You are on page 1of 13

A B C D E F G

6600 6870 4500 3430 5400 6002

4830

2
4200

3
4200

EXISTING CABLE LADDER


4200

EXISTING CABLE LADDER


4200

6 FUEL TANK
(1500L)

EXISTING CABLE LADDER


6060
NEW PARTITION WALL
(BATTERY ROOM)

7 C.R.1 C.R.2 PANTRY

NEW PARTITION WALL


FUTURE FUTURE
BATTERY BATTERY

SMART

ATS
2380 GENSET
ROOM
ROOM FUTURE
BATTERY
NEW BATTERY
500 AH

MDP
FUTURE NEW BATTERY
BATTERY 500 AH
SD
40KW

8 GENSET

DTS
BATTERY

M.B.
BANK 1

NP
BATTERY

EP
ROOM
2540 ECB MTS PR2
P-ISNET

STOCK ROOM BATTERY


BANK 2

9 AC PANEL ECB DCPDB

HUAWEI

ISNET

PR-2 PANEL
ODF

OFFICE MDF SD
MDF

5800 CCTV
ODF

NEW PARTITION WALL


FIBER-
HOME

EXP.1000A
NEW 500A

HUAWEI
ACBEL
RECTIFIER

HUAWEI

10 WACU 1
2.5 HP
WACU 2
2.0 HP
WACU 3
2.5 HP

NEW WACU (2.5HP)


NEW WACU (2.5HP)
4000 NEW PARTITION WALL
(EQUIPMENT ROOM)

11
PARKING
AREA

6020

11
1x50KVA
TRANSFORMER

PLDT MAUBAN
NEW SITE DEVELOPMENT PLAN

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF STEEL DOOR AND
PROJECT MANAGEMENT DOUBLE WALL PARTITION
ADDRESS:
ENGR. MONICA SHAYNE VILLAFUERTE IAN KRISTIAN DEL E. INGRESO
JEHAN IMPLEMENTATION MANAGER
TREVOR CADAG
JEHAN REGIONAL PM
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
CE-1 / CE-4
PROFESSIONAL CIVIL ENGINEER
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON DATE: JUNE 01, 2021 DATE: JUNE 01, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
³

PLDT MAUBAN
NEW DOUBLE WALL PARTITION DETAILS (EQUIPMENT ROOM)
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF STEEL DOOR AND
PROJECT MANAGEMENT DOUBLE WALL PARTITION
ADDRESS:
ENGR. MONICA SHAYNE VILLAFUERTE IAN KRISTIAN DEL E. INGRESO
JEHAN IMPLEMENTATION MANAGER
TREVOR CADAG
JEHAN REGIONAL PM
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
CE-2 / CE-4
PROFESSIONAL CIVIL ENGINEER
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON DATE: JUNE 01, 2021 DATE: JUNE 01, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
³

PLDT MAUBAN
NEW DOUBLE WALL PARTITION DETAILS (BATTERY ROOM)
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF STEEL DOOR AND
PROJECT MANAGEMENT DOUBLE WALL PARTITION
ADDRESS:
ENGR. MONICA SHAYNE VILLAFUERTE IAN KRISTIAN DEL E. INGRESO
JEHAN IMPLEMENTATION MANAGER
TREVOR CADAG
JEHAN REGIONAL PM
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
CE-3 / CE-4
PROFESSIONAL CIVIL ENGINEER
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON DATE: JUNE 01, 2021 DATE: JUNE 01, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
FASTENER
B
DOOR FRAME

100 x 50 x 3m TABULAR

DETAIL B

FFL

SECTION- AA'
ELEVATION

SECTION BB'

DOOR HANDLE
60MM THICK PLAIN METAL SHEET
100 x 50 x 3m HORIZONTAL TUBULAR
100 x 50 x 3m VERTICAL TUBULAR
4" x 4.5"
ISOMETRIC VIEW OF DOOR
HINGE DOOR SPECS:
- LEC STEEL
DETAIL C - 1 1/2 HR FIRE RATED

