DRYING AND IMPREGNATING EQUIPMENT

with LOW-FREQUENCY HEATING


for DISTRIBUTION TRANSFORMERS
Hedrich GmbH
Budgetary Price Quotation
Greifenthaler Straße 28
D-35630 Ehringshausen-Katzenfurt
Telefon 06449 929-0
Telefax 06449 929-149
E-Mail hedrich@hedrich.com
Internet www.hedrich.com

Quotation No. 11.001787


Project No. P1000311
Date 23.04.2015
Diagram Oil Treatment Plant No. not applicable
Diagram Oil Purification Equipment No. not applicable mineral oil
Diagram Oil Purification Equipment No. not applicable special oil
Diagram Vac. Drying & Filling Equipment No. 3.2-1157.0
Our Reference Mr. Bernd Meerkamp
Our USt-ID-No. DE 113 742 218
Your Request 23.04.2015
Customer ID No. 59397

ABB Transformers S.A.E.


Attn. Mr. Samy EL-Gohary
PPTR Production Manager

Industrial Zone B1, Plot VIIC


10th of Ramadan City El-Sharkia, Egypt

E-Mail:
Mr. S. EL-Gohary
samy.EL-Gohary@eg.abb.com

Dear Mr. EL-Gohary,

Thank you for your request for quotation and according to our ‘General Terms and Conditions for
Sale and Delivery’ we quote as requested:

1 / 41
HEDRICH GmbH
Greifenthaler Straße 28
D-35630 Ehringshausen-Katzenfurt
fon: +49 6449 929-0
fax: +49 6449 929-149
e-mail: hedrich@hedrich.com
internet: www.hedrich.com

Contact:

Bernd Meerkamp ● fon +49 6449 / 929-121


Project Manager

Dr. Udo Fuessel ● fon +49 6449 / 929-190


Head of Project Management
Oil/Paper Applications

2 / 41
The HEDRICH Group - customer driven technology!
The HEDRICH Group is a medium-sized
company with a history of more than
50 years in the field of vacuum
process technology. We are specialised in
development, design, manufacture and
assembly of tailor-made customer solutions
and have a global network of subsidiaries
and representatives.

We are:
… a globally operating engineering enterprise in machine and equipment construction and
specialized in development, construction, assembly and testing of customized solutions.
… specialist for the processing of insulating media under vacuum for optimizing dielectric
properties in the field of silicone, cast resin as well as oil-paper insulating equipment.
… system supplier for the electrical and automotive industry as well as for the wind power,
pharmaceutical and medical sector.

Our scope of supply is complemented by software development and automation systems.

Mainly, our customers are from the electrical industry (medium and high voltage).
Furthermore, we are suppliers for the electronic, automotive, chemical and optical
industry. Our customers are well-known large-scale enterprises as well as medium-sized
and small companies.

3 / 41
CONTENTS

INTRODUCTION 6

PROCESS DESCRIPTION 12

OIL TREATMENT PLANT 15

VACUUM DRYING AND IMPREGNATING EQUIPMENT 16


with electric low-frequency heating unit for 3-phase transformers

INCLUSIONS AND EXCLUSIONS 32

ASSEMBLY SUPERVISION, TRIAL RUNS AND START-UP 35

PRICES 36

COMMERCIAL TERMS 37

GENERAL TERMS AND CONDITIONS FOR SALE AND


40
DELIVERY

4 / 41
customer driven technology !

DRYING AND IMPREGNATING EQUIPMENT


WITH LOW-FREQUENCY HEATING
FOR DISTRIBUTION TRANSFORMERS
With respect to the general objectives to The advantages are derived from physical
rationalize manufacturing processes, the facts: On one hand, only winding and insu-
focus of interest is preferably technologies lation of the appliances must be heated up
which are time and energy consuming. The to full temperature, on the other hand, heat
sequence of operations during preparation and moisture flow direction is the same -
of distribution transformers has not been from inside to the outside - achieving effi-
changed for decades. Now, they could be cient results. Optimum exploitation of these
replaced by a uniform, modern and econo- advantages can be reached by the trans-
mic process. former design and fabrication.

The electric low-frequency direct heating of Prepreg elements for fixing the winding lay-
the transformer windings in combination ers have to be used to achieve dimensional
with an appropriate vacuum and oil filling stability of the winding construction. The
process has been joined to a new effective axial forces can be compensated by elastic
unit by HEDRICH and the electric enter- compressible insulation elements and dist-
prise EFACEC as producer of distribution ance profiles, if it is possible to ensure
transformers in close co-operation. This same axial lengths of the high and low
equipment, in connection with the appro- voltage windings during the production.
priate phases for treating the different bat- Supports made from laminated wood are to
ches with regard to the size and number of be avoided or should be pre-dried.
distribution transformers, offers the follow-
ing advantages compared to the conven-
tional treatment:
 Reduction of process time
 Energy saving
 Improved quality
 Automation and manufacturing security

5 / 41
DRYING AND IMPREGNATING EQUIPMENT
WITH LOW-FREQUENCY HEATING
FOR DISTRIBUTION TRANSFORMERS

Introduction
The quality demands to the transformer suppliers for power transformers given by the network
operators are also those applied to the drying and insulation of distribution transformers today.
Also the requirements of the final customers to the manufacturing supervision and production
monitoring, especially when manufacturing distribution transformers have increased worldwide.
Hedrich has had a response to this and has continued their development in various equipment
technologies from purification of insulating liquids and drying and insulation and extended it to the
sections of power transformers in the medium voltage class and distribution transformers, setting
standards in quality, efficiency and safety.

Quality
In the range of medium-voltage power transformers Hedrich Vapour Phase plants with expansion
evaporator system and with thin-film evaporator as well s Hedrich Vacuum Plants with hot
nitrogen and current heating system are more and more used. For these applications, Hedrich
offers favourable equipment solutions that are also efficient for medium-voltage power transformer
suppliers. We will gladly submit to you as well a quotation for an individually adapted equipment
solution.

With the drying and impregnating plant with low-frequency heating, Hedrich does not only supply
a modern equipment solution for distribution transformers but also a drying quality that fits highest
demands. The high demands set on the drying quality for power transformers worldwide
nowadays and correspond to state-of-the-art technology are offered by Hedrich to their customer
with their most advanced vacuum drying and impregnating plant with low-frequency, even for the
drying of distribution transformers.

Average of winding temperature pre-drying ≥ 110 °C


Ultimate vacuum fine drying phase ≤ 0.5 mbar
Residual moisture in the insulation fine drying phase < 0.5 % percent per weight
Standard requirements to the drying quality for distribution transformers

State of the art drying qualities are final vacuum below of 0.2 mbar and average residual moisture
content in the insulation of less than < 0.3 % percent per weight.

