 20.00 359.7 354.0 363.00 0.92 2.54 0.1835 0.5085
Other materials 20% 100 20.00 140.7 136.2 148.8 5.76 9.25 1.1514 1.8502
Fuel & lubricants 15% 100 15.00 126.0 117.9 146.9 16.59 24.60 2.4881 3.6896
LAR-B
Mar-22
Jul-19
Labour 20% 100 20.00 319.0 363.00 13.79 2.7586
Fuel & lubricants 15% 100 15.00 100.4 146.9 46.31 6.9472
100.00 16.65
Schedule -I
Tender
% of
opening
escalati
month
on
during
the
Basic interven
value of ing
% of Sch period
components as Basic value
Components per PVC formula of Sch-
(Other works (In Rs) (Compone A A
contract) nt wise
proportion
) (In Rs)
LAR-A
Mar-22
Jul-21
Labour 20% 100 20.00 356.7 363.00 1.78 0.3555
Fuel & lubricants 15% 100 15.00 115.2 146.9 27.52 4.1276
100.00 7.31
ScheduleB
Tender % of escalation during the intervening
LARs issued in the month of opening Escalated amount during the intervening period on (In Rs)
period
month
Basic
value of A B C E G H/I/J K J A B C E G H/I/J K J
% of Sch-A
components as Basic value
LAR-H/I/J
of Sch-A
Components per PVC formula
LAR-G
LAR-A
LAR-K
(In (Compone
LAR-B
LAR-C
LAR-E
LAR-J
(Other works Rs)
contract) nt wise
Aug-21
Mar-21
Sep-21
Dec-19
Mar-20
Feb-22
Jun-21
Oct-21
Jul-19
proportion
) (In Rs)
ALL COM 100% 100 100.00 135.9 134 139.1 129.3 121.3 136 123 120.4 142.90 5.15 6.88 2.73 10.52 17.81 5.07 16.18 18.69 5.1508 6.88 2.73 10.5182 17.8071 5.0735 16.1789 18.69
Labour 20% 100 20.00 355.1 354.0 344.0 359.71 330.0 362.02 1.95 2.27 5.24 0.64 9.7 0.39 0.45 1.05 0.13 1.94
Other materials 20% 100 20.00 136 135.9 129.3 139.1 123 142.9 5.07 5.15 10.52 2.73 16.18 1.01 1.03 2.1 0.55 3.24
Plant, machinery
30% 100 30.00 120.7 119.4 116.3 120.5 113.0 120.7 0 1.09 3.78 0.17 6.81 0 0.33 1.13 0.05 2.04
& spares
Fuel & lubricants 15% 100 15.00 114.7 116.0 109.7 124.7 103.2 131.7 14.82 13.53 20.05 5.61 27.62 2.22 2.03 3.01 0.84 4.14
100.00 21.84 22.04 39.59 9.15 60.31 3.62 3.84 7.29 1.57 11.36
ScheduleA
Tender
Basic value of LARs issued in the month of opening % of escalation during the intervening period Escalated amount during the intervening period on (In Rs)
% of Sch-A
components as Basic value of month
Components per PVC formula Sch-A (Component A B C D E F H J N O Q R
(Other works (In Rs) wise Jun-21
contract) proportion) (In LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-M LAR-N LAR-O LAR-Q LAR-R LAR-A LAR-B LAR-C LAR-D LAR-E LAR-F LAR-H LAR-M LAR-N LAR-O LAR-Q LAR-R
Sep-19 Nov-19 Sep-19 Sep-18 May-20 Oct-19 May-19 Dec-19 Feb-19 Apr-18 Feb-21 Mar-18
Rs)
Labour 20% 100 20.00 322 328 322 301 330 325 314 330 307 288 343 287 347.33 7.87 5.89 7.87 15.39 5.25 6.87 10.61 5.25 13.14 20.6 1.26 21.02 1.57 1.18 1.57 3.08 1.05 1.37 2.12 1.05 2.63 4.12 0.25 4.2
Other materials 20% 100 20.00 121 122 121 121 118 122 122 123 120 117 128 116 133.70 10.22 9.32 10.22 10.59 13.79 9.59 9.95 8.7 11.88 13.98 4.37 14.96 2.04 1.86 2.04 2.12 2.76 1.92 1.99 1.74 2.38 2.8 0.87 2.99
Fuel & lubricants 15% 100 15.00 101 101 101 108 80 102 104 103 101 99 106 98 113.70 13.02 12.24 13.02 5.47 41.59 11.14 8.91 10.17 13.13 14.85 7.57 16.02 1.95 1.84 1.95 0.82 6.24 1.67 1.34 1.53 1.97 2.23 1.14 2.4
420.40
100.00 34.72 31.79 34.72 36.92 64.88 32.04 33.72 28.28 43.33 56.33 15.28 59.1 6.64 6.18 6.64 7.66 11.33 6.29 6.73 5.57 8.53 11.22 2.88 11.72
Schedule -A & B
Tender
LARs % of escalation Escalated amount
opening
issued in during the during the
month
the intervening intervening period
Basic value of
% of month of period on (In Rs)
Sch-A
components as Basic value of
Components per PVC formula Sch-A (Component A/B
(Other works (In Rs) wise
01-10-2022
contract) proportion) (In
But rates
Rs) LAR-A LAR-A
Oct-21 taken for
06/22
Plant, machinery
& spares 30% 100 30.00 120.4 124.70 3.57 1.07
Fuel & lubricants 15% 100 15.00 126 155.40 23.33 3.5
Labour 20% 100 20.00 359.71 371.52 374.98 4.25 0.93 0.85 0.19
Other materials 20% 100 20.00 140.7 155.00 153.10 8.81 -1.23 1.76 -0.25
Plant, machinery
30% 100 30.00 120.4 124.90 125.70 4.4 0.64 1.32 0.19
& spares
Fuel & lubricants 15% 100 15.00 126 163.60 157.60 25.08 -3.67 3.76 -0.55
346
Labour 35% 100 35.00 347.33 274.00 344.00 301.00 330.00 325.00 314.00 287.00 307.00 288.00 343.00 287.00 -0.38 26.28 0.58 14.95 4.85 6.46 10.19 20.56 12.7 20.14 0.87 20.56 #REF! -0.13 9.2 0.2 5.23 1.7 2.26 3.57 7.2 4.45 7.05 0.3 7.2
132.9
Other materials 35% 100 35.00 132.70 113.00 127.30 120.90 117.50 122.00 121.60 115.60 119.50 117.30 128.10 116.30 0.15 17.61 4.4 9.93 13.11 8.93 9.29 14.97 11.21 13.3 3.75 14.27 #REF! 0.05 6.16 1.54 3.48 4.59 3.13 3.25 5.24 3.92 4.66 1.31 4.99
109.8
Fuel & lubricants 15% 100 15.00 110.60 94.50 104.20 107.80 80.30 102.30 104.40 93.80 100.50 99.00 105.70 98.00 -0.72 16.19 5.37 1.86 36.74 7.33 5.17 17.06 9.25 10.91 3.88 12.04 #REF! -0.11 2.43 0.81 0.28 5.51 1.1 0.78 2.56 1.39 1.64 0.58 1.81
0
Fixed 15% 100 15.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
100.00 -0.95 60.08 10.35 26.74 54.7 22.72 24.65 52.59 33.16 44.35 8.5 46.87 -0.19 17.79 2.55 8.99 11.80 6.49 7.60 15.00 9.76 13.35 2.19 14.00
ALL INDIA AVERAGE CONSUMER PRICE INDEX (Base 2001=100) for industrial workers
Year Jan. Feb. March April May. June July Aug. Sept. Oct. Nov. Dec.
2022 360.29 360 363 367.77 371.52 372.1 374.11 374.98 378.14 381.6 381.6
2021 340 343 344.45 346 347.33 350.5 353.66 354 355.1 359.71 362.02 361
LABOUR
2020 330 328 326 329 330 332 336 338 340 344 345 342
2019 307 307 309 312 314 316 319 320 322 325 328 330
2018 288 287 287 288 289 291 301 301 301 302 302 301
2017 274 274 275 277 278 280 285 285 285 287 288 286
2016 269 267 268 271 275 277 280 278 277 278 277 275
Note: The index numbers with base 1982=100 can be obtained by multiplying the above values with the link factor of 4.63.
