6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

Structural loads, structural analysis and structural design are simply


explained with the worked example for easiness of understanding.
Element designs with notes and discussions have added to get
comprehensive knowledge. Also, construction materials, shoring
system design, water retaining structures, crack width calculations, etc.
have discussed in addition to other aspects. 

Home

PDF
Spreadsheets
Download
Softwares
Online Footing design
Online Beam Design
About Us

CATEGORIES  DESIGN AND CONSTRUCTION

NEXT STORY

Shear key [ Purpose, types, design,


construction details]

Pile Foundation
PREVIOUS STORY
Construction
 Pile Design [Things to be
Remembered] Problems and
► Bridge (6)
Solutions
► Construction (31) BY PRASAD ·
► Design (31)
▼ Design and Construction (49) Share
»  11 Methods for Curing of Concrete
»  6 Factors Affecting Curing Time of
Concrete Pile foundation problems and solutions for
»  Advantages of Prestressed Concrete the same are discussed in this article. Pile
»  Alkali-Aggregate Reaction | What |
construction is a wide subject that needs
How | Avoid
to study in-depth to know the
»  All about Mechanical Couplers
shortcomings in the construction.
»  All about Workability of Concrete
Privacy - Terms

https://www.structuralguide.com/pile-foundation-construction/ 1/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

»  Borehole Investigation | Important However, there is a key aspect to be


facts to be Known remembered and attended during the
»  Brick Cracks [types and course]
construction of piles to avoid major issues
»  Cantilever Beam - Design and
in the construction.
Construction Aspects
»  Cold Joint in Concrete | Why
We can not observe the condition of the
Important to Know
pile or what happens underground with
»  Combating Rebar Corrosion : Tips and
Techniques the naked eye. What we can do is just to
»  Comprehensive Study on Waterstops follow the correct construction procedures
»  Compressive Strength of Concrete to make sure we are doing the quality
and Concrete Testing control and quality assurance.
»  Concrete Column Forms [Design &
Construction] Though the pile foundations are
»  Concrete Crack Repair - Methods & designed by an expert in the subject, the
Procedures
pile could fail if not constructed correctly.
»  Concrete Pouring Steps and
Techniques Let’s discuss each of the construction
»  Concrete Slump Classes
problems in detail.
»  Construction Joints in Concrete
Structures
»  Control Joints in Concrete [a deep
Pile Setting Out
study]
One of the most important works to be
»  Cover to Reinforcement Bars
done at the beginning of the construction
»  Design Considerations for Coastal
of a pile.
Structures
»  Destructive Testing of Welds | Detail
If this goes wrong, everything that we do
Study
»  Excavation for Foundation [shallow
will be subjected to the initial error.
and deep]
It is true that we can not always maintain
»  Flat Slab - types and design aspects
»  How to Carry out Slab Inspection
the precision of the setting out to the
Correctly exactly coordinated given in the drawings.
»  How to Compact Soil | Available However, at least, it shall be made sure to
Methods be with the acceptable limit of tolerance.
»  Inclined Column Design
»  Key Factors Affecting Strength of In most of the guidelines, pile construction
Concrete tolerance is specified as 75mm. However,
»  Lintel [a comprehensive study on different guidelines specify different
types of lintel]
ranges based on the nature of
»  Load Bearing Wall Structural
construction.
Engineers Overview
»  Method of Strengthening Concrete
The following table states the range of
Column
tolerances acceptable in the construction.
»  Methods of Setting Out of Slabs
https://www.structuralguide.com/pile-foundation-construction/ 2/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

»  Non-Destructive Testing of Welds | Code Allowable Tolerance


Structural Guide
»  Pile Foundation Construction 4% of diameter or 75mm;
ACI-336
Problems and Solutions whichever less
»  Plinth Beams [impact on structure]
100mm; for pile
»  Properties of Hardened Concrete
diameter(D) ≤ 1000mm
»  Rebar Weight | per m per foot
»  Screed Concrete
0.1D for 1000<D≤1500
»  Self Compacting Concrete
»  Shear key [ Purpose, types, design, 150mm D>1500
construction details]
BS EN 1536
»  Slab Foundations - what is it Design for rake less than
»  Slab Types - deep review on types, 1 in 15 limit to 20mm/m
design and construction
»  Slump Test of Concrete | Measure of Design with rake of
Workability of Concrete between 1 in 4 and 1 in
»  Strengthening of Concrete Beam 15 limit to 40mm/m
»  Tallest Buildings in the World
»  Types of Beams CP4 75mm
»  Types of Concrete Blocks
»  Types of Concrete Joints [ A Detailed Not more than 1 in 75
Study] from the vertical or 75mm
»  Welding Inspection - What it is and
Deviation of up to 1 in 25
How it done BS 8004
► Design Loads (5) permitted for bored piles
► Design to BS 5950 (4) drilled at rakes of up to 1
► Design to BS 8110 (14) in 4
► Design to EC2 (13)
► Design to EC3 (5)
► Foundation Design (47) If the pile tolerance is within the limit, the
► Geotechnical Design (18) construction of the pile is accepted. The
► Materials (105) structural designer shall be considered the
► Post Tension (4) acceptable tolerance in his design.
► Project Management (28)
► Retaining Structures (16) For example, if the acceptable tolerances
► Road (1) for pile deviation are 75mm, the
► Seismic Design (16) superstructure shall be designed for the
► Servisibility Design (17)
same. We cannot change the location of
► Special Designs (29)
the column through the pile is shifted.
► Structural Detaling (15)
► Structural Failures (8) Then we have to design the ground beam
► Testing (16)
if there are two or single pile to carry the
column loads. When there are three or