Furthermore, not only the drying quality but also the quality of impregnation in a process can be
realized today with the modern Hedrich process technology.
The active parts of the distribution transformers are completely, with or without cover depending
on the design of the distribution transformers, installed into the transformer housing and
subsequently dried and impregnated by means of the Hedrich drying and impregnating
equipment. Depending on size and weight of the hygroscopic material like paper and pressboard
of the distribution transformers, openings of nominal width of DN40 to DN65 are sufficient for the
escaping water vapour from the insulation.
10 to 500 kVA DN40, 1 ½’’
500 kVA to 2,500 kVA DN50, 2‘’
2,500 kVA to 4,000 kVA DN65, 2 ½’’
Recommended openings of nominal widths

6 / 41
Expensive dry-gas flushing through the transformer to avoid condensation of water vapours
escaping from the insulation at the active part core and at the transformer housing is not at all
necessary when applying the Hedrich drying process. The complete drying and impregnating
process is effected under vacuum from beginning to end.

Heating-up and pre-drying phase 15 mbar to 20 mbar


Fine drying phase ≤ 0.2 mbar
Impregnating phase ≤ 0.5 mbar
Process pressures

With the process permanently under vacuum conditions, oxygen is evacuated from the process
from the beginning. The heating-up, pre-drying, temperature holding, fine drying and
filling/impregnating phases are operated under vacuum. An efficient vacuum pumping unit extracts
the water vapours escaping from the insulation during the heating-up and fine drying phase and
evacuates the distribution transformers even during impregnation. The insulation material is thus
spared and a low degradation of polymerisation of the cellulose insulation is ensured.

New absorption of moisture by the hygroscopic insulating materials like paper and pressboard is
thus avoided at any rate. Even after the process the re-humidification is prevented by
superimposing the active part or complete filling of the transformers by insulating oil.

After cooling down of the transformers to room temperature, they can immediately be transferred
to the test facility.

The quality of the drying and the lower stress of the insulation is characterized by the safe and
continuously monitored determination of the conductor temperature of the windings, the precise
measuring of heating voltage and current of each phase, the safety device against internal
electrical flashover, the overcurrent warning and interruption, the monitoring of synchronous run
and balance of the three phases as well as by the reduced depolymerization of the cellulose
insulation due to absence of oxygen in the process atmosphere and due to short drying cycles.

Efficiency
The batch times for a drying and impregnating process are reduced to 6 hours for an average
batch with three-phase distribution transformers including loading and unloading of the distribution
transformers in the vacuum tank. A cause for this is the direction of action of supplied process
heat and discharged moisture. With the electric low-frequency heating unit, the direct and
continuous heating of the connected distribution transformers is realized by supply of a regulated
low frequency current. This current with reduced frequency heats up the copper or aluminium
winding of the high-tension voltage side and the induction current the short-circuited winding of the
low-tension voltage side.

So the windings are the heat source in the active part whereby the insulation is heated up as well.
Consequently, the direction of action of the process heat is directed from the inside to the outside.
The heat source is located close to the moisture to be evaporated. The water vapour escape from
the winding is evacuated by the efficient and exactly adapted vacuum pumping unit. The direction
of action of the moisture transport is consequently from the inside to the outside. Because the
heat and moisture transport takes place in the same direction and optimally controlled process
guidance is ensured by Hedrich, short drying times can be realized.

7 / 41
The vacuum tanks are designed according to the customer’s requirements taking into account the
dimensions of the distribution transformers. A vacuum tank with a vertically moving upper part
(vacuum bell) and a stationary lower part proved to be the optimum design. The lifted bell permits
free access to the transformers for the connection of the low-frequency heating and the
transformer oil supply. The bottom of the vacuum bell comprises all connecting ports for vacuum,
transformer oil and for the electrical leadthroughs for heating and measuring. The leadthroughs for
the heating current are specially designed for use under vacuum conditions. The vacuum bell is
lifted by means of a wire rope hoist.

For transport of the distribution transformers, two roller conveyors are provided in the lower part.
Other means of transportation like trolley or air cushion are also possible.

The vacuum tank does not require a wall heating and heat insulation with covering as it is the
case with other drying processes because an accompanying heating of the vacuum tank for the
drying process is not necessary with the Hedrich drying technology.

The vacuum bell has repeatedly proved to be an economically attractive construction because it
imposes lower requirements in terms of fabrication, setup and transportation costs to the final
erection site than other tank designs.

Example of a vacuum bell with two roller conveyors

The full capacity and highest economic efficiency of the equipment is achieved if two vacuum bells
are operated sequentially. While the heating and pre-drying phase is running in one vacuum tank,
the fine vacuum phase takes place and the transformers are filled with insulating oil in the other
tank.
For parallel operation on two vacuum tanks only one low-frequency heating system is needed,
that is switched on the first or the second tank, depending on the process phase. This allows
increasing the utilization rate of the low-frequency heating and achieving better equipment
profitability.
The Hedrich low-frequency heating consists of several low-frequency heating units offering
besides the high degree of capacity utilization, large production flexibility in batch occupancy.
Each low-frequency heating can be connected to one distribution transformer in individual
operation or to at least two and at maximum three distribution transformers in parallel operation. In

8 / 41
parallel operation are distribution transformers with identical electrical properties like nominal
power and voltage, same phase number, switching group, short circuit voltage and same winding
construction.

Production schedule in parallel operation on 2 vacuum tanks I and II

The number of distribution transformers in parallel operation is individually adapted to the diversity
of types according to the customer’s requirements in order to ensure high equipment profitability
and flexibility.

Usual production capacities

1,200 batches per year = 4 batches per day x 6 working days x 50 weeks per year

Transformer power for three-phase Max. pcs. of transformers Capacity per year
distribution transformers per batch
50 kVA ≤ electric power < 1,000 kVA 2 x 2 LF units 4,800
electric power ≥ 1,000 kVA 1 x 2 LF units 2,400
Production capacity with 2 LF heating units and 1 vacuum bell
(Standard equipment with 2 LF-heating units)

Transformer power for three-phase Max. pcs. of transformers Capacity per year
distribution transformers per batch
50 kVA ≤ electric power < 1,000 kVA 2 x 4 LF units 9,600
electric power ≥ 1,000 kVA 1 x 4 LF units 4,800
Production capacity with 4 LF heating units and 1 vacuum bell
(Standard equipment with 2 additional LF-heating units)

Transformer power for three-phase Max. pcs. of transformers Capacity per year
distribution transformers per batch
50 kVA ≤ electric power < 1,000 kVA 2 x 4 LF x 2 vacuum bells 19,200
electric power ≥ 1,000 kVA 1 x 4 LF x 2 vacuum bells 9,600
Production capacity with 4 LF heating units and 2 vacuum bells
(Phase shifted drying and impregnating process on 2 vacuum bells – possible extension)

9 / 41
Due to the sinusoidal/sine wave-form heating currents and the precise measurement technology
and data evaluation used, the Hedrich LF heating units determine online continuously without
interrupting the heating process, the winding temperatures of the connected windings of a trans-
former with high accuracy even for low heating frequencies.

