Professional Documents
Culture Documents
Penambahan Kolom & Pondasi Jelambar
Penambahan Kolom & Pondasi Jelambar
A B
SKALA : 1 : 25 DATE : DAKE REVISION NOTE SIGNATURE Drawing code Page number Total page Note.
DRAWING TITLE :
info@emporioarchitect.com JULI 2021
DETAIL PONDASI FOOTPLATE
contact : 081222955519 FILE NAME PRINT DATE : ST - 01 03 031
- -
KETERANGAN :
1. Mutu Beton
- Pile Cap : fc' 20,75 Mpa (slump 12 2)
- Kolom : fc' 20,75 Mpa (slump 12 2)
- Balok : fc' 20,75 Mpa (slump 12 2)
- Pelat : fc' 20,75 Mpa (slump 12 2) 7
- Dinding : fc' 20,75 Mpa (slump 12 2)
2. Mutu Baja Tulangan
£ Ø12 BJTP 24 (SNI)
> Ø12 BJTD 32 (SNI)
Wiremesh BJTD 50 (besi ulir)
3. Struktur Atap
Rangka Baja Ringan Profil Uk 75 (opsional)
6
4. Kontraktor harus menyesuaikan
kembali dimensi dan leveling
struktur sesuai perencanaan arsitektur
TABEL PONDASI
TIPE DIMENSI
A B C D E
DENAH PONDASI
SKALA : 1 : 100 DATE : DAKE REVISION NOTE SIGNATURE Drawing code Page number Total page Note.
DRAWING TITLE :
info@emporioarchitect.com JULI 2021
DENAH PONDASI
contact : 081222955519 FILE NAME PRINT DATE : ST - 01 02 031
- -
KETERANGAN :
1. Mutu Beton
- Pile Cap : fc' 20,75 Mpa (slump 12 2)
- Kolom : fc' 20,75 Mpa (slump 12 2)
- Balok : fc' 20,75 Mpa (slump 12 2)
- Pelat : fc' 20,75 Mpa (slump 12 2) 7
- Dinding : fc' 20,75 Mpa (slump 12 2)
2. Mutu Baja Tulangan
£ Ø12 BJTP 24 (SNI) SFL.-0.150 SFL.-0.750
> Ø12 BJTD 32 (SNI)
SFL.-0.050 SFL.-0.050
Wiremesh BJTD 50 (besi ulir)
3. Struktur Atap
Rangka Baja Ringan Profil Uk 75 (opsional)
6
4. Kontraktor harus menyesuaikan
kembali dimensi dan leveling
struktur sesuai perencanaan arsitektur
SFL.-0.770 SFL.-0.830
SFL.-0.050
TABEL PELAT TABEL TIE BEAM SFL.-0.170
SFL.-0.820 SFL.-0.050
TIPE TEBAL TIPE DIMENSI
SFL.-0.820
SFL.-0.170
4 SFL.-0.830
SFL.-0.770
A
B
SFL.-0.050 SFL.-0.050
SFL.-0.150 SFL.-0.750
SFL.-0.170
A B C D E
DENAH TIEBEAM
SKALA : 1 : 100 DATE : DAKE REVISION NOTE SIGNATURE Drawing code Page number Total page Note.
DRAWING TITLE :
info@emporioarchitect.com JULI 2021
DENAH TIEBEAM
contact : 081222955519 FILE NAME PRINT DATE : ST - 01 05 031
- -
KETERANGAN :
1. Mutu Beton
- Pile Cap : fc' 20,75 Mpa (slump 12 2)
- Kolom : fc' 20,75 Mpa (slump 12 2)
- Balok : fc' 20,75 Mpa (slump 12 2)
- Pelat : fc' 20,75 Mpa (slump 12 2) 7
- Dinding : fc' 20,75 Mpa (slump 12 2)
2. Mutu Baja Tulangan
£ Ø12 BJTP 24 (SNI)
> Ø12 BJTD 32 (SNI)
Wiremesh BJTD 50 (besi ulir)
3. Struktur Atap
Rangka Baja Ringan Profil Uk 75 (opsional)
6
4. Kontraktor harus menyesuaikan
kembali dimensi dan leveling
struktur sesuai perencanaan arsitektur
A B C D E
SKALA : 1 : 100 DATE : DAKE REVISION NOTE SIGNATURE Drawing code Page number Total page Note.
DRAWING TITLE :
info@emporioarchitect.com JULI 2021
DENAH BALOK KUSEN & TOPIAN LT. DASAR
contact : 081222955519 FILE NAME PRINT DATE : ST - 02 01 031
- -
KETERANGAN :
1. Mutu Beton
- Pile Cap : fc' 20,75 Mpa (slump 12 2)
- Kolom : fc' 20,75 Mpa (slump 12 2)
- Balok : fc' 20,75 Mpa (slump 12 2)
- Pelat : fc' 20,75 Mpa (slump 12 2) 7
- Dinding : fc' 20,75 Mpa (slump 12 2)
2. Mutu Baja Tulangan
£ Ø12 BJTP 24 (SNI)
> Ø12 BJTD 32 (SNI)
Wiremesh BJTD 50 (besi ulir)
3. Struktur Atap
Rangka Baja Ringan Profil Uk 75 (opsional)
6
4. Kontraktor harus menyesuaikan
kembali dimensi dan leveling
struktur sesuai perencanaan arsitektur
3
TABEL KOLOM
TIPE DIMENSI
A B C D E
SKALA : 1 : 100 DATE : DAKE REVISION NOTE SIGNATURE Drawing code Page number Total page Note.
DRAWING TITLE :
info@emporioarchitect.com JULI 2021
DENAH KOLOM LANTAI DASAR
contact : 081222955519 FILE NAME PRINT DATE : ST - 05 01 031
- -