You are on page 1of 7

NEW BATTERY CABLE

2-100mm² (BLUE)(-) BANK 1 IN EXISTING CABLE LADDER


2-100mm² (RED)(+) BANK 1 IN EXISTING CABLE LADDER

RE-USED EXISTING BATTERY CABLE


1-100mm² (BLUE)(-) BANK 1 IN EXISTING CABLE LADDER
1-100mm² (RED)(+) BANK 1 IN EXISTING CABLE LADDER
1-100mm² (BLUE)(-) BANK 2 IN EXISTING CABLE LADDER
1-100mm² (RED)(+) BANK 2 IN EXISTING CABLE LADDER
CABLE FOR MIGRATED BATTERY BANK FROM DPC RECTIFIER

LEGEND:

EXISTING

EXISTING CABLE
LADDER

EXISTING WALL
PLDT LIIP SLOT
NEW CABLE ROUTING RECTIFIER TO BATTERY NEW CABLE
LADDER
SCALE: NTS NEW

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-1 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
283 563.4

NEW 8x1800W
258 RECTIER MODULE
@ EXISTING ACBEL RECTIFIER

FCU 3
5TR

NEW DC CABLE
2-100mm² (BLUE(+) IN DCPDB 3 FEED A
433 2-100mm² (RED)(+) IN DCPDB 3 FEED A
1-100mm² (BLUE)(+) IN DCPDB 4 FEED B
1-100mm² (BLUE)(+) IN DCPDB 4 FEED B
2-100mm² (RED)(+) IN DCPDB 4 FEED B
1-100mm² (BLUE)(+) IN DCPDB 5 FEED A
1-100mm² (RED)(+) IN DCPDB 5 FEED A
1-100mm² (BLUE)(+) IN DCPDB 5 FEED B
1-100mm² (RED)(+) IN DCPDB 5 FEED B
LEGEND:

EXISTING

EXISTING CABLE
LADDER

EXISTING WALL
PLDT LIIP SLOT
NEW CABLE ROUTING RECTIFIER TO DCPDB NEW CABLE
LADDER
SCALE: NTS NEW

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-2 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
EXISTING BATTERY CABLE RE-USED EXISTING BATTERY CABLE
1-100mm² (BLUE)(-) BANK 1 IN EXISTING CABLE LADDER 1-100mm² (BLUE)(-) BANK 1 IN EXISTING CABLE LADDER
1-100mm² (RED)(+) BANK 1 IN EXISTING CABLE LADDER 1-100mm² (RED)(+) BANK 1 IN EXISTING CABLE LADDER
1-100mm² (BLUE)(-) BANK 2 IN EXISTING CABLE LADDER 1-100mm² (BLUE)(-) BANK 2 IN EXISTING CABLE LADDER
1-100mm² (RED)(+) BANK 2 IN EXISTING CABLE LADDER 1-100mm² (RED)(+) BANK 2 IN EXISTING CABLE LADDER
TECHNICAL SPECIFICATION OF RECTIFIER A
RECTIFIER CAPACITY 600 Adc
1 Cabinets: for Rectifier Module
NO. OF CABINETS
and for Distribution
DIMENSIONS 1 - 600x600x2000 (WxLxH)
AC INPUT MCCB NO. /BATTERY FUSE RATING 2 x 1000A NH4 FUSE
NO. / LOAD FUSE RATING 5x400A , 5x630A NH4 FUSE
3P 200A NO. / LOAD MCB's RATING 6x80AT , 14x63AT
+ + INPUT AC VOLTAGE 230
LOAD MCB's EXISTING
500AH
EXISTING
500AH OUTPUT DC VOLTAGE 54
BATTERY BATTERY TVSS per line, Cartridge blades;
6 x 80A , 14 x 63A LOAD
FUSE
400A
LOAD
FUSE
400A
LOAD
FUSE
400A
LOAD
FUSE
400A
LOAD
FUSE
400A - VRLA - VRLA SYSTEM PROTECTION
20 micro sec
NO. OF MODULES/ RATING 7 MODULES /1800WATTS
LOAD FUSE # 1-5 NEW. ON/ OPERATIONAL MODE
+ + MODULE
8
EXISTING EXISTING
LOAD FUSE LOAD
FUSE
630A
LOAD
FUSE
630A
LOAD
FUSE
630A
LOAD
FUSE
630A
LOAD
FUSE
630A
250AH
BATTERY
250AH
BATTERY
VACANT SLOTS
MODULE RATING @ 54VDC
9
50
- VRLA - VRLA
5 x 400A & 5 x 630A LOAD FUSE # 6-10
TOTAL POWER CONSUMPTION
OF EXISTING & NEW TNT 5,216.4WATTS
BANK 2 BANK 1 EQUIPMENT
TOTAL LOAD (AMPERE)
5,216.4W/54V = 96.6A
BATTERY BATTERY
FUSE
630A
FUSE
630A CONSUMPTION OF EXISTING &
NEW TNT EQUIPMENT
%RECTIFIER LOAD @ EXISTING
96.6A/600A = 16.1%
& NEW TNT EQUIPMENT
BATTERY FUSE TECHNICAL SPECIFICATION OF BATTERY
2*630A LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP TYPE /BRAND OF BATTERY SACRED SUN/VRLA
500 AH
BATTERY CAPACITY
BATTERY VOLTAGE 54 V
EXTG. 7x1800W LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP
NO. OF BATTERY PER BANK 24
EXISTING BATTERY BANK 2x500AH = 1000 AH
RECTIFIER MODULE CAPACITY
MIGRATED BATTERY BANK 2x250AH = 500 AH
FROM DPC RECTIFIER
NEW. 8x1800W CAPACITY
ESTIMATED BACK-UP TIME @
RECTIFIER MODULE TOTAL LOADS (AMPERE) OF
EXISTING OF TNT EQUIPMENT
15.53hrs