An interruption of the heating process for measuring the winding temperature is not necessary
with the Hedrich online LF heating device.

With equal drying batch and equal equipment capacity, the energy consumption is reduced by at
least 70 % and up to 94 % with the modern Hedrich process technology using low frequency
heating compared with conventional drying processes like hot air re-circulating drying (hot air
drying) since the vacuum tank is not heated, the core is only slightly heated, there is no heat loss
of heated vacuum ovens and vacuum pumps have short running times.

This results in extremely short drying times. The drying period only takes approx. 25 % compared
to the conventional hot air re-circulating drying and the state of the art of the design of equipment
parts and of the control of the process.

Safety
Process and production safety today includes a broad spectrum ranging from equipment reliability
and operating safety against unintended input of wrong parameters and process cycles to process
data logging and electronic archiving of process data.

The equipment reliability is ensured by Hedrich because tested and reliable equipment parts and
hardware components are used by avoiding products with increased failure frequency and
applying intelligent and tailored component solutions.

Furthermore the safe process sequence, data logging and evaluation as well as user friendliness
are ensured by Hedrich by the controller to be programmed by means of microprocessor and PC
visualization. Input, storage, output and registration of the data and switchover conditions required
for process guidance and for certification of production (DIN, EN, ISO), the possibility of showing
special process parameters in case of anomalies, possibility for switching off in case of
emergencies and possibility for intervention by means of modem or internet VPN connection by
our specialists worldwide or by our head office Hedrich Ehringshausen-Katzenfurt in Germany.

Moreover we offer solutions for automatic data collection by means of barcode scanner and
terminal as well as database query of the transformer data relevant for the process.

Automatic electronic drawing up of drying reports and process trends as well as safe archiving on
external data bases in company networks also belongs to our solutions for the Hedrich vacuum
drying and impregnating equipment with low frequency heating.

The Hedrich process control monitors the complete drying and impregnating process and re-
gulates each LF heating device individually depending on the connected transformer type and the
heating progress.
The hardware components used on the LF heating devices allow a precise control of the
sinusoidal/sine wave-form heating currents ensuring, jointly with the precise measuring tech-
nology, a high accuracy in measuring the required data like current and voltage of each winding.
The especially developed evaluation calculation of the measured data together with the
transformer data allow a high precision of the determination of the individual winding temperatures
and for all transformer types.

10 / 41
The safety device against internal electrical flashover, overcurrent warning and interruption,
monitoring of synchronous run of the winding phases of three-phase transformers as well as the
reduced depolymerisation of the cellulose insulation due to reduction of oxygen in the process
atmosphere and short process cycles are constituents of the modern Hedrich process technology.
The result is a careful heating and drying as well as the safety of the production “Drying and
Insulation” of distribution transformers.

11 / 41
DRYING AND IMPREGNATING EQUIPMENT
WITH LOW-FREQUENCY HEATING
FOR DISTRIBUTION TRANSFORMERS

Process description
Preparatory work
The transformers including housing with or with no lid are ready mounted. The transformers to be
treated are moved into the vacuum tank (1.1) by means of roller conveyor, trolley or air cushion
and connected to the appropriate filling hoses depending on the oil type and the filling level mo-
nitoring device (LA+1.1.1 to LA+1.1.4). The low voltage windings have to be short circuited by
means of a short circuit copper bar and the high voltage windings have to be connected to the
low-frequency current supply.

After the transformer data have been entered and the process data have been pre-selected ma-
nually by means of PC visualization, the automatic process can be started by the operator.

If requested, the input of transformer data and pre-selection of process data is also possible
according to the customer’s requirements by means of barcode scanner with terminal and auto-
matic data base query of the transformer data from the data base in the company network.
Hedrich will be pleased to offer a suitable individually adapted solution.

Heating-up and pre-drying


After the automatic program has been started by the operator, the control system first performs a
safety routine in which, prior to the start of the heating process, the heating system and the
connected transformers are tested and the measured values of each winding are compared with
the input data of the transformers.

The vacuum pumping unit (sub-assembly group 31) evacuates the vacuum tank (1.1) and the
active parts in the transformer housing to less than 20 mbar and to more than 15 mbar (Paschen
law).

The transformer windings are heated up to an adjustable upper limit temperature by supply of
energy from the electrical current supply. The necessary heating of the windings with the insula-
tions to be dried is reached in the high voltage winding by direct current supply, in the low voltage
winding this is done by means of an appropriate induction current. The heat generated by the cur-
rent is directly transmitted into the conductor and coil insulation. A heat flow is produced from
inside the oils towards the outside. The temperature is calculated continuously from the heating
capacity supplied. Due to the inner heating and external vacuum, the same flow direction of heat
and water vapour is reached to effectively drying of the insulation.

This results in extremely short drying times. The drying period only takes approx. 25 % compared
to the conventional hot air re-circulating drying. Only the windings are heated. The transformer
core and the transformer housing remain cold with this process. Compared with the conventional
hot air re-circulating process, this means a reduction by at least 70 % and up to 94 %.

12 / 41
With increasing winding temperature and changing resistance of the copper or aluminium winding,
the heating capacity is continuously reduced to avoid that the set temperature is exceeded by
some degrees Kelvin.

The temperature of the winding is then constantly kept at set temperature until all transformers,
depending on the loading of the vacuum tank (1.1) with different types and sizes, have reached
the set temperature. After the short dwell time, the fine drying is started.

Fine drying
When the pre-selected set temperature of the windings is reached, the full pumping speed of the
vacuum pumping unit takes effect by connection of the roots pump (31.15). The temperature of
the unheated windings drops very little due to the already low moisture content and the extremely
low heat loss by “vacuum insulation”. When the pressure falls below 0.5 mbar, the standard and a
sufficient drying degree of less than 0.5 percent by weight is reached already. State of the art
drying qualities are final vacuum below of 0.2 mbar and average residual moisture content in the
insulation of less than < 0.3 % percent per weight.

Typical process sequence during drying and filling of distribution transformers

Impregnation
After the drying process the transformers are impregnated and filled with insulating oil under va-
cuum. The filling level monitoring is preferential sensory by means of a filling level sensor
(LA+1.1.1 to LA+1.1.4) at the transformer.

