You are on page 1of 27

AS PLANNED DRAWING

BAKTI - LTE 4G PROJECT

SITE ID : KLB0101

SITE NAME : KERTA BARU

TOWER HEIGHT : SST - 4L - 62M LIGHT

ADDRESS : Desa. Kerta Baru, Kec. Pemahan, Kab. Ketapang,


Provinsi Kalimantan Barat

COORDINATE : N:-
E:-
LEGEND

W E

COLOR CODE

R. WARGA R. WARGA LAPANGAN R. WARGA


VOLI
Keterangan
Note

PT. BAKTI

JALAN DESA

LAPANGAN
SEPAK BOLA NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

20000
APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

K. DESA

SST - 4L - 62M LIGHT


20000 Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
SITE MAP LOCATION
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar

KEBUN Map Ref. Drawing No.

KARET DRAWING APPROVAL


FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

01
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
CONTOUR SITE LAYOUT

Site name Site ID


Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

02
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

SECTION 1 DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
CUT AND FILL ( I )

Site name Site ID


SECTION 2 Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

02A
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

SECTION A
NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
CUT AND FILL ( II )
SECTION B
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

02B
LEGEND

COLOR CODE
Proposed RF Antenna Proposed RF Antenna
61m Az. : _° Az. : _°
EL. +61.0 m EL. +61.0 m
59m
RRU
57m Proposed MW Antenna
Ø1.2 m, Az. : _°
EL. +57.0m Keterangan
Note

SST - 4L - 62M LIGHT


PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
SITE LAYOUT
Solar Panel Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Guarding Light
6m Kordinat Hub
Coordinated Hub
Revisi
Revision

Ref. Peta No. Gambar


GPS Map Ref. Drawing No.
3m

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

03
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
CIVIL WORK GENERAL DRAWING
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

04
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
TOWER FOUNDATION DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision
NOTE :
Ref. Peta No. Gambar
Reinforcement shall be use : Map Ref. Drawing No.

Deformed bar : Fy = 390 MPa


Fu = 560 MPa
Plain bar : Fy = 235 MPa DRAWING APPROVAL
APPROVE
Fu = 380 MPa FBB PARTNER
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Concrete shall be use :


K-225 (Characteristic Compressive Strength = 225 kg/cm²) Tanggal Tanggal

f 'c = 18.675 MPa Date

Arah
Date

Skala
Direction
N Scale

Please use the proper method during construction As shown


according to correct standard Halaman
Page
All dimension are in mm 05
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
BAR BENDING SCHEDULE
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

06
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
TOWER ANCHOR DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

07
LEGEND
KETERANGAN
LENG. QTY. WGT.(kg)
NO. UKURAN NOTE
(mm) SING. SUB.

TOTAL COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
TOWER ANCHOR DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

08
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name FOUNDATION DETAIL
SOLAR PANEL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision
NOTE :
Ref. Peta No. Gambar
Reinforcement shall be use : Map Ref. Drawing No.

Deformed bar : Fy = 390 MPa


Fu = 560 MPa
Plain bar : Fy = 235 MPa DRAWING APPROVAL
Fu = 380 MPa FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Concrete shall be use :


K-225 (Characteristic Compressive Strength = 225 kg/cm²)
Tanggal Tanggal
f 'c = 18.675 MPa Date Date

Arah Skala

Please use the proper method during construction


Direction
N Scale

As shown
according to correct standard
Halaman
Page

09
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name BAR BENDING SCHEDULE
SOLAR PANEL FOUNDATION
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

09A
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
DC CABINET FOUNDATION

Site name Site ID


Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

09B
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
FENCE FOUNDATION
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

10
LEGEND
1 1

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021


1
CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
RETAINING WALL FOUNDATION
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

10A
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
FENCE FOUNDATION DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

10B
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
BARBENDING SCHEDULE FENCE
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

10C
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
DOOR DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

11
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
FENCE SIDE VIEW
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

12
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
YARD LAMP
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

13
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
GROUNDING CONTROL BOX
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

14
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
GROUNDING SYSTEM LAYOUT
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

15
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
GROUNDING DETAIL
Site name Site ID
Site Nama Site ID

KERTA BARU KLB00101

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

16
LEGEND

NO Deskripsi Unit Jumlah Dimensi (L*W*H) Keterangan

1 Kamera Set 2

2 NVR Set 1
Penangkal Petir
3 Lampu Taman Set 1
Aviation Obstruction Light
62m
Remarks:
1. Pemancar luar ruangan terdiri dari 2 kamera pengintai dan 1 perangkat NVR.
Sebuah kamera akan digunakan untuk memantau kabinet stasiun BTS,
COLOR CODE
memantau status peralatan dan anti-pencurian
Kamera lain akan digunakan untuk memantau lingkungan sekitar stasiun BTS
posisi pemasangan ditentukan sekitar 3-5 meter di atas permukaan tanah.
2. Lampu Penjaga ditenagai oleh panel surya produk itu sendiri .

Keterangan
Note

PT. BAKTI

SST - 4L - 62M LIGHT


NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

6m
LAMPU TAMAN
5m
Camera 2
Camera 1 Sudut Pandang Kamera pada Perangkat
Nama Proyek
Project Name
Mengawasi Sekitar Pagar BAKTI - LTE 4G
Nama Gambar
3m Drawing Name
CCTV LAYOUT
Site name Site ID
Site Nama Site ID
Fence PAGAR
KERTA BARU KLB00101

Cabinet1Cabinet2 Kordinat Hub Revisi


Coordinated Hub Revision
X

X
X

0m Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
CCTV FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

17
LEGEND

COLOR CODE

Keterangan
Note

PT. BAKTI

NAME DATE SIGNED

DRAWN BY Hendri 19 - 06 - 2021

CHECKED BY Resti - Nana 19 - 06 - 2021

APPROVED BY Gin Gin Ginanjar 19 - 06 - 2021

No. DATE REVISION SIGNED

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
BTS FOUNDATION & CABLE TRAY
Site name Site ID
Solar Solar
Site Nama Site ID
Controller Battery
KERTA BARU KLB00101
DCPD
Kordinat Hub Revisi
SWITCH Coordinated Hub Revision
NVR

Ref. Peta No. Gambar


Map Ref. Drawing No.

DRAWING APPROVAL
FBB PARTNER APPROVE
PT.FIBERHOME TECHNOLOGIES PT. BAKTI
INDONESIA

Tanggal Tanggal
Date Date

Arah Skala
Direction
N Scale

As shown
Halaman
Page

18