Month/Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2023 126.8
2022 143.8 145.3 148.9 152.3 155 155.4 154 153.2 151.9 152.9 152.5 150.4
ALL COMMODITIES
2021 126.5 128.1 129.9 132 132.9 134 135 136.2 137.4 140.7 143.7 143.3
2020 123.4 122.2 120.4 119.2 117.5 119.3 120.6 122 122.9 123.6 124.2 124.5
2019 119.2 119.5 119.9 121.1 121.6 121.5 121.3 121.5 121.3 122 122.3 123
2018 116 116.1 116.3 117.3 118.3 119.1 119.9 120.1 120.9 122 121.6 119.7
2017 112.6 113 113.2 113.2 112.9 112.7 113.9 114.8 114.9 115.6 116.4 115.7
2016 108 107.1 107.7 109 110.4 111.7 111.8 111.2 111.4 111.5 111.9 111.7
Month/Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2023 126.8
2022 121.6 122 122.7 124.3 124.9 125.1 125.8 126.1 126.4 126.5 126.7 126.7
PLANT & MACHINERY
2021 115.2 115.3 116.1 116.6 117 117.7 119.2 119.4 120.7 120.4 120.8 133.8
2020 113.2 113.2 113.3 113 112.9 112.7 112.9 113.7 113.7 114.2 113.7 114.5
2019 111.8 111.9 112.3 112.5 112.9 113.2 113.2 113.6 113.6 112.7 112.8 113
2018 110 109.7 109.9 110.1 109.9 110.5 110.9 111.2 111.6 111.5 111.9 111.8
2017 108.1 108.2 108.3 108.3 108.1 108.5 107.9 108.5 108.5 109 109.3 108.9
2016 108.2 108.1 108.5 107.8 107.7 108 107.8 107.5 107.4 107.9 107.5 108.3
Month/Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2023 155.8
2022 135.3 138.3 143.9 151.2 163.8 167.1 166.6 159.2 158.4 158 162.8 158
FUEL & POWER
2021 100.7 105.7 109.2 108.9 109.8 110.7 115.2 117.9 119 126 136 133.8
2020 104.7 103.6 99.5 92.4 80.3 85.6 90.7 92 91.9 90.9 91.3 94.2
2019 99.3 100.5 102.5 102.8 104.4 102.2 100.6 101.2 100.6 102.3 101.3 103.2
2018 97.5 98.8 98 99 102.4 104.4 104.4 104.9 107.8 111.3 109.3 102.8
2017 93.1 94.5 93.6 91.7 90.9 89.6 88.4 89.1 91.9 93.8 94.6 95.5
2016 79.8 75.5 76.5 78.3 81.3 85.2 84.7 81.1 83.2 84.6 87.3 88.4
Year Jan. Feb. March April May. June July Aug. Sept. Oct. Nov. Dec.
269 267 268 271 275 277 280 278 277 278 277 275
2016
28.62 29.59 29.10 27.68 25.82 24.91 23.57 24.46 24.91 24.46 24.91 25.82
274 274 275 277 278 280 285 285 285 287 288 286
2017
26.28 26.28 25.82 24.91 24.46 23.57 21.40 21.40 21.40 20.56 20.14 20.98
288 287 287 288 289 291 301 301 301 302 302 301
2018
20.14 20.56 20.56 20.14 19.72 18.90 14.95 14.95 14.95 14.57 14.57 14.95
307 307 309 312 314 316 319 320 322 325 328 330
2019
12.70 12.70 11.97 10.90 10.19 9.49 8.46 8.13 7.45 6.46 5.49 4.85
118.1 119.5 119.9 118.8
330 328 326 329 330 332 336 338 340 344 345 342
2020
4.85 5.49 6.13 5.17 4.85 4.22 2.98 2.37 1.76 0.58 0.29 1.17
118.2 119 119.6 120.1
78328.12 0.00%
638000 -28.20%
716328.12
62.64 4687515.00
3.85 288000.00
3.29 246160.00
11.67 873225.20
16.97 1269576.00
1.58 118482.94
100.00 7482959.14
1131335 -14.03%
149400 -19.45%
1280735
5444505
15.00 0 0 0 489600
100.00
0.00
-179916.00
-179916.00
-25.12
-11.80% 4134388.23
-8.80% 262656.00
-9.80% 222036.32
-11.80% 770184.63
-12.80% 1107070.27
-8.80% 108056.44
6604391.89
-158726.30
-29058.30
-187784.60
-14.66
11888.38
Tender % of escalation during the intervening Escalated amount during the intervening
opening period period on (In Rs)
month
LAR-1, 2 LAR-2 LAR-3 LAR-4 LAR-1, 2 LAR-2 LAR-3
&3 &3
May-21
0 0 0 0 0 0 0 0
-0.19
ring the intervening
n (In Rs)
LAR-4
5.72
3.71
0.21
0.28
9.92
Schedule-F
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender % of escalation during the intervening Escalated amount during the intervening
per PVC formula Sch-A A opening period period on (In Rs)
(Other works (In Rs) (Component wise month
contract) proportion) (In Rs) LAR-4, 5 & 6 LAR-2 LAR-3 LAR-4 LAR-4, 5 LAR-2 LAR-3 LAR-4 LAR-4, 5 LAR-2 LAR-3 LAR-4
&6 &6
Dec-19 Aug-20 Dec-18 May-21
Labour 40% 100 40.00 301 344 4.24 #DIV/0! #DIV/0! 14.29 1.7 #DIV/0! #DIV/0! 5.72
330
41414125
Other materials 35% 100 35.00 120.4 122 119.07 131.7 7.07 9.39 7.95 10.61 2.47 3.29 2.78 3.71
123
Plant, machinery & spares 5% 100 5.00 113.3 113.7 111.8 116.6 3.19 2.91 2.55 4.29 0.16 0.15 0.13 0.21
113
Fuel & lubricants 5% 100 5.00 99.5 92 102.8 108.6 5.23 9.15 18.04 5.64 0.26 0.46 0.9 0.28
103.2
5444505
Labour 40% 100 40.00 338 301 344 2.38 1.18 1.78 14.29 0.95 0.47 0.71 5.72
336 340
Other materials 35% 100 35.00 122 119.07 131.7 9.2 7.16 7.95 10.61 3.22 2.51 2.78 3.71
120.6 122.9
Plant, machinery & spares 5% 100 5.00 113.7 111.8 116.6 3.28 2.55 2.55 4.29 0.16 0.13 0.13 0.21
112.9 113.7
Fuel & lubricants 5% 100 5.00 92 102.8 108.6 19.74 18.17 18.04 5.64 0.99 0.91 0.9 0.28
90.7 91.9
5444505
LOA reference Approx. quantities of items Rate Accepted TI Amount Minimum wages Amount Minimum Updated amount based Total updated % of fuel increased Updated TI (fuel Updated amount Basic amount as Basic amount as Ref. of folio Nos.
& Date to be operated in the (Rate+TI) of Driver (as on (excluding wages wages of Driver on WPI (excluding amount during intervening period component) (fuel component) per tender per updated rate
instant tender (Sch-A) the accepted of Driver) (as on date of wages of driver) schedule
date) opneing of
tender)
Item Nos. Qnty.