PLDT MAUBAN
DETAIL A
NEW DOOR DETAILS
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF STEEL DOOR AND
PROJECT MANAGEMENT DOUBLE WALL PARTITION
ADDRESS:
ENGR. MONICA SHAYNE VILLAFUERTE IAN KRISTIAN DEL E. INGRESO
JEHAN IMPLEMENTATION MANAGER
TREVOR CADAG
JEHAN REGIONAL PM
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
CE-4 / CE-4
PROFESSIONAL CIVIL ENGINEER
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON DATE: JUNE 01, 2021 DATE: JUNE 01, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
A B C D E F G
6600 6870 4500 3430 5400 6002

1 UPGRADED 2.0HP TO 2.5HP WACU


4830

2
4200

3
EXISTING 2.0HP SCHEDULED
4200
WINDOW TYPE AIR CONDITIONING UNIT
4

EXISTING CABLE LADDER


4200 NEW 2.5HP
WINDOW TYPE AIR CONDITIONING UNIT
5

EXISTING CABLE LADDER


4200 ISOMETRIC DRAWING

6 FUEL TANK
(1500L)

AC PANEL ECB DCPDB


EXISTING CABLE LADDER

HUAWEI

6060

ISNET

PR-2 PANEL
7 C.R.1 C.R.2 PANTRY
600 600 950 600 600
900

MDF
ODF
NEW 2 x 38mm² THHN & 1x14mm² GW
NEW PARTITION WALL

FUTURE FUTURE
BATTERY BATTERY

SMART
ATS

SD
IN 40mmØ LT FMC
2380 GENSET
ROOM
ROOM FUTURE
BATTERY
NEW BATTERY
500 AH 600
MDF
MDP

FUTURE NEW BATTERY


BATTERY 500 AH 600
SD
40KW
ODF
8 GENSET
320
CCTV
DTS

NEW PARTITION WALL


BATTERY
M.B.

BANK 1
NP

600 600 1100


BATTERY
FIBER-
EP

ROOM
2540 ECB MTS PR2
P-ISNET

600
HOME

EXP.1000A
NEW 500A
STOCK ROOM BATTERY

HUAWEI
BANK 2

9 AC PANEL ECB DCPDB

HUAWEI
600 ACBEL
RECTIFIER
ISNET

HUAWEI
PR-2 PANEL

ODF

OFFICE MDF SD
1000
MDF

5800 CCTV
ODF
NEW PARTITION WALL

600 600 1100 WACU 2


FIBER-
600
HOME WACU 1 2.0 HP
EXP.1000A
NEW 500A

2.5 HP
HUAWEI

WACU 3
600 ACBEL
RECTIFIER
2.5 HP
HUAWEI

1000
1500 660 1180 660 800 NEW 30A WACU OUTLET
10 1500
WACU 1
2.5 HP

660 1180
WACU 2
2.0 HP
WACU 3
2.5 HP

660 800
NEW WACU (2.5HP)
GROUNDING TYPE (WITH PLATE AND COVER)

NEW WACU (2.5HP)


2 x 3.5mm² THHN WIRE &
NEW WACU (2.5HP) 1x3.5mm² GW IN 15mmØ IMC
4000

11
PARKING
AREA

6020

11
1x50KVA
TRANSFORMER

PLDT MAUBAN
NEW SITE DEVELOPMENT PLAN

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN INSTALLATION


NETWORK SUPPORT FACILITIES OF 1x500A EXP. TO 1000A RECTIFIER,
PROJECT MANAGEMENT 2x500AH BATTERY, AND 2x2.5HP WACU
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
IAN KRISTIAN DEL E. INGRESO TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
EE-1 / EE-3
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: APRIL 07, 2021 DATE: APRIL 07, 2021 DATE: DATE: DATE:
50KVA
TRANSFORMER

2 x 250mm² EXISTING WIRE

225AT,
2P
40KW MOBILE BOX

GENSET
2 x 100mm² EXISITNG WIRE

200AT,3P G
2 x 60mm² EXISTNG WIRE 150AT,3P 70AT,3P
SPARE
2 x 100mm² EXISTING WIRE
MDP 2 x 100mm² EXISTING WIRE
2 x 200mm² EXISTING WIRE