https://www.structuralguide.com/pile-foundation-construction/ 3/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

more piles, it could be considered for the


piles, and an increase in the pile load due
to the movement towards the column shall
be taken in to account when pile capacity
is evaluated.

When the deviation is greater than the


acceptable limit for any type of pile
arrangement in the pile cap, it shall be
checked after the construction, and
necessary adjustment shall be made.
Designing the ground beams for the
eccentricity where possible, check the pile
capacity increase with the movement of
piles, check the pile caps for new
eccentricity, etc should be done by the
designer.

Excavation of Pile and


Socketing
There are many issues that we need to
look into when the pile excavation or
drilling is done.

Let’s discuss each of them one by one.

Deviation of the Steel Casing

The steel casing is placed when the


condition of the groud is very weak
and collapsing cannot be stored by
the bentonite fill. The depth of the
casing could be up to the termination
of the soft soil such as peat.

The Center of the casing could


deviate when place due to the
collapsing during its placement. Even
though the center of the casing is

https://www.structuralguide.com/pile-foundation-construction/ 4/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

checked after it placed, it could be


inclined.

In addition, during the excavation,


the position of the casing could be
deviated from its original position due
to the lack of lateral stiffness of the
soil.

It could be avoided by inserting the


casing up to a reasonable depth in
the hard soil layer and checking the
position of the casing before and
after concreting.

Tolerances could be checked as per


the relevant standard or as indicated
in the above table.

Collapse of the Excavtion

Collapsing of the soil is inevitable in


the pile foundation construction.
However, it can be minimized by
controlling the density of the
bentonite slurry.

Periodic checking shall be done to


make sure the density is within the
acceptable limit.

Excessive Water in the Pile

Since the excavation continues


beyond the groundwater table, water
will seep into the excavation.

The bentonite level shall be


maintained regularly to avoid the
water seeping to the pile. Since the
density of the bentonite is higher
there is less chance of movement of
water.
https://www.structuralguide.com/pile-foundation-construction/ 5/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

In addition, the density of the


bentonite shall be checked regularly,
and if required necessary adjustment
shall be done the maintain the
required density of bentonite.

Lateral Movement and Uplifting of


Adjacent Piles

In general, the spacing of the pile is


maintained around 2.5 – 3 times the
pile diameter.

There are possibilities for the


movement of surrounding piles when
the pile casings are driven.

It shall be done with much care and


doing it with much control, lateral
movement could be
minimized/avoided.

Settlements

There will be excessive vibration in


the ground due to the pile driving.

Even though it maintains the


vibration within the acceptable limit,
still the effect of the vibration could
cause settlement of the adjacent
structures.

Especially, the structures founded on


shallow foundations could settle in
the construction of the pile. Further,
excessive vibration could cause a
severy issue.

The settlement of the structure may


lead to cracking and even the old
structure or improperly constructed
structures could collapse.
https://www.structuralguide.com/pile-foundation-construction/ 6/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

Therefore, based on the nature of


construction, vibration shall be
minimized as much as possible. The
use of new tools, the use of electric
drilling machines, etc could reduce
the vibration.

In Adequate Socketing and


Termination

Pile design drawings specify the


socketing depth in the drawings.
However, it is a challenging task to
decide the starting point and
termination point of the socketing
depth.

The socketing depth of a pile is


decided based on several factors.
Some of them are information
gathered from the borehole log, rate
of the penetration in the rock, rock
sample observation, etc.

Further, onsite tests such a point


load test could be done to find the
strength of the rock. It can be
correlated with the end bearing of the
rock. Thus, we can identify the
condition of the rock, and
accordingly, the termination could be
decided.

Poor Cleaning of Pile Toe

It is a must to clean the pile to


adequately. Cleaning of the pile is
called the flushing.

It can be done based on the


parameters obtained by testing the
bentonite. We can not see the toe of
https://www.structuralguide.com/pile-foundation-construction/ 7/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

the pile. So how we decide the pile is


cleaned.

The bentonite in the excavation


taken out and cleaned by a machine
and remove the washed sand and
mud. It gained pumped from the top
of the excavation. Bentonit taken for
cleaning from the toe of the pile.

This process is continued until it


satisfies that there is no mud/sand in
the bentonite.

The tests such as mud balance,


marsh balance, and sand content are
tested in the flushing process.