Item No.1 1400 440 833.36 603 230.36 609 240.98 849.98 616000 1189972
(F/107) (F/___)
(230.36x+4.61%)
4.61% above
(131.7-125.9)/
125.9*100
(F/__)
Item No.2 140000 5.50 10.42 10.21% 108.73% 11.48 770000 1607200
(90.49-82.11)/ 82.11x100
(F/____)
(189.40x+10.21%)-100 (5.50x+108.73%)
89.40%
Item No.3 400 1200 2272.80 1030 1242.80 1040 1300.09 2340.09 480000 936036
e-Tender-
NorthKUR-225-20 / 21.01.21 (1242.8x+4.61%)
00906160031212 4.61% above
(603+427) (609+431) (131.7-125.9)/
125.9*100
(F/__)
(F/107) (F/___)
(90.49-82.11)/ 82.11x100
(F/____) (189.40x+10.21%)-100 (20x+108.73%)
3466000 7073208
104.07% above
Item No.1 1400 440 782.54 593 189.54 609 204.61 813.61 616000 1139054
(F/106) (F/___)
(189.54x+7.95%)
7.95%
(131.7-122)/122*100
(F/____)
Item No.2 140000 5.50 9.78 13.28% 101.47% 11.08 770000 1551200
(90.49-79.88)/
79.88x100 (177.85x+13.28%)-100 (5.50x+101.47%)
77.85% (F/___)
e-tender-eastkur-
103-2020/ 17.08.20
00906160024082 Item No.3 400 1200 2134.20 1013 1121.20 1040 1210.33 2250.33 480000 900132
(1121.20x+7.95%)
(593+420) (609+431) 7.95%
(F/106) (F/___) (131.7-122)/122*100
(F/____)
Item No.1 1400 440 777.13 522 255.13 609 280.23 889.23 616000 1244922
(F/___)
(255.13x+9.84%)
9.84%
(F/105) (131.7-119.9)/
119.9*100
(F/__)
Item No.2 140000 5.50 9.71 23.92% 118.87% 12.04 770000 1685600
(90.49-73.02)/
73.02x100 (176.62x+23.92%)-100 (5.50x+118.87%)
76.62% (F/___)
3466000 7387410
113.14% above
Average 105% above
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula Sch-A A opening intervening period intervening period on (Rs)
(Other works (Rs) (Component wise month
contract) proportion) (Rs)
Other materials 30% 100 30.00 125.9 122 119.9 131.7 4.61 7.95 9.84 1.38 2.39 2.95
Plant, machinery & spares 20% 100 20.00 115.2 113.7 110.9 116.6 1.22 2.55 5.14 0.24 0.51 1.03
Fuel & lubricants 15% 100 15.00 99.7 92 104.4 108.6 8.93 18.04 4.02 1.34 2.71 0.6
Labour 40% 100 40.00 326 338 301 344 1.18 5.52 1.78 14.29 0.47 2.21 0.71 5.72
340
Other materials 35% 100 35.00 120.4 122 119.07 129.3 2.7 7.39 5.98 8.59 0.95 2.59 2.09 3.01
125.9
Plant, machinery & spares 5% 100 5.00 113.3 113.7 111.8 116.3 0.95 2.65 2.29 4.03 0.05 0.13 0.11 0.2
115.2
Fuel & lubricants 5% 100 5.00 99.5 92 102.8 109.7 10.03 10.25 19.24 6.71 0.5 0.51 0.96 0.34
99.7
5.78
F/
10.11.12
Estt 08.09.18 20.02.16
09.10.19 09.02.17
10.11.12 23.04.18
08.09.18
09.02.17 09.10.19
20.02.16
23.04.18
08.09.18
09.02.17
23.04.18
4)
Basic value of Sch- LARs issued in the month of
A
(Component wise
proportion) (In Rs) LAR-1 LAR-2 LAR-3 LAR-4
Mar-20 Mar-20 Aug-20 Dec-18
15.00 0 0 0 0
100.00
0.00
-179916.00
-179916.00
-25.12
0 0 0 0 0 0 0 0
LAR-4
5.45
1.6
0.12
-0.42
6.75
Schedule-A (USSOR items)
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender opening month % of escalation during the Escalated amount during the
per PVC formula Sch-A A intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise
contract) proportion) (In Rs) LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
Jul-20 Oct-19 Sep-18 Feb/21
(Latest available
Jan/21)
Labour 20% 100 20.00 1.19 4.62 12.96 0.24 0.92 2.59
336 325 301 340
Other materials 20% 100 20.00 4.39 3.20 4.14 0.88 0.64 0.83
120.6 122 120.9 125.9
Plant, machinery & spares 30% 100 30.00 2.04 2.22 3.23 0.61 0.67 0.97
112.9 112.7 111.6 115.2
Fuel & lubricants 15% 100 15.00 9.92 -2.54 -7.51 1.49 -0.38 -1.13
90.7 102.3 107.8 99.7
197980
27500
30000
105102 360582 0.00% 0.00
138080.88 138080.88 0.00% 0.00
100000 100000 10.00% 10000.00
598662.88 598662.88 10000.00
1.67
1077688.69 11290.07 1.06
1563479.54 5604.93 0.36
1054979.86 -44208.68 -4.02
2741511.13 -94401.09 -3.33
349186.80 -49160.02 -12.34
1835829.98 10238.28 0.56
639094.43 30433.07 5.00
641612.86 -52007.66 -7.50
1362092.75 -9894.45 -0.72
11265476.02 -192105.55 -1.68
192105.55
1.68
Item Allahabad Construction Works Allahabad Construction Works Allahabad Construction Jai Sustainability Solutions KL Itech Solutions KL Itech Solutions
Nos Works & Co.
KUR/ECoR KUR/ECoR Hazipur/ECR Ferozpur Division/N.Rly Salem Division/ S.Rly Nanded division/S.C. Rly
D/K/T/Automated Water level D/K/T/AMC/Automated ECR Ferozpur Division- Salem Division- Nanded division-Engineering/T-
system/Allahabad Water level gauge/Allahabad HQ-Engineering/02Hajipur20 Engineering/62-2019-20- Engineering/SA-OT-07- 202021-1-001/10186930024925
Construction/584 dt. 08.08.16 Const. Works/152 dt. 14.05.19 19-20OPEN/0085055100203 DRM-FZR/010722000057 2019- dt. 31.08.20
65 dt. 13.06.20 04/10186930012647 dt.
28 dt. 29.08.19 30.12.19
Deptt basic Deptt T.I Bid rate Deptt basic Deptt T.I Bid rate Deptt basic Bid rate Deptt basic Deptt T.I Bid rate Deptt basic Bid rate Deptt basic Deptt Bid rate
rate rate rate rate rate rate T.I
1 470000.00 0.00 -0.50% 462506.24 502400.00 482464.86 0.00 -0.16% 470000 465000 470000 0.00 -1.00%
2 399000.00 0.00 -0.50% 392638.40 426500.00 409581.87 0.00 -0.16% 399000 390000 399000 0.00 -1.00%
3 36000.00 0.00 -0.50% 35425.60 38480.00 36954.76 0.00 -0.16% 36000 36000 36000 0.00 -1.00%
4 150000.00 0.00 -0.50% 150000.00 -0.50% 4.80% 147608.16 160300.00 167311.49 0.00 -0.16% 150000 150000 150000 0.00 -1.00%
5 95000.00 0.00 -0.50% 95000.00 -0.50% 4.80% 93485.28 101500.00 0.00 0.00 0 95000 95000 0.00 -1.00%
97516.32 -14000
Labour 40% 100 40.00 302 274 325 342 13.25 24.82 5.23 5.3 9.93 2.09
Other materials 35% 100 35.00 122 112.6 122.2 124.5 2.05 10.57 1.88 0.72 3.7 0.66
Plant, machinery & spares 5% 100 5.00 111.5 108.1 112.7 114.5 2.69 5.92 1.60 0.13 0.3 0.08
Fuel & lubricants 5% 100 5.00 111.3 93.1 102.1 94.2 -15.36 1.18 -7.74 -0.77 0.06 -0.39
Labour 20% 100 20.00 7.14 7.14 12.38 1.43 1.43 2.48
