Contents
1 Scope ........................................................................................................................................ 3
2 Installation of Sensorhub............................................................................................................ 3
Installation In 19” Rack ......................................................................................................... 3
Connection of Ethernet cables ............................................................................................. 5
3 Swap and commissioning to new Eltek SmartPack controller ..................................................... 5
Guidelines on how to clone SmartPack 1 config over to SmartPack R ................................. 5
Guidelines on how to copy XML file from Smartpack 1 using PowerSuite ............................ 7
Guidelines on how to upload a software update on to Smartpack R ..................................... 9
Site specific information and configuration ......................................................................... 10
Network and SNMP setting ................................................................................................ 13
Enable port pComm to be able to access with USB-B ........................................................ 14
Confirmation and commissioning ....................................................................................... 15
External alarms .................................................................................................................. 15
Mains-output alarm to Baseband (mandatory on all sites) .................................................. 19
4 The testing of external alarms. ................................................................................................. 21
The testing of external alarms. ........................................................................................... 21
Fault on external alarm units .............................................................................................. 22
5 Guide on how to connect to Smartpack R USB-B port. ............................................................ 22
6 Upgrading System C20838.024 16kW with Slave unit to Spartpack R with BSM. .................... 30
Background for upgrading of Eltek system C20838.024 with master-slave ........................ 30
Units................................................................................................................................... 30
Information ......................................................................................................................... 31
Guide for the installation..................................................................................................... 31
Step 1 – Remove old circuit board ...................................................................... 31
Step 2 – Remove cable (200780) ....................................................................... 32
Step 3 – Disconnect smartpack and slave module .............................................. 32
Step 4 - Cabling .................................................................................................. 33
Step 5 – Install and connect SmartPack R .......................................................... 34
Step 6 – Connect BSM ....................................................................................... 34
Step 7 – Blind cover............................................................................................ 36
Setup of the Smartpack R .................................................................................................. 36
Step 1 – Connect smartpack R ........................................................................... 36
Step 2 – Upload XML-file .................................................................................... 36
Step 3 – Enable strings ....................................................................................... 37
Step 4 – Measurement of string .......................................................................... 38
Step 5 - Calibration of the battery ....................................................................... 39
Security Page No
INSTALLATION AND COMMISSIONING Internal 2 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Step 6 - Finished................................................................................................. 40
Revision history
Rev. Appr. Appr.
Rev: Purpose revision: Rev. date:
sign: Sign. Date.
Document transferred to new spec. Rev history 2019-03-30
1.0 MG
back to 1.0
Chap 2.2 has been updated (Info regarding 90
deg connector) 2020-04-02
1.1 New Chap 4 – “The testing of External alarms” MG
has been added. (Old Chap 4 and 5, is now chap
5 and 6))
1.2 Updated example Pic 14 MG 2020-04-20
New chap. 3.9 with Manis connection between 2020-09-28
1.3 MG
rectifier and Baseband
Security Page No
INSTALLATION AND COMMISSIONING Internal 3 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
1 Scope
This document gives instructions on how to install the Sensorhub, switch and how to connect the 48V and ethernet
cables. It also includes a guide for replacing old Smartpack 1 with Smartpack R. Use this Guide also for Smartpack
S systems.
The installation and materials used shall be as specified in Telia Norway and Telia Tower Norway technical spec.
All Telia Subcontractors must have at least on certified person.
Contact number for Safebase is: +47 400 00 675 #3
2 Installation of Sensorhub
The SensorHUB unit shall be mounted in the 19” Rack and it uses 1U. The modem, switch and power supply are
built into the device. Internally the device is pre-connected. When on site you need to connect the 48V cable and
ethernet cable to rectifier. If a free cooler (Dantherm CC3000) is located on the site, this also needs to be
connected. The supplier’s installation manual comes with the unit when its delivered.
Installation In 19” Rack
The 1U 19” SensorHUB is mounted in a 19” Rack. The rack position is specified in the rack form included
in the site design document.
Rack nuts and bolts is not delivered in the installation package for the sensor hub. It’s very important that the
device is mounted with four bolts with rack nuts.
On the back side of the device, you will find the switch (RJ45 inputs for rectifier and the free cooler) and
the terminal for the 48V cables.
One Ethernet cable, antenna cable and a temp sensor cable is pre-configured and comes out from the device
cable entry.
• The antenna has a magnet attached to it, so that it can be fastened on a metal surface. The antenna shall
be placed at the top of the rack. The cable length is 3m.
• The temp sensor shall be placed on the wall above the rack, at the same height as the cable bridge.
• The -48V cable shall be connected to 6A MCB and to the -48V connection on the back of SensorHUB.
