PART 1 GENERAL 1.01 SUMMARY A. Room numbering used for facilities for design, construction, record and as-built models and documents is set by Ford Land. B. Related Requirements 1. Section 00 21 13 - Instructions for Procurement. 2. Section 00 22 25 - 2D CAD Specifications. 3. Section 00 22 33 - 3-D BIM for Facilities (including Attachments). 4. Section 01 92 20 - Facility Operation - Asset Data Integration (including Attachments). C. Submittals 1. BIM - Building Information Model. a. Autodesk Revit file with Ford Land room numbering system. b. Archibus information exported from Autodesk Revit file. Refer to Attachment E, Section 00 22 33, 3-D BIM for Facilities. D. Coordination 1. Architect/Engineer shall schedule a meeting with Owner to review requirements for room numbering. a. Attendees shall include: 1) Architect/Engineer Project Manager 2) Architect/Engineer BIM Manager 3) Ford Land Project Manager 4) Ford Land BIM/CAD Representative PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PROJECT REQUIREMENTS A. Architect/Engineer shall use room numbering system established by Ford Land. B. For open office areas, leave space on documents for addition of cubicle numbering system. C. Closeout Procedures 1. Architect/Engineer shall provide Ford Land with BIM model in Autodesk Revit format that includes Ford Land room numbering system. 2. Architect/Engineer shall provide Ford Land with Archibus information exported from Autodesk Revit file. END OF SECTION