322 322 307 345
Other materials 20% 100 20.00 2.39 2.39 3.93 0.48 0.48 0.79
121.3 121.3 119.5 124.2
Plant, machinery & spares 30% 100 30.00 0.09 0.09 1.61 0.03 0.03 0.48
113.6 113.6 111.9 113.7
Fuel & lubricants 15% 100 15.00 -9.24 -9.24 -9.15 -1.39 -1.39 -1.37
100.6 100.6 100.5 91.3
Item No.1 1400 440 777.13 522 255.13 603 264.29 867.29 616000 1214206
(255.13x+3.59%)
(F/101) (F/102)
(F/103-104)
Item No.2 140000 5.50 9.71 10.52% 95.20% 10.74 770000 1503600
76.62%
(80.29-72.65)/ 72.65x100
1) D/K/T/1 Ton & 10 (F/105-106)
(176.62x+10.52%)-100 (5.50x+95.20%)
Ton/ADEN Wise
11.07.18 Item No.3 400 1200 2119.44 892 1227.44 1030 1271.51 2301.51 480000 920604
/East/Mishra
Construction/141 (522+370) (603+427) (1227.44x+3.59%)
(F/101) (F/102)
Item No.4 80000 20 35.32 10.52% 95.20% 39.04 1600000 3123200
(80.29-72.65)/ 72.65x100
(F/105-106)
(176.62x+10.52%)-100 (20x+95.20%)
3466000 6761610
95.08% above
Item No.1 1400 440 782.54 593 189.54 603 192.95 795.95 616000 1114330
(189.54x+1.80%)
(F/107) (F/102)
(F/104)
Item No.2 140000 5.50 9.78 0.51% 78.76% 9.83 770000 1376200
(80.29-79.88)/ (177.85x+0.51%)-100 (5.50x+78.76%)
79.88x100
77.85%
(F/106-108)
2) e-tender-eastkur- Item No.3 400 1200 2134.20 1013 1121.20 1030 1141.38 2171.38 480000 868552
103-2020/ 17.08.20
00906160024082 (593+420) (603+427) (1121.20x+1.80%)
(F/107) (F/102) (F/104)
(80.29-79.88)/ 79.88x100
(F/106-108)
(177.85x+0.51%)-100 (20x+78.76%)
3466000 6219082
79.43% above
Average 87.26 above
(95.08+79.43)/2
3,04,39,101. 40 30% 9131730.42
40% 12175640.56
60% 18263460.84
150% 45658652.10
Labour 20% 100 20.00 326 332 332 338 3.68 1.81 1.81 0.74 0.36 0.36
Other materials 20% 100 20.00 120.4 119.3 119.3 124.2 3.16 4.11 4.11 0.63 0.82 0.82
Plant, machinery & spares 30% 100 30.00 113.3 112.7 112.7 113.7 0.35 0.89 0.89 0.11 0.27 0.27
Fuel & lubricants 15% 100 15.00 99.5 85.6 85.6 91.3 -8.24 6.66 6.66 -1.24 1.00 1.00
Other materials 20% 100 20.00 1.8 2.56 6.98 0.36 0.51 1.4
122 121.1 116.1 124.2
Plant, machinery & spares 30% 100 30.00 0 1.07 3.65 0 0.32 1.1
113.7 112.5 109.7 113.7
Fuel & lubricants 15% 100 15.00 -0.76 -11.19 -7.59 -0.11 -1.68 -1.14
92 102.8 98.8 91.3
1) D/K/T/1 Ton
& 10 Item No.3 400 1200
Ton/ADEN
Wise 11.07.18
/East/Mishra
Construction/1
41 Item No.4 80000 20
76.62%
35.32
480000 901964
3466000 6751512
94.79 % above
299520 412464
20.80% 43.75% 5.82 194400 279360
(60.17-49.81)x (119x1.2080)-100 (4.05x1.4375) 493920 691824
100/49.81
40
Average 86
4
rom RBI indices (as
nder conventional
Ref. of folio Nos.
above
above
BHC KDJR HCNR Minimum BHC KDJR HCNR Minimum BHC KDJR HCNR
wages as on wages as on
01.04.10 01.04.10
Sweeper Un-skilled 15 24 6 420 6300 10080 2520 427 6405 10248 2562
Caretaker Semi-skilled 60 90 60 492 29520 44280 29520 500 30000 45000 30000
Cook Semi-skilled 15 15 4.5 492 7380 7380 2214 500 7500 7500 2250
43200 61740 34254 43905 62748 34812
1036800 1481760 822096 1053720 1505952 835488
3340656 3395160
1241888.87 1262150.73
Labour 20% 100 20.00 312 288 345 10.58 19.79 5.18 2.12 3.96
Other materials 20% 100 20.00 121.1 116 124.2 2.56 7.07 1.55 0.51 1.41
Plant, machinery & spares 30% 100 30.00 112.5 110 113.7 1.07 3.36 0.80 0.32 1.01
Fuel & lubricants 15% 100 15.00 102.8 97.5 91.3 -11.19 -6.36 -9.87 -1.68 -0.95
7.00% 542744.13
8.00% 2062877.07
6.00% 5331582.13
7.00% 1406666.03
6.00% 803345.53
5.00% 94872.86
6.00% 469489.18
10.00% 81399.13
10792976.05
509477.97
4.95
HCNR
2.00% 608685.00
2.00% 1956132.86
4.00% 5540676.74
7.00% 1234655.59
7.00% 851361.07
7.00% 831950.36
8.00% 435615.86
0.00% 36112.32
11495189.80
308318.14
2.76
A 45042.69 9.05
B 78312.93 3.95
C 302793.63 6.02
D 53111.50 3.92
E 20386.79 2.60
F 804.16 0.85
G 6732.30 1.45
H 2293.98 2.90
509477.97 4.95
2748777.10 134.71% 3702877.63
69820.00 134.24% 93726.37
29110.00 133.48% 38856.03
121800.00 136.01% 165660.18
4500.00 142.61% 6417.45
12000.00 143.19% 17182.80
7250.00 141.22% 10238.45
138000.00 136.50% 188370.00
4500.00 134.19% 6038.55
4000.00 141.24% 5649.60
13000.00 136.30% 17719.00
64900.00 144.32% 93663.68
39000.00 133.48% 52057.20
7128.00 137.56% 9805.28
3263785.10 4408262.21
135.07
288 287 287 288 289 291 301 301 301 302 302 301
2018
16.67 17.07 17.07 16.67 16.26 15.46 11.63 11.63 11.63 11.26 11.26 11.63
307 307 309 312 314 316 319 320 322 325 328 330
2019
9.45 9.45 8.74 7.69 7.01 6.33 5.33 5.00 4.35 3.38 2.44 1.82
Labour 20% 100 20.00 270 258 237 332 22.96 28.68 40.08 4.59 5.74 8.02
Other materials 30% 100 30.00 109.9 111.4 113.6 119.3 8.55 7.09 5.02 2.57 2.13 1.51
Plant, machinery & spares 20% 100 20.00 109.2 110.2 105.9 112.7 3.21 2.27 6.42 0.64 0.45 1.28
Fuel & lubricants 15% 100 15.00 85.5 95.5 119.9 88.3 3.27 -7.54 -26.36 0.49 -1.13 -3.95
Schedule-D
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula Sch-A A opening intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise LAR-1 LAR-2 LAR-3 month LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
contract) proportion) (In Rs)
Sep-19 Oct-19 Oct-19 Jul-20
Labour 20% 100 20.00 322 325 325 332 3.11 2.15 2.15 0.62 0.43 0.43
Other materials 20% 100 20.00 121.3 122 122 119.3 -1.65 -2.21 -2.21 -0.33 -0.44 -0.44
Plant, machinery & spares 30% 100 30.00 -0.79 0.00 0.00 -0.24 0 0
113.6 112.7 112.7 112.7
Fuel & lubricants 15% 100 15.00 100.6 102.3 102.3 88.3 -12.23 -13.69 -13.69 -1.83 -2.05 -2.05
Labour 20% 100 20.00 312 287 288 332 6.41 15.68 15.28 1.28 3.14 3.06
Other materials 20% 100 20.00 121.1 116.1 116.4 119.3 -1.49 2.76 2.49 -0.3 0.55 0.5
Plant, machinery & spares 30% 100 30.00 112.5 109.7 109.3 112.7 0.18 2.73 3.11 0.05 0.82 0.93
Fuel & lubricants 15% 100 15.00 102.8 98.8 94.6 88.3 -14.11 -10.63 -6.66 -2.12 -1.59 -1
