You are on page 1of 3

Question Answer

Operating room is one of the most critical red


area in hospitals. What color should not be
used in this specific space?
As per Water Code of the Philippines, which PRoper easement
of the following should be considered?
Proper easement

It is the dismantling, razing, destroying or demolition


wrecking of any building or structure or
any part thereof
A person is sentenced to life incarceration
due to a major crime he committed. In which
institutional facility will he be confined?
flooring for high traffic areas that will provide Terrazzo tiles
aesthetic, effiency, and durability
Should an escalator be allocated to the 30
project, what is the maximum angle of
inclination along the horizontal surface? le
How many car slot for parking should be allotted 1
for every 500 sqm of gfa
What would be the size of a side table? .45
What is the effective and easiest dimension Scale bar
representation when the plan of the building is
scaled to 1:400 meters?
In designing a restaurant, what is the 40 kitchen 60 dining
effective percentage ratio for kitchen and
dining area?
All are considerations in a micro-site analysis, Contour lines
except:
Which statement is true (basta about dun sa The project requires a 20m easement from its
government kalibo na international airport) neighboring
What is the group classification (kalibo Group e
international airport)
Yung may 3.60m to 12.00m parking slot bus
Problem 7

What will be the area requirement


for the community facilities
With the proposal of the new integrated UTS
terminal, what will be the new zoning
reclassification of the lot once the LGU pursue
with the project
represent steep slopes Closely spaced contour lines
represent gentle slopes. contour lines that are spaced far apart
the lines in a topographic map are thicker lines Index contours
that appear every fifth contour line
Problem 3 1356.56

what is the minimum level of completion for the Shell house with doors and windows
row houses
Setback for frontage ng problem 3 6
Lot frontage servicing the 12meter rrow in 106494.8
meter? (problem 3)
As per pd 1096, which group based on occupancy Group a
of building does the project fall inder? Problem 3
Ideal floor to ceiling height of car showroom 3.5m
Also known as amihan Northeast monsoon
Main advanatage of placing revolving door at the They are always open for pedestrians but closed
entrance of the office building to the outside elements like dust chuchu
Oy di na kayo naglalagay ng tanong at sagot dito
hmp
If you have 3,200 meters stretch of houses for 8
you economic housing, how many blocks will u
provide?
What is the maximum length of a block 400m
What is the minimum clear height of door except 2.00m
for bathroom and mezzanine
Maximum riser height .25m
what other provisions, besides bp220 can be Pd1096 and bp344
applicable to the project
what is the minimum required off-street parking 1 parking slot 100sqm floor area
slot by vendor
what do you call the tapered angle found in the Transition slop
top and bottom of a vehicular ramp parking
buildings
If the floor slab is 10cm thick, how many bags 1440 bags
of cement are needed for the slab using
Class A Concrete mixture?
What is the total area would you allocate if 432 sqm
you were to provide 9 stores for the vegetable
section?
which of the following is not part of the gfa carport
what is the maximum thread height of stairs .25m

what is the minimum height for tables in stalls for fish and meat 75cm (2.5ft

If a spire is placed at the top of the building, what will be its allowable maximum height? 6m
What is the allowable maximum building footpritn if the required setbacks are to be followed? 889sqm