300AT, 250AT,3P
3P

ATS MTS

2 x 100mm EXISTING WIRE


2 x 30mm² EXISTING WIRE
2 x 25mm² EXISTING WIRE

70AT,3P

20AT,2P 20AT,2P ECB - PR2


LIGHTINGS EAVES LIGHTINGS 75AT,2P
2 x 50mm² EXISTING WIRE DTS 20AT,2P 30AT,2P
2 x 38mm² EXISTING WIRE C.O NEW 2.5HP WACU
2
. 30AT,2P 30AT,2P
2 x 38mm² EXISTING x
WACU COMMERCIAL CB SMALL CELL UPS 30mm²
WIRE
30AT,2P 30AT,2P
SPARE 75AT,2P
100AT,3P SPARE
PANEL
30AT,2P
100AT,3P NP
ECB 20AT,2P 20AT,2P TVSS
160AT,2P RECTIFIER
30AT,2P 30AT,2P ECB LIGHTINGS LIGHTINGS PANEL PR2
SPARE SPARE 100AT,2P 20AT,2P 30AT,2P
30AT,2P 30AT,2P C.O . WACU EQUIPMENT 2x3.5mm² THHN WIRE &
30AT,2P 30AT,2P 1x3.5mm² THHN GW WIRE
SPARE SPARE IN 15mmØ IMC
160AT,2P WACU RADIO WACU COMMERCIAL
PANEL PR 20AT,2P 20AT,2P
70AT,2P 70AT,2P
30A WACU OUTLET
FREE ALARM SYSTEM OBSTRUCTION LIGHT
GROUNDING TYPE (WITH PLATE AND COVER)
ELTEK 1A ELTEK 2A 30AT,2P 20AT,2P
70AT,2P 70AT,2P WATER PUMP PERIMETER LIGHTS
NEW 2 x 38mm² THHN &
ELTEK 1B ELTEK 2B 1x14mm² GW IN 40mmØ 40AT,2P
70AT,2P 70AT,2P LT FMC P - ISNET
SPARE SPARE
30AT,2P 30AT,2P PANEL EP
SPARE ACU 1
30AT,2P 30AT,2P NEW 500A
EXP. TO
SPARE ACU 2
1000A
20AT,2P 20AT,2P RECTIFIER
SPARE TOWER LIGHT
20AT,2P 20AT,2P PLDT MAUBAN
SPARE
20AT,2P 20AT,2P
SPARE
NEW SINGLE LINE DIAGRAM
LIGHTINGS C.O.1

ACPDB

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN INSTALLATION


NETWORK SUPPORT FACILITIES OF 1x500A EXP. TO 1000A RECTIFIER,
PROJECT MANAGEMENT 2x500AH BATTERY, AND 2x2.5HP WACU
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
IAN KRISTIAN DEL E. INGRESO TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
EE-2 / EE-3
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: APRIL 07, 2021 DATE: APRIL 07, 2021 DATE: DATE: DATE:
EXISTING NP PANEL, 70AT MCB, 3P
LOCATION: GENSET ROOM
Circuit Load Protection Wire and Conduits
Load Description Volts 1Ø
No.: AT
(VA)
1 LIGHTINGS 230 0.0 20 EXISTING 2x3.5mm² WIRE
2 LIGHTINGS 230 0.0 20 EXISTING 2x3.5mm² WIRE
3 CONVENIENCE OUTLETS 230 0.0 30 EXISTING 2x3.5mm² WIRE
NEW 2.5 HP WACU 230 NEW 2x3.5mm² THHN + 1x3.5mm² THHN
4 8.11 30
GROUNDING IN 15mmØ IMC
5 WACU COMMERCIAL 230 1.2 30 EXISTING 2x3.5mm² WIRE
6 CB-SMALL CELL UPS 230 0.0 30 EXISTING 2x3.5mm² WIRE
NEW 2.5 HP WACU 230 NEW 2x3.5mm² THHN + 1x3.5mm² THHN
7 8.11 20
GROUNDING IN 15mmØ IMC
8 SPARE 230 - 20
Total 17.42
CALCULATION:
I TOTAL =I3Ø+(Highest 1Ø Current*1.732)+0.25(HML)
=17.42+0.25(8.11)
=19.45 Amps