Schedule-D
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula Sch-A A opening intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise LAR-1 LAR-2 LAR-3 month LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
contract) proportion) (In Rs)
Sep-19 Oct-19 Oct-19 Jul-20
Labour 20% 100 20.00 322 325 325 330 2.48 1.54 1.54 0.5 0.31 0.31
Other materials 20% 100 20.00 121.3 122 122.2 119.3 -1.65 -2.21 -2.37 -0.33 -0.44 -0.47
Plant, machinery & spares 30% 100 30.00 -0.79 0.00 0.00 -0.24 0 0
113.6 112.7 112.7 112.7
Fuel & lubricants 15% 100 15.00 100.2 102.1 102.1 88.3 -11.88 -13.52 -13.52 -1.78 -2.03 -2.03
LAR-1
LAR-2
LAR-3
Schedule-B
Components % of components as Basic value of
per PVC formula Sch-A
(Other works (In Rs)
contract)
Schedule-F
Components % of components as Basic value of
per PVC formula Sch-A
(Other works (In Rs)
contract)
Labour 20% 100
15.00 0 0 0 0
100.00
30.00
111.6 112.9 112.3 112.7
30.00
112.8 112.7 112.7 112.7
15.00 0 0 0 0
100.00
neering/e-Tender-NorthKUR-220-19/ 1045430010821 dt. 29.11.19
neering/e-Tender-CENKUR-155-2019/01439890007550 dt. 04.10.19
neering/e-Tender-CENKUR-140-2019/01079090007784 dt. 10.10.19
30.00
109.7 111.6 112.7
15.00 98.8 107.8 88.3
15.00 0 0 0 0
100.00
commodation/Crew/JJKR/P.K. Mohanty/292 dt. 28.02.18
ffice/TTE’s R.Room/BHC stn/PK Mohanty/268 dt. 07.09.18
0 0 0 0 0 0
-2.20 -2.70 -2.20
0 0 0 0 0 0
-2.32 -2.19 -2.19
0 0 0 0
2.78 -0.74
0.88
3.23
3.53
1.28
5.36
3.11
Schedule-C (Item No. 4 & 5)
Components % of components as Basic value of Basic value of Sch- LARs issued in the month of Tender opening % of escalation during the intervening Escalated amount during the
per PVC formula Sch-A A LAR-1 LAR-2 LAR-3 month LAR-1 period
LAR-2 intervening
LAR-1 period on (In Rs)
LAR-2
(Other works (In Rs) (Component wise
contract) proportion) (In Rs) Apr-16 Jan-18 May-20
Labour 40% 100 40.00 271 288 330 21.77 14.58 8.71 5.83
Other materials 35% 100 35.00 109 116 119.3 9.45 2.84 3.31 0.99
Plant, machinery & spares 5% 100 5.00 4.55 2.45 0.23 0.12
107.8 110 112.7
Fuel & lubricants 5% 100 5.00 78.3 97.5 88.3 12.77 -9.44 0.64 -0.47
Labour 20% 100 20.00 328 325 325 330 0.61 1.54 1.54 0.12 0.31 0.31
Other materials 20% 100 20.00 122.3 122.2 122.2 119.3 -2.45 -2.37 -2.37 -0.49 -0.47 -0.47
Plant, machinery & spares 30% 100 30.00 -0.09 0.00 0.00 -0.03 0 0
112.8 112.7 112.7 112.7
Fuel & lubricants 15% 100 15.00 101.3 102.1 102.1 88.3 -12.83 -13.52 -13.52 -1.92 -2.03 -2.03
Schedule-F
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula of Sch-A A LAR-1 LAR-2 opening intervening
LAR-1 LAR-2periodLAR-3 intervening
LAR-1 period on (In Rs)
LAR-2
(Other works (In Rs) (Component wise month
contract) proportion) (In Rs) Feb-18 Sep-18 May-20
Labour 20% 100 20.00 287 301 330 14.98 9.63 3 1.93
Other materials 20% 100 20.00 116.1 120.9 119.3 2.76 -1.32 0.55 -0.26
Plant, machinery & spares 30% 100 30.00 2.73 0.99 0.82 0.3
109.7 111.6 112.7
Fuel & lubricants 15% 100 15.00 98.8 107.8 88.3 -10.63 -18.09 -1.59 -2.71
Plant, machinery & spares 30% 100 30.00 113.3 112.9 -0.35 -0.11
Fuel & lubricants 15% 100 15.00 99.5 83.7 -15.88 -2.38
Fuel & lubricants 15% 100 15.00 102.1 83.7 -18.02 -2.7
Schedule-B
Components % of Basic Basic value of
components as value of Sch-A
per PVC formula Sch-A (Component
(Other works (In wise
contract) Rs) proportion) (In
Rs)
Schedule-F
Components % of Basic Basic value of
components as value of Sch-A
per PVC formula Sch-A (Component
(Other works (In wise
contract) Rs) proportion) (In
Rs)
-0.62
113.6 112.7 112.9
0 0 0 0
LAR-1 LAR-1
Sep-18 May-20
301 329 9.3
1.16
111.6 112.9
0 0 0
LAR-1 LAR-1
Nov-19 May-20
328 329 0.3
0.09
112.8 112.9
0 0 0
LAR-1 LAR-1
Feb-18 May-20
287 329 14.63
2.92
109.7 112.9
0 0 0
-2.75 -3.08
Escalated amount
during the
intervening period
on (In Rs)
LAR-1
1.86
-0.53
0.35
-3.75
0
-2.07
Escalated amount
during the
intervening period
on (In Rs)
LAR-1
0.06
-0.75
0.03
-2.61
0
-3.27
Escalated amount
during the
intervening period
on (In Rs)
LAR-1
2.93
0.28
0.88
-2.29
0
1.80
71.24 6713280 2.06% 6851573.57
5.28 497280 2.06% 507523.97
1.32 124320 2.06% 126880.99
10.60 999038.81 -2.94% 969667.07
11.56 1089000 4.22% 1134955.80
100.00 9422918.81 9590601.40
Plant, machinery & spares 30% 100 30.00 113.3 112.9 -0.35 -0.11
Fuel & lubricants 15% 100 15.00 99.5 83.7 -15.88 -2.38
Labour 20% 100 20.00 322 325 286 330 2.48 1.54 15.38 0.5 0.31 3.08
Other materials 20% 100 20.00 121.3 122.2 115.7 117.7 -2.97 -3.68 1.73 -0.59 -0.74 0.35
Plant, machinery 30% 100 30.00 -0.62 0.18 3.67 -0.19 0.05 1.1
& spares 113.6 112.7 108.9 112.9
Fuel & lubricants 15% 100 15.00 100.20 102.1 95.5 83.7 -16.47 -18.02 -12.36 -2.47 -2.7 -1.85
04 Jun 2020 ₹ 67.71
03 Jun 2020 ₹ 67.71
02 Jun 2020 ₹ 67.71
01 Jun 2020 ₹ 67.71
Schedule-F
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula of Sch-A A LAR-1 LAR-2 opening intervening
LAR-1 LAR-2periodLAR-3 intervening
LAR-1 period on (In Rs)
LAR-2
(Other works (In Rs) (Component wise month
contract) proportion) (In Rs) Feb-18 Sep-18 May-20
Labour 20% 100 20.00 287 301 329 14.63 9.30 2.93 1.86
Other materials 20% 100 20.00 116.1 120.9 117.7 1.38 -2.65 0.28 -0.53
Plant, machinery & spares 30% 100 30.00 2.92 1.16 0.88 0.35
109.7 111.6 112.9
Fuel & lubricants 15% 100 15.00 98.8 107.8 83.7 -15.28 -22.36 -2.29 -3.35
Type of labour
Un-skilled
Semi-skilled
Skilled
Highly skilled
9.00% 3667900.58 7.00% 3600599.65 232188.20
9.00% 264209.07 7.00% 259361.19 16725.16
9.00% 16502055.00 8.00% 16350660.00 0.00
17.00% 4195844.32 5.00% 3765501.32 168192.39
5.00% 230065.92 5.00% 230065.92 10736.41