Due to the continuous drying and filling process under vacuum, the insulation cannot take up moi-
sture again. There are no fumes or pollution of the work area and no need for expensive cleaning
of the transformers.

13 / 41
When the transformers have cooled down, the missing oil due to volume shrinkage and thoroughly
impregnation will be re-filled outside the vacuum equipment.

The advantages of this drying process can only be fully utilized if both drying and filling of the
transformers can be performed in one continuous vacuum process without breaks for retightening.
Possibilities for that are given by the winding design, foil winding of the low-voltage side, keeping
of equal lengths for high and low voltage windings, use of Prepreg elements and flexible
supporting profiles as well as the use of pre-dried laminated wood or even eliminating
compressible, hygroscopic insulating elements completely.

Our specialists for transformer construction will be pleased to provide support.

14 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 15 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

SPECIFICATION OIL TREATMENT PLANT

OIL STORAGE, PURIFICATION AND DISTRIBUTION EQUIPMENT

The oil storage, purification and distribution equipment exists at Customer’s side
(see our diagram no. not applicable).

The customer will provide purified transformer oil (mineral oil) to the specified
interfaces of the drying and filling equipment for distribution transformers.

HEDRICH will provide the required signals for the request to supply purified
transformer oil from the existing oil treatment plant to the drying and filling
equipment.

15 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 16 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

SPECIFICATION
VACUUM DRYING AND IMPREGNATING EQUIPMENT

VACUUM DRYING AND IMPREGNATING EQUIPMENT WITH


ELECTRIC LOW-FREQUENCY HEATING

Components, sub-assemblies and documentation for the vacuum drying and


filling equipment for distribution transformers by applying electrical low-
frequency heating. The equipment is designed for drying and filling of three-
phase distribution transformers with a power of 50 kVA up to 2,500 kVA and
bigger.

The distribution transformers will be dried and impregnated in one process. The
whole heating, drying and filling process will be performed under vacuum
without interruption of the vacuum for optimum drying results and lowest
depolymerization rates of the paper insulation.

The equipment no. 1 with vacuum bell (1.1) is designed to load up to 12 three-
phase transformers at the same time.

The low-frequency heating system consist of four (4) LF heating units (5.1 to
5.4) for operation on up to two (2) production lines in phase shifted parallel
operation (possible later extension).

As a consequence, up to four different transformer types and with different


electric power can be dried and filled per batch. This allows a high flexibility for
your production.

Each of the 4 low-frequency heating units (5.1 to 5.4) are designed for heating
up the windings of 3-phase transformers in single or parallel operation (one, two
or three transformers connected parallel on one heating unit) depending on the
size of the vacuum bell and transformers only.

In parallel operation, up to three (3) three-phase transformers


(50 kVA ≤ transformer power ≤ 630 kVA) with identical electrical specification
can be connected in parallel on each of the 4 heating units (5.1 to 5.4) as
standard.

In parallel operation, up to two (2) three-phase transformers


(630 kVA < transformer power ≤ 1,000 kVA) with identical electrical specification
can be connected in parallel on each of the 4 heating units (5.1 to 5.4) as
standard.

The 3-phase transformers with a power more than > 1,000 kVA are set be dried
16 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 17 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

in single operation as standard depending on the size of the vacuum bell only.

The vacuum tank is designed as vacuum bell with two roller conveyors. The va-
cuum bell allows convenient load and unload of the transformers as well conve-
nient connection of the transformers to the heating units and lines for oil supply.

The vacuum drying and filling equipment is designed for one production line with
one vacuum bell and can be extended by a second production line (see possible
extension, diagram no. 3.2-1157.0).

Hedrich’s low-frequency heating units provide a high flexibility for your


production schedule and high production capacity and quality:

 vacuum drying and impregnating of 3-phase transformers with a power of 50


kVA to 2,500 kVA and bigger,

 up to 4 different sizes of 3-phase transformers in one batch and 4 heating


units (5.1 to 5.4),

 up to 8 three-phase transformers with a power of 50 kVA to 1,000 kVA, two


of each with same electrical specification, in one batch and 4 heating units
(5.1 to 5.4),

 up to 12 three-phase transformers with a power of 50 kVA to 630 kVA, two


of each with same electrical specification, in one batch and 4 heating units
(5.1 to 5.4),

 short process times of abt. 6 hours or less for 3-phase transformers,


including load, heating up and pre-drying, fine drying, filling and unload of
the transformers,

 additional temperature holding phases are possible for verification of re-


quired DDP diamond dotted paper curing times,

 filling with different kinds of oils, selectable for each transformer, according
to the transformer specification,

 input of the transformer data via bar code scanner with terminal and
database query according to the order no. is possible, upon your request
and order,

 drying and filling in one process of the distribution transformers without


interruption of the vacuum,

 controlled heating, fine drying and filling process with backup of the process
data, automatic process operation.
17 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 18 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

The vacuum bell no. 1 (1.1) with roller conveyors will be provided by HEDRICH
according to our documentation.

The drying and filling equipment with vacuum bell no. 1 (1.1) with roller
conveyors will be assembled on site by ABB or his sub-supplier according to
HEDRICH documentation and under supervision by HEDRICH.

18 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 19 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

According to our diagram no. 3.2-1157.0, the equipment consists of the fol-
lowing sub-assemblies and components:

Sub-Assembly Group 1: Vacuum Bell no. 1 (1.1)

The sub-assembly 1 consists of:

1.1 1 rectangular vacuum drying and filling tank, designed as vacuum bell, welded
from sheet steels, walls reinforced with double T beams, internally and
externally primed and painted.

Specification
Leakage rate ≤ 8 mbar litres per second
Design temperature 60 °C
Design pressure -1/0 bar
Max. load 25 t

The vacuum bell will be internally and externally primed and painted. A heat
insulation and covering of the vacuum bell is not necessary.

19 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 20 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

One vacuum drying bell (1.1) consists of:

1 stationary lower part with the inside dimensions:

Length approx. 7,400 mm


Width approx. 3,600 mm
Height approx. 480 mm

The lower part is designed with all required pipe and measurement connections
as well as all required heating current bushings.

For load-in and removal of the transformers by the operator, two roller
conveyors without drive will be used.

The width of each roller conveyer is approx. 875 mm.

Each roller conveyor is designed to carry 4 (6) three-phase transformers with a


power of 50 kVA to 1,000 kVA (630 kVA).

To carry the three-phase transformers in the range of more than 1,000 kVA to
2,500 kVA and bigger, the transformers will be carried by both conveyers cross
the lengthways of the vacuum bell.

The total width of both roller conveyers including operating way (grating) in the
middle, with a width of approx. 400 mm, positioned between both roller
conveyors, is abt. 2,150 mm (= 2 x 875 mm + 400 mm).

