Condition Assessment
• Procedures
–Read Reports & discuss with Client
– Get background information
– Identify requirements for initial site visit
–Initial Site Visit
– Visual Inspection
– Photographs and sketches
– Identify areas of interest and additional data required
– Identify test locations and equipment/personnel required
– Issue report (if required)
–Detailed Site Inspections (if required)
3 RMIT University
RMIT Classification: Trusted
Site Investigations
• Preparation
–Why is assessment being undertaken?
– Discuss with client
– Deterioration detected
– Standard/Routine inspection
– Fire/Impact damage
– Change of Use/Loading conditions
–Obtain previous reports
– Design/As built drawings and construction specifications and records
–Suitability of tests
– Coatings can prevent electrochemical measurements
– Environmental conditions can severely affect tests
4 RMIT University
RMIT Classification: Trusted
Site Investigations
• Testing
–Initial Inspection
– Visual Inspection
– Delamination Survey
–Detailed Inspection
– Cover Survey
– Half Cell Survey
– Resistivity
– Corrosion Rate
– Sampling
– Other
5 RMIT University
RMIT Classification: Trusted
Site Investigations
• Equipment
(visual/delamination survey)
–Pen, pencil, paper (special test
sheets), clipboard
–Copies of construction drawings
(as built if available)
–Chalk/Crayons, chalk line, spray
can
–Tape measure, steel ruler, crack
gauge, brush/scraper, hammer,
chisel
–Camera, batteries, binoculars,
torch
–Storage cases
6 RMIT University
RMIT Classification: Trusted
Site Investigations
• Equipment (specialist)
–Power cables, leads, screwdriver, batteries, sample bags, drill, drill
bits (masonry and steel), generator, bucket, steel rod, gloves
–Covermeter
–Half cell (Cu/CuSO4, AgCl), distilled water, multimeter
–Linear polarisation kit, laptop, half cells (3 x Cu/CuSO4)
–Resistivity meter
–Coring Rig, water supply, replacement mortar, paint, paint brush,
–Phenolphthalein
–Schmidt Hammer
–Any other specialist equipment
7 RMIT University
RMIT Classification: Trusted
Site Investigations
• Personnel
–Experience
– Knowledge of deterioration
process
– Familiar with equipment
–Appropriate safety
training/inductions
– Relevant cards
–Specialist testing
– Coring contractors
– Divers
– Cherry picker/lift operators
– Scaffolders
8 RMIT University
RMIT Classification: Trusted
Site Investigations
• Access
–By foot, pavements, road,
bridge, ladder, car
–Cherry picker, scissor lift
–Crane/Dog Box
–Scaffolding/Platforms
–Boat
–Abseiling
– Inaccessible sides of buildings
–Diving
– Bridge piers
9 RMIT University
RMIT Classification: Trusted
Site Investigations
• OH&S
–Mitigate Risk
–Prepare Risk
Mitigation Plan
–Develop Site
Induction Plan
10 RMIT University
RMIT Classification: Trusted
Site Investigations
• Site Induction
–All personnel must be
inducted on to site
–Each site has own specific
site induction, possibly in
conjunction with company
induction
–May allow them to work alone
or be accompanied by
inducted personnel at all
times
11 RMIT University
RMIT Classification: Trusted
Site Investigations
12 RMIT University
RMIT Classification: Trusted
Site Investigations
13 RMIT University
RMIT Classification: Trusted
Site Investigations
• PPE
–Safety Boots
–Hard Hat
–Reflective vest
–Goggles
–Ear Plugs
–Safety Harness
–Breathing Apparatus
–Life Vest
–Specialist Training
– Confined Spaces
– Working at Heights
14 RMIT University
RMIT Classification: Trusted
Visual Inspection
• Visual Inspections
–Cracks
–Rust staining
–Spalling
–Delamination
–Poor workmanship
–Water leaks/damage
–Poor quality repairs
–Other damage
–Causes
15 RMIT University
RMIT Classification: Trusted
Cracking
• Corrosion
• Casting
–Plastic Shrinkage
–Drying shrinkage
–Surface Crazing
–Thermal
• ASR
• Loading
• Impact
16 RMIT University
RMIT Classification: Trusted
Corrosion - Cracking
RMIT University 17
RMIT Classification: Trusted
18 RMIT University
RMIT Classification: Trusted
19 RMIT University
RMIT Classification: Trusted
20 RMIT University
RMIT Classification: Trusted
21 RMIT University
RMIT Classification: Trusted
22 RMIT University
RMIT Classification: Trusted
23 RMIT University
RMIT Classification: Trusted
Loading
• Increased loads
– Vehicle numbers and size
increase with time
• Repetitive Loading
– Repeated loading cause fatigue
• Poor design
– Design does not account for
actual structural load
• Washout
– Foundations, soil or supports are
washed out due to flooding or
river flow
24 RMIT University
RMIT Classification: Trusted
Loading
• Impact
–Vehicle impact on bridge
–Load dropped on to structure
25 RMIT University
RMIT Classification: Trusted
Cracking
26 RMIT University
RMIT Classification: Trusted
Delamination
27 RMIT University
RMIT Classification: Trusted
Spalling
RMIT University 28
RMIT Classification: Trusted
• Low oxygen
– Water access from rear wall
• Forms FeO
• No rust or cracking
• Sever corrosion of steel
• Difficult to observe
RMIT University 29
RMIT Classification: Trusted
Poor Workmanship
• Low cover
– Poorly fitting formwork
– Wrongly placed steel
– Too high a detail
• Poor compaction
– No vibration
– Too much water in mix
• Poor QA
– No curing
– Wrong mix
– Too long standing
30 RMIT University
RMIT Classification: Trusted
Poor Design
• Durability assessment
–No durability assessment
–No consideration of
environmental loading
–No allowance for change in
exposure/use
–Poor drainage
• Materials selection
–Cheap materials
–Inferior materials
–Insufficient testing
31 RMIT University
RMIT Classification: Trusted
RMIT University 32
RMIT Classification: Trusted
• Single structure
–Client has only one structure
–Structure is unique
• Network of structures
–Large number of similar structures
– Single owner
– e.g. Highways Agency, bridges
– Similar structures many owners
– e.g. Port authorities, docks
33 RMIT University
RMIT Classification: Trusted
• Collect Data
• Record Data
• Evaluate Data
–Rating system
–Algorithm
–Experience
• Recommendations
–Individual structures
–Network of structures
• Store Data
34 RMIT University
RMIT Classification: Trusted
35 RMIT University
RMIT Classification: Trusted
Level of Inspection
• Routine
–Set period of time
– 1-5 years
–Visual/delamination
–Installed monitoring equipment
• Detailed
–Set period of time
– 5 – 10 years
–Defects identified in routine inspection
–Standard NDT equipment
• Specialist
–Defects identified in detailed inspection
–Specialist testing equipment
36 RMIT University
RMIT Classification: Trusted
Rating Systems
37 RMIT University
RMIT Classification: Trusted
Visual Inspection
Rating Description
4 Severe, more than 20% affected Severe defects where urgent action required
39 RMIT University
RMIT Classification: Trusted
Detailed Inspection
Rating Description
1 Initiation of corrosion
2 Longitudinal cracking
4 Potential collapse
40 RMIT University
RMIT Classification: Trusted
Structural Inspection
Rating Description
41 RMIT University