24860074.89 24206188.08 427842.16
1081728.97 427842.16
4.55 1.80
Labour r
403 420
472 492
569 593
666 695
Total
Average
6.89
6.89
0.00
4.68
4.90
1.80
4.22
4.24
4.22
4.35
17.03
4.26
Schedule-C (Item No. 4 & 5)
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender opening % of escalation during the Escalated amount during the
per PVC formula of Sch-A A LAR-1 LAR-2 LAR-3 month intervening
LAR-1 LAR-2period intervening
LAR-1 period on (In Rs)
LAR-2
(Other works (In Rs) (Component wise
contract) proportion) (In Rs) Apr-16 Jan-18 May-20
Labour 40% 100 40.00 271 288 326 20.3 13.19 8.12 5.28
Other materials 35% 100 35.00 109 116 121.1 11.1 4.40 3.89 1.54
Plant, machinery & spares 5% 100 5.00 4.73 2.64 0.24 0.13
107.8 110 112.9
Fuel & lubricants 5% 100 5.00 78.3 97.5 100.7 28.61 3.28 1.43 0.16
Other materials 10% 100 10.00 117.3 120.9 120.9 121.1 3.24 0.17 0.17 0.32 0.02 0.02
Plant, machinery & spares 30% 100 30.00 2.54 1.16 1.16 0.76 0.35 0.35
110.1 111.6 111.6 112.9
Fuel & lubricants 25% 100 25.00 99 107.8 107.8 100.7 1.72 -6.59 -6.59 0.43 -1.65 -1.65
3281040
5% 8184878.42 38.32
10% 3597182.17 16.07
0% 830596.13 4.08
5% 4507571.29 21.10
30% 320658.00 1.21
21741041.36 100.00
Labour 20% 100 20.00 322 322 307 330 2.48 2.48 7.49 0.5 0.5 1.5
Other materials 20% 100 20.00 121.3 121.3 119.5 122.2 0.74 0.74 2.26 0.15 0.15 0.45
Plant, machinery & spares 30% 100 30.00 113.6 113.6 111.9 113.4 -0.18 -0.18 1.34 -0.05 -0.05 0.4
Fuel & lubricants 15% 100 15.00 100.2 100.2 103.9 103.9 3.69 3.69 0.00 0.55 0.55 0
Labour 20% 100 20.00 322 291 302 330 2.48 13.40 9.27 0.5 2.68 1.85
Other materials 20% 100 20.00 121.3 119.1 122 122.2 0.74 2.60 0.16 0.15 0.52 0.03
Plant, machinery & spares 30% 100 30.00 113.6 110.5 111.5 113.4 -0.18 2.62 1.70 -0.05 0.79 0.51
Fuel & lubricants 15% 100 15.00 100.2 104.4 111.3 103.9 3.69 -0.48 -6.65 0.55 -0.07 -1
Other materials 20% 100 20.00 116.1 120.9 122.9 5.86 1.65 1.17 0.33
Plant, machinery & spares 30% 100 30.00 3.01 1.25 0.9 0.38
109.7 111.6 113
Fuel & lubricants 15% 100 15.00 98.8 107.8 102.7 3.95 -4.73 0.59 -0.71
13248495.48 13248495.48
2292203.03 2688129.01
8624051.94 10197358.71
832650.21 847789.31
24997400.66 26981772.51
1984371.85
962884.04
6 472
3 403
10
1
C.P @ 10%
GST@18%
T&P@1%
USK SSK
01.04.17 359 420
01.10.17 359 420
01.04.18 370 433
01.10.18 373 437
01.04.19 390 457
01.10.19 403 472
2254 2639
375.67 439.83
5% 5133590.10 137873.56 2.76
6% 2331708.89 72590.94 3.21
5% 20365748.77 277362.10 1.38
8% 2180088.00 121519.72 5.90
30011135.76 609346.32 609346.32
609346
2.07
109731925.17
4706598.19
7857107.54
12563705.73
562.22
2832
1209
4041
404.1
40.41
72.74
4.04
521.289
0
3.06
0.81
4.56
3.32
11.75
2.35
108.12%
11829013.82 8.73%
2083820.94 8.73%
5827062.12 9.27%
756954.74 5.25%
20496851.62
648200 475.54%
1086472.2 475.54%
220554.24 128.19%
129240 130.83%
349794.24
1640212 479.03%
594463 791.74%
2234675
11829013.82 25.10%
2083820.94 9.39%
5827062.12 9.93%
756954.74 5.90%
52
282728.48
169084.69
451813.17
129.17
7857107.54
4706601.36
12563708.90
562.22
712508
2.93
3.01
18.64
60.15
6.41
13248495.48 -1549600.81 -1549600.81
2292203.03 12711.30 12711.30
8624051.94 2218362.55 -233082.48
832650.21 31035.14 31035.14
24997400.66 712508.19 -1738936.85
1738937
6.50
Schedule-D
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula of Sch-A A opening intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise LAR-1 LAR-2 LAR-3 month LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
contract) proportion) (In Rs)
Mar-18 Apr-18 Aug-18 Dec-19
Labour 20% 100 20.00 287 288 301 325 13.24 12.85 7.97 2.65 2.57 1.59
Other materials 20% 100 20.00 116.3 117.3 120.1 122.3 5.16 4.26 1.83 1.03 0.85 0.37
Plant, machinery & spares 30% 100 30.00 109.9 110.1 111.2 112.6 2.46 2.27 1.26 0.74 0.68 0.38
Fuel & lubricants 15% 100 15.00 98 99 104.9 101.3 3.37 2.32 -3.43 0.51 0.35 -0.51
Labour 20% 100 20.00 287 291 301 322 12.2 10.65 6.98 2.44 2.13 1.4
Other materials 20% 100 20.00 116.1 119.1 120.9 122.2 5.25 2.60 1.08 1.05 0.52 0.22
Plant, machinery & spares 30% 100 30.00 2.83 2.08 1.08 0.85 0.62 0.32
109.7 110.5 111.6 112.8
Fuel & lubricants 15% 100 15.00 98.8 104.4 107.8 102.1 3.34 -2.20 -5.29 0.5 -0.33 -0.79
Labour 4.62% 100 4.62 277 116.4 115.7 322 16.25 176.63 178.31 0.75 8.16 8.24
Plant & machinery 4.61% 100 4.61 107.4 109.3 108.9 112.8 5.03 3.20 3.58 0.23 0.15 0.17
100.00 19.95 -51.29 -50.97
LAR-1 DRM(Engg)/WAT’s LoA No. 8515/16-17/KK-I/Protection works between TXD-BGHU/MdN dt. 12.09.16 (F/178)
Schedules BHC HCNR JJKR KDJR
Deptt TI Nego. TI Final worked Deptt TI Nego. TI Final worked Deptt TI Original Nego. TI Final worked Deptt TI Original Nego. TI Final worked
out TI out TI quoted TI out TI quoted TI out TI
A 424.00% 8.00% 465.92% 445.00% 5.00% 472.25% 430.00% 8.00% 444.98% 30.00%
B 45.00% 9.00% 58.05% 51.98% 5.00% 59.58% 50.22% 9.00% 52.00% 20.00%
C 112.81% 8.00% 129.83% 111.97% 6.00% 124.69% 103.71% 13.00% 116.85% 30.00%
Labour 20% 100 20.00 291 301 275 322 10.65 6.98 17.09 2.13 1.4 3.42
Other materials 20% 100 20.00 119.1 120.9 113.2 122.2 2.6 1.08 7.95 0.52 0.22 1.59
Plant, machinery & spares 30% 100 30.00 2.08 1.08 -0.35 0.62 0.32 -0.11
110.5 111.6 113.2 112.8
Fuel & lubricants 15% 100 15.00 104.4 107.8 93.6 102.1 -2.2 -5.29 9.08 -0.33 -0.79 1.36
9578560
2864832
347900
13152013
25943305
2846986.55 124.17% 3535103.20
85600 125.53% 107453.68
200000 35.55% 71100.00
64000 124.07% 79404.80
11880 62.37% 7409.56
5400 125.74% 6789.96
3213866.55 3807261.20
118.46
% of escalation during the 0.015 0.036 0.073 0.032 0.015 0.036 0.073 0.032
month
Schedule-B
Components % of components as Basic value