20 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 21 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Lengths of the roller conveyors:

Length in front of the vacuum bell approx. 9,0 m


Length behind the vacuum bell (re-cooling and resting area) approx. 9,0 m

Along the side walls of the vacuum bell, gratings are installed inside the bell with
a width of 725 mm each for access to the transformer, i.e. for connection of the
transformer with the oil filling and heating system.

The vacuum bell will be placed in a pit to allow the access to the vacuum bells at
the same level of the workshop floor.

It is also possible to place the vacuum bell on the workshop floor without pit. In
this case, operating platforms will be placed around the vacuum bell and the
roller conveyors to allow a convenient access.

1 upper part with the useful inside dimensions of:

Length approx. 7,400 mm


Width approx. 3,600 mm
Height approx. 2,700 mm

The total outside width of the vacuum bell including lifting device is approx.
5,100 mm.

The side walls and ceiling are reinforced with I-beam sections.

Two illuminated sight glasses are installed into the bell.

The upper part is lifted by means of two rope winches.

The vacuum bells no. 1 (1.1) with roller conveyors will be provided by HEDRICH
according to our documentation.

The vacuum bell will be completely manufactured, assembled and tested before
delivery.

The vacuum bell with roller conveyors will be set-up and final assembled on side
by ABB or his sub-supplier according to HEDRICH documentation and under
supervision by HEDRICH.

The drying and filling equipment line no. 1 will be assembled on site by ABB or
his sub-supplier according to HEDRICH documentation and under supervision
by HEDRICH.

21 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 22 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

HEDRICH will supply:

1 drawings and parts lists in English for manufacturing of the vacuum drying tank
(1.1)

1.1 1 upper part of the vacuum bell

1 stationary lower part

1 roller conveyors inside the vacuum bell

The roller conveyors outside the vacuum bell will be provided by ABB.

1 constructional parts for lifting device

1 various flanges and counter flanges with seals of material viton

Flanges and counter-flanges will be designed according to DIN-standard

2 seals for the vacuum bell, material viton, one as spare part

2 mirrors for observation by the operator of all four sides of the vacuum bell during
opening/closing of the vacuum bell

2 sight glasses with illumination


The side glasses will be assembled on the upper part of the vacuum bell.

2 robe winches with motor for vacuum bell no. 1 (1.1)

1.1F, 1.1R 2 robe winches with motor for vacuum bells

EA±1.1FR, 2 various limit switches for upper part of the vacuum bells
EA±1.1RL

EA 1.1FR, 2 path sensors for upper part of the vacuum bells


EA 1.1RL

Me 1.1.1 - 3 measuring current bushings for float switches (LS±1.1.1 to LS±1.1.12)


Me 1.1.3

H 1.1.1 - 8 heating current bushings for electric connection of the transformers, 3-phases
H 1.1.8

LA±1.1.1 - 12 float switches to switch off the filling process of the transformers
LA±1.1.12

22 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 23 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

12 float switches for pre-assembly area – will be provided by ABB

The oil reservoirs will be provided by ABB or his sub-supplier according to


HEDRICH documentation.

1.2FR, 4 pneumatic cylinders for safety interlock of the lifted upper part of the vacuum
1.2FL, bell
1.2RR,
1.2RL

EA±1.2FL, 4 inductive proximity switches for pneumatic cylinders


EA±1.2FR,
EA±1.2RL,
EA±1.2RR

1.2F/R 2 solenoid valves for pneumatic cylinders

1.1A - 12 magnetically operated valves for oil filling of transformer oil A (mineral oil)
1.12A

Each of the distribution transformer will be filled with a flow rate of


approx. 20 litres per minute with transformer oil A depending on the supply oil
flow rate and the numbers of the connected transformers per batch.

12 connecting hoses for transformer oil A (mineral oil)

1.3 1 leakage-oil collecting vessels with connection for the float switch

LA+1.3 1 float switch for detection of a leakage or overfilling of a transformer

1.4 1 electro pneumatically operated isolating valve for waste oil

1.10 1 solenoid valves

1.10.1A 1 non-return valves

HEDRICH will supply for the re-cooling/refilling area:

LA±1.50.1 - 12 float switches to switch off the refilling process of the transformers in the re-
LA±1.50.12 cooling area (oil volume shrinkage) – will be provided by ABB

The oil reservoirs will be provided by ABB or his sub-supplier according to


HEDRICH documentation.

12 cable rollers for connection of the level switches of the oil reservoirs – will be
provided by ABB

23 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 24 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

6 connecting hoses for transformer oil A (mineral oil) for oil discharge of the oil
reservoirs of production line no. 1, re-cooling area

1.14A 1 solenoid valve for refilling of oil to the reservoirs during re-cooling and oil volume
shrinkage

1 filling lance for transformer oil A (mineral oil) with connecting hose for refilling of
the oil reservoirs of production line no. 1, re-cooling area

24 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 25 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Sub-Assembly Group 31: Vacuum Pumping Unit

HEDRICH Germany will supply:

31 1 vacuum pumping unit, type RK I 3840, with a pump speed of approx.


3,800 m³/hat an inlet pressure in the range of approx. 1 to 0.1 mbar. The ulti-
mate vacuum to be reached is in the range of 5 x 10-2 mbar.

Possible extension according to our diagram no. 3.2-1157.0:

In case the drying and filling equipment will be extended by a second vacuum
bell (2.1) /second production line, the vacuum pumping unit will be operated as
follows:

The vacuum during the heating up and pre-drying phase will be realized by one
rotary vane vacuum pump, item 31.1.1 for vacuum bell no. 1 (1.1) and item
31.1.2 for vacuum bell no. 2 (2.1), with pressure regulating according to the
limits given by the Paschen law. So that the risk of internal electric flashover
during the heating phase is excluded.

The fine drying phase will be performed with the full pumping capacity of one
backing pump and the roots pump, items 31.1.1 and 31.15 for vacuum bell no. 1
(1.1), items 31.1.2 and 31.15 for vacuum bell no. 2 (2.1).

In case the equipment consists of two vacuum bells (1.1 and 2.1), the drying
and filling process of both vacuum tanks will be operated in a phase shifted pa-
rallel process by means of one low-frequency heating system (5.1 to 5.4), and
one vacuum pumping unit with the extension according to diagram
no. 3.2-1157.0 (see possible extension). While the heating and pre-drying phase
is running in one vacuum tank, the fine vacuum phase takes place and the
transformers are filled with insulating oil in the other tank. For more details
please see page 9 of this quotation.

The vacuum pumping unit, as quoted for one vacuum bell (1.1),
consists basically of:

One rotary vane vacuum pump, with a nominal pump speed of 400 m³/h at
1,000 min-1 and 50 Hz

Condenser, with stainless-steel cooling coil

The max. cooling water supply temperature is +10 °C.

