You are on page 1of 1

2 2' 3 3' 2 3

ST-2d A B
ST-2d
A B

E E

4
D' D'

ST-2a PLAN @ BASEMENT

ST-3a PLAN @ BASEMENT TO SIDEWALK FFL ST-3b SIDE ELEVATION


ST-2b PLAN @ GROUND FLOOR

E 3 2 4
A B

ST-2c FRONT ELEVATION ST-2d SIDE ELEVATION ST-4a PLAN @ FGL TO PORCH FFL ST-4b SIDE ELEVATION

3 TYPICAL RAILING DETAIL AT 2ND FLR BALCONY

2 4 TYPICAL RAILING DETAIL AT PORCH AND VERANDA


1 WALL /EAVES/ROOF BLOW UP SECTION 2 TUBULAR SUN BREAKER DETAILS
FOR CONSTRUCTION
DATE: OCTOBER 2020
REPUBLIC ACT 9266 Section 33
Drawings and specifications and other contract documents duly, signed, stamped or sealed, as

FRIAS + TICSAY ARCHITECTS instrument of service, are the properties and documents of Architects/Engineers whether the
object for which they are made is executed or not. It shall be unlawful for any person to duplicate
STAIR 2, 3, AND 4 DETAILS
WALL /EAVES/ROOF BLOW UP SECTION - AR-08 8/11
or to make copies of said documents for use in the repetition of and for other projects or buildings,
whether executed partly or in whole, without the written consent of architect or author of said
PROPOSED 3 STOREY RESIDENCE
HECTORGENIO DELOS SANTOS FRIAS TUBULAR SUN BREAKER DETAIL
documents WITH ATTIC AND BASEMENT TYPICAL RAILING DETAIL
"PROPRIETARY INFORMATION" LOT NO.1, BLOCK 71,ST. TROPEZ ST.,
DENNIS & CATHERINE SANTIAGO
The information on this document is the property of the author is considered confidential. It cannot
McKINLEY WEST VILLAGE, TAGUIG CITY, METRO MANILA
be made public or copied without proper authorization.
REV_02

You might also like