per PVC formula of Sch-A
(Other works (In Rs)
contract)
Schedule-F
Components % of components as Basic value
per PVC formula of Sch-A
(Other works (In Rs)
contract)
66360178.71 2.47%
1026845.31 31.33%
3569257.3 4.48%
8525457.6 -6.82%
1776728.29 6.43%
299173.22 2.86%
81557640.43
1475538 6.86%
238127 31.96%
1713665
Basic value of Sch- LARs issued in the month of Tender % of escalation during the
A opening intervening period
(Component wise month
proportion) (In Rs) LAR-1 LAR-2 LAR-3 LAR-1
Jan-18 Sep-18 Aug-18 Oct-19
15.00 0 0 0 0 0
100.00
S & 2nd FOB-BHC/Braja/246 dt. 18.01.18 (F/__)
wajeet/225 dt. 21.09.18 (F/__)
OB/CTC/ Amulya/298 dt. 17.08.19 (F/__)
Basic value of Sch- LARs issued in the month of Tender % of escalation during the
A opening intervening period
(Component wise LAR-1 LAR-2 LAR-3 month LAR-1
proportion) (In Rs)
Sep-18 May-19 Mar-19 Oct-19
30.00 2.06
111.6 121.6 119.9 113.9
Basic value of Sch- LARs issued in the month of Tender % of escalation during the
A opening intervening period
(Component wise month
proportion) (In Rs) LAR-1 LAR-1
Jan-11 Oct-19
Basic value of Sch- LARs issued in the month of Tender % of escalation during the
A opening intervening period
(Component wise LAR-1 LAR-2 month LAR-1
proportion) (In Rs)
Feb-18 Sep-18 Oct-19
30.00 3.83
109.7 111.6 113.9
15.00 0 0 0 0
100.00
accommodation/crew/JJKR/P.K. Mohanty/292 dt. 28.02.18 (F/__)
t office/TTE’s R-Room/BHC stn/PK Mohanty/268 dt. 07.09.18 (F/__)
1652014.80 1760640
1052139.99 1238161.35
7887099.33 9160394.11
10591254.12 12159195.46
1567941
14.80
67999275.12 71668993.01
1348555.95 2053690.62
3729160.03 3792692.81
7944021.39 9036985.06
1890971.92 1869473.51
307729.57 329090.54
83219713.98 88750925.55
5531212
6.65
101221.91
76105.39
177327.3
10.35
% of escalation during the Escalated amount during the
intervening period intervening period on (In Rs)
0 0 0 0 0
4.76 1.03 1.66
LAR-1
14.26
5.69
10.22
1.79
0
31.96
0 0 0
4.70 1.03
Schedule-A
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula of Sch-A A opening intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise month
contract) proportion) (In Rs) LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
Apr-18 Jul-17 Nov-17 Aug-19
Labour 20% 100 20.00 288 285 288 320 11.11 12.28 11.11 2.22 2.46 2.22
Other materials 20% 100 20.00 117.3 113.9 116.4 121.4 3.5 6.58 4.30 0.7 1.32 0.86
Plant, machinery & spares 30% 100 30.00 110.1 107.9 109.3 113.1 2.72 4.82 3.48 0.82 1.45 1.04
Fuel & lubricants 15% 100 15.00 99 88.4 94.6 100.7 1.72 13.91 6.45 0.26 2.09 0.97
Labour 20% 100 20.00 288 285 288 309 314 320 11.11 12.28 11.11 3.56 1.91 2.22 2.46 2.22 0.71 0.38
Other materials 20% 100 20.00 117.3 113.9 116.4 119.9 121.6 121.4 3.5 6.58 4.30 1.25 -0.16 0.7 1.32 0.86 0.25 -0.03
Plant, machinery & spares 30% 100 30.00 110.1 107.9 109.3 112.3 112.9 113.1 2.72 4.82 3.48 0.71 0.18 0.82 1.45 1.04 0.21 0.05
Fuel & lubricants 15% 100 15.00 99 88.4 94.6 102.5 104.4 100.7 1.72 13.91 6.45 -1.76 -3.54 0.26 2.09 0.97 -0.26 -0.53
LAR-1 D/K/T/Raising /PF 2&3/CLKA Station/A. Jagannath/ 204 dt. 23.04.18 (F/227)
LAR-2 D/K/T/Rep&Impv PF surface/ BUDR-JEN/Aurosun/202 dt. 28.07.17 (F/224)
LAR-3 D/K/T/Rep & Impv PF surface/BHC-JJKR/Sibani/162 dt. 07.11.17 (F/219)
LAR-4 D/K/T/Raising PF/ADEN-JJKR/P.C. Biswal/219 dt. 18.03.19 (F/207)
LAR-5 D/K/T/Raising PF/BUDR-KED-MZZ-BTV/P.K. Mishra/249 dt. 24.05.19 (F/213)
Schedule-E (Item No.1-3)
Components % of components as Basic value Basic value of Sch- LARs issued in the month of Tender % of escalation during the Escalated amount during the
per PVC formula of Sch-A A opening intervening period intervening period on (In Rs)
(Other works (In Rs) (Component wise month
contract) proportion) (In Rs) LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3 LAR-1 LAR-2 LAR-3
Mar-19 May-19 Apr-18 Aug-19
Labour 20% 100 20.00 309 314 288 320 3.56 1.91 11.11 0.71 0.38 2.22
Other materials 20% 100 20.00 119.9 121.6 117.3 121.4 1.25 -0.16 3.50 0.25 -0.03 0.7
Plant, machinery & spares 30% 100 30.00 112.3 112.9 110.1 113.1 0.71 0.18 2.72 0.21 0.05 0.82
Fuel & lubricants 15% 100 15.00 102.5 104.4 99 100.7 -1.76 -3.54 1.72 -0.26 -0.53 0.26
LAR-1 D/K/T/Raising /PF 2&3/CLKA Station/A. Jagannath/ 204 dt. 23.04.18 (F/227)
LAR-2 D/K/T/Rep&Impv PF surface/ BUDR-JEN/Aurosun/202 dt. 28.07.17 (F/224)
LAR-3 D/K/T/Rep & Impv PF surface/BHC-JJKR/Sibani/162 dt. 07.11.17 (F/219)
Other materials 20% 100 20.00 108 107.1 109.4 121.4 12.41 13.35 10.97 2.48 2.67 2.19
Plant, machinery & spares 30% 100 30.00 4.53 4.63 3.76 1.36 1.39 1.13
108.2 108.1 109 113.1
Fuel & lubricants 15% 100 15.00 79.8 75.5 84.8 100.7 26.19 33.38 18.75 3.93 5.01 2.81
Other materials 30% 26590282.95 7977084.89 121.3 120.1 121.3 0 1.00 0 79770.85
Plant, machinery & spares 20% 26590282.95 5318056.59 113.9 111.2 113.9 0 2.43 0 129228.78
Fuel & lubricants 15% 26590282.95 3988542.44 100.2 104.9 100.2 0 -4.48 0 -178686.7
0.00 1.38
Plant, machinery & spares 15% 220000 33000.00 108.1 113.9 5.37 1772.1
Fuel & lubricants 15% 220000 33000.00 119.2 121.3 1.76 580.8
7251606.50 1167890
68042.63 231
1385766.79 352637
411260.60 42360
131298.00 -486
9247974.52 1562633
1562633
14.45
4707818.8 11.99% 564467.47
52530 14.21% 7464.51
176400 52.28% 92221.92
4936748.8 664153.91
13.45
Indices as on
Components Percentage 01.01.11
Labour 20%
2385685
4.05
Indices as on
Aug/19 % of escalation
121.4 28.60%
74.5 -21.56%
13783800.24 6.00%
2845520.04 4.58%
3067080 0.74%
19696400.28
12543258.22
14610828.25
2794300.68
2975844.86
3011872.56
3089776.39
20676449.50 18349431.46
2327018
11.25443729474
0.80 202491.66
1.01 255280.00
98.19 24863641.20