Feeder pump for condensate

25 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 26 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Safety pressure switch for air admission in case of a vacuum lower than the
limits given by the Paschen law during the heating up and pre-drying phase.

One roots pump, type RO 4000 I, with a nominal pump speed of approx.
3,890 m³/h at 2,950 min-1 and 50 Hz with motor 7.5 kW, provided with frequency
converter for infinite speed adjustment.

Electro-pneumatically operated air admission valve with inlet filter.

Vacuum gauge tube with evaluation electronics and signal output with weld-on
flange, measuring range 1,000 to 10-3 mbar.

For a later extension of the drying and filling equipment by one additional
vacuum bell (2.1), the vacuum pumping unit will be designed with the required
flange connections to assemble the required parts and components without
special expenditure at a later date.

The vacuum pumping unit will not be provided with the parts and components
for applying vacuum to the vacuum tank no. 2 (2.1).

The vacuum pumping unit, type RK I 3840, will be set up on a sturdy base
frame, piped with all connecting pipes for vacuum, cooling water and
condensate inside the pumping unit, completely assembled and tested in trial
runs in our facility.

26 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 27 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Sub-Assembly Group 5: Low-Frequency Heating Device

HEDRICH Germany will supply:

5.1 - 5.4 4 low-frequency heating units for direct heating of distribution transformers by
means of sinusoidal current flow at a frequency in the range of 5 Hz, designed
for heating of 3-phase transformers with a power of 50 kVA to 3,000 kVA
according to ABB’s transformer data.

Each heating device (5.1 to 5.4) is designed for a max. heating current of abt.
400 A and max. heating voltage of abt. 850 V.

Designed for three phase current, voltage 400 V, frequency 50 Hz.

The low-frequency heating system consist of four (4) LF heating units (5.1 to
5.4) for operation on up to two (2) production lines in phase shifted parallel
operation.

As a consequence, up to four different transformer types and with different


electric power can be dried and filled per batch. This allows a high flexibility for
your production.

Each of the 4 low-frequency heating units (5.1 to 5.4) are designed for heating
up the windings of 3-phase transformers in single or parallel (two or three
transformers connected parallel on one heating unit) operation depending on
the size of the vacuum bell only.

As a standard, one heating device is capable of heating up two (2) transformers


with a power of up to ≤ 1,000 kVA and with identical electrical specification at
the same time in parallel operation.

One heating device is also capable of heating up three (3) transformers with a
power of up to ≤ 630 kVA and with identical electrical specification at the same
time in parallel operation.

Transformers with a power of more than > 1,000 kVA will be connected on one
heating unit and heated in single operation.

As a consequence by operation with four heating units (5.1 and 5.4), up to 8


(12) transformers with a power of up to ≤ 1,000 kVA (≤ 630 kVA),
two (three) of each with identical electrical specification, can be connected and
heated in parallel operation at the same time in one batch (standard).

27 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 28 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

As a consequence by operation with four heating units (5.1 and 5.4), up to four
transformers with a power of up to 3,000 kVA can be connected and heated in
single operation at the same time in one batch (standard).

Possible batches with four (4) LFH units (5.1 to 5.4):

 12 transformers with a power of up to ≤ 630 kVA and to of each with


identical electrical specification at the same time in one batch,

 8 transformers with a power of up to ≤ 1,000 kVA and to of each with


identical electrical specification at the same time in one batch,

 4 transformers with a power of up to 3,000 kVA and bigger in single


operation at the same time in one batch.

or a combination. With four (4) LF heating units (5.1 to 5.4) up to four (4)
different 3-phase distribution transformers can be connected and heated in one
batch.

The frequency is set to 5 Hz and the heating current is supplied in sinusoidal


wave-form. Distribution transformers are designed for 50 or 60 Hz operating
frequency. Best heating and drying results are reached by supplying of heating
currents in the range of 5 Hz and by sinusoidal wave-form currents.

The heating process is individually controlled by a programmable logic controller


by SIEMENS.

1 various short-circuit bars for different transformer sizes, material copper, for
short-circuit connection of the low-voltage side - to be provided by ABB
according to ABB’s transformer design.

1 set of 36 pcs. connecting cables, single wire, for connection of the distribution
transformers with the heat current bushings of the vacuum bell no. 1 (1.1) with
secured connection on one side and with special hook cable connection on the
other side - to be provided by ABB according to HEDRICH documentation

The special hook cable connection will be provided by ABB according to ABB’s
transformer design and according to HEDRICH drawing.

1 set of 12 pcs. connecting cables, ground phase, for connection of the distri-
bution transformers with the heat current bushings of the vacuum bell no. 1 (1.1)
with secured connection on one side and with cable lug on the other side - to be
provided by ABB according to HEDRICH documentation

28 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 29 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

1 set of 8 pcs. terminal boxes for heat current connection of the distribution
transformers of the vacuum bell no. 1 (1.1) with the heating units (5.1 to 5.4) - to
be provided by ABB according to HEDRICH documentation

1 set of 8 pcs. connecting cables, four wire, for connection of the heat current
bushings of the vacuum bell no. 1 (1.1) with the heating units (5.1 to 5.4) - to be
provided by ABB according to HEDRICH documentation

Sub-Assembly Group 61: Electric Control

HEDRICH Germany will supply:

61.1 1 electric control cabinet for fully automatic control of the complete equipment,
provided with sheet steel casing, type of protection IP 43, designed for an
ambient temperature of 40 °C.

The control cabinet consists of:

1 power distribution section with power switch, lighting for the control cabinet, for
the power distribution of the control cabinet and the low-frequency heating units
(sub-assembly 5).

1 control cabinet section to control the equipment, complete with main switch,
motor protection switches, contactors, fuses, push-buttons, signal lamps as well
as a programmable logic controller, made by SIEMENS, wired to the terminal
strip.

The control cabinet is provided with:

1 PC-visualization system, including color monitor, keyboard, interface, color


printer and appropriate software for fully automatic operation and supervision of
the equipment as well as for process data logging.

1 telecommunication unit with modem for remote diagnosis or one (1) program
software for remote diagnosis via Internet

The remote diagnosis of the program software is possible by means of


telephone modem or via Internet by our expert personnel from our principal
company in Germany.

If so requested, the visualization system is installed into the doors of the control
cabinet or placed on a table in the control room.

The monitor screen shows the equipment divided schematically into sections
and indicates the state of the electric consumers as well as process data.
29 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 30 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Input of data
The input of the process parameters such as heating factors (in percentage of
the nominal current of the transformer), final winding temperature, end vacuum,
station (LF heating unit) and transformer data such as rated burden, nominal
voltage and current, resistances, vector group, short-circuit voltage, Ohmic
portion of the short-circuit voltage, frequency, winding material, oil type will be
entered on the PC-visualization system.