2x25mm² EXISTING WIRE


MAIN PROTECTION: 70AT,230V,60HZ,1P,MCCB

PLDT MAUBAN
NEW SCHEDULE OF LOADS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN INSTALLATION


NETWORK SUPPORT FACILITIES OF 1x500A EXP. TO 1000A RECTIFIER,
PROJECT MANAGEMENT 2x500AH BATTERY, AND 2x2.5HP WACU
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
IAN KRISTIAN DEL E. INGRESO TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
EE-3 / EE-3
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: APRIL 07, 2021 DATE: APRIL 07, 2021 DATE: DATE: DATE:
A B C D E F G
6600 6870 4500 3430 5400 6002

1 UPGRADED 2.0HP TO 2.5HP WACU


4830

2
4200

3
EXISTING 2.0HP SCHEDULED
4200
WINDOW TYPE AIR CONDITIONING UNIT
4

EXISTING CABLE LADDER


4200 NEW 2.5HP
WINDOW TYPE AIR CONDITIONING UNIT
5

EXISTING CABLE LADDER


4200 ISOMETRIC DRAWING

6 FUEL TANK
(1500L)
EXISTING CABLE LADDER

6060

7 C.R.1 C.R.2 PANTRY


600 600 950 600 600
900
NEW PARTITION WALL

FUTURE FUTURE
BATTERY BATTERY

SMART
ATS

2380 GENSET
ROOM
ROOM FUTURE
BATTERY
NEW BATTERY
500 AH 600
MDP

FUTURE NEW BATTERY


BATTERY 500 AH 600
SD
40KW

8 GENSET
320
DTS

BATTERY
M.B.

BANK 1
NP

BATTERY
EP

ROOM
2540 ECB MTS PR2
P-ISNET

STOCK ROOM BATTERY


BANK 2

9 AC PANEL ECB DCPDB

HUAWEI

ISNET
PR-2 PANEL

ODF

OFFICE MDF SD
MDF

5800 CCTV
ODF
NEW PARTITION WALL

600 600 1100


FIBER-
HOME
600
EXP.1000A
NEW 500A

HUAWEI

600 ACBEL
RECTIFIER

HUAWEI

1000

10 1500
WACU 1
2.5 HP

660 1180
WACU 2
2.0 HP
WACU 3
2.5 HP

660 800

NEW WACU (2.5HP)


NEW WACU (2.5HP)
4000

11
PARKING
AREA

6020

11
1x50KVA
TRANSFORMER

PLDT MAUBAN
NEW SITE DEVELOPMENT PLAN

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF 2x2.5HP WACU
PROJECT MANAGEMENT
ADDRESS:
ENGR. RICARDO ROMERO
PROFESSIONAL MECHANICAL
IAN KRISTIAN DEL E. INGRESO TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
ME-1 / ME-2
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: APRIL 07, 2021 DATE: APRIL 07, 2021 DATE: DATE: DATE:
WALL

INSIDE 10 mm Ø OUTSIDE
EXPANSION BOLT

RUBBER SEAL

20mmØ CLEAR HOSE

20mmØ PVC PIPE

10 mm Ø
EXPANSION BOLT
40x40x30mm
ANGLE BAR SUPPORT

RUBBER SEAL

GA #20 PLAIN G.I.