(-48VDC cable is not included in the installation package)
Security Page No
INSTALLATION AND COMMISSIONING Internal 4 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 3 – Antenna
Security Page No
INSTALLATION AND COMMISSIONING Internal 5 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 6
Picture 7
Picture 8
Picture 9
Security Page No
INSTALLATION AND COMMISSIONING Internal 9 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 10 Picture 11
Step 2:
• Fill in the DC plant information
Step 3:
• Fill in general battery configuration with the battery type, size, number of strings, install date and
battery table.
Step 4:
• Fill in the current limitation. The standard is to set 20A for each 190Ah string, 15A for each 150Ah
string and 10A for each 100Ah string. (3x190Ah strings = 60A Mains feed current limit)
Step 5:
• Use “simplified test” enable max duration and fill in 2h=120min or 4h=240min depending on the
requirements for that site. Enable Guard time and fill in 24 hours. Not all sites are 2h and 4h, check
Final Config document under “Special Info”.
Step 6:
• Enabled interval test and fill in the next start date for the test. Set the date one week after installation
date. Start date 02.00. interval period 180 days.
Step 7:
• All alarms must be cleared before leaving the site. This shall be confirmed and documented.
Step 2:
Make sure that the right IP is inserted on the #2.
Step 3:
When all the configuration is done go to “Network settings” and enable “DHCP”. Click save and log out.
Picture 23 - External alarms (Indoor sites with 2-4 hours battery backup)
Picture 24 - External alarms (Indoor sites with 2-4 hours battery backup)
Security Page No
INSTALLATION AND COMMISSIONING Internal 16 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
External alarms Sites 2-4 hours backup Outdoor
From From
New site (without termination termination Input Number ProgInputs to
Severity Alarm name in system existing plinth) Plinth 1 Plinth 2 Cable color on unit Input Unit Use in SP Relay config
Critical Earth Leak Alarm Device output 1a-1b Black-Blue Input Circut 1 I/O Monitor 2 ProgInput 82.1 Normally Closed
Major SPD -48V/230/400 Device output 2a-2b Black-Blue Input Circut 2 I/O Monitor 2 ProgInput 82.2 Normally Closed
Minor Unlocked Door Internal
Critical HighTemp Room Internal
Major Mains Failure Internal
Critical Critical Capasity Alarm Internal
Major DC Supply To Low Internal
Major Rectifier Module failure Internal
Minor FreeCool Filter Internal
Major FreeCool Fan Internal
Major Mains Failure 2 Internal
Critical Critical Capasity Alarm 2 Internal
Major DC Supply To Low 2 Internal
Major Rectifier Module failure 2 Internal
Major AirCon WaterPump N/A
Critical Obstruct. Light Device output 5a-5b Black-Blue Input Circut 6 I/O Monitor 2 ProgInput 82.6 Normally Closed
Picture 25 - External alarms (Outdoor sites with 2-4 hours battery backup)
Picture 26 - External alarms (Outdoor sites with 2-4 hours battery backup
Security Page No
INSTALLATION AND COMMISSIONING Internal 17 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
3. Check that the batteries are calibrated so the system has the right symmetry values.
o Go to http://onlinehelp.eltek.com/cwui and follow the instructions for calibration.
Telia has some different systems in the network with different ways of connecting the output. We have the old
outdoor and indoor updated from SP1 to SPR and the newer systems with SPS.
Most of the old indoor systems with SPR has an alarm card showed in Picture 28. Connect mains-output on
Relay 1, port 5-6.
Security Page No
INSTALLATION AND COMMISSIONING Internal 20 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
The old outdoor systems already have a Krone-Plinth. This needs to be rebranded and only one alarm will go
out and that’s relay 1- plinth nr 7 (old “DC supply to Low”).
Figure 1
New systems with SmartPack S will not have any alarm card or krone-plinth. The Eltek Temp systems has a
terminal block in the indoor and outdoor rectifier. Connect to terminal 1on Relay output connect NO and
Common. Note: Eltek NO is closed loop => Telias NC
Figure 2
New Telia systems with Smartpack S will not have terminal block. Connect direct to Smartpack relay output
nr 1. Note: Same connection on panel mounted as for the rack mounted Smartpack S.
Security Page No
INSTALLATION AND COMMISSIONING Internal 21 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 31
The connection to baseband alarm port shall be done as specified in document 09.01-01. All sites need this
mains failure connection for the logic in the ENM to work.
Earth Leak Alarm Earth leak monitor in EDP Push TEST button on the Earth leak monitor
SPD -48V/230V/400V -48V SPD unit Remove one of the SPD modules and the alarm
will trigger.
230V/400V SPD unit
Unlocked Door On door blade or lock cylinder Leave the door open or unlock the cylinder and
the alarm will trigger.