ACBEL RECTIFIER APPROX. AWG NO.


CROSS SECTIONAL
AREA (mm²)
CONDUCTOR

DIA. OF STRAND
(mm)
NO. OF STRAND
PCS.
APPROX. OUTSIDE
DIAMETER
INSULATOR

INSULATION
THICKNESS, nom.,
mm
APPROX. OVERALL
DIAMETER, mm
ALLOWABLE AMPACITIES
(+30°C AMBIENT)

600A DC SYSTEM A 6

2
4
14 mm²

22 mm²

30 mm²
0.32 mm

0.32 mm

0.32 mm
175

252

361
5.433 mm

6.519 mm

7.895 mm
1.52 mm

1.52 mm

1.52 mm
8.473 mm

9.559 mm

10.935 mm
75

135

180

1 38 mm² 0.32 mm 494 9.235 mm 2.0 mm 13.295 mm 210

1
0 50 mm² 0.32 mm 665 10.715 mm 2.0 mm 14.775 mm 245

2
0 60 mm² 0.32 mm 836 12.010 mm 2.0 mm 16.070 mm 285

3
0 80 mm² 0.32 mm 1045 13.430 mm 2.0 mm 17.490 mm 330

4
0 100 mm² 0.32 mm 1254 14.710 mm 2.0 mm 18.770 mm 385

MIGRATED BATTERY FROM DPC RECTIFIER


PLDT LIIP
NEW DC SYSTEM SINGLE LINE DIAGRAM
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-3 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
NEW. BATTERY CABLE
2-100mm² (BLUE)(-) IN EXISTING CABLE LADDER
2-100mm² (RED)(+) IN EXISTING CABLE LADDER

