Professional Documents
Culture Documents
DEPARTMENT OF MECHANICAL
II- Semester
PD4391 – Product Lifecycle Management
(M.E– CAD/CAM)
(Regulations 2021)
UNIT-I (HISTORY, CONCEPTS AND TERMINOLOGY OF PLM)
PART A
2. Define PLM
7. Benefits of CPC
9. Define EDM
12 Define BOM.
13 Define cPDm.
2. Develop a case study for a company developing a PLM initiative and bring out 15
its challenges.
3. Bring out the case study of a firm that doesn’t have control over its product using 15
PLM.
4 Discuss the scope and objective of engineering data management with 15
suitable illustrations.
5 Explain the generic product development process with neat sketch. 15
UNIT-II (PLM/PDM FUNCTIONS AND FEATURES)
PART A
1. Define PDM.
2. Define utility functions.
3. Mention the five categories of utility functions.
4. Illustrate the workflow for change approval.
5. Mention the activities of product structure management.
6. Define product structure.
7. Define effectivity.
8. Define information architecture.
Compare business item and data item.
9.
1. Define Strategy.
2. Define PLM vision.
3. Differentiate between plan and tactics.
4. Mention the necessity of PLM vision.
5. State the reasons for developing the PLM vision.
6. Mention the uses of PLM strategy.
7. Differentiate between PLM strategy and implementation strategy.
8. Mention the merits of implementation strategy.
9. Mention the characteristics of mass production.
10. Compare trend leader strategy and follower strategy.
11 Mention the significance of strategy.
12 Indicate the key points of business strategy.
13 Identify the similarities between military strategy and company strategy.
14 Mention the principles of PLM strategy.
15 Express the implications of “focus on the product”.
16 Mention the implications of “continuous improvement”.
17 Define cycle time.
18 List the advantages of short development process.
19 Mention the benefits of PLM in automotive industries.
20 State the various levels of PLM maturity level.
UNIT-IV
PART – B
1. Write short notes on PLM visioning process. 13
2. Describe the factors impacting the PLM. 13
3. Discuss the hazards of PLM vision. 13
4. Write short notes on the ten step approach to PLM. 13
5. Explain the consequences of the ten step approach. 13
6. Explain the key points of strategy elements. 13
7. Explain the implications of the strategy elements and also 13
explain the deliverables of vision development.
8. Point out the questionnaires required to test the draft PLM 13
vision with suitable illustration.
9. Describe the steps involved to select the preferred strategy. 13
10. Write short notes on SWOT analysis. 13
11 Express the steps to overcome the PLM dilemma 13
12 Write short notes on PLM feasibility study. 13
13 Explain in detail the benfits of PLM for (i) Organisation (ii) Customers 13
14 Discuss the barriers for implementing the PLM in a firm. 13
15 Explain about the steps in implementation of PLM in automobile industry. 13
PART – C
1. Enumerate the steps involved in PLM initiative. 15
2. Develop a suitable case study for the selection of PLM. 15
3. Enumerate on the principles and results of implementing the ten step approach 15
to PLM.
4. Develop a case study indicating the efforts taken by the strategy team inorder 15
to develop and draft the PLM Vision and strategy.
5 Elaborate the principles and technologies used in prototype design with suitable 15
case study.
1. Define CAD.
2. Mention the activities involved in CAD
3. State the elements of CAD.
4. Define ERP.
5. Mention the uses of ERP.
6. List the modules of ERP.
7. Point out the information that can be obtained from CAD system in a PLM.
8. Define EAI.
9. State the principle of EAI.
10. Mention the uses of CAD system.
11 Expand API
12 Mention the functions of API
13 Express the merits of data base integration.
14 Indicate the merits of transfer file integration.
15 State the demerits of data base integration.
16 List the demerits of transfer file integration.
17 Define SLM.
18 Compare SLM and PLM.
19 Mention the components of SLM.
20 Indicate the uses of middleware technology.
UNIT-V
PART – B
1. Explain the necessity of integrating the PLM with the legacy database using 13
suitable illustrations.
2. Enumerate on Enterprise resources planning and its impact. 13
3. Explain the methods of integrating the PLM system. 13
4. Describe the factors that influence the PLM system while integrating with other 13
systems.
5. Write short notes on the functions and necessity of transfer file. 13
6. Discuss the principle of data base integrations and its usage in IT sector. 13
7. Write short notes on a) merits and demerits of transfer file integration b) merits 13
and demerits of database integration.
8. Explain the relationship between ERP and PLM. 13
9. Describe the modules of ERP system. 13
10. Enumerate on the significance of CAD system in the PLM. 13
11 Write short notes on the types of configurators. 13
12 Express the criteria for selecting the PLM software. 13
13 Write short notes on Service life cycle management. 13
14 Describe the challenges faced while integrating the legacy database. 13
15 Elaborate about measuring customer response and interpreting results through EAI 13
technology.
PART – C
1. Describe the impact of PLCM on development commercial cad tools with a 15
suitable illustration.
2. Develop a case study indicating the effective usage of Enterprise resource 15
planning system in the PLM.
3. Explain the use of EAI technology in the PLM integration with suitable 15
illustration.
4 Describe the integration of the PLM system with other applications with 15
suitable illustration.
Discuss about the real time ERP package used in software industry in function of
5 15
PLM.