1
Nicoll Highway
Nicoll Highway 2
Site Plan
Collapsed
section of NCH
The Concourse
Station Area
Plaza Hotel
Golden Mile
Merdeka
Golden Mile
Tower Complex
Bridge
X-over Box
Collapse
Area I Area K Area
Area H Area J
Tunnel Box
Nicoll Highway 3
Nicoll Highway 4
Nicoll Highway 5
Nicoll Highway 6
Nicoll Highway 7
Nicoll Highway 8
Nicoll Highway 9
Nicoll Highway 10
Layout Plan
66 KV Cable
TSA
Nicoll Highway 11
Soil Conditions
RL (m)
103.0
Fill Sand Fill
100.0
E Soft Clay
98.0
UMC Upper
Marine Clay
85.5
F2 upper Stiff Clay
82.5
Lower
LMC Marine Clay
JGP1
69.4
JGP2
F2 lower Stiff Clay
63.7
OA Dense
Silty Sand
Nicoll Highway 12
13
Construction Sequence
Ground Level Ground Level
1ST STRUT
FILL 2ND STRUT FILL
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
MARINE Sacrificial JGP MARINE
CLAY 10TH STRUT CLAY
JGP
D/WALL D/WALL
PILES
PILES
Nicoll Highway 15
waler
swayed
downward
Nicoll Highway 16
17
Strut Forces
5000
3000
2000
1000
3000
2000
1000
Nicoll Highway 18
Strut Forces
6000
Strut S335 - Level 6
5000
3000
2000
1000
6th 0
7th 20/4
5000
2000
1000
20/4
Nicoll Highway 19
95 17 April 04
90
20 April 04
Reduced Level (m)
85
80
Level 9 Strut
75
70
65
60
55
50
0 50 100 150 200 250 300 350 400 450 500
Wall Deflection (mm)
Nicoll Highway 20
• Wall deflections
• Strut forces
• Pore pressures
• Ground settlements
• Field observations
Nicoll Highway 21
Wall deflections
Inclinometer I104 – sea side Inclinometer I65 – highway side
Nicoll Highway 22
Wall Deflections
23
Nicoll Highway 24
450
400
3rd Goal Post
Wall Deflection (mm)
350
200
50
0
1/4/04 1/19/04 2/3/04 2/18/04 3/4/04 3/19/04 4/3/04 4/18/04
0.0
5/24/02 9/1/02 12/10/02 3/20/03 6/28/03 10/6/03 1/14/04 4/23/04
-50.0
Settlement (mm)
-100.0
-150.0
-200.0
-250.0
-300.0
GW(V)25
29/1/04
Nicoll Highway 29
Nicoll Highway 31
Uplift Failure
Ground Level Ground Level
1ST STRUT
Ground Ground
Water Table 2ND STRUT Water Table
FILL FILL
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
W<U
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
MARINE MARINE
10TH STRUT
CLAY CLAY
JGP
W
D/WALL D/WALL
U
Nicoll Highway OLD 32
ALLUVIUM
Slide 32
Uplift Failure
Ground Level Ground Level
FILL FILL
MARINE MARINE
CLAY CLAY
FLUVIAL
CLAY
FLUVIAL
CLAY W<U
MARINE MARINE
CLAY CLAY
D/WALL D/WALL
Nicoll Highway 33
OLD ALLUVIUM
LMC LMC
68.3 68.3
JGP
E / F2 E / F2
61.6 61.6
Old Alluvium
Sand pocket
Nicoll Highway 35
Removal of JGP
Ground Level Ground Level
1ST STRUT
FILL 2ND STRUT FILL
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
MARINE Removal of this JGP layer MARINE
CLAY 10TH STRUT CLAY
JGP
D/WALL D/WALL
PILES
PILES
Nicoll
OLDHighway
ALLUVIUM 36
UMC UMC
85.4
F2 upper F2 upper
16 rigs
LMC 24 hrs / day
LMC
JGP1
LMC 72.1
F2 F2 lower
69.4
JGP2 JGP3 OA N = 20
F2 lower 66.8
OA N = 30
64.7
63.7 OA N = 70
OA N = 20
61.2 60.0
OA N = 30
59.2 OA N = 100
OA N = 70
55.0
37
Nicoll Highway
Nicoll Highway 38
S335
AC-3
Nicoll Highway 39
FILL 2 FILL
4
MARINE MARINE
CLAY CLAY
5
6
FLUVIAL FLUVIAL
7
CLAY CLAY
8
9
MARINE JGP MARINE
CLAY CLAY
JGP
D/WALL D/WALL
Nicoll Highway
OLD ALLUVIUM 40
65
JGP 60
D/WALL D/WALL 55
50
0 50 100 150 200 250 300 350 400 450 500
Wall Deflection (mm)
OLD ALLUVIUM 41
FILL 2 FILL
4
MARINE MARINE
CLAY CLAY
5
6
FLUVIAL FLUVIAL
7
CLAY CLAY
8
9
MARINE JGP MARINE
CLAY CLAY
JGP Toe
kick-in?