100.00 25321412.86
5.18% above
6.18% below
6.79% above
D/K/T/Improvement/Drain/PRDP/ADEN-II/CTC/A.K. Rout/242 dt. 30.05.19 4.99% on 5.11% 10.35% 2 months 11.23%
D/K/T/RVNL work/PRNR & NANR St/Mahavir Infra/205 dt. 11.10.18 0% on 5.93% 5.93% 10 months 10.38%
D/K/T/Imp/Yd Drainage/NYG/GLDH/Arun Satapathy/148 dt. 18.06.18 6% on 2.78% 8.95% 1-2 months 15.31%
D/K/T/Rep drain/CTC Stn-LC-178 & side drain/DNM/Premananda/176 dt. 06.12.17 -4% on 11% 6.56% 1-8 months 15.58%
936570.6 1217541.78 3.04% 965042.35
577795.94 577795.94 0% 577795.94
36000 39600 5.80% 38088.00
1550366.54 1834937.72 1580926.29
936570.6 60.41
577795.94 37.27
36000 2.32
1550366.54 100.00
1023671.67 58629.32
577795.94
38160
1639627.61
58701
3.71
2017-18 3rd 5210657 F/88
4th 10933215 f/86
159600
287232
1496000
1942832
106400
53200
197120
90112 446832 4.38% 19571.24
1496000 1496000 68% 1017280.00
1942832 1942832 1036851.24
53.36803396279
1894993.09 3% 1951842.88
1466217.00 3% 1510203.51
10338564.14 4% 10752106.71
4043421.96 4.38% 4220523.84
18434676.94
1951842.88 4.02% 1971171.81
1510203.51 4.00% 1524865.68
10752106.71 3.78% 10729361.86
6469475.14 70.74% 6903738.65
20683628.23 21129138.01
66.96 7835096 5.80% 8289531.61 10.44% 9154958.71 9035589 -119369 10% 9118484.77 -36474
7.02 817075 6.31% 868632.43 2.81% 893041.00 946809.35 53768 10% 955495.68 62455
0.30 35136 4.75% 36804.96 -2.07% 36043.10 40117.41 4074 8% 39749.36 3706
25.72 2948340 8.00% 3184207.20 13.25% 3606114.65 3470786 -135329 8% 3438943.78 -167171
100.00 12379176.20 13690157.47 13493302 13552673.58 -137484
196855 -137483.89
1.44 -1.00
D/K/T/Rasing PF/ADEN-JJKR/PC Biswal/219 dt. 18.03.19 12.69% 6.24%
5% on 7.32% 0% on 6.24%
36669817.66 60.54
202662.62 0.33
18523437.37 30.58
21152.81 0.03
5151497.37 8.51
60568567.83 100.00
44370479.37
222928.88
18893906.11
21152.81
5357557.27
68866024.44
36669817.66
202662.62
18523437.37
21152.81
5151497.37
60568567.83
4707818.80 15.04%
52530 29.27%
176400 38.33%
4936748.80
44370479.37
222928.88
18893906.11
21152.81
5357557.27
68866024.44
3320384
5.07
2790000 13.87% 386973
912420 15.90% 145074.78
3702420 532047.78
14.37
Advertised value Quoted
(Basic +TI) rate
36669817.66 21.00%
202662.62 10.00%
18523437.37 2.00%
21152.81 0%
5151497.37 4.00%
60568567.83
Quoted amount expected Nego. Nego.
Rate Amount
44370479.37 11.97% 41059194.83
222928.88 6.83% 216504.48
18893906.12 6.51% 19729313.14
21152.81 -2.45% 20634.57
5357557.26 5.69% 5444617.57
68866024.44 66470264.59
2395760
3.60
13361403.59 3.77% 13865128.51 13.00% 15098386.0567 14.00% 15232000.09
2609822.08 8.35% 2827742.22 3% 2688116.7424 3.00% 2688116.74
4999340.4 -2.27% 4885855.37 5% 5249307.42 4.00% 5199314.02
1884923.03 4.85% 1976341.80 0% 1884923.03 0.00% 1884923.03
1136558.48 6.86% 1214526.39 5% 1193386.404 3.50% 1176338.03
23992047.58 24769594.29 26114119.6531 26180691.91
USSOR
Deptt TI Accepted TI
D/K/T/Misc/Rep/Maj & Min/Br/ADEN-KDJR/L.N. Mallick/139 dt. 06.12.18 -10.84% -10.43%
D/K/T/Misc/Rep/Major & Minor/Bridges/ADEN/BALU/Binaya/210 dt. 20.04.18 10.97% -22.35%
D/K/T/Misc. Rep/Maj & Min Bridges/ADEN/BBS/DKD/207 dt. 28.11.17 1.68% -9.90%
D/K/T/Misc rep major bridges/GJTA-TLHR-ANGL/Aurosun/277 dt. 31.07.17 1.68% -11.68%
D/K/T/Misc rep/Minor bridges/GJTA-TLHR-ANGL/AKS/163 dt. 17.07.17 1.68% -11.32%
D/K/T/Misc rep & painting/Brides/RNTL-JJKR/Rajesh/142 dt. 07.11.17 3.24% -4.00%
D/K/T/Misc. Rep works/Bridges/BAM-PSA/Rajesh/169 dt. 06.03.17 12.20% -7.20%
Cement (PPC)
D/K/T/Misc/Rep/Major & Minor/Bridges/ADEN/BALU/Binaya/210 dt. 20.04.18 7.30% -8.90%
D/K/T/Misc. Rep/Maj & Min Bridges/ADEN/BBS/DKD/207 dt. 28.11.17 10.05% 0%
D/K/T/Misc rep major bridges/GJTA-TLHR-ANGL/Aurosun/277 dt. 31.07.17 10.05% 0%
D/K/T/Misc rep/Minor bridges/GJTA-TLHR-ANGL/AKS/163 dt. 17.07.17 10.05% -0.30%
D/K/T/Misc. Rep works/Bridges/BAM-PSA/Rajesh/169 dt. 06.03.17 5.90% -5.90%
Steel
D/K/T/Misc/Rep/Maj & Min/Br/ADEN-KDJR/L.N. Mallick/139 dt. 06.12.18 13.10% -16%
D/K/T/Misc/Rep/Major & Minor/Bridges/ADEN/BALU/Binaya/210 dt. 20.04.18 6.30% -6.50%
D/K/T/Misc. Rep/Maj & Min Bridges/ADEN/BBS/DKD/207 dt. 28.11.17 8.84% 0%
D/K/T/Misc rep major bridges/GJTA-TLHR-ANGL/Aurosun/277 dt. 31.07.17 8.84% 0%
D/K/T/Misc rep/Minor bridges/GJTA-TLHR-ANGL/AKS/163 dt. 17.07.17 8.84% 0.50%
D/K/T/Misc rep & painting/Brides/RNTL-JJKR/Rajesh/142 dt. 07.11.17 20.46% 0%
D/K/T/Misc. Rep works/Bridges/BAM-PSA/Rajesh/169 dt. 06.03.17 6.90% -6.90%
6867760.10 1.28% 6955667.43 60.90
1341130.00 6.31% 1425755.30 12.48
1663104.00 4.75% 1742101.44 15.25
444511.00 22.13% 542881.28 4.75
755413.35 0% 755413.35 6.61
11421818.81 100.00
1443020
6.81
15675691.34 13.03% 17718233.92 17363869.24 19667239.65
4899000 5.11% 5149338.90 5406805.85 5561286.01
1434720 2.58% 1471735.78 1618909.35 1707213.50
223040.9 -5.49% 210795.95 210795.95 210795.95
24550104.55 24600380.39 27146535.11
465701
7.56
2089254.29 2277287.18 2264751.65
262560.00 286190.4 286190.40
4106456.93 4722425.47 4722425.47
1311985.50 2492772.45 2072937.09
81387.03 154635.36 86107.48
512627.28 563890.01 551023.06
8364271.03 10497200.87 9983435.15
-475833
-5.00
47660016.64 1.57% 48408278.9 59.88
247565 1.57% 251451.77 0.31
24033275 7.32% 25792510.73 31.91
17568 6.24% 18664.24 0.02
6156956 3.42% 6367523.9 7.88
80838429.54 100.00
48408278.9 11.25%
48408278.9 11.25%
251451.77 6.12%
25792510.73 4.88%
18664.24 -2.25%
6367523.9 11.52%
80838429.54
10.51% 53495989.01 27.00% 61478514.20
5.37% 264954.73 5.00% 264024.36
4.69% 27002179.48 7.00% 27597986.48
-1.55% 18374.94 3.00% 19224.17
10.58% 7041207.93 13.00% 7195302.01
87822706.10 96555051.22
8732345
9.94
0.50% 12.13%
RKN/C.R.Swain/189 dt. 27.02.18 -8% 12.13%