XN-HD01/BM02 CN tổ hoàn thành . QLCL-QA .
04 SP nhiễm kim KCS sau ủi . TT KCS .
Dò kim 100%
TT hoàn thành GĐXN
Đạt Dùng máy dò tay
kiểm tra toàn bộ
các vị trí SP
Đạt
Đạt
TT HOÀN THÀNH .
07 Xuất hàng GĐXN
TT HOÀN THÀNH .
08 LƯU HỒ SƠ GĐXN
Packaging department
Packaging Dept receive finished supervisor QA
02 1/ Vacuuming Packing workers QC SUPERVISOR
2/ Ironing After-ironing QC
Fail
- Cleaning of Finished products Pass QA inspect and
- After ironng QC inspect and measure record CL-
TT02/BM14
Packaging department
return for QA
supervisor
03 correcting - Attach swing tag Packing workers
QC SUPERVISOR
Pass FACTORY DIRECTOR
- Classify size/colour After-ironing QC
Pass - Check swing tag/PO For oil pro-absorbing, ease of fibre
- Cut PO Classified tie contaminating materials: Dry Room-->
Pass QA re-inspecting - Transfer to Dry Room adding tag--> QC inspecting
Packaging Dept
Supervisor
- Folding - Add barcode
- Check packing
list
- Pack in polybag
Record XN-HD01/BM02 Packing department
Pass metal contaminated products QA
supervisor
04 Packing workers
QC SUPERVISOR
Metal detection 100 % FACTORY DIRECTOR
Fail Use hand held metal After-ironing QC
detector to check the
product ( disposed product if
failed to find metal parts)
Pass
Pass
Packaging Dept control
Packing department
metal detection before QA
return for supervisor
06 folding Final
Packing workers
QC SUPERVISOR
re-work
Fail FACTORY DIRECTOR
After-ironing QC
check all the carton if
Packaging Dept control
there's any sharp tool
missing when re-working Pass check all the carton
metal detection if there's any sharp
Note: in case prefinal, final inspection tool missing when
before folding
is passed, all repaired garments must
done metal detection with record
before re-packing.
Packing department
07 Delivery supervisor
FACTORY DIRECTOR
Packing department
08 Record document
supervisor
FACTORY DIRECTOR