TECHNICAL SPECIFICATION OF RECTIFIER A


RECTIFIER CAPACITY 600 Adc
1 Cabinets: for Rectifier Module
NO. OF CABINETS
and for Distribution
DIMENSIONS 1 - 600x600x2000 (WxLxH)
AC INPUT MCCB NO. /BATTERY FUSE RATING 2 x 500A NH4 FUSE
8x355A NH4 FUSE
NO. / LOAD FUSE RATING
3P 200A NO. / LOAD MCB's RATING 40x63AT
INPUT AC VOLTAGE 230
OUTPUT DC VOLTAGE 54
+ SYSTEM PROTECTION
TVSS per line, Cartridge blades;
NEW 20 micro sec
LOAD MCB's 300AH
BATTERY NO. OF MODULES/ RATING 10 MODULES /3000WATTS
- VACANT SLOTS 12
MODULE RATING @ 54VDC 55.56
BANK 1 TOTAL POWER CONSUMPTION
BATTERY
FUSE
500A
BATTERY
FUSE
500A
LOAD
FUSE
355A
LOAD
FUSE
355A OF EXISTING & NEW TNT 2,851.2 WATTS
EQUIPMENT
BATTERY FUSE LOAD FUSE # 7-8
TOTAL LOAD (AMPERE)
CONSUMPTION OF EXISTING & 2,851.2W/54V = 52.8A
2*500A LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
NEW TNT EQUIPMENT
%RECTIFIER LOAD @ EXISTING
52.8A/600A = 8.8%
& NEW TNT EQUIPMENT
LOAD FUSE # 1-6

LOAD FUSE TECHNICAL SPECIFICATION OF BATTERY


TYPE /BRAND OF BATTERY LITHIUM/ZNERGY
8 x 355A BATTERY CAPACITY 100 AH
BATTERY VOLTAGE 54 V
NO. OF BATTERY PER BANK 3
1x300AH = 300 AH
NEW BATTERY BANK CAPACITY
EXTG. 10x3000W ESTIMATED BACK-UP TIME @
TOTAL LOADS (AMPERE) OF 5.68hrs
RECTIFIER MODULE EXISTING OF TNT EQUIPMENT

CONDUCTOR INSULATOR
ALLOWABLE AMPACITIES

DPC RECTIFIER APPROX. AWG NO.

6
CROSS SECTIONAL
AREA (mm²)

14 mm²
DIA. OF STRAND
(mm)

0.32 mm
NO. OF STRAND
PCS.

175
APPROX. OUTSIDE
DIAMETER

5.433 mm
INSULATION
THICKNESS, nom.,
mm

1.52 mm
APPROX. OVERALL
DIAMETER, mm

8.473 mm
(+30°C AMBIENT)

75

600A DC 4

1
22 mm²

30 mm²

38 mm²
0.32 mm

0.32 mm

0.32 mm
252

361

494
6.519 mm

7.895 mm

9.235 mm
1.52 mm

1.52 mm

2.0 mm
9.559 mm

10.935 mm

13.295 mm
135

180

210

SYSTEM B 1
0

2
0

3
0
50 mm²

60 mm²

80 mm²
0.32 mm

0.32 mm

0.32 mm
665

836

1045
10.715 mm

12.010 mm

13.430 mm
2.0 mm

2.0 mm

2.0 mm
14.775 mm

16.070 mm

17.490 mm
245

285

330

4
0 100 mm² 0.32 mm 1254 14.710 mm 2.0 mm 18.770 mm 385

PLDT LIIP
NEW DC SYSTEM SINGLE LINE DIAGRAM
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-4 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
NEW DC CABLE
1-100mm² (BLUE)(-) IN DCPDB 4 FEED B
NEW DC CABLE
1-100mm² (BLUE)(-) IN DCPDB 4 FEED B
2-100mm² (BLUE)(-) IN DCPDB 3 FEED A
1-100mm² (BLUE)(-) IN DCPDB 5 FEED B
2-100mm² (RED)(+) IN DCPDB 3 FEED A
2-100mm² (RED)(+) IN DCPDB 4 FEED B
1-100mm² (BLUE)(-) IN DCPDB 5 FEED A
1-100mm² (RED)(+) IN DCPDB 5 FEED B
1-100mm² (RED)(+) IN DCPDB 5 FEED A