The input of the transformer data via bar code scanner with terminal and
database query according to the ID identification numbers/order no. is possible
(not included in the scope of supply).

HEDRICH offer solutions for automatic data collection by means of barcode


scanner and terminal as well as database query of the required transformer data
for the process. Please inform us about your requirements regarding company
network and database query.

Disturbance on the equipment are represented by visual and audible signal on


the control cabinet and in clear text on the monitor screen of the PC-
visualization system.

Archiving of process data


The course of process (trend) with indication of the measured process
parameters of each transformer such as temperatures, resistances, heating
voltage, heating current, and process parameters such as vacuum, time, date,
station (LF heating unit) are stored automatically on the PC for a period of
approx. 6 months. The process course can be printed on the printer and stored
in PDF file format.

Reading-out of process data and formatting in the csv-file format


The process data of the drying and filling process is stored in the CSV file
format automatically and can be read out via the PC network connection to an
external PC. Thus, it is possible to process and evaluate the process data on an
external PC. The CSV file format also allows formatting in the XLS file format.

Cooling water and compressed air supervision system, consisting basically of:

Service unit for compressed air with pressure reducing fitting

Pressure switch for compressed air with minimum contact

Manually operated isolating valves for cooling water

Dirt trap for cooling water

30 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 31 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

Flow control for cooling water with minimum contact

Resistant thermometer for cooling water

31 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 32 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

EXCLUSIONS AND INCLUSIONS

The scope of quotation does not include:

 Any required foundations and masonry;

 Covering of foundation and installation channels, pits etc.;

 Foundation and pit covering for vacuum bell (1.1);

 Steel structure with operating platform, stairs and guard rails to hold the individual
components and sub-assemblies;

 Any required steel structures with operating platforms, stairs and guard rails for
supervision and maintenance of the equipment;

 Assembly of the equipment;

 Assembly material, consisting of pipelines, flexible oil connection pipes, electric cables,
electric connection cables etc. and fixing material;

 Heat-insulation of oil pipes and vessels;

 Final assembly of the vacuum bell (1.1) in Customer’s workshop;

 Roller conveyors outside of the vacuum bell;

The vacuum bell with roller conveyors inside (1.1) for production line no. 1 will be
provided by Hedrich.

 Vacuum bell with roller conveyors (2.1) for production line no. 2;

 Lightning within the equipment installation;

 Building site approach road for special shipments from next highway departure to
foundation edge (transport approval will be applied by the SELLER);

 Unload, placing and temporary storage of the vacuum bell (1.1), parts and components
delivered by the SELLER on the final location;

 Unload, placing and temporary storage of the delivered parts and components by the
SELLER;

 Mobile cranes, hoists, ladders, scaffoldings etc. for unloading, transportation, placing and
positioning of the delivered parts and components by the SELLER,

32 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 33 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

 Mobile cranes, hoists, ladders, scaffoldings etc. for setup and assembly of the equipment,

 Extension of the equipment with a second production line, vacuum tank (2.1) and the
required parts and components as well as parts for extension of the vacuum pumping unit
for the second production line;

 Documentation and components for further transformer oils like type B, C;

 Oil treatment, distribution equipment;

 Input of process data via bar code scanner with terminal and database query;

 Any required exhaust air and suction devices for dust, vapours, condensate outside the
range of the equipment installation;

 Any required precautions for sound emission protection;

 Distribution transformers for the production including oil reservoirs;

 Copper bars for short-circuit of the low-voltage side of the transformers;

 Operating media such as pump oil, transformer oil etc;

 Cooling water, cooling water/glycol mixture, compressed air;

 Cooling water re-cooling unit;

 Energy supply, electric current;

 Finish coating and tagging with item numbers of the equipment after assembly and
installation as well as material for this;

The labels with item numbers for the components will be supplied by HEDRICH. The tagging of
the electric cables will be provided by ABB.

 Transport of our personnel from and to the working place.

33 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 34 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

In case of an order, you will receive:

 Detailed equipment diagram;

 Drawings for the vacuum tank (1.1);

 Arrangement drawing with the necessary information as well as required data for procuring the
assembly material and heat-insulation;

 Foundation diagrams with dimensions and loads;

 Connecting diagram for energy supply;

 Wiring diagrams with cable specification;

 Spare and wearing parts list;

 Operating and maintenance instructions;

 Lubrication plans.

All components are delivered with required counter-flanges and seals. Flanges and counter-
flanges will be designed according to DIN-standard.

34 / 41
Budgetary Price Quotation
ABB Transformers S.A.E.
El-Sharkia, Egypt

Quotation No.: 11.001787 Page: 35 / 41


Date: 23.04.2015 Our Ref.: Mr. Bernd Meerkamp

Item Quantity Description

ASSEMBLY SUPERVISION, COMMISSIONING AND TRAINING OF


OPERATING PERSONNEL

The equipment will be assembled in your factory according to HEDRICH arrangement drawing by
your sub-supplier under supervision by HEDRICH personnel.

For this we will delegate our experienced assembly personnel for supervision of assembly work at
times, for commissioning and instruction.

 1 assembly supervisor for final assembling supervision, commissioning and instruction of


your personnel for 4 man-weeks,

 1 electrical engineer for final assembling supervision, commissioning and instruction of your
personnel for 6 man-weeks.

Travelling expenses, including 4 air tickets as well as the costs for hotel accommodation and
meals for the Seller’s personnel are included in the price.

If overtime is requested by you, costs for it will be invoiced separately or the time of presence on
site is reduced accordingly.

If a longer sojourn of our personnel of more than 10 man-weeks is required without our fault,
these additional costs will be invoiced based on the rates applicable at the time of assembly.

The local transport of our personnel from and to the working place will be arranged by the
customer.

Costs for assembly are based on an assembly until December 31, 2016.

35 / 41
PRICE SHEET

PRICE OF EQUIPMENT

HEDRICH offer you:

Vacuum Drying and Filling Equipment


Components, sub-assemblies and documentation according to assem-
bly groups 1, 31, 51 and 61, as specified above:
 including vacuum bell (sub-assembly group 1),
 including delivery vacuum bell EXW Hedrich, China,
 including four LF-heating units (51.1 and 51.4),
 including vacuum pumping unit (sub-assembly group 31) and electric
control (sub-assembly group 61),
 excluding final assembly and assembly material,
 including delivery EXW Hedrich Ehringshausen-Katzenfurt, Germany.