SHEET DRAIN PAN

2° PITCH DOWN

20mmØ CLEAR HOSE


WACU SUPPORT DETAILS
20mmØ PVC PIPE

1.4m

FFL

WACU MOUNTING DETAILS


PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES INSTALLATION OF 2x2.5HP WACU
PROJECT MANAGEMENT
ADDRESS:
ENGR. RICARDO ROMERO
PROFESSIONAL MECHANICAL
IAN KRISTIAN DEL E. INGRESO TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
ME-2 / ME-2
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: APRIL 07, 2021 DATE: APRIL 07, 2021 DATE: DATE: DATE:
A B C D E F G
6600 6870 4500 3430 5400 6002

4830

2
4200

3
4200

EXISTING CABLE LADDER


4200

EXISTING CABLE LADDER


4200

6 FUEL TANK
(1500L)

EXISTING CABLE LADDER


6060

7 C.R.1 C.R.2 PANTRY


600 600 950 600 600
900

NEW PARTITION WALL


FUTURE FUTURE
BATTERY BATTERY

SMART

ATS
2380 GENSET
ROOM
ROOM FUTURE
BATTERY
NEW BATTERY
500 AH 600

MDP
FUTURE NEW BATTERY
BATTERY 500 AH 600
SD
40KW

8 GENSET
320

DTS
BATTERY

M.B.
BANK 1

NP
BATTERY

EP
ROOM
2540 ECB
MTS PR2
P-ISNET

STOCK ROOM BATTERY


BANK 2

9 AC PANEL ECB DCPDB

HUAWEI

ISNET

PR-2 PANEL
ODF

OFFICE MDF SD
MDF
NEW BATTERY CABLES
5800 CCTV
ODF

3 RUNS of 100mm² for BLUE(-) FEED A BANK 1

NEW PARTITION WALL


600 600 1100 LEGEND:
FIBER-
600
HOME
3 RUNS of 100mm² for RED(+) FEED A BANK 1 EXISTING

EXP.1000A
NEW 500A
AS-BUILT

HUAWEI
3 RUNS of 100mm² for BLUE(-) FEED A BANK 2
NEW CABLE LADDER

EXISTING CABLE LADDER


600 ACBEL
RECTIFIER

HUAWEI 3 RUNS of 100mm² for RED(+) FEED A BANK 2


1000

10 1500
WACU 1
2.5 HP

660 1180
WACU 2
2.0 HP
WACU 3
2.5 HP

660 800

NEW WACU (2.5HP)


NEW WACU (2.5HP)
4000

11
PARKING
AREA

6020

11
1x50KVA
TRANSFORMER

PLDT MAUBAN
NEW DC CABLE ROUTING RECTIFIER TO BATTERY

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES DC SYSTEM FOR RECTIFIER AND BATTERY
PROJECT MANAGEMENT
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
FILMARK SADIUA TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
DC-1 / DC-4
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: JUNE 23, 2021 DATE: JUNE 23, 2021 DATE: DATE: DATE:
NEW 3-100mm² BATTERY CABLE
RECTIFIER SYSTEM B (BLUE)(-) IN PROPOSED CABLE LADDER
(500A EXP. 1000A DC)

AC INPUT MCCB NOTE: MITIGATION PLAN FOR 1x500Adc Exp 1000Adc


RECTIFIER IN SINGLE PHASE PHASE SYSTEM
BATTERY BATTERY BATTERY BATTERY
FUSE FUSE FUSE FUSE
1000A 1000A 1000A 1000A

TECHNICAL SPECIFICATION OF RECTIFIER B


BATTERY FUSE RECTIFIER CAPACITY 500A EXP. 1000 Adc
4*1000A NH4 NO. OF CABINETS
2 Cabinets: 1 for Rectifier Module
and 1 for Distribution
DIMENSIONS 2 - 600x600x2000 (WxLxH)
LOAD FUSE #1-6
+ NO. /BATTERY FUSE RATING 4 x 1000A NH4 FUSE
PROPOSED NO. / LOAD FUSE RATING 12x630A NH4 FUSE
RCT MCB's LOAD LOAD LOAD LOAD LOAD LOAD
500AH INPUT AC VOLTAGE 230V
FUSE FUSE FUSE FUSE FUSE FUSE BATTERY
54V
630A 630A 630A 630A 630A 630A