TNT PROJECT
DCPDB NO.2 DCPDB #1

LOAD LOAD LOAD LOAD LOAD


FUSE FUSE FUSE FUSE FUSE
400A 400A 400A 400A 400A

6 6 4 4 6 4 4 6 6 4 4 6 4 4

LOAD FUSE # 1-5

63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A

LOAD LOAD LOAD LOAD LOAD


FUSE FUSE FUSE FUSE FUSE
630A 630A 630A 630A 630A

LOAD LOAD LOAD LOAD


FUSE FUSE FUSE FUSE
500A 500A 355A 355A

LOAD FUSE # 6-10


5 5 5 5 5 5 5 5 5 5 5 5 5 5
6 6 6 6
4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5

LOAD FUSE # 7-8

LOAD
FUSE
LOAD
FUSE
NEW. DCPDB 3 NEW. DCPDB 4
630A 630A

FEED A FEED B LOAD


FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A
LOAD
FUSE
355A

6 6 4 4 6 4 4

63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A LOAD FUSE # 1-6

FEED A FEED B
LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP

5 5 5 5 5 5 5
6 6
4 4
5 5 5 5 5 5 5

LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP LPR1800HP


NEW. DCPDB 5

ACBEL RECTIFIER EXISTING DCPDB EXISTING DCPDB DPC RECTIFIER


600A DC & RACK & RACK 600A DC
SYSTEM A @NGN ROOM @NGN ROOM SYSTEM B
PLDT LIIP
NEW RECTIFIER TO DCPDB SINGLE LINE DIAGRAM
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-5 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
LOAD SCHEDULE LOAD SCHEDULE
FEED A FEED B
DCPDB BREAKER AMPERE RATING LOT NO. EQUIPMENT MODEL RACK NO. DCPDB BREAKER AMPERE RATING LOT NO. EQUIPMENT MODEL RACK NO.

BREAKER 1 63 1 SPARE 1 BREAKER 1 63 1 SPARE 1

BREAKER 2 63 1 SPARE 1 BREAKER 2 63 1 SPARE 1

BREAKER 3 63 1 SPARE 1 BREAKER 3 63 1 SPARE 1

ACBEL BREAKER 4 63 1 SPARE 1 DPC BREAKER 4 63 1 SPARE 1 DPC


RECTIFIER RECTIFIER RECTIFIER
SYSTEM BREAKER 5 63 1 SPARE 1 SYSTEM BREAKER 5 63 1 SPARE 1 SYSTEM
FUSE#6 FUSE#3 FUSE#4
A BREAKER 6 63 1 SPARE 1
B BREAKER 6 63 1 SPARE 1
B
630A 355A 355A
BREAKER 7 63 1 SPARE 1 BREAKER 7 63 1 SPARE 1
DCPDB 3 DCPDB 4
(14SLOTS) (14SLOTS)
BREAKER 8 63 1 SPARE 1 BREAKER 8 63 1 SPARE 1

BREAKER 9 63 1 SPARE 1 BREAKER 9 63 1 SPARE 1

2-100mm² DC Power Cable (BLUE) BREAKER 10 63 1 SPARE 1 1-100mm² DC Power Cable (BLUE) BREAKER 10 63 1 SPARE 1 1-100mm² DC Power Cable (BLUE)

BREAKER 11 63 1 SPARE 1 BREAKER 11 63 1 SPARE 1

BREAKER 12 63 1 SPARE 1 BREAKER 12 63 1 SPARE 1

BREAKER 13 63 1 SPARE 1 BREAKER 13 63 1 SPARE 1

BREAKER 14 63 1 SPARE 1 BREAKER 14 63 1 SPARE 1

DCPDB 4 DCPDB 4 DCPDB 4


FEED A
(14 SLOTS) FEED B
(7 SLOTS) FEED B
(7 SLOTS)
(-48V) (-48V) (-48V)
2-100mm² DC Power Cable (RED) 1-100mm² DC Power Cable (RED) 1-100mm² DC Power Cable (RED)
CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7 CB#8 CB#9 CB#10 CB#11 CB#12 CB#13 CB#14 CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7 CB#8 CB#9 CB#10 CB#11 CB#12 CB#13 CB#14
63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A

(+48V) (+48V) (+48V)

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

LOAD SCHEDULE
FEED A
DCPDB BREAKER AMPERE RATING LOT NO. EQUIPMENT MODEL RACK NO.