Budgetary Price for the equipment as outlined above: EUR 715.000,--

PRICE OF OTHER SERVICES

HEDRICH offer you:

Assembly supervision, commissioning and training, as specified in


this quotation:
 including assembly supervision, commissioning and training for the
drying and filling equipment.

Price for assembly supervision, commissioning and training


of your personnel as described above: EUR 125.000,--

36 / 41
COMMERCIAL CONDITIONS

COMMERCIAL CONDITIONS

1. Paint:
The equipment including frames of the equipment will be coated with a synthetic resin varnish
according to RAL 5015, sky blue, except for components which are heat-insulated and covered
with galvanized sheet steel which will be primed and the components purchased from our sub-
contractors, including electrical control cabinet, which will keep their original colour.

2. Electrical connection:
The electric control cabinet will be rated for the connection to three-phase current 400 V/
50 Hz, admissible voltage deviation of max. ± 5 %. The control voltage is AC 230 V/ 50 Hz and DC
24 V.

3. Design:
In addition the Electromagnetic Compatibility Directive 2004/108/EC (EMC Directive) is applied.
All components will be designed according to the EC Directive 2006/ 42/EC Annex IIA (Machinery
Directive).
In addition the Electromagnetic Compatibility Directive 2004/108/EC (EMC Directive) is applied.

The following energy carriers were assumed:


a) Three-phase current 400 V, 50 Hz,
b) Cooling water max. 10 °C,
c) Compressed air 4 - 6 bar,

4. We reserve the right to make changes based on technical improvements.

5. Liability of defects:
We are liable for defects within the scope of paragraphs VIII, IX and X of our enclosed “General
Terms and Conditions for Sale and Delivery”.
HEDRICH assumes liability for consequential damages within the scope of the industrial and
production liability insurance concluded by us (the latter according to the HUK model) up to a lump
covering sum of EUR 10 million. Insurance company is the Gerling Konzern.
A liability for other, indirect damages, particularly for a loss of profit or for damages which were not
caused to the delivered goods is excluded.

Duty of care of the customer and liability of HEDRICH in case of remote assistance by
modem:

(1) The customer is aware that within the scope of the remote assistance work carried out by
HEDRICH the system control may be modified causing a direct change of the mode of opera-
tion of the equipment. This may result in an increased risk of accident on the installation site of
the equipment while the remote assistance work is being carried out.

(2) With regard to this risk, HEDRICH and the customer agree that HEDRICH will first notify the
customer in writing of all remote assistance work. HEDRICH shall state the date and period of
time during which the remote assistance work will be carried out. This notification shall be
confirmed in writing by the customer to HEDRICH.

(3) The customer shall take care that no damage will be caused to persons or property on the
installation site of the equipment while the control system is being modified within the scope of
37 / 41
COMMERCIAL CONDITIONS

the remote assistance work.

(4) HEDRICH is not liable for damages to persons or property caused by the customer having
offended against his duties of care specified in this paragraph.

(5) Compensation claims of any kind are excluded, in particular compensation for positive infrin-
gement of contract, non-fulfilment, illegal action and delay, as far as Hedrich is not legally
obliged to assume any liability.

(6) This exclusion of liability does not apply in case of intent or culpable negligence.

6. Our scope of supply does not include:


See part “Inclusions and Exclusions” of this quotation.

7. On delivery of the equipment, you will receive:


See part “Inclusions and Exclusions” of this quotation.

All documents will be written in English.

8. Drawings, technical documentation:


At a date to be determined in the contract we will send you a layout drawing of the equipment with
the request for approval and/or comments.

9. Trial run, acceptance in Hedrich’s facility:


Not applicable.

10. Acceptance in customer's facility:


When commissioning of the equipment in your facility is completed, the equipment will be checked
for completeness and tested for operativeness in the presence of our specialist.

Testing parameters are determined by the data contained in the technical part of the order
confirmation.

After the equipment is accepted by your personnel, an acceptance report will be signed by both
parties.

If acceptance of the equipment is delayed through no fault of HEDRICH, the equipment will be
deemed accepted:
a) when commissioning and training of the personnel for operation of the equipment is completed,
but latest 14 days after announcement of the Seller that the equipment is ready for acceptance and
questioning of the testing material, or
c) in case the equipment will be used by the Buyer for production.

11. Official approvals:


If necessary, you being the operator of the equipment, will apply for all official approvals required
for construction, installation and operation of the equipment. We will submit to you in time all
documents to be provided by us and assist you to the best of our ability.

However, since we have no influence on the working methods of the local authorities, we cannot
be held responsible for any measures and requirements which are so far unknown and which may
delay the delivery or the commissioning.
38 / 41
COMMERCIAL CONDITIONS

In case such measures and requirements are imposed, we must reserve the right to charge any
additional costs incurred.
12. Protection rights:
See VIII.7 of our enclosed “General Terms and Conditions for Sale and Delivery”.
13. Delivery date:
At present, 8 months EXW ex works Hedrich, Germany and China, after receipt of order and
clarification of all technical and commercial details and after receipt of the down-payment.
14. Payment terms:
30 % down-payment, payable upon order placement, against presentation of the Seller's order
confirmation and down-payment invoice.

70 % out of an irrevocable, divisible letter of credit (L/C), confirmed by a first-class German bank,
valid for a period of 180 days, to be opened in our favour when placing the order, payable:
60 % on delivery, against presentation of the shipping documents;
10 % after acceptance of the equipment in the Buyer's facility, against presentation of the
acceptance certificate duly signed by both parties, however, not later than 6 months
after delivery, if acceptance cannot be effected without the Seller's fault.
All payments will be due immediately and without deduction.
15. Pricing:
Above stated price is valid for delivery EXW Hedrich, Germany and China, as per Incoterms 2010,
excluding packing, transport insurance, without customs duties, without sales tax, VAT.
16. Transport, shipping instructions
Exact shipping instructions must be available to us 4 weeks prior to shipment at the latest.
17. Validity
This quotation remains binding to us for a period of three months.
For the rest apply our attached “General Terms and Conditions for Sale and Delivery” and “Con-
ditions of Assembly”.

Please consider this budgetary quotation as basis for further discussion in your or in our company.
We hope that our quotation will meet with your approval. If you need any further information,
please do not hesitate to contact us.

Looking forward to hearing from you soon, we remain,

with best regards,

HEDRICH GmbH

Dr. Udo Fuessel Bernd Meerkamp


Head of Project Department Project Manager
Oil/Paper Applications

Enclosure:
Diagram no. 3.2-1157.0 (drying and filling equipment with electric low-frequency heating)

39 / 41
GENERAL TERMS AND CONDITIONS
FOR SALE AND DELIVERY

40 / 41
GENERAL TERMS AND CONDITIONS
FOR SALE AND DELIVERY

41 / 41