D/WALL D/WALL
Elevation Contour
of Top of OA
(Ishihara & Lee, 2008)
Before
Nicoll Highway 44
Toe kick-in?
I104
Nicoll Highway 45
66 kv Cable
TSA
46
Nicoll Highway
MC3007
AC3 MC3008
M2064
47
48
Nicoll Highway
Settlement of D Wall
1ST STRUT
Ground Level
2ND STRUT
4TH STRUT
MARINE
CLAY
5TH STRUT
6TH STRUT
9TH STRUT
MARINE
CLAY
JGP
Nicoll Highway 49
OLD ALLUVIUM
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
MARINE MARINE
JGP
CLAY 10TH STRUT CLAY
JGP
D/WALL D/WALL
PILES
PILES
Buckling of Struts ?
ORIGINAL GROUND LEVEL STRUTS
INEFFECTIVE
NICOLL HIGHWAY
0m
10m
VERY SOFT
CLAY NO SUPPORT
TO NORTH WALL 20m
30m
40m
DEPTH
OLD ALLUVIUM
0 10 20m
~ 3.30pm 51
Slide 51
Buckling of Struts ?
Fill Fill
E E
MC MC
F2 F2
LMC
LMC
F2
69.4
JGP OA N=20
F2 OA N=30
63. OA N=70
7 OA N=20
61.
OA N=30 OA
2
59.2
OA N=70 N=100
55.
NLC Design > Measured
Therefore, strut failure did not
Nicoll Highway
initiate the collapse. 52
Waler/Strut Connection
Ground Level Ground Level
1ST STRUT
Levels 1 to 6
FILL 2ND STRUT FILL
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
MARINE MARINE
JGP
CLAY 10TH STRUT CLAY
JGP
D/WALL D/WALL
PILES
PILES
OLD ALLUVIUM 53
Waler/Strut Connection
Ground Level Ground Level
1ST STRUT
Levels 1 to 6
FILL 2ND STRUT FILL
3RD STRUT
4TH STRUT
MARINE MARINE
CLAY CLAY
5TH STRUT
6TH STRUT
FLUVIAL FLUVIAL
7TH STRUT
CLAY CLAY
8TH STRUT
9TH STRUT
Levels 7 to 10
MARINE MARINE
JGP
CLAY 10TH STRUT CLAY
JGP
D/WALL D/WALL
PILES
PILES
OLD ALLUVIUM 54
10m
M
VERY SOFT
CLAY
F2 20m
9am 20 APRIL
WALER STARTS TO FAIL
M
30m
INCREASED WALL
MOVEMENT 17th TO 20th APRIL
40m
DEPTH
OLD ALLUVIUM
BORED PILES
0 10 20m
17th/20th APRIL SCALE
Nicoll Highway 55
10m
30m
40m
DEPTH
OLD ALLUVIUM
BORED PILES
0 10 20m
20th APRIL 2004 SCALE
~ 3.30pm
Nicoll Highway 56
Slide 56
Concrete Packing
C - Channel
Strut
Waler
D/Wall
Nicoll Highway 57
Slide 57
ROTATION ANGLE OF
WALL
WALL
ROTATION
58
Slide 58
95 17 April 04
90
20 April 04
Reduced Level (m)
85
Wall Deflection at I104
80
80
Preload Strut 9
Level 9 Strut
75 17 April 04
78
20 April 04
60
74
55
50 72
250 300 350 400 450 500
0 50 100 150 200 250 300 350 400 450 500
Wall Deflection (mm)
Wall Deflection (mm)
59
Nicoll Highway
4000
3500
Waler Capacity (kN)
3000
2500
2000
1500
1000
500
0
0 1 2 3 4 5 6 7
Stiffener Plate
Stiffener Plate
Nicoll Highway 61
Slide 61
62
C-channel as Stiffness
C - Channel
63
Nicoll Highway
Slide 63
64
Nicoll Highway 65
Nicoll Highway 66
Nicoll Highway 67
Stiffener Plate at
top and bottom
C-channel at top
and bottom
C-channel at top
68
strut
splay
waler
(2/3)P P/3
Nicoll Highway = 1771 kN 69
Improper Design!
Nicoll Highway 70
Original Design
Computed Measured
Level 10
325 mm
Formation = 118 mm
Final = 145 mm 71
• Undrained analysis
This is
• Mohr-Coulomb soil model known as
• Effective stress parameters: Method A.
“Correct” Method
• Undrained analysis
This is
• Mohr-Coulomb soil model known as
• Total/effective stress parameters: Method B.
Nicoll Highway 73
Method A
Bending
Moment
in Wall
Method B
Nicoll Highway 75
500
450
400
3rd Goal Post
Wall Deflection (mm)
350
200
150
1st Goal Post
100
50
0
1/4/04 1/19/04 2/3/04 2/18/04 3/4/04 3/19/04 4/3/04 4/18/04
Nicoll Highway 76
Inappropriate
Back-Analysis?
Nicoll Highway 77
Wall Stiffness
Reduced 50% from Step 11 onward
Nicoll Highway 79
Nicoll Highway 81
Thank You
for your attention!
Nicoll Highway 82