HighTemp Room Thermostat (usually over door) Turn the thermostat to zero and the alarm will
trigger. (Back to 40)
(Thermostat only)
Mains Failure Rectifier Turn the MCBs for rectifier off and the alarm will
trigger.
Module Failure Rectifier Remove One Rectifier module and the alarm will
trigger.
FreeCool Filter ACUE300/CC3000 Dantherm Run self-test on controller
FreeCool Fan ACUE300/CC3000 Dantherm Run self-test on controller
Table 1
NOTE: In order to connect via the USB-B port, the configuration in Chapter 3.6 must have been completed
Step 1:
Go into the control panel in your windows computer. Select “Devices and Printers”.
Step 2:
Under unspecified you will find a new device when connecting the USB to computer. Double click on the icon
Step 3:
Security Page No
INSTALLATION AND COMMISSIONING Internal 24 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Step 4:
Click on “Change settings” in “General” tab.
Security Page No
INSTALLATION AND COMMISSIONING Internal 25 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Step 5:
Click on the “Driver tab”, then choose “Update Driver”
Step 6:
Click on “Search automatically”. OBS! PC must be connected to internet! (if it does not find the driver and
you can see the new local area connection then you need to install driver manually. Driver is on Telia SFTP
server)
Step 7:
When Driver is installed you go back to control panel and click on “Network and Sharing Center”.
Step 8:
Click on “Change adapter Settings”.
Step 9:
Check that you have a new Local Area Connection for SmartPack R
Step 10:
Go into a web browser and enter default IP address “10.10.0.1”
Step 11:
Now you will get the login page for Eltek.
Step 12:
Log in using: Username: “Admin”, Password: “Admin”.
6 Upgrading System C20838.024 16kW with Slave unit to Spartpack R with BSM.
Background for upgrading of Eltek system C20838.024 with master-slave
Systems with Master-Slave have a symmetry monitor and battery temperature sensor that runs via one circuit
board and does not have the BSM we use today.
This upgrade involves removing existing SmartPack, slave module and circuit board (for symmetry and
battery temperature).
You need to install a new Smart pack and BSM (Battery monitor)
New Smartpack R shall be inserted where the slave module was. This means that you need to move the
cables that where connected to the old SmartPack module to where the new SmartPack R is inserted.
Shall only be done by qualified electrician with (Certification: Groupe L).
Units
Picture 44
Security Page No
INSTALLATION AND COMMISSIONING Internal 31 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Information
This is what you need:
• 1 piece - SmartPack R part nr. 242100.120
• 1 piece - Battery monitor part nr. 242100.300
• 1 piece - Blind cover to cover slot after old SmartPack is removed.
• 2m CAN BUS cable to replace existing cable in the rectifier.
* Old SmartPack units (v1.4 and v1.2) is replaced to SmartPack R
* Telia shall be notified before work is started and the site is taken off air.
* The rectifier shall be without power when the installation is done. Measure to check if the rectifier is
current free before you start the work.
* Only electrician with group. L certification is approved for this job
Picture 45
Security Page No
INSTALLATION AND COMMISSIONING Internal 32 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 46 Picture 47
Picture 48
Security Page No
INSTALLATION AND COMMISSIONING Internal 33 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 49 Picture 50
Step 4 - Cabling
The cables that goes to the old smart pack position needs to be routed to the position where the slave
module where. (New position for SmartPack R)
The cables need to be placed behind the powercore. The powercore can be pulled out so that you get more
space to pull the cable to the new position.
Picture 51
Security Page No
INSTALLATION AND COMMISSIONING Internal 34 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 52 Picture 53
Picture 54
Security Page No
INSTALLATION AND COMMISSIONING Internal 36 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 55
Picture 56 Picture 57
Picture 58
Security Page No
INSTALLATION AND COMMISSIONING Internal 38 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 59
Security Page No
INSTALLATION AND COMMISSIONING Internal 39 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Picture 60
Security Page No
INSTALLATION AND COMMISSIONING Internal 40 (40)
GUIDELINE FOR SENSOR HUB AND
SMARTCOM
Created Responsible for document
Martin Gyllenhammar Solveig Aanby Aas
Date Ver Belonging object
2020-09-28 1.3 Telia – Technical Spec
No.
05.02-01
Step 6 - Finished
• If you follow these points, the system has been upgraded to. today's 16kw rectifier layout.
• When uploading and reviewing control points on XML config, use Doc: 05.02-02 Eltek Installation Guide
BULL 2016.
• In this guide, we have covered the most important points needed to upgrade Master-Slave 16kw rectifiers
to today's setup with new SmartPack and new BSM.
• Setup of BSM in Eltek's document, Installation Guide Battery Monitor, CAN Bus Node (B - 351507.033 -
1 - 1.20) - 1
Picture 61