- OUTPUT DC VOLTAGE
TVSS per line, Cartridge blades;
RECTIFIER SYSTEM PROTECTION
20 micro sec
MODULE 3000W + NO. OF MODULES/ RATING 32 MODULES /3000WATTS
PROPOSED
500AH ON/ OPERATIONAL MODE 4
BATTERY VACANT SLOTS 28
- MODULE RATING @ 54VDC 55.56A
LOAD FUSE #7-12
TOTAL POWER CONSUMPTION OF 1819.3 WATTS
TNT HUAWEI TE
LOAD LOAD LOAD LOAD LOAD LOAD
FUSE FUSE FUSE FUSE FUSE FUSE
630A 630A 630A 630A 630A 630A
TOTAL LOAD (AMPERE) 1819.3W/54V = 33.69A
CONSUMPTION OF TNT HUAWEI TE

%RECTIFIER LOAD @ 4 MODULE ON 33.69A/222.24A = 15.15%

TECHNICAL SPECIFICATION OF BATTERY


BATTERY BRAND ZNERGY
TYPE OF BATTERY LITHIUM-ION
COMMON (+) BUSBAR
BATTERY CAPACITY 100 AH
BATTERY VOLTAGE 54 V
NO. OF BATTERY PER BANK 10
BATTERY BANK CAPACITY 2x500AH = 1000 AH
ESTIMATED BACK-UP TIME @
23.74hrs
TNTPH2 LOAD_HUAWEI TE
ESTIMATED BACK-UP TIME @ 40%
6hrs
RECTIFIER CAPACITY
NEW 2-240mm² BATTERY CABLE (RED)(+)
NEW 3-100mm² BATTERY CABLE
(RED)(+) IN PROPOSED CABLE LADDER

PLDT MAUBAN

NEW DC SYSTEM SINGLE LNE DIAGRAM

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES DC SYSTEM FOR RECTIFIER AND BATTERY
PROJECT MANAGEMENT
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
FILMARK SADIUA TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
DC-2 / DC-4
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: JUNE 23, 2021 DATE: JUNE 23, 2021 DATE: DATE: DATE:
MONITOR
BATTERY
0.585
BUSBAR
0.55
0.50
1.78

1.70

0.42

Ø12
0.42
TOP VIEW
FRONT VIEW SIDE VIEW ISOMETRIC VIEW SCALE: NTS
SCALE: NTS SCALE: NTS SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES DC SYSTEM FOR RECTIFIER AND BATTERY
PROJECT MANAGEMENT
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
FILMARK SADIUA TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
DC-3 / DC-4
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: JUNE 23, 2021 DATE: JUNE 23, 2021 DATE: DATE: DATE:
40
6 SETS RED
6 SETS BLUE

6 SETS RED

6 SETS BLUE

1 FRONT VIEW DC CABLE RECTIFIER TO BATTERY ORIENTATION


A-1 40

6 SETS RED 6 SETS BLUE


ISOMETRIC VIEW DC CABLE RECTIFIER
1 TO BATTERY ORIENTATION
A-3

RIGHT SIDE LEFT SIDE

1
SIDE VIEW DC CABLE RECTIFIER TO BATTERY ORIENTATION
A-2

PLDT MAUBAN

RECTIFIER TO BATTERY DC CABLE ORRIENTATION

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PHASE 2 PLDT MAUBAN


NETWORK SUPPORT FACILITIES DC SYSTEM FOR RECTIFIER AND BATTERY
PROJECT MANAGEMENT
ADDRESS:
ENGR. MARIO LEBRILLA
PROFESSIONAL ELECTRICAL
FILMARK SADIUA TREVOR CADAG
RONALDO P. NERY
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
NOEL S. SANTOS
TEAM HEAD
DC-4 / DC-4
JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
QUEZON AVE. BRGY BAGONG BAYAN, MAUBAN, QUEZON ENGINEER PLDT INC. PLDT INC. PLDT INC.
DATE: JUNE 23, 2021 DATE: JUNE 23, 2021 DATE: DATE: DATE:

You might also like