Characteristics for Bentonite Suspensions

Stages

Ready
Test
Property Unit for Before
Fresh Equipment
Re- Concreting
use

Mud
Density g/ml <1.10 <1.25 <1.15
Balance

Marsh
32- Marsh
Viscosity sec 32-60 32-50
50 Funnel
(946 ml)

Sand Sand
% N/A N/A <4
Content content

7 to 7 to
pH n.a. pH meter
11 12

The ranges specified in the above


table could be maintained before
concreting. The values may vary
from specification to specification.

https://www.structuralguide.com/pile-foundation-construction/ 8/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

The project specification shall be


referred for the date.

Concreting Problems
The issues usually observed during
construction and are highlighted as
follows.

In Adequate Strenght of the


Concrete

Generally, piles are cast from the


grade 30 concretes. This value may
vary from country to country.

Inadequate compressive strength of


the concrete in the pile leads to
severe issues in the construction.

Since the pile is an underground


structure, it is very difficult to rectify. If
the real application of load exceeds
the pile capacity, additional piles
could be constructed.

Voids in the Concrete

Since the self compacting concrete


is poured into the pile, no vibration is
required. Further, due to the depth of
the pile, it is very difficult to vibrate
the concrete for the better
commotion.

Due to the construction issues,


cavities could be created in the pile.
It could be due to the poor quality of
the concrete and inconsistency in the
workability of the concrete.

Regular checking and monitoring the


quality of concrete could avoid these
https://www.structuralguide.com/pile-foundation-construction/ 9/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

issues.

Mixing Concrete with Bentonite

Concrete is poured in a way that it


does not mix with the bentonite.

Initially, the tremie place in the tore of


the excavated pile. Then concrete is
poured into the tremie. After that
tremie is lifted slowly allowing the
concrete to flow out.

Then again the tremie is filled with


concrete. Then the tremie is slightly
lifted allowing concrete to move out
gradually. This process is to continue
in the pile concreting.

We always keep the end of the


tremie within the fresh concrete and
we never lift the tremie into the top
level of the pile concrete during the
concreting process.

We try to retain the end of the tremie


at least 1-1.5m within the fresh
concrete to avoid fresh concrete
mixing with bentonite.

Bulging and Necking

Concrete could bulge or it could


necking during the construction.

Necking of the pile cold exposes the


reinforcement cage and it leads to
reduce the cross-section area of the
pile.

Reduction of the pile cross-sectional


area of the pile leads to reduce the
load-carrying capacity of the pile.

https://www.structuralguide.com/pile-foundation-construction/ 10/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

Rise of Temperature of Concrete

The rise of the temperature of the


pile shall be tested at least at the
beginning of the piling construction
work.

The first pile could be checked from


the strain gages and temperature
variation could be monitored.

Based on the outcome of the data


analysis, concrete could be adjusted.

Reinforcement Cage
Movement
 Lifting of Reinforcement Cage

The reinforcement cage could be


lifted if the rate of pouring of concrete
is high. Therefore, concrete pouring
shall be done in a controlled manner.

Once the case is lifted, we cannot


lower it. Lifting the cage beyond the
socketing length causes sever issue
in the pile construction.

It could lead to abandoning the pile.

Lack of Cover to the Reinforcement

Lateral movement of the


reinforcement cage could lead to
exposing it from one side. It could be
due to the collapsing the soil from
one side of the pile excavation.

Our Latest
video

https://www.structuralguide.com/pile-foundation-construction/ 11/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

Visit Our Youtube


Channel

Cold Weather Concreting | …

 YOU MAY ALSO LIKE...

Slump Test Plinth


Destructive
of Concrete Beams
Testing of
| Measure [impact on
Welds |
of structure]
Detail Study
Workability
of Concrete

MAIN CATEGORIES LATEST ARTICLES RANDOM ARTICLE

Bridge Construction DESIGN AND CONSTRUCTION

Design Design and Combating Rebar Corrosion


: Tips and Techniques
Construction Design
Loads Design to BS 5950
DESIGN
Design to BS 8110 Nonlinear Analysis of MATERIALS
Design to EC2 Design to Structures What Cause Rust |
Foundation
EC3 Overview on Formation and
Avoid
Design Geotechnical DESIGN

Design Materials Pushover Analysis:


Structural Advanced
Post Tension Project
Simulations
Management
Retaining Structures DESIGN

https://www.structuralguide.com/pile-foundation-construction/ 12/13
6/26/23, 6:16 PM Pile Foundation Construction Problems and Solutions - Structural Guide

Seismic Design
Road Linear Analysis of
Servisibility Design Structures | Overview
Special Designs
Structural Detaling
Structural Failures
Testing

Share the joy

Subscribe for New Article


 Notification*
Terms and Conditions
Structural Guide © 2023. All Privacy Policy
Rights Reserved. Subscribe

Designed by KitS

https://www.structuralguide.com/pile-foundation-construction/ 13/13

You might also like