BREAKER 1 63 1 SPARE 1

BREAKER 2 63 1 SPARE 1

BREAKER 3 63 1 SPARE 1
DCPDB 5
BREAKER 4 63 1 SPARE 1
(7SLOTS)

BREAKER 5 63 1 SPARE 1

BREAKER 6 63 1 SPARE 1
ACBEL DPC
RECTIFIER BREAKER 7 63 1 SPARE 1 RECTIFIER
SYSTEM SYSTEM
FUSE#7 FUSE#5
B FEED B B
630A DCPDB BREAKER AMPERE RATING LOT NO. EQUIPMENT MODEL RACK NO. 355A

BREAKER 1 63 1 SPARE 1

BREAKER 2 63 1 SPARE 1

BREAKER 3 63 1 SPARE 1
1-100mm² DC Power Cable (BLUE) 2-100mm² DC Power Cable (BLUE)
DCPDB 5
BREAKER 4 63 1 SPARE 1
(7SLOTS)

BREAKER 5 63 1 SPARE 1

BREAKER 6 63 1 SPARE 1

BREAKER 7 63 1 SPARE 1

DCPDB 5 DCPDB 5
FEED A
(7 SLOTS) FEED B
(7 SLOTS)
(-48V) (-48V)
1-100mm² DC Power Cable (RED) 2-100mm² DC Power Cable (RED)
CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7 CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7
63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A 63A

(+48V) (+48V)

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

PLDT LIIP
NEW RECTIFIER TO DCPDB SINGLE LINE DIAGRAM & DCPDB LOADS SCHEDULE
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-6 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE:
UNISTRUT CHANNEL
45mm x 45mm x 6.00m
2mm THICKNESS

00
12 2 SETS BLUE(-)
40
0 2 SETS RED(+)

0
THREADED ROD 16mm DIA.
MAX 3m LENGTH @ 1.20M O.C.
30

2 SETS RED(+) 2 SETS BLUE(-)

FOAM NUTS
FOAM NUTS
LONG

400mm SCHELLE CLAMP

ROHR TUBE

FOAM NUTS

ISOMETRIC VIEW DC CABLE RECTIFIER


1 TO BATTERY ORIENTATION
1 FRONT VIEW DC CABLE RECTIFIER TO BATTERY ORIENTATION 3 CHAMBER

A-3
A-1
R=10

25

40 16 16

1200mm 1200mm 1200mm 1200mm 20 30

30 Foam Nuts
100
16 UNIT: mm

2 SETS BLUE(-) 2 SETS RED(+) L Bracket

33
25

300 300 40
UNIT: mm

RIGHT SIDE LEFT SIDE S03 Clamps for tubes


25 Splice Assembly
Note: Install Splice Assembly
for all (3) chamber sections

1
SIDE VIEW DC CABLE RECTIFIER TO BATTERY ORIENTATION 1
MISCELLANEOUS DETAILS
A-2 A-4

PLDT LIIP
RECTIFIER TO BATTERY CABLE ORIENTATION
SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.

TNT PH2 PLDT LIIP


DC SYSTEM FOR DCPDB, BATTERY, AND
NETWORK SUPPORT FACILITIES
RECTIFIER MODULE ENGR.MARIO LEBRILLA FILMARK SADIUA TREVOR CADAG
KENNETH RONALD G. ORIBE
PM IN-CHARGE
DEBORAH R. PALOMAR
PROJECT ENGINEER
SANTOS, NOEL S.
TEAM HEAD
DC-7 / DC-7
ADDRESS: PROFESSIONAL ELECTRICAL JEHAN IMPLEMENTATION MANAGER JEHAN REGIONAL PM
CORPORATION PLDT INC. PLDT INC. PLDT INC.
LIIP BIÑAN LAGUNA ENGINEER DATE:FEBRUARY 24, 2022 DATE: FEBRUARY 24, 2022
DATE: DATE: DATE: