You are on page 1of 44

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400

DEXCOM FACTORY 3
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800

CERs FIT OUT 100% OF PHASE 4 CONSTRUCTION DOCUMENTS


www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
ARCHITECT DRAWING LIST - CERP FIT OUT 604 228 8852
www.byggroup.com

DWG No. DRAWING TITLE


CR_A0000 ARCHITECTURAL COVER SHEET MECHANICAL AND ELECTRICAL ENGINEER
CR_A0001 ARCHITECTURAL DRAWING SUMMARY SHEET 01 Pen Konsult Sdn Bhd
CR_A0002 ARCHITECTURAL DRAWING SUMMARY SHEET 02 7L-3 Asas Center
Jalan Gottlieb
CR_A2101_A3 ARCHITECTURAL FLOOR PLAN LEVEL 1 ZONE 3 10350 Penang
CR_A2101A_A3 ARCHITECTURAL FLOOR PLAN LEVEL 1A ZONE 3 Malaysia
604 2282 515
CR_A2102_A3 ARCHITECTURAL FLOOR PLAN LEVEL 2 ZONE 3 www.penkonsult.com
CR_A2102A_A3 ARCHITECTURAL FLOOR PLAN LEVEL 2A ZONE 3
CR_A2103_A3 ARCHITECTURAL FLOOR PLAN LEVEL 3 ZONE 3 QUANTITY SURVEYOR
CR_A2103A_A3 ARCHITECTURAL FLOOR PLAN LEVEL 3A ZONE 3 Unitech QS Consultancy
CR_A2104_A3 ARCHITECTURAL FLOOR PLAN ROOF PLAN ZONE 3 SDN BHD
CR_A3201_A3 ARCHITECTURAL REFLECTED CEILING PLAN LEVEL 1 ZONE 3 12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
CR_A3201A_A3 ARCHITECTURAL REFLECTED CEILING PLAN LEVEL 1A ZONE 3 10050 Penang Malaysia
CR_A3202_A3 ARCHITECTURAL REFLECTED CEILING PLAN LEVEL 2 ZONE 3 04 229 0092
CR_A3203_A3 ARCHITECTURAL REFLECTED CEILING PLAN LEVEL 3 ZONE 3 Web/Email: admin@uqs.com.my

CR_A3301 ARCHITECTURAL FLOOR FINISHES KEY PLAN SHEET 01


PROJECT NAME
CR_A3302 ARCHITECTURAL FLOOR FINISHES KEY PLAN SHEET 02
CR_A3601 ARCHITECTURAL WALL KEY PLAN SHEET 01 PROPOSED MANUFACTURING FACILITY CONSISTING OF:
CR_A3602 ARCHITECTURAL WALL KEY PLAN SHEET 02
CR_A3701 ARCHITECTURAL WATERPROOFING KEY PLAN 3 STOREY CERP
CR_A4001 ARCHITECTURAL ELEVATION 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
CR_A5001 ARCHITECTURAL SECTION
7 STOREY OFFICE HEAD BUILDING
CR_A5002 ARCHITECTURAL SECTION-ENLARGEMENT SHEET 01 7 STOREY PARKING STRUCTURE
CR_A5003 ARCHITECTURAL SECTION-ENLARGEMENT SHEET 02 2 STOREY SUBSTATION
CR_A5004 ARCHITECTURAL SECTION-ENLARGEMENT SHEET 03 3 NOS OF GUARDHOUSE
CR_A5005 ARCHITECTURAL SECTION-ENLARGEMENT SHEET 04
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
CR_A5006 ARCHITECTURAL SECTION-ENLARGEMENT SHEET 05 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CR_A7001 ARCHITECTURAL WALL DETAIL SHEET 01 PERAI SELATAN.
CR_A7002 ARCHITECTURAL WALL DETAIL SHEET 02 FOR DEXCOM (M) SDN. BHD.
CR_A7003 ARCHITECTURAL WALL DETAIL SHEET 03
CR_A7101 ARCHITECTURAL DOOR & WINDOW SCHEDULE
CR_A7102 ARCHITECTURAL DOOR & WINDOW DETAIL
CR_A7301 ARCHITECTURAL FLOOR FINISHES DETAIL
CR_A7401 ARCHITECTURAL CEILING DETAIL SHEET 01
CR_A7402 ARCHITECTURAL CEILING DETAIL SHEET 02 PROJECT NUMBER
CR_A7501 ARCHITECTURAL TOILET DETAIL SHEET 01
278585-00
CR_A7502 ARCHITECTURAL TOILET DETAIL SHEET 02
CR_A7503 ARCHITECTURAL TOILET DETAIL SHEET 03
PACKAGE
CR_A7504 ARCHITECTURAL TOILET DETAIL SHEET 04
CR_A7505 ARCHITECTURAL TOILET DETAIL SHEET 05 CERs FIT OUT
CR_A7801 ARCHITECTURAL GENERAL CONSTRUCTION SHEET 01
CR_A7802 ARCHITECTURAL GENERAL CONSTRUCTION SHEET 02 DESIGNED DRAWN CHECKED APPROVED
CR_A7803 ARCHITECTURAL GENERAL CONSTRUCTION SHEET 03
CR_A8001 ARCHITECTURAL STAIRCASE DETAIL SHEET 01 BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

CR_A8002 ARCHITECTURAL STAIRCASE DETAIL SHEET 02


DATE

28-MAY-2021

SCALE

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
COVER SHEET

CR_A0000
28/5/2021 9:38:04 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

T1B
EAST BOUNDARY
STONE SETTING
WEST BOUNDARY OUT POINT
STONE SETTING W1
43600
LINE
6100 (20'0") SET BACK

OUT POINT
W I D E
D R I V E
W A Y
TG

16295
M M
9 1 0 0
OPEN CAR PARK C (20 NOS)

RL 3.10 DN

WH
SPRINKLER
VALVE ROOM
WH
SPRINKLER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DN

VALVE ROOM EGRESS E E E E SPRINKLER


E E E

WK
2
APRON 1 APRON VALVE ROOM

82000
15 m² STAIRS 1 F.F.L. 3.40
TOILET 1B
F.F.L. 3.30 9 m² 6 m² E
F.F.L. 3.30 10 m² STAIRCASE 1 4 m²
25 m² TOILET 1A TOILET 1C
4 m² 4 m²
riser for elec/IT riser for rwdp/sprinkler/water
TOILET 1F
WH DATA PRAYER (F) FWS
STAIRCASE 5 4 m²
24 m² 21 m²
17 m² E
PRAYER (M) CORRIDOR 1A TOILET 1D TOILET 1E
WH ELEC 23 m² 25 m² 4 m² 4 m²
TEMPORARY MHE UP

PARKING 24 m² MAINTENANCE

TNB
162 m² TRUCKER'S

10690
LOUNGE
OFFICE
158 m²
HUDDLE 114 m²
F.F.L. 3.40
29 m² UP

DOCK
WH ELEC 2 LEVELLER
( 5 TONS) 1
TOILET 1
22 m²
5 m²

TOILET 2 TOILET 3 JAN


UP
UP
DOCK

5 m² 5 m² 5 m²
LEVELLER
( 5 TONS)
2
1 2 3 4 5 6 7
UP

PORTABLE
EYE WASH
Protective bollard to detail
E UP

FOLKLIFT CHARGING DN RAMP UP

DOCK
APRON LEVELLER
3

Y1
( 5 TONS)

F.F.L. 3.30
FOLKLIFT TRAVEL LANE

DOCK
8 9 10 11 12 13 PORTABLE
LEVELLER
( 5 TONS) 4

MP (388 NOS)
EYE WASH

TUNNEL BELOW
E
OFFLOADING
FOLKLIFT CHARGING VESTIBULE 1
1625 m² DOCK
LEVELLER
( 5 TONS) 5

RL 3.10 FOLKLIFT TRAVEL LANE

YA
DOCK E
LEVELLER
( 5 TONS)
6
PORTABLE
14 15 16 17 18 19 20 EYE WASH

platform
FOLKLIFT CHARGING DOCK
LEVELLER
large size ( 5 TONS) 7
BIG equipment
WH EQUIPMENT
SPRINKLER ELEVATOR
VALVE ROOM
3 BIG CONCRETE
9 m² 60M
EQUIPMENT 8 PLATFORM
RADIUS
ELEVATOR VERTICAL SHAFT F.F.L. 4.30 R.L. 3.10
60M
RADIUS
EGRESS STAIRCASE 2 E
STAIRS 2 FWS 23 m²
6 m² 60M F.F.L. 3.40
60M RADIUS
RADIUS E
DOCK
LEVELLER
( 5 TONS)
9
DOMESTIC 1
FOLKLIFT TRAVEL LANE

STAIRCASE 4 21 22 23 24 25 26 27 DOCK
PORTABLE LEVELLER 10
15 m² WAREHOUSE EYE WASH
( 5 TONS)

F.F.L. 4.40 14406 m²


E

W A Y
F.F.L. 4.30 FOLKLIFT CHARGING

WH CORNER FOLKLIFT TRAVEL LANE


DOCK
LEVELLER
( 5 TONS)

DOCK
LEVELLER
( 5 TONS)
11

12
DOMESTICv2

28 29 30 31 32 33 34 OFFLOADING

COLUMN SETTING
PORTABLE
EYE WASH
VESTIBULE 2
1308 m²

D R I V E
E
F.F.L. 4.30
FOLKLIFT CHARGING

DOCK
LEVELLER 13
( 5 TONS)

OUT POINT WAREHOUSE


FOLKLIFT TRAVEL LANE

DOCK
LEVELLER
( 5 TONS)
14

OPEN CARPARK B (154 NOS)


E

W I D E
TANK DOMESTIC
ELEC
MH

DOCK
LEVELLER
( 5 TONS) 15 PUMP ROOM
FOLKLIFT TRAVEL LANE

60M ELEC
DOCK
RADIUS
16
MH
LEVELLER
( 5 TONS)
35 36 37 38 39 40 41 PORTABLE
JP
PUMP
EYE WASH SP1

C1
60M ROOM API 2

ISSUE DATE DESCRIPTION


RADIUS E FP1
OFFLOADING

M M
FOLKLIFT CHARGING
VESTIBULE 3
1417 m² DOCK
ELEC
MH
LEVELLER
( 5 TONS) 17
PUMP
FOLKLIFT TRAVEL LANE
ROOM API 1 SP2
FP2
DOCK
LEVELLER 18

6 1 0 0
( 5 TONS)
42 43 44 45 46 47 48 PORTABLE
METER
ELEC
EYE WASH MH

234650
E ROOM
HY1
ELEC
FOLKLIFT CHARGING DOCK
MH

LEVELLER 19 VIE

Protective bollard to detail


AMBIENT
( 5 TONS) 6,000
TANK VAPOURISER
L

FOLKLIFT TRAVEL LANE HY2


ELEC
MH

DOCK AMBIENT

20
VAPOURISER
LEVELLER
VIE
( 5 TONS)
40,000
TANK
VAPOURISER
L

STAIRCASE 3 AMBIENT
VAPOURISER

23 m² DN RAMP UP VAPOURISER

Dexcom
F.F.L. 3.40
E te
ga
100MM N2 PIPE LAID UNDERGROUND g

34000
FWS
100MM N2 PIPE & AR PIPE LAID UNDERGROUND din
sli

1400
TESTING MATERIAL
DOCK
100MM AR PIPE LAID UNDERGROUND
ga
te
6340 Sequence Drive

6100 (20'0") SET BACK LINE


LEVELLER

er
( 5 TONS)
STAGING STAMPING
rri
CER-P3 CER-P2 CER-P1 75 m² 186 m²
ba San Diego, CA 92121
888 738 3646
DOCK

2790 m² 2791 m² 2791 m²


LEVELLER
( 5 TONS)

E
www.dexcom.com
F.F.L. 11.500 F.F.L. 11.500 F.F.L. 11.500
WASH AREA
(TAP & OUTLET)
RAW HAZ. WASH HAZ. WASTE WASH WASH HAZ. WASTE
MATERIAL AREA AREA AREA
(TAP &
53 m² (TAP & (TAP &
54 m²
54 m² OUTLET) OUTLET) OUTLET)

PROJECT LEAD

WA
WASTE WASTE AREA CORRIDOR EYEWASH
& SHOWER
HOLDING 359 m² 128 m²
SPACE

Arup Jururunding Sdn Bhd

FD
273 m²
RAW HAZ. WASH WASH WASH
AREA HAZ. WASTE AREA AREA HAZ. WASTE
MATERIAL (TAP & (TAP & (TAP &
OUTLET)
52 m² OUTLET) OUTLET)
53 m²
CROSS BRACING CROSS BRACING
52 m²

FREIGHT
ELEV
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
?
(3 TON)

MATERIAL SUPER MATERIAL SUPER MATERIAL SUPER


CORRIDOR CORRIDOR
HIGHWAY HIGHWAY HIGHWAY FREIGHT

163-D Persiaran Gurney


118 m² 118 m²
692 m² 646 m² 609 m² ELEV
F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300 (3 TON)

10250 Penang Malaysia

485
HR

STAIR A

CJ
CORRIDOR
8 m² STAIRCASE 9
HR HR

FREIGHT
HR HR HR

FREIGHT
HR HR HR

FREIGHT 604 2933 800


www.arup.com
ELEV ELEV ELEV
32 m² (3 TON) (3 TON) (3 TON)
ELEC 2
ELEC 1
FLOOR MARKING ON 56 m² FLOOR MARKING ON FLOOR MARKING ON
56 m²
ELEC 3 GOUND INDICATED GOUND INDICATED GOUND INDICATED
44 m² FREE SPACE FREIGHT FREE SPACE FREIGHT FREE SPACE FREIGHT
ELEV ELEV WASTE-OUT ELEV
(3 TON) (3 TON) 68 m² (3 TON)

ler
STAIRCASE 6 STAIRCASE 3

ediate Semi-Trai
FINISED GOODS FINISED GOODS FINISED GOODS

OUT
35 m² SUPPORT 35 m² SUPPORT
PALLET STAGING KANBAN PALLET STAGING KANBAN PALLET STAGING KANBAN
29 m² 29 m² WASTE-OUT
251 m² 505 m² FREIGHT 239 m² 505 m² FREIGHT 239 m² 505 m² FREIGHT
66 m²

DESIGN ARCHITECT
ELEV ELEV ELEV
WASTE-OUT
(3 TON) 68 m² (3 TON) (3 TON)

WB-50 - Interm
IN
FEMALE PRAYER
ROOM
71 m²
MALE PRAYER ROOM MALE PRAYER ROOM
66 m² 71 m²

SABArchitects
W1 W1 W1
HR HR HR
HR HR HR HR HR HR

PE PE PE

HR HR HR HR HR HR
2 Nickerson Suite 200

89335
Seattle, Wa 98109
W2 W2 W2
KITTING SUPPLIES CALIBRATION LAB
OFFICE 154 m²
188 m²

206 957 6400


W4

HR HR
ES
www.sabarch.com
MANUFACTURING
SPARE PARTS

BULK METER
323 m² HR HR HR HR

W3 ENGINEERING
TESTING LAB

BUS

ba
101 m²

rr
ie
IN
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

r
KITTING / KITTING / KITTING /

ga
ES
PACKAGING PACKAGING PACKAGING

LEVEL 2 ROOF LEVEL

te
2298 m² 2112 m² 2301 m²
F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300
OFFICE

Arup Jururunding Sdn Bhd


65 m²

HR HR HR HR HR HR

CER 3 CER 2 CER 1 Gurney Paragon Mall Level 6

sl
CONFERENCE ROOM

id
72 m²

SCALE : 1:600 SCALE : 1:600 Lots L6.01 to L6.09

in
GENERAL PURPOSE

g
394 m²

ga
163-D Persiaran Gurney
HR

te
PE PE PE

10250 Penang Malaysia


MAINTENANCE SHOP
260 m²

P10
HR HR
HR HR HR

604 2933 800

BUILDING LINE
www.arup.com
CER SPARE PARTS
186 m²
W1

CONCRETE FLOOR CONCRETE FLOOR CONCRETE FLOOR ?

SPRINKLER
HR

?
SPRINKLER
HR

? SPRINKLER
HR

VALVE ROOM 3 VALVE ROOM 2 VALVE ROOM 1


19 m² 19 m² 19 m²

ARCHITECT
HR HR HR
ES ES ES

FREIGHT FREIGHT FREIGHT


? ELEV ELEV ? ELEV
? (3 TON) (3 TON) ? (3 TON)

9150 (30'-0")
MAL
61 m² MAL MAL
ENGINEERING
60 m² 60 m² IT CENTER SERVER /

CA
STAIRCASE 8 DEVELOPMENT LAB FIRE COMMAND
FREIGHT FREIGHT FREIGHT
45 m² 329 m² DEX TECH INVENTORY / OFFICE
STAIRCASE 2 ROOM STAIRCASE 1

BYG Architecture Sdn. Bhd.


ELEV ELEV ELEV
288 m² 45 m² 260 m² 75 m² 46 m²
(3 TON) (3 TON) (3 TON)
STAIRCASE 7 STAIRCASE 5 STAIRCASE 4
45 m² 45 m² 45 m²
JAN 1 HCAP 1 JAN 1 HCAP 1 JAN 1 HCAP 1

CONCRETE
ELEV IT TELCO ELEV IT TELCO ELEV IT TELCO MDF ROOM
(1.6 TON 7 m² 10 m² 11 m² (1.6 TON 7 m² 10 m² 11 m² (1.6 TON 7 m² 10 m² 11 m² 7 m²

CONCRETE CONCRETE CONCRETE 12A, Arratoon Road 10050


/ 24 Pax) / 24 Pax) / 24 Pax)
HR HR

VOID VOID
RWDP HR RWDP HR RWDP

RWDP RWDP
RWDP

FLOOR FLOOR FLOOR FLOOR Penang, Malaysia

W A Y
604 228 8852
www.byggroup.com

PA
STAIRCASE 3
RWDP RWDP RWDP RWDP RWDP
36 m²

D R I V E
FIRE
LIFT 2
STAIRCASE 2
SPRINKLER VALVE ROOM 1 FIRE LOBBY 2
34 m²

MECHANICAL AND ELECTRICAL ENGINEER


F.F.L. 4.10 17 m² 7 m²

sliding gate
F.F.L. 3.50 F.F.L. 3.60

WALL TO BE 0.67
WRAPPED UP WALL TO BE

Pen Konsult Sdn Bhd


9600
WITH ALUMN. WRAPPED UP

PARKING
F.R.L. 3.10
SOLID PANEL WITH ALUMN.
SOLID PANEL

CER CORNER
RWDP
2 NOS.
RWDP

barrier gate
BUS 7L-3 Asas Center

W I D E
OUT Jalan Gottlieb
10350 Penang
COLUMN SETTING FACADE ALUMN.
PERFORATED PANEL
STRUCTURE 0.67
F.F.L. 3.10
R.F.L. 3.025

IN Malaysia
604 2282 515

VOID VOID VOID


www.penkonsult.com
OUT POINT

M M
RWDP

RAMP UP
2 NOS.

VOID VOID VOID


RWDP

C1
C1 QUANTITY SURVEYOR

6 1 0 0
Unitech QS Consultancy
SDN BHD
H17 H16 H15 H14 H13 H12 H11 H10 H9 H8 H7 H6 H5 H4 H3 H2 H1 0.67 0.67

12A-A, Menara Northam, 55, Jalan


RWDP
2 NOS.
EXTERIOR WALKWAY PAVEMENT
RWDP

HA F.F.L. 3.90 F.F.L. 3.70 DOCUMENT BADGE

CONCRETE Sultan Ahmad Shah,


R.F.L. 3.825 R.F.L. 3.625
CONTROL ROOM

CONCRETE CONCRETE 10050 Penang Malaysia


FLOOR
FLOOR FLOOR 04 229 0092
F.F.L. 4.10
ACCESS FROM PARKING STRUCTURE
w/OVERHEAD DOORS
R.F.L. 4.025
HB

Web/Email: admin@uqs.com.my
LOCKER ROOM
TOILETS
barrier gate
28 m² SHOWER ROOM
12 m²

HC 2 NOS.

PROJECT NAME
RWDP

ST-02
ELEV.
SHOWER ROOM 8 m²
LOCKER ROOM 12 m²

BUS DEPOT
TOILETS
28 m²

ST-04 ELEV. 5802 m² 0.67


EXIT CORRIDOR
EXIT CORRIDOR
50 m² 8 m²
metal railing UP F.F.L. 3.10
FIRE LOBBY HD
1
trucker window UP

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


R.F.L. 3.025
OUTLINE OF ATRIUM
PUMP ROOM
23 m² ELEV.
81 m²
OPENING ABOVE
Receiving
8 m² F.F.L. 4.10
Dock leveller Office

RAMP UP
SU-40

WALL TO BE
ST-01
51 m²

WRAPPED UP

3 STOREY CERP
LOCKER ROOM
TOILETS
27 m²
BUILDING SERVICES
HE WITH ALUMN.
SOLID PANEL
SHOWER ROOM

PIPING SERVICE PIPING SERVICE


Dock leveller 36 m²
SU-40 12 m²

PIPING SERVICE
ELEV.
1.6 ton Service
TRUCK LOADING SPACE LOADING DOCK elevator WASTE
10 m² 2 NOS.

1 STOREY WAREHOUSE
W/ OVERHEAD DOORS 188 m² RWDP

ACCESS ROOM 2 ACCESS ROOM 1


392 m² UP

ACCESS ROOM 1
SU-40

COLUMN TO BE
Dock leveller
F.F.L. 3.30 F.R.L. 3.10
1.6 ton Service SHOWER ROOM
elevator SUPPLIES ELEV.
-90

86 m² 86 m²
LOCKER ROOM 12 m²

3 STOREY CENTRAL UTILITY BUILDING


WRAPPED UP
10 m² TOILETS
R.F.L. 3.225
28 m²
1 : 18
86 m²
HF WITH ALUMN.
5
ST-03
BUILDING SERVICES
56 m²
SOLID PANEL RAMP UP

7 STOREY OFFICE HEAD BUILDING


IDF
MEN'S RESTROOM WOMEN'S RESTROOM 11 m²
54 m² 54 m² 0.67

HEAD BUILDING

W A Y
Dock leveller

refuse compactor truck scissor platform


HG
WALL TO BE
WRAPPED UP
WITH ALUMN.
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
SOLID PANEL

Roller shutter
ELEV. ELEV.
4 m² 4 m²
WASTE STORAGE BUILDING SERVICES

3
40 m² 73 m²

RWDP

0.32
0.42
3 NOS OF GUARDHOUSE

D R I V E
kitchen
exhaust duct

0.22
grease trap below
RECYCLE CENTER MEP ROOM RAMP (1 : 10) MOTORCYCLE (IN)
HH 50
60 m²
F.F.L. 3.50
MV ROOM LV ROOM
MEP ROOM
RECYCLE
MEP ROOMCENTER
60 m² 60 m²
LEVEL 01
MEP
?
CAR (IN)
7329 m²

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


9 ?m² RAMP (1 : 10)

LEVEL 1A LEVEL 3A

ST-05
0
IDF Elec 2 NOS.
6.9 sq.m 9.1 sq.m RWDP RWDP

PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG


HI

W I D E
PERAI SELATAN.
RAMP (1 : 10) CAR (OUT)
EAST ENTRY EXIT DOOR

FOR DEXCOM (M) SDN. BHD.


HJ

SCALE : 1:600 SCALE : 1:600


ALIGN
ENTRY
MOTORCYCLE (OUT)

EXTERIOR WALKWAY PAVEMENT

M M
RAMP (1 : 10)

RWDP

ELEC
10
10 m²

FIRE

9 0 0 0
HK LIFT 3

sliding gate EXTERIOR WALKWAY PAVEMENT EXTERIOR WALKWAY PAVEMENT


FIRE LOBBY 3
LEVEL 1 VISITOR PARKING 14 m²
1635 m²
STAIRCASE 4
40 m²
F.F.L. 3.40

STAIRCASE 5
40 m²
VISITOR (IN) VISITOR (OUT)

RWDP RWDP RWDP RWDP RWDP

PROJECT NUMBER
F.F.L. 3.30

OPEN CAR PARK A (45 NOS) 1 : 24


RAMP DN 278585-00

PACKAGE

DN CERs FIT OUT


VISITOR VISITOR
IN OUT
DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

1 2 0 0 0 M M W I D E D R I V E W A Y
MECHANICAL MECHANICAL MECHANICAL 9150 (30'-0") BUILDING LINE

MEZZENE MEZZENE MEZZENE DATE


2654 m² 2729 m² 2693 m²
KITTING / IN OUT sliding gate

PACKAGING
F.F.L. 18.700 F.F.L. 18.700 F.F.L. 18.700 28-MAY-2021
KITTING / KITTING / 1715 m²
PACKAGING PACKAGING
1715 m² 1715 m² SCALE

F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300


VOID VOID VOID As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

KEY PLAN
DRAWING TITLE

ARCHITECTURAL
DRAWING SUMMARY
SCALE : N.T.S SHEET 01

APRON AREA CR_A0001


28/5/2021 8:16:07 PM

APRON AREA F.F.L. 4.150 APRON AREA

STAMP

LEVEL 1 LEVEL 3 IFC – 100% CD


SCALE : 1:600 SCALE : 1:600
© Arup
KEY PLAN
TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

N.T.S

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
DRAWING SUMMARY
SHEET 02

CR_A0002
28/5/2021 8:16:21 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

UC
A3
WB

12.00
UB

25.40
WAREHOUSE CUB
20.00 SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

12.00
WA
UA
1.40

1.40
CJ

FIRE RATED ROLLER FIRE RATED ROLLER MOVEMENT JOINT FIRE RATED ROLLER
SHUTTER BOX MOVEMENT JOINT SHUTTER BOX SHUTTER BOX
11.00

FIRE RATED ROLLER


SHUTTER BOX

1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY
WALL PARTITION WALL PARTITION WALL PARTITION

CH
ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX
UP
11.00

1200MM HEIGHT LOW DRY UP 1200MM HEIGHT LOW DRY UP 1200MM HEIGHT LOW DRY
WALL PARTITION WALL PARTITION WALL PARTITION

RWDP x 4 NOS
COLOUR WALL TYPE LEGEND : ISSUE DATE DESCRIPTION
200MM DIA
RWDP x 4 NOS
200MM DIA
F.F.L. 8.800 RWDP x 4 NOS
200MM DIA

CG
F.F.L. 8.800
F.F.L. 8.800 FIRE RATED BRICK WALL / FIRE RATED LIGHT
ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX ROLLER SHUTTER BOX
WEIGHT CONCRETE PANELS
Dexcom
11.00

6340 Sequence Drive


San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
CF 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY
WALL PARTITION WALL PARTITION WALL PARTITION 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
11.00

DESIGN ARCHITECT

SABArchitects
4
BRICK WALL C/W PLASTERING & PAINT 2 Nickerson Suite 200
CR_A5001 Seattle, Wa 98109
ON BOTH SIDES 206 957 6400
www.sabarch.com
88.00

CE
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

10250 Penang Malaysia


STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


CD 12A, Arratoon Road 10050
Penang, Malaysia
FIRE RATED DRY WALL PARTITION C/W INSULATION 604 228 8852
WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com
BOTHWAYS
MECHANICAL AND ELECTRICAL ENGINEER
11.00

Pen Konsult Sdn Bhd


7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com
CLEANROOM SANDWICHED PANEL
CC QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W 10050 Penang Malaysia
11.00

INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092


Web/Email: admin@uqs.com.my
RUNNER SUPPORT TO MANUFACTURER'S DETAIL
PROJECT NAME
REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
VOID VOID VOID COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
3 STOREY CERP
CB LEVEL 2 - CORRIDOR 2 , 4 AND 6 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
PIPING SERVICE PIPING SERVICE
ACCESS ROOM 1
PIPING SERVICE 3 NOS OF GUARDHOUSE
ACCESS ROOM 2
11.00

ACCESS ROOM 1
86 m² 86 m² 86 m²
UP UP UP AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
F.F.L. 8.800 UP F.F.L. 8.800 UP UP PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
F.F.L. 8.800
STAIRCASE 1 PERAI SELATAN.
STAIRCASE 8 STAIRCASE 7 STAIRCASE 5 STAIRCASE 2 FOR DEXCOM (M) SDN. BHD.
STAIRCASE 4 45 m²
43 m² 45 m² 43 m² 43 m²
45 m²
D1-FD2 D1-FD2 D1-FD2

CA
RWDP x 4 NOS RWDP x 4 NOS RWDP x 4 NOS RWDP x 4 NOS RWDP x 4 NOS
4.00

200MM DIA 200MM DIA 200MM DIA 200MM DIA 200MM DIA
RWDP x 4 NOS
200MM DIA
PROJECT NUMBER
CA1
8.00

278585-00
4.00

PACKAGE

CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
CR_A5001 CR_A5001 3 1 : 200
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 1A FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 1A
ZONE 3

CR_A2101A_A3
28/5/2021 8:17:51 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.

DN

UC
A3
WB

12.00
UB

25.40
20.00
WAREHOUSE CUB
SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

12.00
WA
UA
1.40

1.40
CJ FRS-1 FRS-1 FRS-1 FRS-1
FREIGHT
D1-FD1 D1-FD1 D1-FD1 MOVEMENT JOINT D1-FD1 ELEV
MOVEMENT JOINT FIRE RATED (3 TON)
FIRE RATED ROLLER SHUTTER
MATERIAL SUPER FIRE RATED MATERIAL SUPER MATERIAL SUPER
MATERIAL SUPER ROLLER SHUTTER MATERIAL SUPER
FIRE RATED HIGHWAY C ROLLER SHUTTER HIGHWAY B HIGHWAY A

10.895
11.00

HIGHWAY B HIGHWAY A FREIGHT


ROLLER SHUTTER 116 m² 116 m² 599 m²
684 m² 637 m² ELEV
F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300 (3 TON)

FRS-2 FRS-2 FRS-2 FRS-2


BMS COMPARTMENT BMS COMPARTMENT
BMS COMPARTMENT D1-E1 HR
D1-E1 2 m² D1-E1 D1-E1 2 m²
D1-E1 2 m² D1-E1 D1-E1 D1-E1 D1-E1
D2-FD1 D2-FD3c STAIR A
D1-A1 D1-FD1c D2-D1 D2-D1 D2-D1 D2-B1c

CH HR
RS-2 RS-2
HR
RS-2
HR HR
RS-2 RS-2
HR
RS-2
HR HR
RS-2 RS-2
HR
RS-2
STAIRCASE 9 FREIGHT STAIRCASE 6 FREIGHT STAIRCASE 3 FREIGHT
31 m² D2-B1c D1-B1 D2-B1c D1-A1
CORRIDOR D1-B1 D1-B1 D1-B1 ELEV 35 m² D2-FD3c D1-B1 D1-B1 ELEV 35 m² D2-FD3c D1-B1 D1-B1 D1-B1 ELEV
RS-2 RS-2 RS-2

27.94
15 m² UP (3 TON) (3 TON) (3 TON)

6.24
ELECTRICAL ELECTRICAL
D2-FD1 ELECTRICAL FLOOR MARKING ON FLOOR MARKING ON 59 m² FLOOR MARKING ON
59 m²
48 m² GOUND INDICATED GOUND INDICATED GOUND INDICATED
FREIGHT 3.465 FREIGHT 3.465 FREIGHT
11.00

FREE SPACE FREE SPACE WASTE-OUT FREE SPACE


ELEV ELEV ELEV
64 m²
(3 TON) (3 TON) (3 TON)
D1-B1 UP D1-E1 D1-B1 UP D1-E1 D1-B1
FINISHED GOODS D1-FD1 HR FINISHED GOODS HR
D1-FD1 D1-FD1 D1-FD1
STAGING MATERIAL STAGING STAGING MATERIAL STAGING FINISHED GOODS MATERIAL STAGING
198 m² 505 m² FREIGHT D2-FD1 214 m² 505 m² FREIGHT D2-FD1 STAGING 505 m² FREIGHT WASTE-OUT

D1-E1 HR RWDP x 4 NOS


ELEV
(3 TON) RWDP x 4 NOS
ELEV
(3 TON) RWDP x 4 NOS
213 m² ELEV
(3 TON)
65 m²
COLOUR WALL TYPE LEGEND : ISSUE DATE DESCRIPTION
200MM DIA 200MM DIA 200MM DIA

CG D1-A1 D2-FD1 D1-A1 D2-FD1


D2-FD3

12.70
WASTE-OUT D2-FD3
64 m² RUPS RUPS
D2-FD3 FIRE RATED BRICK WALL / FIRE RATED LIGHT
F.F.L. 3.300

F.F.L. 3.300
150 m² 150 m²
RUPS
140 m² WEIGHT CONCRETE PANELS
D1-E1 D1-E1
D1-E1
D1-E1 3.75 12.555 11.695 D1-E1 36.00 D1-E1

Dexcom
11.00

W5 D2-B1c W5 D2-B1c W5 D2-B1c


HR HR HR HR HR HR 6340 Sequence Drive
San Diego, CA 92121
D2-FD3c RS-2 RS-2 RS-2 D2-FD3c RS-2 RS-2 RS-2 D2-FD3c RS-2 RS-2 RS-2 888 738 3646
www.dexcom.com

3.70

3.70

3.70
D1-B1 D1-B1 D1-B1 CORRIDOR D1-B1 D1-B1 D1-B1 CORRIDOR D1-B1 D1-B1 D1-B1 CORRIDOR
271 m² 271 m² 203 m²
D2-B1c D2-B1c D2-B1c
PROJECT LEAD

3.06
RUPS AHU
D2-FD3c RUPS AHU D2-FD3c 35 m² D2-FD3c RUPS AHU
35 m² PE HR PE HR 35 m² PE HR Arup Jururunding Sdn Bhd
CF HR
D1-E1 D1-E1
HR D1-E1
D1-E1
HR
D1-E1 D1-E1 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
D2-B1 D2-B1 D1-B1 D2-B1 163-D Persiaran Gurney
D1-B1
10250 Penang Malaysia
D2-B1 D2-B1 604 2933 800
GENERAL PURPOSE www.arup.com
GENERAL PURPOSE W3 W3 PRODUCTION
W4 PRODUCTION 93 m²
11.00

103 m² DESIGN ARCHITECT


800x1200MM CLEAN W1
8.58 3.65 D2-B1c ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL SABArchitects
4 ES R.A.C
MANUFACTURING
BRICK WALL C/W PLASTERING & PAINT 2 Nickerson Suite 200
CR_A5001 D2-B1 Seattle, Wa 98109
HR ENGINEERING D1-E1
D2-B1c
KITTING SUPPLIES D1-E1
GENERAL PURPOSE HR
D2-B1 D1-E1 ON BOTH SIDES 206 957 6400
STORE OFFICE PRODUCTION D1-E1
D1-E1 HR HR 195 m² HR
www.sabarch.com
264 m²
88.00

263 m²
CE
HR

D1-E1 W2
D1-B1 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
QUALITY RELEASE
CORRIDOR
102 m²
247 m² Arup Jururunding Sdn Bhd
CORRIDOR W2
GENERAL PURPOSE Gurney Paragon Mall Level 6
247 m² PRODUCTION Lots L6.01 to L6.09
W5 KITTING / KITTING / D2-B1c KITTING /
PACKAGING PACKAGING 272 m² DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

PACKAGING ES
1715 m² 10250 Penang Malaysia
CORRIDOR
1715 m² W5 1715 m² STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
263 m² F.F.L. 4.300 F.F.L. 4.300 D1-B1 F.F.L. 4.300 www.arup.com
W1
3.65 12.605 3.70 12.56 D2-B1 OFFICE
ARCHITECT
D1-B1 65 m²
D1-E1
D1-E1 D1-E1 3.70 12.555 D1-E1
D2-B1c HR HR HR HR HR HR BYG Architecture Sdn. Bhd.
CD D1-E1 D1-E1 12A, Arratoon Road 10050
Penang, Malaysia
D1-B1 D1-B1 FIRE RATED DRY WALL PARTITION C/W INSULATION 604 228 8852
D2-B1c D2-B1 D2-B1c
MALE PRAYER ROOM
D1-B1 WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com
204 m² CONFERENCE ROOM BOTHWAYS
W3
73 m²
MECHANICAL AND ELECTRICAL ENGINEER
W8
11.00

8.58 3.65 Pen Konsult Sdn Bhd


W4
D2-B1 7L-3 Asas Center
W5 D1-B1 Jalan Gottlieb
FEMALE PRAYER D1-E1 HR
10350 Penang
W8 ROOM 8.58 3.65 Malaysia
111 m² W2
GENERAL PURPOSE GENERAL PURPOSE 604 2282 515
www.penkonsult.com
W8 PRODUCTION
262 m²
PRODUCTION
261 m²
CLEANROOM SANDWICHED PANEL
CC HR PE
HR D1-E1 HR PE
HR D1-E1
PE
HR D1-E1 FIRE COMMAND QUANTITY SURVEYOR
D1-E1 D1-B1 D1-E1 D1-B1 ROOM
70 m²
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
CALIBRATION D2-B1c
W4 1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W 10050 Penang Malaysia
3.60

W4 W4 W4 W4 187 m²
11.00

D1-E1 D1-E1 D1-E1


W5 D2-B1c INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092
Web/Email: admin@uqs.com.my
JANITOR 2 HR HR HR RUNNER SUPPORT TO MANUFACTURER'S DETAIL
28 m² JANITOR 1
28 m² D2-D1b PROJECT NAME
REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
D1-B1
D1-E1
D2-B1 SPRINKLER VALVE D2-D1b SPRINKLER VALVE D2-D1b
D1-E1 SPRINKLER VALVE COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
D2-B1c D2-B1c D1-E1 19 m² D2-B1c
HR D1-D3c
19 m²
HR D1-D3c HR
19 m² LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
3 STOREY CERP
CB LEVEL 2 - CORRIDOR 2 , 4 AND 6
ES ES ES
EMERGENCY

D2-B1 D2-B1
EGRESS ONLY
1 STOREY WAREHOUSE

2.755
CORRIDOR D2-B1c D1-E1 D2-FD1c
3 STOREY CENTRAL UTILITY BUILDING
WOMEN'S FREIGHT 4.99 WOMEN'S
RESTROOM
FREIGHT
4.99 WOMEN'S FREIGHT
4.99 102 m² MPOE-CER1 7 STOREY OFFICE HEAD BUILDING
RESTROOM ELEV ELEV RESTROOM ELEV
9 m² 7 STOREY PARKING STRUCTURE
(3 TON) (3 TON)
3.60 3.385 (3 TON) HR
MDF-CER1-1.1 D1-B1c

2.28
MAL D1-B1 2 STOREY SUBSTATION
3.60 3.385 MAL MAL 101 m²
F.F.L. 4.150

F.F.L. 4.150
38 m² ENGINEERING
GASEOUS
3 NOS OF GUARDHOUSE
38 m² 39 m²
SUPPRESSION
11.00

3.385 FREIGHT DEVELOPMENT LAB FREIGHT


DEX TECH
FREIGHT IT
319 m² 62 m²
ELEV ELEV
319 m²
ELEV
D2-B1
D2-B1c AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
UP IT BUILD ROOM UP

HALF GLASS PARTITION


UP

WORKBENCH

8.69
(3 TON) (3 TON) (3 TON) W3 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

LOW CABINET
UP UP 52 m²
UP CRAC PERAI SELATAN.
MEN'S 20 m² STAIRCASE 1
MEN'S
ACCESSIBLE TOILET
STAIRCASE 7
46 m² RESTROOM ACCESSIBLE TOILET STAIRCASE 4 STAIRCASE 2 MEN'S 2.725 47 m² FOR DEXCOM (M) SDN. BHD.
STAIRCASE 8 RESTROOM ELEV 11 m² IDF-CER3-1.1 STAIRCASE 5 ELEV 11 m² IDF-CER2-1.1 46 m² 44 m² RESTROOM ELEV IDF-CER1-1.1 2.80 7.26 6.30 11.80
44 m² (1.6 TON 13 m² 44 m² (1.6 TON 13 m² (1.6 TON 14 m²
D2-B1c D1-D1 / 24 Pax) D2-B1c / 24 Pax) D2-B1c D2-B1c D1-D1 / 24 Pax)
D1-C1
D1-D1 D1-B1
CA
HR HR
HR HR HR HR HR

D1-D2 D2-B1c D2-B1c D1-D2 D2-B1c D2-B1c


F.F.L. 3.300

F.F.L. 3.300
RWDP x 4 NOS RWDP x 4 NOS RWDP x 4 NOS RWDP x 4 NOS D2-B1c
D1-B1c D1-E1 D2-B1c D1-B1c D1-E1
4.00

D1-E1 CORRIDOR 1200x3000MM ALUMN SOLID

4.555
D1-FD1c D1-E1 RWDP x 4 NOS D2-D1 200MM DIA
D1-FD1c D1-FD1c D1-E1
200MM DIA D2-D1 D1-E1 200MM DIA D1-FD1c D1-FD1c D1-E1 CORRIDOR 200MM DIA
D1-B1c D2-D1
200MM DIA 200MM DIA RWDP 416 m² 142 m² F.F.L. 4.300 PANER C/W INSULATION
BMS COMPARTMENT CORRIDOR BMS COMPARTMENT 200MM DIA RWDP 200MM DIA RWDP BMS COMPARTMENT RWDP x 4 NOS PROJECT NUMBER
2 m² 551 m² 2 m²
CA1
8.245

8.245

2 m²
8.00

200MM DIA
CARD READER
CONTROLLED DOOR 278585-00
F.F.L. 4.300 F.F.L. 4.300 1200x3000MM ALUMN SOLID 1200x3000MM ALUMN SOLID RWDP. R.C SUMP WITH G.I
4.00

200MM DIA RWDP


CARD READER 1200x3000MM ALUMN SOLID WA2 PANER C/W INSULATION PANER C/W INSULATION GRATING COVER ON
200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP WA3 TOP CONNECT TO NEAREST PACKAGE
CONTROLLED DOOR PANER C/W INSULATION
WA1 RWDP R.C SUMP WITH G.I DRAINAGE TO ENGR'S DETAIL
CA2 GRATING COVER ON
TOP CONNECT TO NEAREST
RWDP R.C SUMP WITH G.I
GRATING COVER ON
CERs FIT OUT
1200x3000MM ALUMN SOLID 1200x3000MM ALUMN SOLID DRAINAGE TO ENGR'S DETAIL TOP CONNECT TO NEAREST
CARD READER
PANER C/W INSULATION PANER C/W INSULATION 200MM DIA RWDP DRAINAGE TO ENGR'S DETAIL DESIGNED DRAWN CHECKED APPROVED
CONTROLLED DOOR
8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00 DATE


RWDP R.C SUMP WITH G.I RWDP R.C SUMP WITH G.I RWDP R.C SUMP WITH G.I 28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
GRATING COVER ON GRATING COVER ON GRATING COVER ON
TOP CONNECT TO NEAREST TOP CONNECT TO NEAREST TOP CONNECT TO NEAREST
DRAINAGE TO ENGR'S DETAIL DRAINAGE TO ENGR'S DETAIL DRAINAGE TO ENGR'S DETAIL SCALE
2 1
CR_A5001 CR_A5001
3 1 : 200
CARD READER CR_A5001
CONTROLLED DOOR DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 1 FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 1
ZONE 3

CR_A2101_A3
28/5/2021 9:12:14 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

UC
A3
WB

VOID
UB
WAREHOUSE CUB
20.00 SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

WA 6MM THICK. VINYL TILES FLOOR FINISHES


WITH EDGING ON TOP OF WALKABLE CEILING
6MM THICK. VINYL TILES FLOOR FINISHES
WITH EDGING ON TOP OF WALKABLE CEILING
UA ROLLER SHUTTER BOX
1.40

CJ

K11.2

K11.2
K11.2

K11.2

CR

CR
CR

CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR FREIGHT
1200MM HEIGHT LOW DRY CEILING LEVEL 15.100 1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY CEILING LEVEL 15.100 CR CR CR 1200MM
CR HEIGHT LOW
CR DRY CR CR CR CR CR CR CR CR CR CR CR CR CEILING
CR LEVEL
CR 15.100
CR CR
ELEV
WALL PARTITION WALL PARTITION WALL PARTITION WALL PARTITION

K11.2
K11.2

K11.2
K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 HEIGHT LOW
K11.2DRY K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2LOW DRY K11.2 CR
1200MM HEIGHT LOW DRY 1200MM HEIGHT
CR LOW DRY 1200MM HEIGHT LOW DRY 1200MM HEIGHT LOW DRY CR 1200MM 1200MM HEIGHT

CR
11.00

CR CR K11.2 CR K11.2 CR K11.2 CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 CR K11.2 CR K11.2 CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 CR K11.2 CR CR CR CR CR CR CR CR CR CR CR K11.2
WALL PARTITION WALL PARTITION WALL PARTITION WALL PARTITION CR CR CR CR CR CR WALL
CR PARTITION CR WALL PARTITION
K11.2 K11.2 K11.2 K11.2 FREIGHT
F.F.L. 16.000 K11.2 K11.2K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR
K5.6 K5.6 CR CR D D K11.2 CR CR K11.2 MOVEMENT
K5.6 JOINT
K11.2 K5.6 CR CR D D K11.2 CR CR MOVEMENT
K5.6 JOINT
K11.2 K5.6 D D ELEV
K11.2 K11.2 K11.2 K11.2

K11.2
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
D D
K11.2 K11.2 K11.2 K11.2 D D K11.2 K11.2 K11.2 K11.2 D D K11.2 K11.2 K11.2 K11.2 CR
F.F.L. 16.000 F.F.L. 16.000

K11.2
K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

CH
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR CR K11.2 K11.2 K11.2 K11.2 K11.2 CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
STAIRCASE 9 K11.2 K11.2 K11.2 K11.2
CR CR STAIRCASE 6 K11.2 K11.2 K11.2 K11.2
CR
STAIRCASE 3 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 31 m² K11.2 K11.2 K11.2 34 m² K5.6 K5.6 K11.2 K11.2 K11.2 34 m² K5.6 K5.6 K11.2 K11.2 K11.2
UP K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 CR CR K11.2 K11.2 CR CR K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
11.00

K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR UP K11.2 K11.2 K11.2 CR CR UP K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

COLOUR WALL TYPE LEGEND :


K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K11.2 K11.2 CR CR K5.6 K5.6 K11.2 CR CR K5.6 K5.6 K11.2
RWDP x 4 NOS K11.2K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 ISSUE DATE DESCRIPTION
200MM DIA

CG
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR RWDP x 4 NOS CR CR RWDP x 4 NOS

CLEANROOM PANEL UP TO LEVEL 3


200MM DIA
CLEANROOM PANEL UP TO LEVEL 3
200MM DIA
K11.2 CLEANROOM PANEL UP TO LEVEL 3 UP CLEANROOM PANEL UP TO LEVEL 3
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 ON K11.2 K11.2ONLY
PERIMETER AREA K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 ON K11.2 K11.2ONLY
PERIMETER AREA K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR ON PERIMETER AREA ONLY ON PERIMETER AREA ONLY K11.2
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
FIRE RATED BRICK WALL / FIRE RATED LIGHT
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR K11.2
CR CR CR CR
WEIGHT CONCRETE PANELS
K5.6 K5.6 K5.6 K5.6 CR K5.6 K5.6 K5.6 K5.6 CR K5.6 K5.6 K5.6 K5.6 CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

Dexcom
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
11.00

K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
K11.2
6340 Sequence Drive
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR San Diego, CA 92121
K11.2 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 888 738 3646
K11.2 CR
K5.6 K5.6
CR
K5.6 K5.6
CR
K5.6 K5.6
CR
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 www.dexcom.com
CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6
K11.2 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6
K11.2 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6
K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
PROJECT LEAD
Arup Jururunding Sdn Bhd
CR CR CR K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR

CF
CR
K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K5.6 K5.6 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
Lots L6.01 to L6.09
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR 163-D Persiaran Gurney
K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6 10250 Penang Malaysia
K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR CR CR CR CR CR 604 2933 800
CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 www.arup.com
CR CR CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR
11.00

K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2
DESIGN ARCHITECT
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 CR CR CR CR CR CR CR CR CR K5.6 K5.6 CR CR CR CR CR CR CR CR CR K5.6 K5.6 CR
CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR
CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6 K11.2
CR
SABArchitects
4
BRICK WALL C/W PLASTERING & PAINT
CR CR CR CR CR CR CR CR
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 2 Nickerson Suite 200
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR_A5001 CR CR CR CR CR Seattle, Wa 98109
ON BOTH SIDES
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR

K11.2 K11.2 K11.2 K11.2 206 957 6400


K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR K11.2 www.sabarch.com
88.00

CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR

CE
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR
CR CR CR CR CR CR
K5.6 K5.6 K5.6
CEILING LEVEL 15.100 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2
K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K5.6 K5.6 CR
CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
Arup Jururunding Sdn Bhd
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2
CEILING LEVEL 15.100
K11.2 K11.2
CR CLEANROOM PANEL UP TO LEVEL 3 CR CLEANROOM PANEL UP TO LEVEL 3 CR CLEANROOM CR PANEL UP TO
CR LEVEL 3 CR CR CR CR CR CR CR CR CR CR CR CR
ON PERIMETER AREA ONLY ON PERIMETER AREA ONLY ON PERIMETER AREA ONLY
K5.6 K5.6 K5.6 K11.2 Gurney Paragon Mall Level 6
K11.2
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
CEILING LEVEL 15.100
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR K11.2
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR K11.2 CR
Lots L6.01 to L6.09
K5.6 K5.6 CR K5.6 K5.6 CR K5.6 K5.6 CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
10250 Penang Malaysia
K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K5.6
K11.2
K11.2 STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
CR
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 www.arup.com
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2

ARCHITECT
CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

VOID VOID BYG Architecture Sdn. Bhd.


CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2

CD
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2
CR
12A, Arratoon Road 10050
Penang, Malaysia
FIRE RATED DRY WALL PARTITION C/W INSULATION
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
K11.2 604 228 8852
K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K5.6 K5.6 K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K5.6 K5.6 K5.6 K5.6
K11.2
CR
WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com
BOTHWAYS
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR
CR CR CR CR CR CR CR
K11.2

K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR MECHANICAL AND ELECTRICAL ENGINEER
11.00

K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K5.6 K5.6 K5.6
Pen Konsult Sdn Bhd
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2
K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR K11.2
CR CR CR CR CR CR CR
K11.2 CR 7L-3 Asas Center
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR Jalan Gottlieb
CR CR CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6
CR CR CR CR CR CR CR
K5.6 K5.6 K5.6
CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2
10350 Penang
K11.2
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR CR
CR
CR CR CR
CR Malaysia
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 604 2282 515
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR www.penkonsult.com
CLEANROOM SANDWICHED PANEL
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
CR CR CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

CC
CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR CR CR CR
QUANTITY SURVEYOR
K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR K5.6 K5.6
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 Unitech QS Consultancy

32.40
K5.6 K5.6 K5.6 CR CR CR CR K5.6 K5.6 K5.6 CR CR CR CR K5.6 K5.6 K5.6 CR
SDN BHD
K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR
CR CR CR CR
K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 12A-A, Menara Northam, 55, Jalan
K11.2
K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR
Sultan Ahmad Shah,
1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W
CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR 10050 Penang Malaysia
11.00

K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR


K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092
Web/Email: admin@uqs.com.my
RUNNER SUPPORT TO MANUFACTURER'S DETAIL
K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR CR CR K11.2
CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 CR
K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 CR CR CR CR
PROJECT NAME
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR K5.6 K5.6 K11.2 K11.2 K11.2 K11.2
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR K5.6 K5.6 REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
VOID VOID
K11.2
VOID COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR K11.2
CR CR CR CR CR CR CR CR CR
CR
K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K5.6 K5.6 K5.6 K5.6 LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
3 STOREY CERP
CB LEVEL 2 - CORRIDOR 2 , 4 AND 6
K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR
K11.2
CR 1 STOREY WAREHOUSE
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
CR CR CR CR CR CR CR CR CR CR CR
7 STOREY PARKING STRUCTURE
CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2

FLOOR FINISHES LEGEND :


CR CR CR CR CR CR CR CR CR CR
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6 K5.6
11.00

CR CR CR CR CR CR CR CR CR CR CR CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
K11.2 K11.2 K11.2 K11.2
K11.2
UPK11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 UP PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UP
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
PERAI SELATAN.
CR CR CR CR CR CR CR CR CR CR CR
6MM THICK. VINYL TILES FLOOR FINISHES
CR K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR
K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
FOR DEXCOM (M) SDN. BHD.
K11.2 K11.2
CLEANROOM PANEL UP TO LEVEL 3
ONK11.2
PERIMETER AREA
K11.2 ONLY K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CLEANROOM PANEL UP TO LEVEL 3
ONK11.2
PERIMETER AREA
K11.2 ONLY K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CLEANROOM PANEL UP TO LEVEL 3
ON PERIMETER AREA ONLY WITH EDGING ON TOP OF WALKABLE CEILING
K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6 K5.6 K5.6 CR CR CR CR CR CR CR CR CR CR K5.6
K5.6 K5.6 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR

CA K11.2 K11.2K11.2
K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2 K11.2
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR

RWDP x 4 NOS
RWDP x 4 NOS
RWDP x 4 NOS
RWDP x 4 NOS
RWDP x 4 NOS 6MM THICK. VINYL TILES FLOOR FINISHES
4.00

200MM DIA 200MM DIA 200MM DIA


K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6200MM DIA K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6200MM DIA K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 WITH EDGING ON TOP OF WALKABLE RWDP x 4 NOS
200MM DIA
CEILING
PROJECT NUMBER
CA1
8.00

K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
278585-00
4.00

PACKAGE

CA2 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6 K5.6
CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
CR_A5001 CR_A5001 3 1 : 200
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 2A FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 2A
ZONE 3

CR_A2102A_A3
28/5/2021 8:21:40 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.

UC
A3
WB

12.00
VOID

UB

25.40
20.00 WAREHOUSE CUB
SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

12.00
WA
UA
1.40

1.40
DN
CJ D1-FD1 FRS-5
MOVEMENT JOINT MOVEMENT JOINT D1-FD1 RS-1 D1-D3a
BMS COMPARTMENT BMS COMPARTMENT

3.80

3.80
3.85
F.F.L. 11.500 FRS-4 F.F.L. 11.500 FRS-4 D1-E1 F.F.L. 11.500 BMS COMPARTMENT FREIGHT
D1-E1 D2-FD3c D1-E1 3 m² FIRE RATED D1-E1 D1-E1 3 m² FIRE RATED D1-E1 3 m² ELEV

6.00

6.05

6.05
CORRIDOR ROLLER SHUTTER ROLLER SHUTTER
CORRIDOR CORRIDOR
D1-B1 603 m² D2-FD1c D2-FD1c D2-D1 D1-E1 D1-B1 D2-B1c D2-FD1c D2-FD1c D2-D1 D1-E1 D1-B1 D2-B1c D2-FD1c D2-FD1c D2-D1
613 m² 610 m²
HR HR HR HR HR HR HR HR
ES D1-B1c ES ES 1400x1200MM CLEAN
D1-B1c D1-B1c
11.00

PAL GENERAL PURPOSE GENERAL PURPOSE D1-B1c ROOM RETURN AIR GRILLE
ES
COLD STORAGE D1-B1 D1-B1
ES PAL D1-B1 D1-B1
ES
CER SANITIZATION PAL COLD STORAGE TO MANUFACTURE DETAIL D1-E1 FREIGHT
CER SANITIZATION 7 m² R.A.C CER SANITIZATION R.A.C PRODUCTION
PRODUCTION 7 m² 7 m² 17 m²
GENERAL PURPOSE 12 m² 17 m² 12 m² COLD STORAGE 34 m² 12 m² ELEV
MAL 34 m² GENERAL PURPOSE MAL
PRODUCTION ES
RS-3c D1-F1 DP 125 RS-3c GENERAL PURPOSE ES
RS-3c D1-F1 17 m² RS-3c
ES
RS-3c D1-F1 DP 125 RS-3c R.A.C
ELECTRICAL D1-B1c GENERAL PURPOSE 28 m² DP 125 PRODUCTION 26 m² GENERAL PURPOSE D1-B1c HR D2-B1c
25 m² PRODUCTION D1-B1 PRODUCTION
49 m² D1-B1 COLD ROOM PANEL PRODUCTION COLD ROOM PANEL 24 m² D1-B1 COLD ROOM PANEL
TO SPECIFICATION 24 m² 28 m² TO SPECIFICATION 28 m² TO SPECIFICATION
D2-B1b D2-B1b D2-B1b D2-B1b D2-B1b MAL
MANUFACTURING MANUFACTURING MANUFACTURING D2-B1
ELECTRICAL 21 m²

7.60
MATERIAL STAGING ELECTRICAL MATERIAL STAGING SUPPORT MATERIAL STAGING
SUPPORT D2-B1b SUPPORT D2-B1b D2-B1b

8.50
D2-FD3c 49 m² 75 m² D2-FD3c 49 m²
75 m²
CH 88 m² SOLUTIONS 88 m² 88 m² 72 m²
MANUFACTURING SOLUTIONS SOLUTIONS
D1-FD1c WASH ROOM 137 m² D2-FD1 FREIGHT WASH ROOM MANUFACTURING D2-FD1 FREIGHT WASH ROOM MANUFACTURING FREIGHT
121 m² R.A.C 121 m² 137 m² R.A.C 121 m² 137 m² R.A.C
ELEV ELEV D2-FD1 ELEV
UP
D2-B1 D2-B1 4.345 3.60 D2-B1
DN
CHEM STORAGE RS-3a CHEM STORAGE RS-3a CHEM STORAGE RS-3a
46 m² MAL STAIRCASE 6 46 m² 46 m²
RS-3a 43 m² CAL CHECK MODULE RS-3a D1-B1a STAIRCASE 3 CAL CHECK MODULE RS-3a D1-B1a
STAIRCASE 9 D1-B1a FREIGHT 34 m² ES FREIGHT MAL ES FREIGHT
11.00

7.395
ES
31 m² CAL CHECK MODULE MAL
51 m² ELEV
MAINTENANCE
70 m²
MAL
51 m² ELEV 43 m²
34 m² MAINTENANCE
70 m²
8.35 9.525 4.475 MAL
51 m² ELEV
MAL
38 m²
MAINTENANCE DN
39 m² MAL UP MAL UP DN MAL
D1-B1b 58 m² D1-B1b 58 m² MAL D1-B1b 59 m²
D1-B1b D2-B1b D1-FD1c D1-FD1 D1-B1b D2-B1b D1-FD1c D1-FD1 25 m² D1-B1b D2-B1b
D2-B1 D2-B1 D2-B1
D1-B1a FREIGHT D1-B1a FREIGHT HR FREIGHT
HR

D1-E1 HR MAL MAL MAL


R.A.C ELEV D1-E1
MAL MAL MAL
R.A.C ELEV D1-E1
D1-B1a
MAL MAL MAL
R.A.C ELEV COLOUR WALL TYPE LEGEND : ISSUE DATE DESCRIPTION
RWDP x 4 NOS R.A.C 6 m² 6 m² 9 m² R.A.C 6 m² 6 m² 9 m² R.A.C 6 m² 6 m² 9 m²
RWDP x 4 NOS RWDP x 4 NOS

CG
200MM DIA
R.A.C R.A.C HR R.A.C 200MM DIA R.A.C R.A.C HR R.A.C 200MM DIA R.A.C R.A.C HR R.A.C D2-B1b

RS-3a R.A.C R.A.C PE RS-3a R.A.C R.A.C PE RS-3a R.A.C R.A.C PE


D1-E1a RS-3a D1-E1a RS-3a D1-E1a RS-3a
SENSOR WIP SENSOR WIP SENSOR WIP
69 m² D1-B1b D1-B1b D2-B1b D2-B1b 69 m² D2-B1a D1-B1b D1-B1b D2-B1b D2-B1b 69 m² D2-B1a D1-B1b D1-B1b D2-B1b
D2-B1a R.A.C R.A.C R.A.C FIRE RATED BRICK WALL / FIRE RATED LIGHT
6000x1200MM CLEAN 900x1200MM CLEAN 3900x1200MM CLEAN 1800x1200MM CLEAN 6000x1200MM CLEAN 900x1200MM CLEAN 3900x1200MM CLEAN
WEIGHT CONCRETE PANELS

R.A.C

R.A.C

R.A.C
1900x1200MM CLEAN 1900x1200MM CLEAN
ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL
D1-E1a D1-E1a
HR HR HR
Dexcom
11.00

3900x1200MM CLEAN 3900x1200MM CLEAN


ROOM RETURN AIR GRILLE
D1-E1a ROOM RETURN AIR GRILLE 6340 Sequence Drive
D1-E1a HR TO MANUFACTURE DETAIL D1-E1a HR TO MANUFACTURE DETAIL D1-E1a HR San Diego, CA 92121
888 738 3646
R.A.C

R.A.C

R.A.C
W3 W6 W6 W6 W6 W6 W6 www.dexcom.com
W3 W3

GOWNING B 4900x1000MM CLEAN GOWNING B 4900x1000MM CLEAN GOWNING B 4900x1000MM CLEAN PROJECT LEAD
94 m² D2-B1b ROOM RETURN AIR GRILLE 93 m² D2-B1b ROOM RETURN AIR GRILLE 93 m² D2-B1b ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL Arup Jururunding Sdn Bhd
CF R.A.C
R.A.C
R.A.C
R.A.C 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
PAL 3300x1200MM CLEAN
PAL 3300x1200MM CLEAN R.A.C PAL
D2-B1c R.A.C D2-B1b D2-B1c ROOM RETURN AIR GRILLE D2-B1b D2-B1c ROOM RETURN AIR GRILLE D2-B1b 163-D Persiaran Gurney
9 m² TO MANUFACTURE DETAIL 9 m² TO MANUFACTURE DETAIL 9 m² 10250 Penang Malaysia
19400x1200MM CLEAN 19400x1200MM CLEAN
ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE 604 2933 800
TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL www.arup.com
D2-B1b D2-B1b D2-B1b D2-B1b D2-B1b D2-B1b
2.25

2.25
D2-B1 EXIT B D2-B1 EXIT B D2-B1 EXIT B
20 m² 20 m² 20 m²
11.00

R.A.C

R.A.C

R.A.C
DESIGN ARCHITECT
2700x1200MM CLEAN 2700x1200MM CLEAN
R.A.C R.A.C ROOM RETURN AIR GRILLE R.A.C ROOM RETURN AIR GRILLE
3.00

3.00

3.00
SERVICE CORRIDOR SERVICE CORRIDOR SERVICE CORRIDOR
D2-B1 32 m² PE D2-B1
32 m² PE
TO MANUFACTURE DETAIL
D2-B1
32 m² PE
TO MANUFACTURE DETAIL
SABArchitects
4 R.A.C R.A.C R.A.C
BRICK WALL C/W PLASTERING & PAINT 2 Nickerson Suite 200
CR_A5001 Seattle, Wa 98109
ON BOTH SIDES 206 957 6400
2.25

2.25

2.25
EXIT A EXIT A EXIT A
D2-B1 D2-B1b D2-B1b D2-B1 D2-B1b D2-B1b D2-B1 D2-B1b D2-B1b www.sabarch.com
20 m² 20 m² 20 m²
88.00

CE D1-E1 HR D1-E1 HR D1-E1 HR


R.A.C PAL D2-B1b
R.A.C PAL D2-B1b
R.A.C PAL D2-B1b CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
R.A.C 9 m² R.A.C 9 m² R.A.C 9 m²
D2-B1c D2-B1c
3300x1200MM CLEAN
ROOM RETURN AIR GRILLE D2-B1c
3300x1200MM CLEAN
ROOM RETURN AIR GRILLE
Arup Jururunding Sdn Bhd
HR D1-E1a CER-P3 TO MANUFACTURE DETAIL
HR D1-E1a CER-P2 TO MANUFACTURE DETAIL
HR D1-E1a Gurney Paragon Mall Level 6
2790 m² 2791 m² Lots L6.01 to L6.09
D2-B1b D2-B1b D2-B1b DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

F.F.L. 11.500 D1-E1a F.F.L. 11.500 D1-E1a W3 F.F.L. 11.500 D1-E1a 10250 Penang Malaysia
HR HR HR
STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
GOWNING A W3 GOWNING A GOWNING A CER-P1
W3 W6 W6 W6 W6 W6 W6 www.arup.com
94 m² 94 m² 94 m² 2791 m²

ARCHITECT

D1-B1c 17400x1000MM CLEAN


VOID D1-B1c 17400x1000MM CLEAN
VOID D1-B1c 17400x1000MM CLEAN BYG Architecture Sdn. Bhd.
CD
ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL 12A, Arratoon Road 10050
Penang, Malaysia
FIRE RATED DRY WALL PARTITION C/W INSULATION 604 228 8852
R.A.C

R.A.C

R.A.C
WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com

W8
21500x1200MM CLEAN
ROOM RETURN AIR GRILLE
21500x1200MM CLEAN
ROOM RETURN AIR GRILLE
BOTHWAYS
W7 W7 W7 W7 TO MANUFACTURE DETAIL
W7 W7 TO MANUFACTURE DETAIL
W8
W5 MECHANICAL AND ELECTRICAL ENGINEER
OPEN OFFICE OPEN OFFICE OPEN OFFICE
11.00

W5 W5
W8 124 m² 124 m² 124 m² Pen Konsult Sdn Bhd
R.A.C

R.A.C

R.A.C
D1-B1b D1-B1b D1-B1b
7L-3 Asas Center
4000x1200MM CLEAN 4000x1200MM CLEAN Jalan Gottlieb
ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL
10350 Penang
Malaysia
R.A.C 604 2282 515
R.A.C R.A.C www.penkonsult.com
D1-B1c PAL D1-B1c PAL D1-B1c PAL CLEANROOM SANDWICHED PANEL
CC
18 m² 18 m² 800x1200MM CLEAN
18 m² 800x1200MM CLEAN
HR ES R.A.C HR ES R.A.C ROOM RETURN AIR GRILLE
D1-E1 HR ES R.A.C ROOM RETURN AIR GRILLE QUANTITY SURVEYOR
D1-E1 D1-E1 TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL
Unitech QS Consultancy
D1-B1b D1-B1b D1-B1b D1-B1b
D2-B1c D1-B1b D2-B1c
D1-B1b
D2-B1c SDN BHD
MANUFACTURING D2-B1b 12A-A, Menara Northam, 55, Jalan
D2-B1b D2-B1b Sultan Ahmad Shah,
MANUFACTURING MAL MANUFACTURING MAL ENGINEERING MAL
ENGINEERING 7 m²
D2-B1b
ENGINEERING 7 m²
D2-B1b
WORKSHOP 7 m²
D2-B1b 1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W 10050 Penang Malaysia
11.00

WORKSHOP WORKSHOP 117 m² INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092
Web/Email: admin@uqs.com.my
117 m² R.A.C 117 m² R.A.C
D1-E1a HR D1-E1a HR 2600x1200MM CLEAN
D1-E1a HR RUNNER SUPPORT TO MANUFACTURER'S DETAIL
D1-E1a D1-E1a ROOM RETURN AIR GRILLE R.A.C D1-E1
W4 HR W4 HR
TO MANUFACTURE DETAIL
HR
PROJECT NAME
W4
11,800x1200MM CLEAN REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
VOID VOID ROOM RETURN AIR GRILLE
TO MANUFACTURE DETAIL VOID COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
R.A.C R.A.C 3 STOREY CERP
CB
R.A.C
LEVEL 2 - CORRIDOR 2 , 4 AND 6 1 STOREY WAREHOUSE
WOMEN'S WOMEN'S WOMEN'S
RESTROOM MAL MAL 3 STOREY CENTRAL UTILITY BUILDING
RESTROOM FREIGHT MAL FREIGHT RESTROOM FREIGHT
49 m² ELEV 30 m² 49 m² ELEV 30 m² 49 m² ELEV
30 m² 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
MAL MAL 2 STOREY SUBSTATION
MAL D2-B1b D2-B1b D2-B1b D2-B1b D2-B1b D2-B1b
31 m²
31 m² 31 m² 3 NOS OF GUARDHOUSE
11.00

FREIGHT FREIGHT FREIGHT


DN DN 4.10 4.02 DN AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
D2-B1
MEN'S ELEV DN MEN'S ELEV DN MEN'S ELEV 4.10 4.02 DN
RESTROOM 10500x1000MM CLEAN 16900x1000MM CLEAN D2-B1 RESTROOM 10500x1000MM CLEAN 16900x1000MM CLEAN D2-B1
STAIRCASE 2 RESTROOM PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE
STAIRCASE 5 ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE STAIRCASE 4 STAIRCASE 1
17 m² TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL STAIRCASE 7 17 m² TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL
45 m² 43 m² 17 m²
45 m² PERAI SELATAN.
STAIRCASE 8 D1-E1a 45 m² 43 m² D1-E1a 10500x1000MM CLEAN
D1-E1a 16900x1000MM CLEAN
43 m² ACCESSIBLE TOILET IDF-CER2-2.1 ROOM RETURN AIR GRILLE ROOM RETURN AIR GRILLE FOR DEXCOM (M) SDN. BHD.
IDF-CER3-2.1 W9 W9 D1-FD2c ACCESSIBLE TOILET 13 m² W9 W9 D1-FD2c IDF-CER1-2.1 ACCESSIBLE TOILET TO MANUFACTURE DETAIL TO MANUFACTURE DETAIL D1-FD2c
ELEV 11 m² ELEV ELEV
D1-FD1 13 m² D1-FD1 11 m² 15 m² 9 m²
D1-D1 R.A.C HR R.A.C HR D1-D1 R.A.C HR R.A.C HR D1-D1 R.A.C HR R.A.C
CA HR

D1-D2
HR

W9 W9
HR HR

W9 W9 D1-E1
HR

D1-B1c
HR
EMERGENCY
D1-FD1 D1-E1 D1-D2
EGRESS ONLY
D1-FD1 WA7 D1-D2 RWDP x 4 NOS WA7 RWDP x 4 NOS
CRAC CONDENSING
D1-B1c D1-E1 D1-FD1
4.00

RWDP x 4 NOS
D1-E1 D2-D1 D1-E1 BMS COMPARTMENT D1-E1 D1-B1c 200MM DIA 200MM DIA
D2-D1 D1-E1
200MM DIA D1-E1 D2-D1 UNITS RWDP x 4 NOS
2 m² 200MM DIA RWDP
F.F.L. 11.500 CORRIDOR
BMS COMPARTMENT
RWDP x 4 NOS D2-D1 200MM DIA RWDP MOVEMENT JOINT 7 m² 200MM DIA
200MM DIA MOVEMENT JOINT CORRIDOR
RWDP x 4 NOS
200MM DIA WA6 160 m² D2-B1 BMS COMPARTMENT PROJECT NUMBER
2 m²
CA1
8.00

434 m² 2 m²
278585-00
F.F.L. 11.500 CORRIDOR F.F.L. 11.500 WA5
4.00

536 m²
200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP 200MM DIA RWDP PACKAGE
WA4 1200x3000MM ALUMN SOLID 200MM DIA RWDP 1200x3000MM ALUMN SOLID 200MM DIA RWDP
PANER C/W INSULATION PANER C/W INSULATION
CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

1200x3000MM ALUMN SOLID


PANER C/W INSULATION 64.00 69.00 69.00
DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
CR_A5001 CR_A5001 3 1 : 200
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 2 FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 2
ZONE 3

CR_A2102_A3
28/5/2021 8:18:37 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

UC
A3
WB

12.00
UB

25.40
WAREHOUSE CUB
20.00 SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

12.00
WA
UA
1.40

1.40
CJ
CONCRETE FLOOR CONCRETE FLOOR CONCRETE FLOOR

6.66

6.66
F.F.L. 22.700 F.F.L. 23.200 F.F.L. 23.200
11.00

CH
4.50 12.545 7.955
12.545

CONCRETE
FLOOR VOID CONCRETE VOID CONCRETE VOID CONCRETE
11.00

11.35
FLOOR FLOOR FLOOR
F.F.L. 23.200 F.F.L. 23.200 F.F.L. 23.200 F.F.L. 23.200

RWDP x 4 NOS RWDP x 4 NOS


200MM DIA 200MM DIA
COLOUR WALL TYPE LEGEND : ISSUE DATE DESCRIPTION
RWDP x 4 NOS

CG
200MM DIA

FIRE RATED BRICK WALL / FIRE RATED LIGHT


WEIGHT CONCRETE PANELS
Dexcom
11.00

10.79
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
35.77
PROJECT LEAD
Arup Jururunding Sdn Bhd
CF 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
11.00

DESIGN ARCHITECT

SABArchitects
4
BRICK WALL C/W PLASTERING & PAINT 2 Nickerson Suite 200
CR_A5001 Seattle, Wa 98109
ON BOTH SIDES 206 957 6400
www.sabarch.com
88.00

CE
VOID VOID VOID CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

VOID VOID VOID


10250 Penang Malaysia
STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
www.arup.com

ARCHITECT
8.075
BYG Architecture Sdn. Bhd.
CD 12A, Arratoon Road 10050

1.925
Penang, Malaysia
FIRE RATED DRY WALL PARTITION C/W INSULATION 604 228 8852
WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com
BOTHWAYS
CONCRETE CONCRETE CONCRETE MECHANICAL AND ELECTRICAL ENGINEER
11.00

FLOOR FLOOR FLOOR Pen Konsult Sdn Bhd


7L-3 Asas Center
F.F.L. 23.200 F.F.L. 23.200 F.F.L. 23.200

11.00
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com
CLEANROOM SANDWICHED PANEL
CC QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W 10050 Penang Malaysia
11.00

INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092


Web/Email: admin@uqs.com.my
RUNNER SUPPORT TO MANUFACTURER'S DETAIL
PROJECT NAME
REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
3 STOREY CERP
CB LEVEL 2 - CORRIDOR 2 , 4 AND 6 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
11.00

STEEL STAIRCASE STEEL STAIRCASE STEEL STAIRCASE AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
TO ENGR'S DETAIL TO ENGR'S DETAIL TO ENGR'S DETAIL PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
TREAD = 275MM TREAD = 275MM TREAD = 275MM
RISER = 200MM RISER = 200MM RISER = 200MM PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DN D1-D1a DN D1-D1a DN D1-D1a

CA
4.00

PROJECT NUMBER
CA1
8.00

278585-00
4.00

PACKAGE

CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
CR_A5001 CR_A5001 3 1 : 200
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 3A FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 3A
ZONE 3

CR_A2103A_A3
28/5/2021 8:22:44 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.

UC
A3
WB

12.00
VOID

UB

25.40
20.00
WAREHOUSE CUB
SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE SCOPE IN THE NORTH SECTION OF
INCLUDED IN THE WAREHOUSE CONSTRUCTION THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE CUB CONSTRUCTION

12.00
MOVEMENT JOINT
WA
UA
1.40

1.40
CJ FRS-3
FREIGHT
D1-FD1 ELEV

6.66

6.66

6.66
GENERAL PURPOSE GENERAL PURPOSE ELECTRICAL: 11KV GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE
ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: 11KV ELECTRICAL: MAIN ELECTRICAL: 11KV
PRODUCTION PRODUCTION ELECTRICAL: LIFE SAFETY 1 PRODUCTION PRODUCTION ELECTRICAL: PRODUCTION PRODUCTION ELECTRICAL:
SWITCHGEAR 3 TRANSFORMER 3 SWITCHGEAR 2 TRANSFORMER 2 LIFE SAFETY 1 SWITCHGEAR 1 TRANSFORMER 1
23 m² 53 m² ESSENTIAL 3 46 m² 25 m² 53 m² ESSENTIAL 2 25 m² 53 m² ESSENTIAL 1 D1-FD3c
111 m² 56 m² 111 m² 56 m² 46 m² 111 m² 56 m²
11.00

113 m² 113 m² 113 m² FREIGHT


ELEV
FRS-5 FRS-5 FRS-5 FRS-5 FRS-5 FRS-5
HR

FRS-5 FRS-5 FRS-5 FRS-5 FRS-5 FRS-5


D2-FD3 D2-FD3 D2-FD3 D2-FD3c D2-FD3 D2-FD3c D2-FD3 D1-FD3c D1-FD3c D2-FD3 D2-FD3 D2-FD3 D2-FD3c D2-FD3 D2-FD3c D2-FD3 D1-FD3c D1-FD3c D2-FD3 D2-FD3 D2-FD3 D2-FD3c D2-FD3 D2-FD3c D2-FD3 D1-FD3c PROVIDED 2 SIDES (2 Nos.)
FRS-3 D1-FD3c
PROVIDED 2 SIDES (2 Nos.) OF ROLLER SHUTTER
OF ROLLER SHUTTER FRS-3 MOVEMENT JOINT PROVIDED 2 SIDES (2 Nos.) FRS-5 MOVEMENT JOINT
FRS-5 OF ROLLER SHUTTER

CH HR
R.C PLINTH
R.C PLINTH
HR R.C PLINTH
FRS-5
HR
R.C PLINTH R.C PLINTH
HR
FRS-5
HR
R.C PLINTH
R.C PLINTH
HR R.C PLINTH

D1-FD1c STAIRCASE 9 STAIRCASE 6 STAIRCASE 3 PROVIDED 2 SIDES


D1-FD3c 34 m² D1-FD3c 34 m²
OF ROLLER SHUTTER
31 m²
FRS-5 FRS-5
DN IDF-CER3-3.2 IDF-CER2-3.2 F.F.L. 18.700 IDF-CER1-3.2 F.F.L. 18.700
17 m² D1-B1c 16 m² D1-B1c 16 m²
F.F.L. 18.700 ELECTRICAL
11.00

R.C PLINTH R.C PLINTH R.C PLINTH


ELECTRICAL ELECTRICAL 97 m²
87 m² 87 m²
DN DN
D1-B1c
D1-FD1c D1-FD1c 150MM SCUPPER DRAIN KERB
RWDP x 4 NOS R.C PLINTH RWDP x 4 NOS

COLOUR WALL TYPE LEGEND :


200MM DIA 200MM DIA
R.C PLINTH R.C PLINTH
R.C PLINTH RWDP x 4 NOS
R.C PLINTH R.C PLINTH ISSUE DATE DESCRIPTION
200MM DIA

CG
HR HR HR
R.C PLINTH D1-FD1c R.C PLINTH D1-FD1c R.C PLINTH D1-FD1c

DN DN DN
R.C PLINTH R.C PLINTH R.C PLINTH
WASH AREA C/W HR WASH AREA C/W HR WASH AREA C/W
WATER TAP & FT 150MM SCUPPER WATER TAP & FT WATER TAP & FT
HR
FIRE RATED BRICK WALL / FIRE RATED LIGHT
DRAIN KERB MECHANICAL
TO DETAIL
R.C PLINTH
STEEL STAIRCASE
TO ENGR'S DETAIL
TO DETAIL
R.C PLINTH
STEEL STAIRCASE
TO ENGR'S DETAIL
TO DETAIL
MEZZENE
STEEL STAIRCASE
TO ENGR'S DETAIL
WEIGHT CONCRETE PANELS
TREAD = 255MM TREAD = 255MM 2693 m² TREAD = 255MM
Dexcom
11.00

10.79

10.79
RISER = 180MM RISER = 180MM RISER = 180MM
150MM SCUPPER DRAIN KERB

MECHANICAL 6340 Sequence Drive


MECHANICAL MEZZENE San Diego, CA 92121

150MM SCUPPER DRAIN KERB


MEZZENE 2729 m²
888 738 3646
2654 m²
www.dexcom.com
150MM SCUPPER
DRAIN KERB
150MM SCUPPER
DRAIN KERB
35.77
35.77

150MM SCUPPER DRAIN KERB


PROJECT LEAD
Arup Jururunding Sdn Bhd
CF R.C PLINTH 230MM THK FIRE RATED BRICK WALL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
WASH AREA C/W WASH AREA C/W WASH AREA C/W 163-D Persiaran Gurney
R.C PLINTH R.C PLINTH R.C PLINTH
WATER TAP & FT WATER TAP & FT WATER TAP & FT 10250 Penang Malaysia
TO DETAIL TO DETAIL TO DETAIL 604 2933 800
www.arup.com
R.C PLINTH R.C PLINTH
11.00

R.C PLINTH R.C PLINTH R.C PLINTH DESIGN ARCHITECT

SABArchitects
4
BRICK WALL C/W PLASTERING & PAINT 2 Nickerson Suite 200
CR_A5001 Seattle, Wa 98109
ON BOTH SIDES 206 957 6400
www.sabarch.com
HR

CE
HR HR

HR HR
HR
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
150MM SCUPPER DRAIN KERB

150MM SCUPPER DRAIN KERB

150MM SCUPPER DRAIN KERB


R.C PLINTH R.C PLINTH R.C PLINTH Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
96.00

Lots L6.01 to L6.09


DRY WALL PARTITION C/W INSULATION WITH G.I 163-D Persiaran Gurney
11.00

10250 Penang Malaysia


STUD & M.S FRAME AT 2400MM C/C BOTHWAYS 604 2933 800
www.arup.com

R.C PLINTH
VOID R.C PLINTH
VOID R.C PLINTH
VOID ARCHITECT

WASH AREA C/W


VOID WASH AREA C/W
VOID BYG Architecture Sdn. Bhd.
CD
WATER TAP & FT WATER TAP & FT WASH AREA C/W
TO DETAIL 12A, Arratoon Road 10050
TO DETAIL WATER TAP & FT
Penang, Malaysia
TO DETAIL FIRE RATED DRY WALL PARTITION C/W INSULATION 604 228 8852
WITH G.I STUD & M.S FRAME AT 2400MM C/C www.byggroup.com
BOTHWAYS
MECHANICAL AND ELECTRICAL ENGINEER
11.00

ELECTRICAL HVAC ELECTRICAL HVAC ELECTRICAL HVAC


SWITCH ROOM 3 SWITCH ROOM 2 SWITCH ROOM 1
Pen Konsult Sdn Bhd
87 m² 87 m² 87 m² 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
R.C PLINTH R.C PLINTH
R.C PLINTH www.penkonsult.com
D2-FD3 D2-FD3 D2-FD3 CLEANROOM SANDWICHED PANEL
CC HR HR
QUANTITY SURVEYOR
R.C PLINTH
HR Unitech QS Consultancy
F.F.L. 18.700 F.F.L. 18.700 SDN BHD
HR R.C PLINTH
HR
R.C PLINTH
HR
R.C PLINTH F.F.L. 18.700 12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,

150MM SCUPPER DRAIN KERB


1200x3000MM ALUMN. PANEL RAL# 7047 EGGSHELL C/W 10050 Penang Malaysia
11.00

INSULATION UP TO CEILING LEVEL AND ALL ALUMN PANEL 04 229 0092


Web/Email: admin@uqs.com.my
150MM SCUPPER DRAIN KERB

RUNNER SUPPORT TO MANUFACTURER'S DETAIL


PROJECT NAME
REMARK: APPLY TO ALL INTERNAL SURFACE OF WALL /
R.C PLINTH R.C PLINTH
COLUMN / RWDP & DRY WALL PARTITION AT PROPOSED MANUFACTURING FACILITY CONSISTING OF:
150MM SCUPPER DRAIN KERB 150MM SCUPPER DRAIN KERB 150MM SCUPPER DRAIN KERB 150MM SCUPPER
DRAIN KERB LEVEL 1 - CORRIDOR 3 , 7 AND 10 /
3 STOREY CERP
CB LEVEL 2 - CORRIDOR 2 , 4 AND 6 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
R.C PLINTH STEEL STAIRCASE R.C PLINTH STEEL STAIRCASE WASH AREA C/W STEEL STAIRCASE 7 STOREY OFFICE HEAD BUILDING
WASH AREA C/W TO ENGR'S DETAIL TO ENGR'S DETAIL WATER TAP & FT TO ENGR'S DETAIL
WATER TAP & FT TREAD = 255MM TREAD = 255MM TO DETAIL R.C PLINTH TREAD = 255MM 7 STOREY PARKING STRUCTURE
TO DETAIL RISER = 180MM CONCRETE RISER = 180MM CONCRETE RISER = 180MM CONCRETE 2 STOREY SUBSTATION
FLOOR WASH AREA C/W FLOOR WASH AREA C/W FLOOR
WATER TAP & FT WATER TAP & FT 3 NOS OF GUARDHOUSE
11.00

HR HR
TO DETAIL TO DETAIL HR
D1-FD1c D1-FD1c AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
D1-FD1c PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
DN PERAI SELATAN.
RWDP x 4 NOS
200MM DIA RWDP x 4 NOS D1-B1c FOR DEXCOM (M) SDN. BHD.
200MM DIA
D1-B1c IDF-CER3-3.1 IDF-CER2-3.1 IDF-CER1-3.1
RWDP x 4 NOS D1-B1c RWDP x 4 NOS
HR
R.C PLINTH UP 11 m² 200MM DIA
HR
R.C PLINTH
UP 11 m² RWDP x 4 NOS
HR
R.C PLINTH
UP 17 m² 200MM DIA

CA
200MM DIA
4.00

4.00

4.00
RWDP x 4 NOS
150MM SCUPPER DRAIN KERB 150MM SCUPPER DRAIN KERB 200MM DIA

6.30
WASH AREA C/W WASH AREA C/W PROJECT NUMBER
CA1 WATER TAP & FT
TO DETAIL
WATER TAP & FT
TO DETAIL 278585-00

2.30
4.00

4.00

PACKAGE
4.00
CA2 CERs FIT OUT
1.985

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
CR_A5001 CR_A5001 3 1 : 200
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 3 FLOOR PLAN DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 3
ZONE 3

CR_A2103_A3
28/5/2021 8:22:35 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

UC
A3
WB

12.00
UB

25.40
20.00 WAREHOUSE CUB
SCOPE IN THE NORTH SECTION OF SCOPE IN THE NORTH SECTION OF
THE CERP NORTH OF GRID WA SHALL BE THE CERP NORTH OF GRID UA SHALL BE
INCLUDED IN THE WAREHOUSE CONSTRUCTION INCLUDED IN THE CUB CONSTRUCTION

12.00
WA DOUBLE DECK ROOF C/W
INSULATION TO DETAIL
DOUBLE DECK ROOF C/W
INSULATION TO DETAIL
DOUBLE DECK ROOF C/W

UA
INSULATION TO DETAIL
1.40

1.40
CJ
11.00

4.9°

4.9°

4.9°

4.9°
4.9°

4.9°
CH
DOUBLE DECK ROOF C/W
INSULATION TO DETAIL
11.00

ISSUE DATE DESCRIPTION

CG
GUTTER C/W RWDP GUTTER C/W RWDP GUTTER C/W RWDP
TO DETAIL TO DETAIL TO DETAIL

Dexcom
11.00

6340 Sequence Drive


San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
CF Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
11.00

DESIGN ARCHITECT

SABArchitects
4 2 Nickerson Suite 200
CR_A5001 Seattle, Wa 98109
206 957 6400
www.sabarch.com

CE
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
96.00

Lots L6.01 to L6.09


163-D Persiaran Gurney
11.00

10250 Penang Malaysia


604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


4.0°

4.0°

4.0°
4.9°

4.9°
4.9°
CD 12A, Arratoon Road 10050

66.03
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


11.00

Pen Konsult Sdn Bhd


7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

CC QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
11.00

04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
CB 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
16.61 16.61 16.61 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
11.00

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

D1-D1a D1-D1a D1-D1a

CA
4.00

PROJECT NUMBER
CA1 278585-00
DOUBLE DECK ROOF C/W GUTTER C/W RWDP DOUBLE DECK ROOF C/W DOUBLE DECK ROOF C/W GUTTER C/W RWDP DOUBLE DECK ROOF C/W DOUBLE DECK ROOF C/W GUTTER C/W RWDP DOUBLE DECK ROOF C/W
4.00

INSULATION TO DETAIL TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL TO DETAIL INSULATION TO DETAIL
PACKAGE

CA2 CERs FIT OUT

8.00 8.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 DESIGNED DRAWN CHECKED APPROVED
12.00
69.00 69.00 BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE
2 1
1 : 200
ROOF PLAN CR_A5001 CR_A5001 3
CR_A5001
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
ROOF PLAN
ZONE 3

CR_A2104_A3
28/5/2021 8:22:52 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

A3

WA
UA
CJ
11.00

CH CEILING LEGEND :
11.00

NO
NO CEILING
CEILING

ISSUE DATE DESCRIPTION

CG

Dexcom
11.00

3MM THK. SKIM COAT 6340 Sequence Drive


San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
CF Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
1200x3050MM WALKABLE CEILING BY 50MM T-FRAME
11.00

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CE
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
600x1200MM LAMINATED GYPSUM BOARD WITH
Arup Jururunding Sdn Bhd
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING Gurney Paragon Mall Level 6
96.00

C/W 50MM T-FRAME Lots L6.01 to L6.09


163-D Persiaran Gurney
11.00

10250 Penang Malaysia


604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


CD 600x1200MM LAMINATED GYPSUM BOARD WITH
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING www.byggroup.com

C/W 50MM T-FRAME


MECHANICAL AND ELECTRICAL ENGINEER
11.00

Pen Konsult Sdn Bhd


7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

CC MOISTURE RESISTANCE SEAMLESS PLATERGLASS QUANTITY SURVEYOR


CEILING C/W G.I STUD FRAME & PLASTERGLASS COVE Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
11.00

04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME
NO NO NO PROPOSED MANUFACTURING FACILITY CONSISTING OF:
CEILING CEILING CEILING

3 STOREY CERP
CB 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
PIPING SERVICE 3 NOS OF GUARDHOUSE
PIPING SERVICE ACCESS ROOM 1
11.00

PIPING SERVICE ACCESS ROOM 2 86 m²


86 m² AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
ACCESS ROOM 1
86 m² PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

CA
4.00

PROJECT NUMBER
CA1 278585-00
4.00

PACKAGE

CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE

1 : 200
LEVEL 1A FLOOR PLAN - REFLECTED CEILING
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 1A
ZONE 3

CR_A3201A_A3
28/5/2021 8:23:22 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

A3

CJ
NO
CEILING

5.00 5.00 5.00 5.00 5.00


11.00

NO
MATERIAL SUPER MATERIAL SUPER MATERIAL SUPER CEILING
MATERIAL SUPER MATERIAL SUPER
HIGHWAY C HIGHWAY B HIGHWAY A
HIGHWAY B HIGHWAY A
116 m² 116 m² 599 m²
684 m² 637 m²

CH CEILING LEGEND :
NO NO NO
CEILING CEILING CEILING
ELECTRICAL
ELECTRICAL
ELECTRICAL 59 m²
59 m²
48 m² NO FINISHED GOODS FINISHED GOODS
NO FINISHED GOODS STAGING MATERIAL STAGING NO STAGING
CEILING
11.00

NO 505 m² NO MATERIAL STAGING


NO CEILING
CEILING STAGING MATERIAL STAGING 214 m² CEILING 213 m² NO
198 m² 505 m² CEILING CEILING 505 m²
5.00 5.00 5.00 5.00 5.00 5.00
CEILING NO
CEILING
NO NO NO
CEILING CEILING CEILING
ISSUE DATE DESCRIPTION

CG
RUPS RUPS
RUPS 150 m²
150 m²
140 m²

Dexcom
11.00

3MM THK. SKIM COAT 6340 Sequence Drive


San Diego, CA 92121
888 738 3646
www.dexcom.com

RUPS AHU RUPS AHU RUPS AHU PROJECT LEAD


35 m² 35 m² 35 m² Arup Jururunding Sdn Bhd
CF 5.00 5.00 5.00
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
3.60 604 2933 800
3.60 www.arup.com
GENERAL PURPOSE
PRODUCTION
1200x3050MM WALKABLE CEILING BY 50MM T-FRAME
11.00

103 m² DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
MANUFACTURING GENERAL PURPOSE Seattle, Wa 98109
ENGINEERING PRODUCTION 206 957 6400
STORE 195 m² www.sabarch.com
264 m²
CE
KITTING SUPPLIES CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
OFFICE QUALITY RELEASE
GENERAL
PURPOSE 600x1200MM LAMINATED GYPSUM BOARD WITH
263 m² Arup Jururunding Sdn Bhd
102 m² PRODUCTION
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING Gurney Paragon Mall Level 6
96.00

KITTING / C/W 50MM T-FRAME Lots L6.01 to L6.09


163-D Persiaran Gurney
11.00

PACKAGING 10250 Penang Malaysia


3.60 3.60 1715 m² 3.60
604 2933 800
www.arup.com

OFFICE
65 m² ARCHITECT

BYG Architecture Sdn. Bhd.


CD 600x1200MM LAMINATED GYPSUM BOARD WITH
12A, Arratoon Road 10050
Penang, Malaysia
MALE PRAYER ROOM 604 228 8852
204 m²
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING www.byggroup.com
CONFERENCE ROOM
73 m² C/W 50MM T-FRAME
KITTING / MECHANICAL AND ELECTRICAL ENGINEER
11.00

KITTING / PACKAGING
PACKAGING GENERAL PURPOSE
1715 m² Pen Konsult Sdn Bhd
1715 m² PRODUCTION
7L-3 Asas Center
261 m²
Jalan Gottlieb
FEMALE PRAYER 10350 Penang
ROOM Malaysia
111 m² 604 2282 515
www.penkonsult.com

CC FIRE COMMAND
MOISTURE RESISTANCE SEAMLESS PLATERGLASS QUANTITY SURVEYOR
GENERAL PURPOSE
PRODUCTION
ROOM
70 m²
CEILING C/W G.I STUD FRAME & PLASTERGLASS COVE Unitech QS Consultancy
262 m²
CALIBRATION
SDN BHD
187 m² 12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
GENERAL PURPOSE 10050 Penang Malaysia
PRODUCTION
11.00

04 229 0092
261 m² Web/Email: admin@uqs.com.my
3.60 3.60 3.60
JANITOR 2 PROJECT NAME
28 m² JANITOR 1
28 m²
NO NO NO PROPOSED MANUFACTURING FACILITY CONSISTING OF:
CEILING CEILING CEILING

3 STOREY CERP
CB 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
3.00 NO 3.00 NO 3.00 NO MPOE-CER1 7 STOREY OFFICE HEAD BUILDING
CEILING CEILING CEILING 9 m²
MAL
7 STOREY PARKING STRUCTURE
MAL
MAL 38 m² 39 m²
2 STOREY SUBSTATION
38 m² 3 NOS OF GUARDHOUSE
ENGINEERING
11.00

NO DEVELOPMENT LAB NO NO IT
NO NO NO DEX TECH NO NO 62 m² NO
CEILING 3.60 319 m² CEILING 3.60 CEILING 3.60 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
CEILING CEILING CEILING 319 m² CEILING CEILING MDF-CER1-1.1 CRAC CEILING
101 m² 20 m² PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
NO
IT BUILD ROOM CEILING
FOR DEXCOM (M) SDN. BHD.
NO NO NO 52 m²
CEILING CEILING CEILING

CA
4.00

PROJECT NUMBER
CA1 278585-00
4.00

PACKAGE

CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00


DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE

1 : 200
LEVEL 1 FLOOR PLAN - REFLECTED CEILING
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 1
ZONE 3

CR_A3201_A3
28/5/2021 8:23:11 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

A3

WA
UA
CJ
NO
CEILING
3.60 3.60 3.60
11.00

NO
3.60 CEILING
COLD STORAGE
17 m² 3.60
3.60

MATERIAL STAGING
75 m² MANUFACTURING
MATERIAL STAGING MATERIAL STAGING
SUPPORT
75 m² 72 m²
CH SOLUTIONS SOLUTIONS
88 m²
SOLUTIONS CEILING LEGEND :
MANUFACTURING WASH ROOM MANUFACTURING NO WASH ROOM MANUFACTURING NO WASH ROOM MANUFACTURING NO
121 m² 137 m² MANUFACTURING 121 m² 137 m² 121 m² 137 m²
SUPPORT CEILING CEILING CEILING
88 m² CHEM STORAGE SUPPORT
46 m² 88 m²
MAL MAL
CAL CHECK MODULE CAL CHECK MODULE CAL CHECK MODULE
51 m² 51 m²
NO MAINTENANCE MAL NO MAINTENANCE NO MAINTENANCE
11.00

NO NO NO
CEILING 39 m² 3.60 51 m²
CEILING
CEILING 70 m² 3.60
MAL
CEILING
CEILING 70 m² 3.60
MAL
CEILING
NO
NO CEILING
58 m² 59 m²
MAL CEILING
58 m²
NO NO NO
CEILING CEILING CEILING
ISSUE DATE DESCRIPTION

CG
SENSOR WIP
69 m²
SENSOR WIP SENSOR WIP
69 m² 69 m²

Dexcom
11.00

3MM THK. SKIM COAT 6340 Sequence Drive


San Diego, CA 92121
888 738 3646
GOWNING B GOWNING B www.dexcom.com
94 m² 93 m²

PROJECT LEAD
GOWNING B
93 m² Arup Jururunding Sdn Bhd
CF Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
1200x3050MM WALKABLE CEILING BY 50MM T-FRAME
11.00

DESIGN ARCHITECT

SERVICE CORRIDOR
32 m²
SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com
88.00

CE
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
600x1200MM LAMINATED GYPSUM BOARD WITH
Arup Jururunding Sdn Bhd
GOWNING A GOWNING A ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING Gurney Paragon Mall Level 6
94 m²
C/W 50MM T-FRAME
GOWNING A 94 m² Lots L6.01 to L6.09
94 m² CER-P3 CER-P2 CER-P1
163-D Persiaran Gurney
11.00

2790 m² 2791 m² 2791 m²


10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
3.60 3.60
BYG Architecture Sdn. Bhd.
CD 3.60 600x1200MM LAMINATED GYPSUM BOARD WITH
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING www.byggroup.com

3.60 3.60 3.60 C/W 50MM T-FRAME


OPEN OFFICE MECHANICAL AND ELECTRICAL ENGINEER
11.00

124 m² OPEN OFFICE


124 m²
Pen Konsult Sdn Bhd
7L-3 Asas Center
OPEN OFFICE Jalan Gottlieb
124 m² 10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

CC MOISTURE RESISTANCE SEAMLESS PLATERGLASS QUANTITY SURVEYOR


CEILING C/W G.I STUD FRAME & PLASTERGLASS COVE Unitech QS Consultancy
SDN BHD
MANUFACTURING MANUFACTURING 12A-A, Menara Northam, 55, Jalan
ENGINEERING ENGINEERING Sultan Ahmad Shah,
MANUFACTURING WORKSHOP WORKSHOP 10050 Penang Malaysia
ENGINEERING
11.00

117 m² 117 m² 04 229 0092


WORKSHOP Web/Email: admin@uqs.com.my
117 m²

PROJECT NAME
NO NO NO PROPOSED MANUFACTURING FACILITY CONSISTING OF:
CEILING CEILING 3.60 CEILING

3 STOREY CERP
CB 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
3.00 NO 3.00 NO 3.00 NO 7 STOREY OFFICE HEAD BUILDING
CEILING CEILING CEILING 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
11.00

NO NO NO AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


CEILING CEILING CEILING 3.00 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
NO NO NO
CEILING CEILING CEILING

CA
3.00
4.00

3.60
PROJECT NUMBER
CA1
8.00

3.60 3.60
278585-00
4.00

PACKAGE

CA2 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL LEE SK.HO BEN YEOH
64.00 69.00 69.00
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE

1 : 200
LEVEL 2 FLOOR PLAN - REFLECTED CEILING
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 2
ZONE 3

CR_A3202_A3
28/5/2021 8:23:38 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

A3

CJ
GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE ELECTRICAL: 11KV
ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: 11KV ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: 11KV ELECTRICAL: MAIN
PRODUCTION PRODUCTION ELECTRICAL: PRODUCTION PRODUCTION ELECTRICAL: PRODUCTION PRODUCTION ELECTRICAL: TRANSFORMER 1
SWITCHGEAR 3 TRANSFORMER 3 LIFE SAFETY 1 SWITCHGEAR 2 TRANSFORMER 2 LIFE SAFETY 1 SWITCHGEAR 1
23 m² 53 m² ESSENTIAL 3 25 m² 53 m² ESSENTIAL 2 25 m² 53 m² ESSENTIAL 1 56 m²
111 m² 56 m² 46 m² 111 m² 56 m² 46 m² 111 m²
113 m² 113 m² 113 m²
11.00

CH CEILING LEGEND :

NO NO NO
STAIRCASE 9
31 m² CEILING STAIRCASE 6
34 m²
CEILING STAIRCASE 3
34 m²
CEILING
11.00

ELECTRICAL
87 m²
ELECTRICAL
87 m²
ELECTRICAL
97 m² NO
NO CEILING
3.00 3.00 3.00
CEILING

ISSUE DATE DESCRIPTION

CG

Dexcom
11.00

3MM THK. SKIM COAT 6340 Sequence Drive


San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
CF Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
1200x3050MM WALKABLE CEILING BY 50MM T-FRAME
11.00

DESIGN ARCHITECT

SABArchitects

NO NO NO
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
CEILING CEILING CEILING www.sabarch.com
88.00

CE
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
600x1200MM LAMINATED GYPSUM BOARD WITH
Arup Jururunding Sdn Bhd
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING Gurney Paragon Mall Level 6
C/W 50MM T-FRAME Lots L6.01 to L6.09
163-D Persiaran Gurney
11.00

10250 Penang Malaysia


604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


CD NO NO NO 12A, Arratoon Road 10050

CEILING CEILING CEILING 600x1200MM LAMINATED GYPSUM BOARD WITH Penang, Malaysia
604 228 8852
ALL 6 SURFACE WRAPPED SUSPENDED BY CEILING www.byggroup.com

C/W 50MM T-FRAME


MECHANICAL AND ELECTRICAL ENGINEER
11.00

ELECTRICAL HVAC ELECTRICAL HVAC ELECTRICAL HVAC Pen Konsult Sdn Bhd
SWITCH ROOM 3 SWITCH ROOM 2 SWITCH ROOM 1 7L-3 Asas Center
87 m² 87 m² 87 m² Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

CC MOISTURE RESISTANCE SEAMLESS PLATERGLASS QUANTITY SURVEYOR


CEILING C/W G.I STUD FRAME & PLASTERGLASS COVE Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
11.00

04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
CB 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
11.00

3.00 3.00 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


3.00 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

CA
4.00

PROJECT NUMBER
CA1
8.00

278585-00
4.00

PACKAGE

CA2 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
CERs FIT OUT

64.00 69.00 69.00 DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
SCALE

1 : 200
LEVEL 3 FLOOR PLAN - REFLECTED CEILING
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 3
ZONE 3

CR_A3203_A3
28/5/2021 8:23:50 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

FLOOR FINISHES LEGEND :


GENERAL PURPOSE GENERAL PURPOSE
PRODUCTION PRODUCTION
GENERAL PURPOSE COLD STORAGE 34 m² COLD STORAGE 34 m² COLD STORAGE

A3
PRODUCTION ELECTRICAL 17 m²PANEL 17 m²PANEL 17 m²PANEL
PU 6MM THK.
COLD ROOM COLD ROOM COLD ROOM
25 m² 49 m²

MANUFACTURING MATERIAL STAGING ELECTRICAL MATERIAL STAGING ELECTRICAL MATERIAL STAGING


SOLUTIONS 75 m² 49 m² MANUFACTURING SOLUTIONS 75 m² 49 m² MANUFACTURING SOLUTIONS 72 m²
SUPPORT
WASH ROOM MANUFACTURING SUPPORT WASH ROOM MANUFACTURING SUPPORT WASH ROOM MANUFACTURING
88 m²
121 m² 137 m² 88 m² 121 m² 137 m² 88 m² 121 m² 137 m²
CHEM STORAGE CHEM STORAGE CHEM STORAGE
46 m² 46 m² 46 m²
CAL CHECK MODULE MAL MAL MAL MAL MAL MAL
51 m² 43 m² CAL CHECK MODULE 51 m² 43 m² CAL CHECK MODULE 51 m² 38 m²
MAINTENANCE MAINTENANCE MAINTENANCE
39 m² MAL MAL MAL
58 m² 70 m² 58 m²
70 m²
59 m² PU ESD 6MM THK.

SENSOR WIP SENSOR WIP SENSOR WIP


69 m² 69 m² 69 m²

PU COATING

GOWNING B GOWNING B GOWNING B


94 m² 93 m² 93 m²

VINYL TILES 6MM THK.

GOWNING A GOWNING A GOWNING A


94 m² 94 m² 94 m²
VINYL ESD TILES 6MM THK.
CER-P3 CER-P2 CER-P1
2790 m² 2791 m² 2791 m²

VOID VOID
OPEN OFFICE OPEN OFFICE OPEN OFFICE
STONE PLASTIC COMPOSITE
124 m² 124 m² 124 m² VINYL TILES

TILES FINISHES
MANUFACTURING MANUFACTURING MANUFACTURING
ENGINEERING ENGINEERING ENGINEERING
WORKSHOP WORKSHOP WORKSHOP
117 m² 117 m² 117 m² ISSUE DATE DESCRIPTION

TILES FINISHES C/W INTEGRATED


NOSING TILES
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
CHEMICAL RESISTANT PU WITH ESD
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
POWER FLOAT www.arup.com

(FLOOR FLATNESS FF35 / FL25)


LEVEL 2 FLOOR PLAN - FLOOR FINISHES KEY PLAN DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


MATERIAL SUPER MATERIAL SUPER MATERIAL SUPER
12A, Arratoon Road 10050
HIGHWAY B HIGHWAY A HIGHWAY A
Penang, Malaysia
684 m² 637 m² 599 m²
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
ELECTRICAL
Jalan Gottlieb
59 m²
10350 Penang
Malaysia
FINISHED GOODS FINISHED GOODS FINISHED GOODS 604 2282 515
MATERIAL STAGING MATERIAL STAGING MATERIAL STAGING www.penkonsult.com
STAGING STAGING STAGING
505 m² 505 m² 505 m²
198 m² 214 m² 213 m²
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


MANUFACTURING
ENGINEERING
3 STOREY CERP
STORE 1 STOREY WAREHOUSE
264 m² 3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
QUALITY RELEASE
102 m² AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
KITTING / PERAI SELATAN.
PACKAGING KITTING / FOR DEXCOM (M) SDN. BHD.
KITTING / 1715 m² PACKAGING
PACKAGING 1715 m²
1715 m² OFFICE
65 m²

CONFERENCE ROOM
73 m² PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


GENERAL PURPOSE GENERAL PURPOSE
PRODUCTION PRODUCTION CALIBRATION
261 m² BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

262 m² 187 m²

DATE

28-MAY-2021

MAL MAL
MAL SCALE
39 m² PIPING SERVICE
38 m² 38 m² PIPING SERVICE
PIPING SERVICE ACCESS ROOM 1
ACCESS ROOM 1
ACCESS ROOM 2 1 : 300
86 m² 86 m²
86 m²
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


APRON AREA
APRON AREA APRON AREA DRAWING TITLE

ARCHITECTURAL
FLOOR FINISHES KEY PLAN
SHEET 01

LEVEL 1 FLOOR PLAN - FLOOR FINISHES KEY PLAN LEVEL 1A FLOOR PLAN - FLOOR FINISHES KEY PLAN
CR_A3301
28/5/2021 8:24:45 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

CONCRETE FLOOR CONCRETE FLOOR CONCRETE FLOOR FLOOR FINISHES LEGEND :


F.F.L. 22.700 F.F.L. 23.200 F.F.L. 23.200

PU 6MM THK. A3

CONCRETE CONCRETE CONCRETE


CONCRETE
FLOOR VOID FLOOR
F.F.L. 22.700 VOID FLOOR
F.F.L. 23.200 VOID FLOOR
F.F.L. 23.200
PU ESD 6MM THK.

PU COATING

VINYL TILES 6MM THK.

VOID VOID VOID


VOID VOID VOID
VINYL ESD TILES 6MM THK.

STONE PLASTIC COMPOSITE


CONCRETE CONCRETE CONCRETE VINYL TILES
FLOOR FLOOR FLOOR
F.F.L. 22.700 F.F.L. 23.200 F.F.L. 23.200

TILES FINISHES

ISSUE DATE DESCRIPTION

TILES FINISHES C/W INTEGRATED


NOSING TILES
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
CHEMICAL RESISTANT PU WITH ESD
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
POWER FLOAT www.arup.com

(FLOOR FLATNESS FF35 / FL25)


LEVEL 3A FLOOR PLAN - FLOOR FINISHES KEY PLAN DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE
PRODUCTION
ELECTRICAL: MAIN
SWITCHGEAR 3
ELECTRICAL: 11KV
TRANSFORMER 3
PRODUCTION
ELECTRICAL:
ESSENTIAL 2
ELECTRICAL: MAIN
SWITCHGEAR 2
ELECTRICAL: 11KV
TRANSFORMER 2
PRODUCTION
ELECTRICAL: MAIN
SWITCHGEAR 1
ELECTRICAL: 11KV
TRANSFORMER 1
BYG Architecture Sdn. Bhd.
53 m² 53 m² 53 m² 12A, Arratoon Road 10050
111 m² 56 m² 113 m² 111 m² 56 m² 111 m² 56 m²
HR Penang, Malaysia
604 228 8852
www.byggroup.com

HR HR HR HR HR HR MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
ELECTRICAL Jalan Gottlieb
97 m² 10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

HR HR HR
QUANTITY SURVEYOR
UP HR HR DN
HR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
MECHANICAL MECHANICAL MECHANICAL 1 STOREY WAREHOUSE
MEZZENE MEZZENE MEZZENE 3 STOREY CENTRAL UTILITY BUILDING
2654 m² 2729 m² 2693 m² 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
HR HR HR 2 STOREY SUBSTATION
HR HR HR
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

VOID VOID VOID


VOID VOID VOID VOID

ELECTRICAL HVAC ELECTRICAL HVAC ELECTRICAL HVAC PROJECT NUMBER


SWITCH ROOM 3 SWITCH ROOM 2 SWITCH ROOM 1
87 m² 87 m² 87 m² 278585-00

PACKAGE

HR HR HR
CERs FIT OUT

HR HR HR DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

HR HR 28-MAY-2021

SCALE
CONCRETE CONCRETE CONCRETE
FLOOR FLOOR FLOOR
1 : 300

DRAWING STATUS
CONCRETE CONCRETE
HR HR
ROOF HR ROOF HR 100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR FINISHES KEY PLAN
SHEET 02

CR_A3302
LEVEL 2A FLOOR PLAN - FLOOR FINISHES KEY PLAN LEVEL 3 FLOOR PLAN - FLOOR FINISHES KEY PLAN
28/5/2021 8:25:06 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH
WALL LEGEND :
N
CLEANROOM SANDWICHED PANEL
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR CEILING LEVEL)

DRY WALL PARTITION AND CLEANROOM SANDWICHED PANEL C/W


INSULATION WITH G.I STUD AND M.S FRAME AT 2400MM C/C BOTHWAYS
MATERIAL STAGING MATERIAL STAGING MATERIAL STAGING (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR CEILING LEVEL) A3
75 m² 75 m² 72 m²
SOLUTIONS SOLUTIONS SOLUTIONS
MANUFACTURING MANUFACTURING MANUFACTURING

WASH ROOM
137 m²
WASH ROOM
137 m²
WASH ROOM
137 m²
DRY WALL PARTITION C/W INSULATION WITH G.I STUD AND M.S FRAME AT
CAL CHECK MODULE CAL CHECK MODULE
2400MM C/C BOTHWAYS (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR
121 m² CAL CHECK MODULE 121 m² 121 m²
MAINTENANCE MAL MAINTENANCE MAL MAINTENANCE MAL
39 m² 51 m² 51 m² 70 m² 51 m²
CEILING LEVEL)
70 m²
MAL MAL MAL
58 m² 58 m² 59 m²

2 HOUR FIRE RATED DRY WALL PARTITION C/W INSULATION WITH G.I
SENSOR WIP
69 m² SENSOR WIP SENSOR WIP
69 m²
STUD AND M.S FRAME AT 2400MM C/C BOTHWAYS
69 m²
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR ROOFING SHEET)

GOWNING B GOWNING B GOWNING B


94 m² 93 m² 93 m²

230MM THK. FIRE RATED BRICK WALL (2HR FIRE RATED) C/W
PLASTERING & PAINT ON BOTH SIDES (UP TO UNDER SIDE OF FLOOR
SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
SERVICE CORRIDOR SERVICE CORRIDOR SERVICE CORRIDOR
32 m² 32 m² 32 m² 150MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED
ON ELEVATION)
GOWNING A GOWNING A GOWNING A
94 m² 94 m² 94 m²

150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANELS C/W


CER-P3
2790 m²
CER-P2
2791 m²
CER-P1
PLASTERING & PAINT ON BOTH SIDES (2HR FIRE RATED) (UP TO UNDER
2791 m² SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)

OPEN OFFICE OPEN OFFICE 150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANELS C/W
124 m² 124 m²
OPEN OFFICE PLASTERING & PAINT ON BOTH SIDES (4HR FIRE RATED) (UP TO UNDER
124 m²
SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)

150MM THK. FIRE RATED BRICK WALL (2HR FIRE RATED) C/W
MANUFACTURING MANUFACTURING PLASTERING & PAINT ON BOTH SIDES (UP TO UNDER SIDE OF FLOOR SLAB
ENGINEERING
WORKSHOP
MANUFACTURING
ENGINEERING
ENGINEERING
WORKSHOP SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
117 m² 117 m²
WORKSHOP ISSUE DATE DESCRIPTION
117 m²

230MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED
MAL MAL MAL ON ELEVATION)
31 m² 31 m² 31 m²
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
ALUMINUM PANEL C/W INSULATION & CURTAIN WALL TO FACADE ELEVATION
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
ALUMINUM PANEL C/W INSULATION AND ALL ALUMN PANEL RUNNER 604 2933 800
www.arup.com
SUPPORT TO MANUFACTURER'S DETAIL
LEVEL 2 FLOOR PLAN - WALL KEY PLAN DESIGN ARCHITECT

SABArchitects
REMARK : 2 Nickerson Suite 200
Seattle, Wa 98109
- ALL THE STEEL COLUMNS NEED TO BE BOX-UP WITH DRY WALL PARTTION / 206 957 6400
www.sabarch.com
CLEANROOM PANEL UP TO CEILING LEVEL AT LEVEL 1 AND 2.
- PROVIDE PLASTER & PAINT TO WALLS LEFT UNFINISHED UNDER BUILDING CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
SHEEL PACKAGE (REFER TO BUILDING SHEEL WALL KEY PLAN DRAWING) Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

MATERIAL SUPER
BYG Architecture Sdn. Bhd.
MATERIAL SUPER MATERIAL SUPER
HIGHWAY B HIGHWAY A HIGHWAY A 12A, Arratoon Road 10050
684 m² 637 m² 599 m² Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
ELECTRICAL 7L-3 Asas Center
59 m² Jalan Gottlieb
10350 Penang
FINISHED GOODS FINISHED GOODS Malaysia
MATERIAL STAGING MATERIAL STAGING MATERIAL STAGING 604 2282 515
STAGING STAGING 505 m²
FINISHED GOODS 505 m² 505 m² www.penkonsult.com
214 m² 213 m²
STAGING
198 m²
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME
MANUFACTURING
ENGINEERING PROPOSED MANUFACTURING FACILITY CONSISTING OF:
STORE
264 m² 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


QUALITY RELEASE PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
KITTING / 102 m² KITTING / PERAI SELATAN.
PACKAGING PACKAGING FOR DEXCOM (M) SDN. BHD.
KITTING / 1715 m² 1715 m²
PACKAGING OFFICE
1715 m² 65 m²

CONFERENCE ROOM PROJECT NUMBER


73 m²
278585-00

PACKAGE

FIRE COMMAND CERs FIT OUT


ROOM
70 m²
DESIGNED DRAWN CHECKED APPROVED

GENERAL PURPOSE GENERAL PURPOSE CALIBRATION BEN YEOH CL LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

PRODUCTION PRODUCTION 187 m²


262 m² 261 m²
DATE

28-MAY-2021

MAL MAL SCALE


38 m² 39 m²
PIPING SERVICE PIPING SERVICE PIPING SERVICE
ACCESS ROOM 1 ACCESS ROOM 2 ACCESS ROOM 1 1 : 300
86 m² 86 m² 86 m²
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE
APRON AREA APRON AREA APRON AREA
ARCHITECTURAL
WALL KEY PLAN
SHEET 01

LEVEL 1 FLOOR PLAN - WALL KEY PLAN LEVEL 1A FLOOR PLAN - WALL KEY PLAN
CR_A3601
28/5/2021 8:26:06 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH
WALL LEGEND :
N
CLEANROOM SANDWICHED PANEL
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR CEILING LEVEL)

DRY WALL PARTITION AND CLEANROOM SANDWICHED PANEL C/W


INSULATION WITH G.I STUD AND M.S FRAME AT 2400MM C/C BOTHWAYS
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR CEILING LEVEL) A3

DRY WALL PARTITION C/W INSULATION WITH G.I STUD AND M.S FRAME AT
2400MM C/C BOTHWAYS (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR
CEILING LEVEL)

2 HOUR FIRE RATED DRY WALL PARTITION C/W INSULATION WITH G.I
STUD AND M.S FRAME AT 2400MM C/C BOTHWAYS
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT OR ROOFING SHEET)

230MM THK. FIRE RATED BRICK WALL (2HR FIRE RATED) C/W
PLASTERING & PAINT ON BOTH SIDES (UP TO UNDER SIDE OF FLOOR
SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)

150MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED
ON ELEVATION)

150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANELS C/W


PLASTERING & PAINT ON BOTH SIDES (2HR FIRE RATED) (UP TO UNDER
SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)

150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANELS C/W


PLASTERING & PAINT ON BOTH SIDES (4HR FIRE RATED) (UP TO UNDER
SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)

150MM THK. FIRE RATED BRICK WALL (2HR FIRE RATED) C/W
PLASTERING & PAINT ON BOTH SIDES (UP TO UNDER SIDE OF FLOOR SLAB
SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
ISSUE DATE DESCRIPTION

230MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED
ON ELEVATION)
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
ALUMINUM PANEL C/W INSULATION & CURTAIN WALL TO FACADE ELEVATION
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
ALUMINUM PANEL C/W INSULATION AND ALL ALUMN PANEL RUNNER 604 2933 800
www.arup.com
SUPPORT TO MANUFACTURER'S DETAIL
DESIGN ARCHITECT

SABArchitects
REMARK : 2 Nickerson Suite 200
Seattle, Wa 98109
- ALL THE STEEL COLUMNS NEED TO BE BOX-UP WITH DRY WALL PARTTION / 206 957 6400
www.sabarch.com
CLEANROOM PANEL UP TO CEILING LEVEL AT LEVEL 1 AND 2.
- PROVIDE PLASTER & PAINT TO WALLS LEFT UNFINISHED UNDER BUILDING CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
SHEEL PACKAGE (REFER TO BUILDING SHEEL WALL KEY PLAN DRAWING) Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
HR
Penang, Malaysia
604 228 8852
www.byggroup.com

HR HR HR HR HR HR MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
IDF-CER3-3.2 IDF-CER2-3.2 IDF-CER1-3.2 7L-3 Asas Center
17 m² 16 m² 16 m² Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
UP HR HR HR HR HR DN
HR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
HR 2 STOREY SUBSTATION
HR HR HR HR HR
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


MECHANICAL MECHANICAL MECHANICAL
MEZZENE MEZZENE MEZZENE
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
2654 m² 2729 m² 2693 m² PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

VOID VOID VOID


VOID VOID VOID VOID

PROJECT NUMBER

278585-00

PACKAGE

HR HR HR HR HR
CERs FIT OUT

HR DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

VOID DATE

28-MAY-2021

SCALE

1 : 300
IDF-CER1-3.1
17 m² DRAWING STATUS

HR HR HR HR HR HR
100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WALL KEY PLAN
SHEET 02

LEVEL 2A FLOOR PLAN - WALL KEY PLAN LEVEL 3 FLOOR PLAN - WALL KEY PLAN
CR_A3602
28/5/2021 8:26:23 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

GENERAL PURPOSE GENERAL PURPOSE GENERAL PURPOSE


ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: ELECTRICAL: MAIN ELECTRICAL: 11KV ELECTRICAL: MAIN ELECTRICAL: 11KV
PRODUCTION PRODUCTION PRODUCTION
SWITCHGEAR 3 TRANSFORMER 3 ESSENTIAL 2 SWITCHGEAR 2 TRANSFORMER 2 SWITCHGEAR 1 TRANSFORMER 1
53 m² 53 m² 53 m²
111 m² 56 m² 113 m² 111 m² 56 m² 111 m² 56 m²
HR

A3
HR HR HR HR HR HR

ELECTRICAL
97 m²

HR HR HR

HR HR DN
HR

MECHANICAL MECHANICAL MECHANICAL


MEZZENE MEZZENE MEZZENE
2654 m² 2729 m² 2693 m²

HR HR HR

HR HR HR

VOID VOID VOID


VOID VOID

ELECTRICAL HVAC ELECTRICAL HVAC ELECTRICAL HVAC


SWITCH ROOM 3 SWITCH ROOM 2 SWITCH ROOM 1
87 m² 87 m² 87 m²

HR HR HR

HR HR HR

ISSUE DATE DESCRIPTION

WATERPROOFING LEGEND :
HR

CONCRETE CONCRETE CONCRETE


FLOOR FLOOR FLOOR CEMENTITIOUS WATERPROOFING
HR HR Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
CONCRETE CONCRETE www.dexcom.com
HR
ROOF HR ROOF HR
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

LEVEL 3 FLOOR PLAN - WATERPROOFING KEY PLAN DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

SOLUTIONS MECHANICAL AND ELECTRICAL ENGINEER


WASH ROOM
121 m²
MANUFACTURING
137 m²
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

1 : 300

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WATERPROOFING KEY PLAN

LEVEL 1 FLOOR PLAN - WATERPROOFING KEY PLAN LEVEL 2 FLOOR PLAN - WATERPROOFING KEY PLAN
CR_A3701
28/5/2021 8:27:17 PM

STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

C23 C22 C21 C20 C19 C18 C17 C16 C15 C14 C13 C12 C11 C10 C9 C8 C7 C6 C5 C4 C3 C2 C1 N
69.00 69.00 64.00
12.00 12.00 12.00 12.00 8.00 8.00 4.00 1.00 12.00 12.00 12.00 12.00 8.00 8.00 4.00 1.00 12.00 12.00 12.00 12.00 8.00 8.00
PERFORMANCE ALUMN. LOUVRES
EXTERIOR FINISH MATERIAL LEGEND :
C/W ANTI-VERMIN NETTING THIS FACADE AREA UNDER CUB PACKAGES PERFORMANCE ALUMN. LOUVRES ALUMN SOLID PANEL C/W PERFORMANCE ALUMN. LOUVRES ALUMN SOLID PANEL C/W
& PAINT TO MATCH MP-3
C/W ANTI-VERMIN NETTING INSULATION TO DETAIL C/W ANTI-VERMIN NETTING INSULATION TO DETAIL
& PAINT TO MATCH MP-3

1.00
MP-3 ALUMN SOLID PANEL C/W ALUMN SOLID PANEL C/W MP-3 MP-3 & PAINT TO MATCH MP-3
INSULATION TO DETAIL INSULATION TO DETAIL

MP-1 = 500x3000MM RAL# 7047 EGGSHELL


A3

1.20
27.90

Roof Plan
1.00 3.40

25.90

2.70
THIS FACADE AREA UNDER WAREHOUSE PACKAGES THIS FACADE AREA UNDER WAREHOUSE PACKAGES
THIS FACADE AREA UNDER CUB PACKAGES Level 3A Floor Plan

7.20
23.20

4.50
MP-2 = 1000x2000MM RAL# 7038 METALLIC
Level 3 Floor Plan
27.715

27.715
18.70

3.60
ROLLER SHUTTER TO
DETAIL
Level 2A Floor Plan

21.60
7.20
(WALKABLE CEILING LEVEL) 15.10
3.60

3.60
Level 2 Floor Plan
11.50 MP-3 = 2000x1000MM RAL# 9022 EGGSHELL

2.70
Level 1A Floor Plan

7.20
8.80
THIS FACADE AREA UNDER CUB PACAKAGES

4.50
Level 1 Floor Plan
4.30

MP-8 = 250mm x 500mm RAL# 7043 EGGSHELL

OVERALL ELEVATION - CER NORTH


4 1 : 200

MP-9 = JOINT FREE RAL# 7047 METALLIC


C1 C2 C3 C4 C5 C6 C7C8 C9 C10 C11 C12 C13 C14 C15
C16 C17 C18 C19 C20 C21 C22 C23
ISSUE DATE DESCRIPTION

202.00
1.00 1.00
8.00 8.00 12.00 12.00 12.00 12.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00

MP-3 MP-2 MP-3 MP-3 MP-2 MP-3 MP-3 MP-2 MP-3


SC-1 SC-1 Dexcom
PERFORMANCE ALUMN. LOUVRES PERFORMANCE ALUMN. LOUVRES PERFORMANCE ALUMN. LOUVRES P1 = PMS 369 PANTONE GREEN 6340 Sequence Drive
San Diego, CA 92121
C/W ANTI-VERMIN NETTING C/W ANTI-VERMIN NETTING C/W ANTI-VERMIN NETTING
& PAINT TO MATCH MP-1 MP-2 & PAINT TO MATCH MP-1 MP-2 SC-1 & PAINT TO MATCH MP-1
888 738 3646
SC-1 SC-1 www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
MP-1 MP-1 MP-1 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
Roof Plan www.arup.com
P-1 P-1 P-1 25.90 SC-1 = RAL# 7043 METALLIC

2.70
DESIGN ARCHITECT
Level 3A Floor Plan
SABArchitects

7.20
23.20
2 Nickerson Suite 200

4.50
4.00

3.20

3.20
Seattle, Wa 98109
WD-1 WD-1 WD-1 WD-1 206 957 6400
www.sabarch.com
SC-1 Level 3 Floor Plan
8.00
18.70
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

3.60
WD-1
Level 2A Floor Plan WD-1 = WOOD SLAT PER MANUF RAL#TBD Arup Jururunding Sdn Bhd

7.72

7.72

21.60
7.20
Gurney Paragon Mall Level 6
EGGSHELL

19.88

19.88
Lots L6.01 to L6.09
(WALKABLE CEILING LEVEL) 15.10 163-D Persiaran Gurney

3.60
10250 Penang Malaysia
604 2933 800
Level 2 Floor Plan www.arup.com

13.90
11.50

2.70
ARCHITECT
Level 1A Floor Plan
BYG Architecture Sdn. Bhd.

7.20
8.80 12A, Arratoon Road 10050
5.50

Penang, Malaysia

4.50
604 228 8852
www.byggroup.com
Level 1 Floor Plan

1.00
4.30 MECHANICAL AND ELECTRICAL ENGINEER
MP-8 MP-9 MP-8 MP-8 MP-1 Pen Konsult Sdn Bhd
SKY BRIDGE OPENING SKY BRIDGE OPENING 7L-3 Asas Center
MP-9 MP-9 Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

OVERALL ELEVATION - CER SOUTH


QUANTITY SURVEYOR
Unitech QS Consultancy
3 1 : 200
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

CA2 CA1 CA CB CC CD CE CF CG CH CJ UA PROJECT NAME


WA CJ CH CG CF CE CD CC CB CA CA1 CA2 PROPOSED MANUFACTURING FACILITY CONSISTING OF:
8.00 88.00
88.00 8.00
3 STOREY CERP
1.40 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 4.00 4.00 4.00 4.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 1.40 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
SC-1 METAL FLASHING PAINT 7 STOREY OFFICE HEAD BUILDING
METAL FLASHING PAINT METAL FLASHING PAINT TO MATCH MP-3 7 STOREY PARKING STRUCTURE
MP-3 TO MATCH MP-3
PERFORMANCE ALUMN. LOUVRES MP-3 TO MATCH MP-3 4.0° MP-3 MP-2 MP-1 MP-3 2 STOREY SUBSTATION
C/W ANTI-VERMIN NETTING
& PAINT TO MATCH MP-3 3 NOS OF GUARDHOUSE
ALUMN SOLID PANEL C/W ALUMN SOLID PANEL C/W
MP-1 INSULATION TO DETAIL INSULATION TO DETAIL
4.0° AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
4.9° PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
3.60 1.00 3.60 1.00 10.00 1.00 10.00 1.00 10.00 1.00 10.00 1.00 10.00 PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
4.9°
STEEL DOOR TO DETAIL
2.00

SC-1
Roof Plan 4.9° Roof Plan
25.90 SC-1 25.90
78

2.70

2.70
PROJECT NUMBER
Level 3A Floor Plan Level 3A Floor Plan
278585-00
7.20

7.20
23.20 23.20
P-1 MP-1
4.50

4.50
PACKAGE
PERFORMANCE ALUMN. LOUVRES MP-2
MP-2 CERs FIT OUT
C/W ANTI-VERMIN NETTING Level 3 Floor Plan Level 3 Floor Plan
& PAINT TO MATCH MP-2
18.70 18.70 DESIGNED DRAWN CHECKED APPROVED
3.60

3.60
Level 2A Floor Plan Level 2A Floor Plan BEN YEOH CL LEE SK.HO BEN YEOH
21.60

21.60
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

7.20

7.20
4.80

9.40
19.88
15.10 15.10

5.00
(WALKABLE CEILING LEVEL) (WALKABLE CEILING LEVEL)
DATE
3.60

3.60
28-MAY-2021
1.00

Level 2 Floor Plan Level 2 Floor Plan


11.50 11.50 SCALE
2.70

2.70
Level 1A Floor Plan P-1 Level 1A Floor Plan
MP-3 1 : 200
7.20

7.20
8.80 8.80
4.80

5.50

5.50
DRAWING STATUS
4.50

4.50
MP-3

1.00
4.20

4.20
Level 1 Floor Plan Level 1 Floor Plan 100% OF PHASE 4 CONSTRUCTION DOCUMENTS
15

4.30 4.30
DRAWING TITLE
ALUMN SOLID PANER C/W R.C WALL / BEAM TO ALUMN SOLID PANER C/W R.C WALL / BEAM TO
ALUMN SOLID PANER C/W R.C WALL / BEAM TO ALUMN FRAME DOUBLE R.C WALL / BEAM TO
INSULATIONTO DETAIL MP-1 ENGR'S DETAIL MP-2 MP-3 INSULATIONTO DETAIL ENGR'S DETAIL ARCHITECTURAL
INSULATIONTO DETAIL MP-3 ENGR'S DETAIL GLAZING WINDOW TO DETAIL ENGR'S DETAIL ELEVATION

CR_A4001
OVERALL ELEVATION - CER WEST OVERALL ELEVATION - CER EAST
28/5/2021 8:27:57 PM

1 1 : 200
2 1 : 200
STAMP

IFC – 100% CD
© Arup
KEY PLAN
TRUE NORTH

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
64.00 69.00 69.00

8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00

A3
DOUBLE DECK ROOF C/W ALUMN SOLID PANEL C/W DOUBLE DECK ROOF C/W DOUBLE DECK ROOF C/W ALUMN SOLID PANEL C/W DOUBLE DECK ROOF C/W DOUBLE DECK ROOF C/W ALUMN SOLID PANEL C/W DOUBLE DECK ROOF C/W
INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL INSULATION TO DETAIL

TRUSS SPACE TO TRUSS SPACE TO TRUSS SPACE TO


ENGR'S DETAIL ENGR'S DETAIL ENGR'S DETAIL

SC-1 SC-1
Roof Plan
TRUSS SPACE TO TRUSS SPACE TO 25.90

2.70
ALUMN SOLID PANEL C/W CONCRETE ROOF ENGR'S DETAIL ALUMN SOLID PANEL C/W CONCRETE ROOF ENGR'S DETAIL ALUMN SOLID PANEL C/W CONCRETE ROOF
TO ENGR'S DETAIL INSULATION TO DETAIL TO ENGR'S DETAIL INSULATION TO DETAIL TO ENGR'S DETAIL
INSULATION TO DETAIL Level 3A Floor Plan
23.20
MP-2 MP-2
MECHANICAL

4.50

4.50

4.50

4.50
MECHANICAL MECHANICAL
MEZZENE ALUMN FRAME DOUBLE MEZZENE ALUMN FRAME DOUBLE MEZZENE
2654 m² 2729 m² 2693 m²
GLAZING WINDOW TO DETAIL GLAZING WINDOW TO DETAIL
Level 3 Floor Plan
18.70

3.60
ALUMN FRAME DOUBLE STRUCTURE SUPPORT ROLLER SHUTTER STRUCTURE SUPPORT WALKABLE CEILING STRUCTURE SUPPORT
CEILING ROLLER SHUTTER WALKABLE CEILING
GLAZING WINDOW TO DETAIL TO ENGR'S DETAIL TO DETAIL TO ENGR'S DETAIL TO ENGR'S DETAIL
TO DETAIL
Level 2A Floor Plan

21.60
7.20

7.20

7.20
(WALKABLE CEILING LEVEL) 15.10
CORRIDOR SERVICE CORRIDOR CER-P2
3.60

3.60

3.60

3.60

3.60

3.60

3.60
CORRIDOR CER-P3 CORRIDOR SERVICE CORRIDOR CER-P1
603 m² SERVICE CORRIDOR 2790 m² 613 m² 32 m² 2791 m² 610 m² 32 m² 2791 m²
32 m²
Level 2 Floor Plan
11.50

2.20

2.20

2.20

2.70
STRUCTURE SUPPORT STRUCTURE SUPPORT STRUCTURE SUPPORT
TO ENGR'S DETAIL CEILING TO ENGR'S DETAIL
CEILING
TO ENGR'S DETAIL
CEILING Level 1A Floor Plan

7.20

7.20

7.20
CEILING CEILING
8.80
MANUFACTURING

5.00

5.00

5.00

5.00
KITTING / GENERAL PURPOSE

4.50
ENGINEERING KITTING / GENERAL PURPOSE KITTING SUPPLIES CORRIDOR KITTING /
3.60

3.60

3.60

3.60

3.60

3.60
CORRIDOR CORRIDOR CORRIDOR PACKAGING PRODUCTION CORRIDOR QUALITY RELEASE
STORE PACKAGING PRODUCTION OFFICE 247 m² PACKAGING
263 m² 271 m² 247 m² 1715 m² 195 m² 271 m² 102 m²
264 m² 1715 m² 103 m² 263 m² 1715 m²
Level 1 Floor Plan
4.30

SECTION 4
4 1 : 200

ISSUE DATE DESCRIPTION

CA2 CA1 CA CB CC CD CE CF CG CH CJ WA
DOUBLE DECK ROOF C/W
8.00 88.00 INSULATION TO DETAIL Dexcom
ALUMN SOLID PANEL C/W 6340 Sequence Drive
INSULATION TO DETAIL San Diego, CA 92121
4.00 4.00 11.00 11.00 11.00 11.00 11.00 11.00
GUTTER TO DETAIL
11.00 11.00 888 738 3646
www.dexcom.com
SC-1 PERFORMANCE ALUMN. LOUVRES
4.9° C/W ANTI-VERMIN NETTING
ALUMN SOLID PANEL C/W ALUMN SOLID PANEL C/W PROJECT LEAD
INSULATION TO DETAIL INSULATION TO DETAIL
MP-2 Arup Jururunding Sdn Bhd
MP-1 4.9°
Gurney Paragon Mall Level 6
DOUBLE DECK ROOF C/W Lots L6.01 to L6.09
TRUSS SPACE TO
SC-1 INSULATION TO DETAIL 163-D Persiaran Gurney
ALUMN SOLID PANEL C/W ENGR'S DETAIL
10250 Penang Malaysia
INSULATION TO DETAIL
604 2933 800
4.9° Roof Plan www.arup.com
CONCRETE FLOOR 25.90

2.70
TO ENGR'S DETAIL DESIGN ARCHITECT
Level 3A Floor Plan
23.20 SABArchitects
DOUBLE DECK ROOF C/W 2 Nickerson Suite 200

4.50

4.50
INSULATION TO DETAIL GENERAL PURPOSE Seattle, Wa 98109
PRODUCTION 206 957 6400
GUTTER TO DETAIL
www.sabarch.com

8.10
25 m² Level 3 Floor Plan
18.70
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

3.60
STRUCTURE SUPPORT
TO ENGR'S DETAIL
Level 2A Floor Plan Arup Jururunding Sdn Bhd

21.60
ALUMN FRAME DOUBLE Gurney Paragon Mall Level 6
9.40

CORRIDOR
GLAZING WINDOW TO
GENERAL PURPOSE
(WALKABLE CEILING LEVEL) 15.10 Lots L6.01 to L6.09
DETAIL 163-D Persiaran Gurney

3.60
CORRIDOR
434 m² PRODUCTION 10250 Penang Malaysia
613 m²
28 m² 604 2933 800
Level 2 Floor Plan www.arup.com

11.50
ARCHITECT
Level 1A Floor Plan
BYG Architecture Sdn. Bhd.

7.20
8.80 12A, Arratoon Road 10050
5.50

5.00
MATERIAL SUPER Penang, Malaysia
HIGHWAY C 604 228 8852
116 m² www.byggroup.com
Level 1 Floor Plan
4.30 MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
SECTION 3 Unitech QS Consultancy
3 1 : 200
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


CA2 CA1 CA CB CC CD CE CF CG CH CJ CA2 CA1 CA CB CC CD CE CF CG CH CJ
3 STOREY CERP
1 STOREY WAREHOUSE
96.00 96.00 3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
4.00 4.00 11.00 11.00 11.00 22.00 11.00 11.00 11.00 4.00 4.00 11.00 11.00 11.00 22.00 11.00 11.00 11.00 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
MP-3 DOUBLE DECK ROOF C/W DOUBLE DECK ROOF C/W
INSULATION TO DETAIL INSULATION TO DETAIL 3 NOS OF GUARDHOUSE
ALUMN SOLID PANEL C/W
4.0° DOUBLE DECK ROOF C/W ALUMN SOLID PANEL C/W INSULATION TO DETAIL AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
ALUMN SOLID PANEL C/W 4.0° DOUBLE DECK ROOF C/W
MP-3 INSULATION TO DETAIL INSULATION TO DETAIL
INSULATION TO DETAIL INSULATION TO DETAIL PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
MP-3 PERAI SELATAN.
4.0° 4.9° 4.0° GUTTER
GUTTER TO
TO DETAIL
DETAIL 4.9°
FOR DEXCOM (M) SDN. BHD.
PERFORMANCE ALUMN. LOUVRES
C/W ANTI-VERMIN NETTING TRUSS SPACE TO
STEEL DOOR TO DETAIL ALUMN SOLID PANEL C/W ENGR'S DETAIL
INSULATION TO DETAIL PERFORMANCE ALUMN. LOUVRES
TRUSS SPACE TO C/W ANTI-VERMIN NETTING
DOUBLE DECK ROOF C/W TRUSS SPACE TO
4.9°

2.00
D1-D1a ENGR'S DETAIL
INSULATION TO DETAIL ENGR'S DETAIL
SC-1
Roof Plan Roof Plan
TRUSS SPACE TO PROJECT NUMBER
TRUSS SPACE TO CONCRETE ROOF 25.90 ENGR'S DETAIL CONCRETE ROOF 25.90
2.70

2.70
ENGR'S DETAIL TO ENGR'S DETAIL TO ENGR'S DETAIL 278585-00
Level 3A Floor Plan DOUBLE DECK ROOF C/W
Level 3A Floor Plan

7.98
INSULATION TO DETAIL
DOUBLE DECK ROOF C/W 23.20 23.20 PACKAGE
INSULATION TO DETAIL MECHANICAL MECHANICAL
4.50

4.50

4.50

4.50

4.50
ELECTRICAL: MAIN MEZZENE
MEZZENE GUTTER TO DETAIL ALUMN FRAME DOUBLE ELECTRICAL: CERs FIT OUT
GUTTER TO DETAIL CLEANROOM CLEANROOM SWITCHGEAR 3 2654 m²
2654 m² GLAZING WINDOW TO DETAIL ESSENTIAL 3
3.0° SANDWICHED PANEL SANDWICHED PANEL 111 m²
Level 3 Floor Plan 113 m² Level 3 Floor Plan DESIGNED DRAWN CHECKED APPROVED
18.70 18.70
BEN YEOH CL LEE SK.HO BEN YEOH
3.60

3.60

3.60
1200MM HEIGHT LOW DRY
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

STRUCTURE SUPPORT WALKABLE CEILING WALKABLE CEILING ALUMN FRAME CEILING WALL PARTITION
TO ENGR'S DETAIL CEILING
DOUBLE
Level 2A Floor Plan Level 2A Floor Plan
21.60

21.60
DATE

7.20
7.00

7.00

GLAZING
9.40

WINDOW TO MANUFACTURING
SOLUTIONS (WALKABLE CEILING LEVEL) 15.10 DETAIL MEN'S ENGINEERING (WALKABLE CEILING LEVEL) 15.10
MANUFACTURING CORRIDOR 28-MAY-2021
3.60

3.60

3.60

3.60

3.60

3.60
RESTROOM WORKSHOP MAL PAL OPEN OFFICE GOWNING A PAL SERVICE CORRIDOR PAL GOWNING B SENSOR WIP MANUFACTURING WALKABLE CEILING

3.00
ALUMN FRAME DOUBLE CER-P3 137 m² 603 m² CORRIDOR 17 m² 124 m² 94 m² 9 m² 32 m² 9 m² 94 m² 69 m²
117 m² 7 m² 18 m² SUPPORT
GLAZING WINDOW TO 2790 m²
DETAIL Level 2 Floor Plan 536 m² 88 m² Level 2 Floor Plan SCALE
11.50 PIPING SERVICE 11.50
2.70

2.70
ALUMN FRAME ACCESS ROOM 1 CONCRETE ROOF CEILING 1 : 200
STRUCTURE SUPPORT
TO ENGR'S DETAIL
Level 1A Floor Plan DOUBLE 86 m² CEILING
TO ENGR'S DETAIL Level 1A Floor Plan
CEILING GLAZING STRUCTURE SUPPORT
DRAWING STATUS
7.20

7.20
CEILING 8.80 WINDOW TO TO ENGR'S DETAIL 8.80
5.50

DETAIL
5.00

5.00
CEILING MATERIAL SUPER GENERAL PURPOSE MANUFACTURING
4.50

4.50

4.50

4.50
MATERIAL STAGING MATERIAL SUPER
MEN'S ENGINEERING 100% OF PHASE 4 CONSTRUCTION DOCUMENTS
3.60

3.60

3.60

3.60
KITTING / HIGHWAY B PRODUCTION RUPS AHU ELECTRICAL HIGHWAY B
505 m² RUPS
PACKAGING 684 m² CORRIDOR RESTROOM 262 m² STORE 48 m²
35 m² 140 m² 684 m²
551 m² 17 m² 264 m²
1715 m² Level 1 Floor Plan Level 1 Floor Plan
DRAWING TITLE
4.30 4.30
ARCHITECTURAL
SECTION

CR_A5001
28/5/2021 8:29:17 PM

SECTION 1 SECTION 2
1 1 : 200
2 1 : 200
STAMP

IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH
G.L WA CJ CH CG CF CE CD CC CB CA CA1 CA2
N
88.00 8.00

1.40 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 4.00 4.00

C1
3.60 1.00 3.60 1.00 10.00 100 10.00 100 10.00 100 10.00 100 10.00 A3

2.00
ROOF PLAN
G.L 25.90

78

2.70
LEVEL 3A FLOOR PLAN

7.20
23.20

4.50
30.45
LEVEL 3 FLOOR PLAN

27.715
18.70
C1

3.60
LEVEL 2A FLOOR PLAN

21.60
7.20
4.80

9.40
16.00

3.60
1.00
LEVEL 2 FLOOR PLAN
11.50

2.70
LEVEL 1A FLOOR PLAN

7.20
8.80

4.80

5.50

4.50
MP-3

4.20
LEVEL 1 FLOOR PLAN

2.22
4.30

ELEVATION WEST

DETAIL 1

LEVEL 2

ROOF PLAN ROOF PLAN


G.L

ISSUE DATE DESCRIPTION

LEVEL 3A FLOOR PLAN LEVEL 3A FLOOR PLAN

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
LEVEL 2
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
DETAIL 4 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
LEVEL 3 FLOOR PLAN LEVEL 3 FLOOR PLAN 206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

G.L BYG Architecture Sdn. Bhd.


DETAIL 2 12A, Arratoon Road 10050
Penang, Malaysia
LEVEL 2A FLOOR PLAN LEVEL 2A FLOOR PLAN 604 228 8852
www.byggroup.com
(WALKABLE CEILING LEVEL) (WALKABLE CEILING LEVEL)

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
G.L
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
LEVEL 2 FLOOR PLAN LEVEL 2 FLOOR PLAN 04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
LEVEL 1A FLOOR PLAN LEVEL 1A FLOOR PLAN 3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
LEVEL 1 PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DETAIL 6 PROJECT NUMBER

278585-00

PACKAGE

DETAIL 3 DETAIL 5 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

LEVEL 1 FLOOR PLAN LEVEL 1 FLOOR PLAN BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

TYPICAL SECTION 1 TYPICAL SECTION 2 28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
SECTION - ENLARGEMENT DETAIL
SHEET 01

DETAIL 7 CR_A5002
24/5/2021 10:45:26 AM

STAMP

ENLARGEMENT DETAIL IFC – 100% CD


1
© Arup
KEY PLAN

TRUE NORTH

A3

G.L G.L

G.L

FLOOR

ISSUE DATE DESCRIPTION


LEVEL 2 FLOOR PLAN (WINDOW AREA)

G.L G.L
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
G.L Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
FLOOR
DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

LEVEL 2 FLOOR PLAN BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

G.L G.L MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

G.L QUANTITY SURVEYOR


Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


FLOOR
3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

LEVEL 1 FLOOR PLAN (WINDOW AREA)

PROJECT NUMBER
G.L G.L
278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

G.L BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

AS SHOWN

FLOOR DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
SECTION - ENLARGEMENT DETAIL
SHEET 02

CR_A5003
24/5/2021 10:45:26 AM

LEVEL 1 FLOOR PLAN


STAMP

ENLARGEMENT DETAIL - FLOOR PLAN VIEW IFC – 100% CD


1
© Arup
KEY PLAN
CA2 CA1 CA CB CC CD CE CF CG CH CJ WA TRUE NORTH

8.00 88.00
N
4.00 4.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
CA2 CA1 CA CB CC CD CE CF CG CH CJ WA
8.00 88.00
4.00 4.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
4.0°

CA2 CA1 CA 4.0° 4.9°


4.9°

4.9°

A3

2.00
4.9°
ROOF PLAN ROOF PLAN
25.90 25.90

11.45

2.70
2.70
LEVEL 3A FLOOR PLAN LEVEL 3A FLOOR PLAN

7.98

7.20
ELECTRICAL
23.20 23.20
ESSENTIAL ELECTRICAL

4.50

4.50

4.50
4.50

4.50

4.50
MECHANICAL
MECHANICAL DISTRIBUTION ROOM STAIRCASE 6 BATTERY ROOM 2
2729 m²
34 m² 25 m²

30.45
2654 m² 3
113 m² LEVEL 3 FLOOR PLAN LEVEL 3 FLOOR PLAN

95
18.70 18.70

3.60
3.60
LEVEL 2A FLOOR PLAN LEVEL 2A FLOOR PLAN

21.60
21.60
7.20
4.80

6.25

9.40
9.40

19.88
16.00 16.00

4.50

4.50

3.60
3.60
CER 3
5779 m²
LEVEL 2 FLOOR PLAN LEVEL 2 FLOOR PLAN

1.00

95
11.50 11.50

2.70

2.70
LEVEL 1A FLOOR PLAN LEVEL 1A FLOOR PLAN

7.20
7.20
8.80 8.80

4.80

6.25

5.50
5.50

5.00
4.50

4.50

4.50
LEVEL 1 FLOOR PLAN LEVEL 1 FLOOR PLAN

1.00
15
4.30 4.30

CG

G.L

ROOF PLAN

ISSUE DATE DESCRIPTION

ROOF PLAN

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
LEVEL 3A FLOOR PLAN www.dexcom.com

PROJECT LEAD
TYPICAL DETAIL Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
LEVEL 3A FLOOR PLAN 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
DETAIL 2 - SECTION VIEW 2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
LEVEL 3 FLOOR PLAN Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

LEVEL 3 FLOOR PLAN ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
LEVEL 2A FLOOR PLAN 10350 Penang
(WALKABLE CEILING LEVEL) Malaysia
604 2282 515
www.penkonsult.com

LEVEL 2A FLOOR PLAN QUANTITY SURVEYOR


Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
LEVEL 2 04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

LEVEL 2 FLOOR PLAN 3 STOREY CERP


1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
LEVEL 2 FLOOR PLAN
3 NOS OF GUARDHOUSE
DETAIL 4
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

LEVEL 1A FLOOR PLAN

PROJECT NUMBER
LEVEL 1A FLOOR PLAN
278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE
LEVEL 1
28-MAY-2021

SCALE
LEVEL 1 FLOOR PLAN
AS SHOWN

DRAWING STATUS
LEVEL 1 FLOOR PLAN
100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
SECTION - ENLARGEMENT DETAIL
SHEET 03

DETAIL 5
CR_A5004
24/5/2021 10:45:26 AM

DETAIL 3- SECTION
DETAIL 1- SECTION
STAMP

ENLARGEMENT DETAIL IFC – 100% CD


1
© Arup
KEY PLAN
CA2 CA1 CA CB CC CD CE CF CG CH CJ WA TRUE NORTH

N
8.00 88.00

4.00 4.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 1.40

MP-3
4.0°

4.0° 4.9°

A3
4.9°

ROOF PLAN
25.90

11.50

2.70
LEVEL 3A FLOOR PLAN

7.20
ELECTRICAL MAIN

4.50

4.50
MECHANICAL SWITCHGEAR ROOM 23.20
2654 m² 3
30.45

111 m²
LEVEL 3 FLOOR PLAN

75
18.70

3.60
LEVEL 2A FLOOR PLAN

21.60
7.20
7.00

7.20
6.25
9.40

19.88

16.00

4.50

3.60
CER 3
5779 m²
LEVEL 2 FLOOR PLAN
11.50
LEVEL 1A FLOOR PLAN

7.20

7.20
7.20
8.80
5.50

4.50
CEP 3
4789 m²
LEVEL 1 FLOOR PLAN
4.30

SECTION 1

CA2 CA1 CA

CA1 CA

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
LEVEL 3A FLOOR PLAN San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


LEVEL 3 FLOOR PLAN Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER

LEVEL 2A FLOOR PLAN Pen Konsult Sdn Bhd


7L-3 Asas Center
(WALKABLE CEILING LEVEL) Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
DETAIL 2 www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

LEVEL 2 FLOOR PLAN PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
LEVEL 1A FLOOR PLAN

PROJECT NUMBER
LEVEL 1
278585-00

PACKAGE

CERs FIT OUT

TYPICAL DETAIL LEVEL 2 DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021
LEVEL 1 FLOOR PLAN
SCALE

AS SHOWN
DETAIL 4
DETAIL 3 DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
SECTION - ENLARGEMENT DETAIL
SHEET 04

CR_A5005
24/5/2021 10:45:26 AM

DETAIL 1- SECTION
STAMP

ENLARGEMENT DETAIL IFC – 100% CD


1
© Arup
KEY PLAN
CK CHIMNEY PLATFORM 3 CHIMNEY PLATFORM 2 CHIMNEY PLATFORM 1 TRUE NORTH

CA1 CA
N

4.9°

4.9°

4.9°

4.9°

4.9°
4.9°
CH

D4
A3
D3 D3

CG

CF

CE

4.0°

4.0°
4.0°

CD
66.03

66.03

66.03
4.9°

4.9°
CC

16.61 16.61 16.61

CB

ISSUE DATE DESCRIPTION

CA
D1 D1 D1

CA1 Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
CA2 D2 D2 D2 www.dexcom.com

ROOF PLAN C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
C15 C16 C17 C2 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
4.9°

2 Nickerson Suite 200


4.9°

Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


4.9°

4.9°
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

CG BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com
CG

MECHANICAL AND ELECTRICAL ENGINEER

SECTION Pen Konsult Sdn Bhd


7L-3 Asas Center
Jalan Gottlieb

TYPICAL DETAIL 10350 Penang


Malaysia
604 2282 515
www.penkonsult.com
4.9°

QUANTITY SURVEYOR
Unitech QS Consultancy
4.0°

SDN BHD
4.0°

4.0°

12A-A, Menara Northam, 55, Jalan


Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
DETAIL 3 - DETAIL 4 - Web/Email: admin@uqs.com.my

PLAN VIEW PLAN VIEW PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
C23 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
C23 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
CA CA FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00
4.9°

4.9°

PACKAGE
4.9°

4.9°

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

CA1 CA1 DRAWING TITLE

ARCHITECTURAL
SECTION - ENLARGEMENT DETAIL
SHEET 05

CR_A5006
24/5/2021 10:45:26 AM

DETAIL 1 - PLAN VIEW DETAIL 2 - PLAN VIEW


ELEVATION 1 STAMP

ENLARGEMENT DETAIL IFC – 100% CD


1
© Arup
KEY PLAN

TRUE NORTH

Refer Detail A

TYPICAL DETAIL A

X
TYPICAL DETAIL X - THIN BED ADHESIVE BETWEEM PANELS

R.C FLOOR

Refer Detail B
BOLLARD - ELEVATION VIEW

ISOMETRIC VIEW ELEVATION VIEW 10-20mm gap TYPICAL DETAIL B

TYPICAL STEEL COLUMN & BEAM FINISHES DETAIL TYPICAL LIGHT WEIGHT CONCRETE PANELS DETAIL TYPICAL M.S BOLLARD DETAIL
11 11 12

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
DETAIL 6.1 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
DETAIL 7.1 DETAIL 7.2 www.arup.com

DESIGN ARCHITECT

SABArchitects
ELEVATION 1 2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
ISOMETRIC VIEW Malaysia
604 2282 515
TYPICAL SECTION www.penkonsult.com

TYPICAL FIRE RATED/NON-FIRE RATED DRYWALL PARTITION TYPICAL FIRE RATED DRYWALL PARTITION QUANTITY SURVEYOR
ELEVATION 2 Unitech QS Consultancy
JUNCTION JOINT DETAIL JUNCTION JOINT DETAIL SDN BHD
12A-A, Menara Northam, 55, Jalan
6 TYPICAL DRYWALL PARTITION JUNCTION JOINT DETAIL 7 TYPICAL UTILITIES PENETRATION THROUGH FIRE WALL 8 TYPICAL CORNER GUARD DETAIL 9 TYPICAL PARTITION FIXING DETAIL 10 TYPICAL DRYWALL FRAMING SUPPORT AT DOOR OPENING Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
TYPICAL DRYWALL PARTITION DETAIL TYPICAL METAL FRAMING DRY WALL PARTITION DETAIL

PROJECT NUMBER

278585-00

PACKAGE

TYPICAL DRYWALL EXPANSION JOINT DETAIL PLAN VIEW CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE
TYPICAL 2-HOURS FIRE RATED DRYWALL PARTITION DETAIL TYPICAL METAL FRAMING FIRE RATED DRY WALL PARTITION DETAIL
AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WALL DETAIL
SHEET 01

PLAN VIEW CR_A7001


24/5/2021 10:45:26 AM

TYPICAL BRICK WALL SEPARATION JOINT DETAIL


TYPICAL DRYWALL DETAIL TYPICAL HALF GLASS PARTITION DETAIL TYPICAL DRYWALL DETAIL TYPICAL HALF GLASS PARTITION DETAIL
TYPICAL WATERPROOF/DRYWALL PARTITION DETAIL (FOR MORE THAN 3 METER HEIGHT) (FOR MORE THAN 3 METER HEIGHT)
STAMP

1 TYPICAL DRYWALL PARTITION DETAIL 2 TYPICAL DRYWALL PARTITION/BRICK WORK JOINTS DETAIL 3 TYPICAL WALL SEPARATION/EXPANSION JOINT DETAIL 4
TYPICAL STEEL COLUMN WITH DRYWALL /CLEANROOM PANEL
5 TYPICAL DRYWALL PARTITION SECTIONAL DETAIL IFC – 100% CD
ENCASEMENT DETAIL
© Arup
KEY PLAN

TRUE NORTH

12.00
WA
UA

1.40

1.40
DN
CJ
BMS COMPARTMENT BMS COMPARTMENT

3.80

3.80
3.85
BMS COMPARTMENT FREIGHT
3 m² 3 m² 3 m² ELEV

6.00

6.05

6.05
CORRIDOR CORRIDOR CORRIDOR
603 m² 613 m² 610 m²

11.00
PAL GENERAL PURPOSE
GENERAL PURPOSE PAL
CER SANITIZATION 7 m² COLD STORAGE CER SANITIZATION PRODUCTION CER SANITIZATION PAL COLD STORAGE FREIGHT
PRODUCTION 7 m² 7 m² 17 m²
GENERAL PURPOSE 12 m² 17 m² 12 m² COLD STORAGE 34 m² 12 m² ELEV
MAL 34 m² GENERAL PURPOSE MAL
PRODUCTION GENERAL PURPOSE 17 m²
ELECTRICAL GENERAL PURPOSE 28 m² PRODUCTION 26 m² GENERAL PURPOSE
25 m² PRODUCTION PRODUCTION
49 m² PRODUCTION 24 m²
24 m² 28 m² 28 m²
MAL
MANUFACTURING MANUFACTURING MANUFACTURING 21 m²

7.60
MATERIAL STAGING ELECTRICAL MATERIAL STAGING ELECTRICAL SUPPORT MATERIAL STAGING
SUPPORT SUPPORT

8.50
75 m² 49 m² 75 m² 49 m²
CH 88 m² SOLUTIONS 88 m² 88 m² 72 m²
MANUFACTURING SOLUTIONS SOLUTIONS
WASH ROOM 137 m² FREIGHT WASH ROOM MANUFACTURING FREIGHT WASH ROOM MANUFACTURING FREIGHT
121 m² ELEV 121 m² 137 m² ELEV 121 m² 137 m² ELEV
UP 4.34 5
3.60
DN
CHEM STORAGE CHEM STORAGE CHEM STORAGE
46 m² MAL STAIRCASE 6 46 m²
CAL CHECK MODULE STAIRCASE 3 CAL CHECK MODULE 46 m²
FREIGHT 43 m² 34 m² FREIGHT MAL FREIGHT
STAIRCASE 9

11.00

7.395
MAL MAINTENANCE MAL 34 m² MAINTENANCE MAL MAL
31 m² CAL CHECK MODULE
MAINTENANCE 51 m² ELEV 70 m² 51 m² ELEV 43 m² 70 m² 8.35 9.52
5
4.475 51 m² ELEV 38 m²
MAL UP DN MAL UP DN MAL
39 m²
58 m² 58 m² MAL 59 m²
25 m²
FREIGHT FREIGHT FREIGHT
ELEV ELEV ELEV
MAL MAL MAL MAL MAL MAL MAL MAL MAL
6 m² 6 m² 9 m² 6 m² 6 m² 9 m² 6 m² 6 m² 9 m²
CG
SENSOR WIP SENSOR WIP SENSOR WIP
69 m² 69 m² 69 m²

11.00
W3 W6 W6 W6 W6 W6 W6
W3 W3

GOWNING B GOWNING B GOWNING B


94 m² 93 m² 93 m²

CF
PAL PAL PAL
9 m² 9 m² 9 m²

2.25

2.25
EXIT B EXIT B EXIT B
20 m² 20 m² 20 m²

11.00

3.00

3.00

3.00
SERVICE CORRIDOR SERVICE CORRIDOR SERVICE CORRIDOR
32 m² 32 m² 32 m²

2.25

2.25

2.25
EXIT A EXIT A EXIT A
20 m² 20 m² 20 m²

88.00
CE
PAL PAL PAL
9 m² 9 m² 9 m²

CER-P3 CER-P2
2790 m² 2791 m²

11.00
W3

W3 CER-P1
W3 GOWNING A GOWNING A GOWNING A
W6 W6 W6 W6 W6 W6 2791 m²
94 m² 94 m² 94 m²

CD

W8 W7 W7
W7 W7 W7 W7 W8
W5
OPEN OFFICE OPEN OFFICE OPEN OFFICE

11.00
W8 W5 W5
124 m² 124 m² 124 m²

PAL PAL PAL

CC
18 m² 18 m² 18 m²

5 TYPICAL DRYWALL REINFORCEMENT FOR HANGING CABINETS, TV, DBS


MANUFACTURING
MANUFACTURING MAL MANUFACTURING MAL ENGINEERING MAL
ENGINEERING 7 m² ENGINEERING 7 m² WORKSHOP 7 m²

11.00
WORKSHOP WORKSHOP 117 m²
117 m² 117 m²

W4 W4
W4

CB WOMEN'S
WOMEN'S
RESTROOM FREIGHT MAL RESTROOM FREIGHT MAL
30 m²
WOMEN'S
RESTROOM FREIGHT
MAL
30 m²
ISSUE DATE DESCRIPTION
49 m² ELEV 30 m² 49 m² ELEV 49 m² ELEV

MAL MAL
MAL
31 m² 31 m²
31 m²

11.00
FREIGHT FREIGHT DN FREIGHT
DN DN 4.10 4.02
MEN'S ELEV DN MEN'S ELEV DN MEN'S ELEV
4.10 4.02 DN
RESTROOM RESTROOM STAIRCASE 2 RESTROOM
17 m² STAIRCASE 5 17 m² STAIRCASE 4 17 m² STAIRCASE 1
STAIRCASE 7 45 m² 43 m² 45 m²
STAIRCASE 8 45 m² 43 m²
43 m² ACCESSIBLE TOILET IDF-CER2-2.1
11 m² IDF-CER3-2.1 W9 W9 ACCESSIBLE TOILET 13 m² W9 W9 IDF-CER1-2.1 ACCESSIBLE TOILET
ELEV ELEV ELEV 15 m² 9 m²
13 m² 11 m²

CA W9 W9 W9 W9
WA7 WA7 CRAC CONDENSING

4.00
Dexcom
BMS COMPARTMENT
UNITS
2 m² CORRIDOR
BMS COMPARTMENT 7 m²
2 m²
CORRIDOR WA6 160 m² BMS COMPARTMENT

CA1

8.00
434 m² 2 m²
6340 Sequence Drive
San Diego, CA 92121
CORRIDOR WA5

4.00
536 m²

WA4 888 738 3646


CA2 www.dexcom.com

8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 PROJECT LEAD
64.00 69.00 69.00
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

12.00
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
WA Lots L6.01 to L6.09
UA 163-D Persiaran Gurney

1.40

1.40
CJ 10250 Penang Malaysia
FREIGHT
ELEV
604 2933 800
www.arup.com
MATERIAL SUPER MATERIAL SUPER MATERIAL SUPER
MATERIAL SUPER MATERIAL SUPER
HIGHWAY C HIGHWAY B HIGHWAY A

11.00
HIGHWAY B HIGHWAY A FREIGHT

10.895
116 m² 116 m²
ARCHITECT
684 m² 637 m² 599 m² ELEV

BMS COMPARTMENT BMS COMPARTMENT


BMS COMPARTMENT 2 m²

BYG Architecture Sdn. Bhd.


2 m² 2 m²

CH 12A, Arratoon Road 10050


STAIRCASE 9 FREIGHT STAIRCASE 6 FREIGHT STAIRCASE 3 FREIGHT
CORRIDOR
31 m² ELEV 35 m² ELEV 35 m² ELEV Penang, Malaysia
604 228 8852

27.94
15 m² UP

6.24
ELECTRICAL ELECTRICAL
ELECTRICAL 59 m²
59 m²
48 m²
FREIGHT 3.46 5
FREIGHT 3.46 5
FREIGHT
www.byggroup.com

11.00
WASTE-OUT
ELEV ELEV ELEV
64 m²
UP UP
FINISHED GOODS FINISHED GOODS
STAGING MATERIAL STAGING STAGING MATERIAL STAGING FINISHED GOODS MATERIAL STAGING
WASTE-OUT
MECHANICAL AND ELECTRICAL ENGINEER
198 m² 505 m² FREIGHT 214 m² 505 m² FREIGHT STAGING 505 m² FREIGHT
ELEV ELEV 213 m² ELEV 65 m²

*** NOTE :- CG Pen Konsult Sdn Bhd

12.70
ALL STUD & HOLLOW SECTION SIZE TO REFER TO DRYWALL LIMITING TABLE WASTE-OUT
64 m² RUPS
150 m²
RUPS 7L-3 Asas Center
150 m²
RUPS
140 m² Jalan Gottlieb
3.75 12.55 5
11.69 5
36.00
10350 Penang

11.00
Malaysia
604 2282 515

3.70

3.70

3.70
CORRIDOR CORRIDOR CORRIDOR
271 m² 271 m² 203 m²
www.penkonsult.com

3.06
RUPS AHU
RUPS AHU RUPS AHU
35 m²
35 m² 35 m²
CF
QUANTITY SURVEYOR
GENERAL PURPOSE
GENERAL PURPOSE
PRODUCTION
Unitech QS Consultancy
PRODUCTION 93 m²
SDN BHD

11.00
103 m²

12A-A, Menara Northam, 55, Jalan


2 TYPICAL NORMAL DRYWALL R.H.S. & G.I. STUD FRAMING DETAIL MANUFACTURING
8.58 3.65
Sultan Ahmad Shah,
ENGINEERING KITTING SUPPLIES GENERAL PURPOSE
PRODUCTION
10050 Penang Malaysia
STORE OFFICE
195 m²
04 229 0092

88.00
264 m² 263 m²
CE Web/Email: admin@uqs.com.my
QUALITY RELEASE
CORRIDOR
102 m²
247 m²
CORRIDOR GENERAL PURPOSE
KITTING /
247 m²
KITTING /
PACKAGING
KITTING /
PACKAGING
PRODUCTION
272 m²
PROJECT NAME

11.00
PACKAGING
1715 m² 1715 m² 1715 m²
CORRIDOR
263 m²

OFFICE
PROPOSED MANUFACTURING FACILITY CONSISTING OF:
3.65 12.605 3.70 12.56 65 m²

3.70 12.55 5

CD 3 STOREY CERP
1 STOREY WAREHOUSE
MALE PRAYER ROOM
204 m² CONFERENCE ROOM
3 STOREY CENTRAL UTILITY BUILDING
W8
73 m²
7 STOREY OFFICE HEAD BUILDING

11.00
8.58 3.65
7 STOREY PARKING STRUCTURE
W8
FEMALE PRAYER
ROOM 8.58 3.65
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
111 m²
GENERAL PURPOSE GENERAL PURPOSE
W8 PRODUCTION PRODUCTION
262 m² 261 m²
CC FIRE COMMAND
ROOM
70 m²
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CALIBRATION
PERAI SELATAN.

3.60
187 m²

11.00
JANITOR 2
28 m² JANITOR 1
FOR DEXCOM (M) SDN. BHD.
28 m²

SPRINKLER VALVE SPRINKLER VALVE SPRINKLER VALVE


19 m² 19 m² 19 m²

CB

2.755
CORRIDOR
WOMEN'S FREIGHT WOMEN'S FREIGHT WOMEN'S FREIGHT
RESTROOM ELEV
4.99 RESTROOM ELEV 4.99 RESTROOM ELEV 4.99 102 m² MPOE-CER1
9 m²
3.60 3.38 5

2.28
MAL MDF-CER1-1.1
38 m² ENGINEERING 3.60 3.385
MAL
38 m²
MAL 101 m²
39 m²

11.00
DEVELOPMENT LAB IT
3.385 FREIGHT
319 m²
FREIGHT
DEX TECH
FREIGHT
62 m²
PROJECT NUMBER
ELEV ELEV ELEV
319 m²
UP UP IT BUILD ROOM UP

8.69
UP UP 52 m²
UP CRAC
STAIRCASE 7 MEN'S 20 m² STAIRCASE 1
MEN'S
ACCESSIBLE TOILET 46 m² RESTROOM ACCESSIBLE TOILET STAIRCASE 4 STAIRCASE 2 MEN'S 2.725
47 m²
STAIRCASE 8 RESTROOM IDF-CER3-1.1 STAIRCASE 5 IDF-CER2-1.1 IDF-CER1-1.1
2.80 7.26 6.30 11.80
278585-00
ELEV 11 m² ELEV 11 m² 46 m² 44 m² RESTROOM ELEV
44 m² 13 m² 44 m² 13 m² 14 m²

CA

4.00
CORRIDOR
PACKAGE

4.555
CORRIDOR
416 m² 142 m²
BMS COMPARTMENT CORRIDOR BMS COMPARTMENT BMS COMPARTMENT
2 m² 551 m² 2 m²
CA1
2 m²
8.00

8.245

8.245
CERs FIT OUT
4.00
WA2 WA3
WA1
CA2
DESIGNED DRAWN CHECKED APPROVED
8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

64.00 69.00 69.00

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23 DATE

28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

*** NOTE :- ARCHITECTURAL


ALL STUD & HOLLOW SECTION SIZE TO REFER TO DRYWALL LIMITING TABLE WALL DETAIL
SHEET 02

CR_A7002
24/5/2021 10:45:26 AM

STAMP

1 TYPICAL FULL HEIGHT DRYWALL R.H.S. & G.I. STUD FRAMING DETAIL 3 DRYWALL LIMITTING TABLE 4 LEVEL 1 & 2 WALL PROTECTION DETAIL IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

TYPICAL PARTITION JOINT DETAIL (PLAN VIEW)


DETAIL 2 DETAIL 4

DETAIL 1 DETAIL 3 TYPICAL CORNER JOINT DETAIL

TYPICAL WALL PARTITION LAYOUT


SECTION 3
ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
TYPICAL WALL PARTITION LAYOUT Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
SECTION 4 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT
CEILING LEVEL CEILING LEVEL CEILING LEVEL
SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
FLUSH DOUBLE GLASS FLUSH DOUBLE GLASS Lots L6.01 to L6.09
WINDOW WINDOW 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

FLUSH DOUBLE GLASS


ARCHITECT
WINDOW

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
FINISH FLOOR FINISH FLOOR FINISH FLOOR 10350 Penang
S.S KICK PLATE
LEVEL LEVEL LEVEL Malaysia
604 2282 515
www.penkonsult.com
SECTION 1 SECTION 2
ELEVATION VIEW QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
4 TYPICAL CLEAN ROOM PANEL / WINDOW & AIR GRILLE DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DETAIL 1 DETAIL 2 PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT


x FACTOR 2 x FACTOR 2
DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

AS SHOWN
TYPICAL BRICK WALL SEPARATION JOINT DETAIL DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WALL DETAIL
SHEET 03

TYPICAL SECTION CR_A7003


24/5/2021 10:45:26 AM

STAMP

1 TYPICAL EXTERNAL WALL WIND UPLIFT FORCE 2 TYPICAL WALL SEPARATION/EXPANSION JOINT DETAIL 3 TYPICAL UTILITIES PENETRATION THROUGH FIRE WALL IFC – 100% CD
© Arup
KEY PLAN

W8 WA 3 TRUE NORTH

WA 1

WA 7
ISSUE DATE DESCRIPTION

WA 2
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

WA 5 WA 6 BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia

NOTES : - 04 229 0092


Web/Email: admin@uqs.com.my

- ALL LOCKSET IS DEADBOLT C/W S.S. HANDLES PROJECT NAME


/ LEVER HANDLE LOCKSET
PROPOSED MANUFACTURING FACILITY CONSISTING OF:
- ALL ESCAPE DOOR TO BE PANIC BAR
3 STOREY CERP
- ALL EXTERNAL DOOR TO HAVE S.S. THRESHOLD 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
- ALL CLEAN ROOM DOOR & WINDOW ALUMN. 7 STOREY OFFICE HEAD BUILDING
FRAME IS WHITE POWDER COATED 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

WA 4 W1 W2 W3 W4 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

W5 W6 W7 W9 DATE

28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WINDOW SCHEDULE

CR_A7101
24/5/2021 10:45:26 AM

STAMP

1 WINDOW SCHEDULE IFC – 100% CD


© Arup
KEY PLAN

TRUE NORTH

D1-A1 D1-B1a D1-B1b D1-C1 D1-D1 D1-D1a D1-D2 D1-D3 D1-D3a D1-E1 D1-E1a D1-F1 D1-FD1 D1-FD2 D1-FD3

TYPICAL DOOR, WINDOW FRAME FOR BRICKWALL


ELEVATION

SECTION D2-B1 D2-B1a D2-B1b D2-D1 D2-D1b D2-FD1 D2-FD3 RS-1 RS-2 RS-3 RS-3a

TYPICAL DOOR, WINDOW FRAME WITH DRYWALL PARTITION JOINING DETAIL

SECTION *** REFER TO DOOR SCHEDULE


FOR IRONMONGERY & SIZES

7 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR 8 TYPICAL DOOR, WINDOW FRAME WITH WALL JOINING DETAIL
WITH VISION PANEL DETAIL FRS-1 FRS-2 FRS-3 FRS-4 FRS-5 NOTES : -
- ALL LOCKSET IS DEADBOLT C/W S.S. HANDLES / LEVER HANDLE LOCKSET
- ALL ESCAPE DOOR TO BE PANIC BAR
ISSUE DATE DESCRIPTION
- ALL EXTERNAL DOOR TO HAVE S.S. THRESHOLD

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400

ELEVATION ELEVATION ELEVATION D1-FD1c D1-FD2c D1-FD3c D2-FD1c D2-FD3c D1-B1c D1-D3c D2-B1c RS-3c www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
SECTION Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney

SECTION SECTION 10250 Penang Malaysia


604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE
QUANTITY SURVEYOR
FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
4 TYPICAL DOUBLE LEAVES M.S. FRAME M.S. DOOR 5 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR DETAIL 6 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR 13 DOOR SCHEDULE Sultan Ahmad Shah,
WITH VISION PANEL DETAIL WITH CLEAR GLASS DETAIL 10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PLAN VIEW ISOMETRIC VIEW

PROJECT NUMBER

FOR EXTERNAL ROLLER SHUTTER SIGNAGE PLATES 278585-00

PACKAGE

CERs FIT OUT

ELEVATION ELEVATION
ELEVATION DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

SECTION DATE

125 x 125 x 1.0MM THK. AISI. 304 GRADE. STAINLESS STEEL 28-MAY-2021
SECTION SECTION MIRROR ETCHED & PAINTED WITH ADHESIVE FIXING SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
DOOR SCHEDULE & DETAIL

TYPICAL SECTION DETAIL 1.1 ELEVATION ELEVATION


CR_A7102
24/5/2021 10:45:26 AM

SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE STAMP
FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES

1 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR 2 TYPICAL DOUBLE LEAVES M.S. FRAME M.S. DOOR 3 TYPICAL DOUBLE LEAVES M.S. FRAME M.S. DOOR DETAIL 9 TYPICAL ROLLER SHUTTER BOTTOM BAR DETAIL 10 TYPICAL EXTERNAL DOOR THRESHOLD DETAIL 11 TYPICAL DOOR SIGNAGE DETAIL 12 TYPICAL ALUMINIUM HASP DETAIL IFC – 100% CD
WITH KICK PLATE DETAIL WITH CLEAR GLASS DETAIL
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
A.H.U 6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
PLAN VIEW 10250 Penang Malaysia
PLAN VIEW 604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


DETAIL 1 DETAIL 2
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800

A.H.U
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb

SECTION SECTION 10350 Penang


Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
6 TYPICAL AHU PLINTH SCUPPER DRAIN DETAIL 7 M&E EQUIPMENT WITHOUT WATER DISCHARGE R.C. PLINTH DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PLAN VIEW PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

ISOMETRIC VIEW

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

TYPICAL SECTION VIEW BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE
FINISHING DETAIL BETWEEN ALL
28-MAY-2021
DIFFERENT FLOOR FINISHES
SCALE

AS SHOWN
TYPICAL UTILITIES PENETRATION THROUGH FLOOR
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR FINISHES DETAIL

TYPICAL SKIRTING DETAIL DETAIL 4.1


CR_A7301
24/5/2021 10:45:26 AM

STAMP

1 FLOOR SKIRTING & COVING DETAIL 6 TYPICAL FLOOR TILES DETAIL 3 FINISHING DETAIL BETWEEN TWO DIFFERENT TYPE FLOOR FINISHES 4 TYPICAL CONCREATE COVER DETAIL 5 TYPICAL UTILITIES PENETRATION THROUGH FLOOR IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH
LEGEND :
N

CJ
FREIGHT LEGEND :
ELEV

DETAIL 2 DETAIL 4
FREIGHT
ELEV

CH

DETAIL 1 DETAIL 3
PLAN VIEW
CG
2 TYPICAL DOUBLE 'C' LAYOUT & SECONDARY SUPPORT DETAIL

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive

CF San Diego, CA 92121


888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400

CE www.sabarch.com

SECTION A CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

CD
MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

CC C19 C20 C21 C22 C23


PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
SECTION B 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
VOID PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

CB ROOF PLAN
25.90

LEVEL 3A FLOOR PLAN PROJECT NUMBER


23.20
278585-00

PACKAGE

CERs FIT OUT


LEVEL 3 FLOOR PLAN
18.70 DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

CA LEVEL 2A FLOOR PLAN


16.00
DATE

28-MAY-2021
(WALKABLE CEILING LEVEL)
CER 1
TYPICAL PLAN VIEW 5461 m² SCALE

LEVEL 2 FLOOR PLAN AS SHOWN


CA1 11.50
DRAWING STATUS
TRUSS SPACE TO
ENGR'S DETAIL LEVEL 1A FLOOR PLAN
100% OF PHASE 4 CONSTRUCTION DOCUMENTS
8.80

CA2 CEP 1
DRAWING TITLE

4272 m² ARCHITECTURAL
CEILING DETAIL
LEVEL 1 FLOOR PLAN SHEET 01
SECTION C
4.30
SECTION VIEW CR_A7401
24/5/2021 10:45:26 AM

C19 C20 C21 C22 C23 STAMP

1 TYPICAL WALKABLE CEILING DOUBLE-C SECONDARY SUPPORT DETAIL IFC – 100% CD


© Arup
KEY PLAN
LEGEND : TRUE NORTH

1.40

CJ
FREIGHT
CEILING LEVEL 15.100 ELEV
11.00

FREIGHT
ELEV

CH
11.00

CG
11.00

ISSUE DATE DESCRIPTION

Dexcom
CF
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
11.00

10250 Penang Malaysia


604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
88.00

CE
206 957 6400
www.sabarch.com

CEILING LEVEL 15.100


CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
11.00

10250 Penang Malaysia


604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852

CD
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
11.00

604 2282 515


ISOMETRIC VIEW (SECONDARY STRUCTURE HANG FROM MAIN TRUSS) www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

CC
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
11.00

7 STOREY OFFICE HEAD BUILDING


7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


HEPA TO ENGR'S DETAIL PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
VOID PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

CB

PROJECT NUMBER
LEGEND :
278585-00
11.00

PACKAGE

SECTION A CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


HEPA TO ENGR'S DETAIL
BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

CA DATE

28-MAY-2021
4.00

TYPICAL PLAN VIEW


SCALE

CA1
8.00

AS SHOWN

DRAWING STATUS
4.00

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


SECTION B
CA2 DRAWING TITLE

ARCHITECTURAL
CEILING DETAIL
12.00 12.00 12.00 12.00 SHEET 02

PLAN VIEW
CR_A7402
24/5/2021 10:45:26 AM

C19 C20 C21 C22 C23


STAMP

1 TYPICAL WALKABLE FLUSH CEILING DETAIL 2 TYPICAL WALKABLE CEILING C/W HD75 CEILING TEE DETAIL IFC – 100% CD
© Arup
REMARK :
1. NO EXPOSED RIVET & SCREW ON SURFACE OF PHENOLIC
KEY PLAN
BOARD AT TOILET CUBICLE.
2. NO EXPOSED RIVET & SCREW ON SURFACE OF BASIN TRUE NORTH
COUNTER TOP CABINET.
3. NO EXPOSED DOWN LIGHT ON THE CEILING .
4. NO EXPOSED EXHAUST AIR GRILLE ON CEILING SURFACE. N
LEGEND :

WOMEN'S RESTROOM 1/2/3 WOMEN'S RESTROOM 1/2/3

WOMEN'S RESTROOM 1/2/3 WOMEN'S RESTROOM 1/2/3

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
MEN'S RESTROOM 1/2/3 MEN'S RESTROOM 1/2/3 888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com
FEMALE & MALE TOILET REFLECTED CEILING PLAN - LEVEL 1 FEMALE & MALE TOILET REFLECTED CEILING PLAN - LEVEL 2
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
WOMEN'S RESTROOM 1/2/3 WOMEN'S RESTROOM 1/2/3 Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


START START
POINT POINT
3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
SERVICE ROOM 1/2/3 3 NOS OF GUARDHOUSE

FFL. 4.300 FFL. 8.800 FFL. 11.50 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
WOMEN'S RESTROOM 1/2/3

WOMEN'S RESTROOM 1/2/3


SERVICE DUCT AREA 1/2/3 SERVICE DUCT AREA 1/2/3 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
SERVICE DUCT AREA 1/2/3

SERVICE DUCT AREA 1/2/3


START START PROJECT NUMBER
POINT POINT
278585-00

PACKAGE

CERs FIT OUT


MEN'S RESTROOM 1/2/3
MEN'S RESTROOM 1/2/3 DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

SERVICE ROOM DETAIL - LEVEL 1A ARCHITECTURAL


TOILET DETAIL
SHEET 01

FEMALE & MALE TOILET DETAIL - LEVEL 1 FEMALE & MALE TOILET DETAIL - LEVEL 2
CR_A7501
24/5/2021 10:45:26 AM

STAMP

1 TYPICAL LEVEL 1 & 2 FEMALE & MALE TOILET DETAIL ( APPLY TO ALL LEVEL 1 & 2 ) IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

N
START
POINT
CEILING LEVEL

HCAP HANDICAP TOILET 1/2


1 /2

HCAP
CEILING LEVEL

LEVEL 1

JANITOR 1/2
FFL. 4.400

HANDICAP TOILET REFLECTED CEILING PLAN JANITOR 1/2

HANDICAP TOILET 1/2 DETAIL

CEILING LEVEL

START
LEVEL 1
POINT

HANDICAP TOILET 3

START
POINT ISSUE DATE DESCRIPTION

LEVEL 1

JANITOR ROOM 1/2 Dexcom


6340 Sequence Drive
HANDICAP TOILET 3 REFLECTED CEILING PLAN San Diego, CA 92121
888 738 3646
www.dexcom.com

HANDICAP TOILET 3 DETAIL PROJECT LEAD


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09

2 TYPICAL LEVEL 1 & 2 HANDICAP DETAIL 3 TYPICAL JANITOR ROOM DETAIL 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
REMARK : Seattle, Wa 98109
1. NO EXPOSED RIVET & SCREW ON SURFACE OF PHENOLIC 206 957 6400
BOARD AT TOILET CUBICLE. www.sabarch.com
2. NO EXPOSED RIVET & SCREW ON SURFACE OF BASIN
CEILING LEVEL CEILING LEVEL 3.
COUNTER TOP CABINET.
NO EXPOSED DOWN LIGHT ON THE CEILING .
4. NO EXPOSED EXHAUST AIR GRILLE ON CEILING SURFACE. CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
MEN'S RESTROOM SERVICE DUCT WOMEN'S RESTROOM WOMEN'S RESTROOM SERVICE DUCT WOMEN'S
AREA AREA RESTROOM
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
LEVEL 2 LEVEL 2 www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
SERVICE ROOM SERVICE ROOM 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
LEVEL 1A LEVEL 1A AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

CEILING LEVEL CEILING LEVEL 278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

MEN'S RESTROOM SERVICE DUCT WOMEN'S RESTROOM WOMEN'S RESTROOM SERVICE DUCT WOMEN'S
AREA AREA RESTROOM DATE

28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

LEVEL 1 LEVEL 1 DRAWING TITLE

ARCHITECTURAL
TOILET DETAIL
SHEET 02

CR_A7502
24/5/2021 10:45:26 AM

STAMP

1 TYPICAL LEVEL 1 & 2 FEMALE & MALE TOILET DETAIL ( APPLY TO ALL LEVEL 1 & 2 ) IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

ABLUTION AREA

FFL. 4.300

FFL. 4.300

START
POINT

FEMALE PRAYER ROOM DETAIL

CEILING LEVEL CEILING LEVEL

ISSUE DATE DESCRIPTION

ABLUTION AREA FEMALE PRAYER ROOM ABLUTION AREA

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

LEVEL 1 LEVEL 1 PROJECT LEAD


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

2 TYPICAL LEVEL 1 FEMALE PRAYER ROOM DETAIL


CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
ABLUTION AREA 604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
MALE PRAYER ROOM 10050 Penang Malaysia
04 229 0092
FFL. 4.300 Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

FFL. 4.300 3 STOREY CERP


1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
START
POINT

MALE PRAYER ROOM DETAIL


PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

CEILING LEVEL CEILING LEVEL DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE
ABLUTION AREA MALE PRAYER ROOM ABLUTION AREA AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

LEVEL 1 LEVEL 1 DRAWING TITLE

ARCHITECTURAL
TOILET DETAIL
SHEET 03

CR_A7503
24/5/2021 10:45:26 AM

STAMP

1 TYPICAL LEVEL 1 MALE PRAYER ROOM DETAIL IFC – 100% CD


© Arup
KEY PLAN

TRUE NORTH

TYPICAL W.C CUBICLE PLAN

DETAIL 10.1

10 TYPICAL PHENOLIC BOARD & WALL/TILES JOINT DETAIL 11 TYPICAL LOW WALL WITH TILES ON TOP DETAIL

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

DETAIL 1 SABArchitects
PLAN VIEW 2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


FRONT ELEVATION VIEW SIDE ELEVATION VIEW SECTION VIEW SECTION
Pen Konsult Sdn Bhd
SECTION VIEW 7L-3 Asas Center
Jalan Gottlieb
10350 Penang

ELEVATION VIEW SECTION VIEW DETAIL 2 Malaysia


604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
*** SANITARY FITTINGS TO REFER SANITARY SCHEDULE *** SANITARY FITTINGS TO REFER SANITARY SCHEDULE Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
6 TYPICAL BASIN COUNTER TOP DETAIL 7 TYPICAL HANDICAP TOILET MIRROR DETAIL 8 TYPICAL CEILING ACCESS PANEL DETAIL 9 TYPICAL COVE LIGHT DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


SERVICE DUCT AREA PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DETAIL 4.1

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT


PLAN
DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

SCALE

DETAIL AS SHOWN

TYPICAL SECTION DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


SECTION
DRAWING TITLE

ARCHITECTURAL
TOILET DETAIL
SHEET 04

ISOMETRIC VIEW CR_A7504


24/5/2021 10:45:26 AM

ISOMETRIC VIEW STAMP

1 TYPICAL TOILET SERVICE DUCT DETAIL 2 TYPICAL TILING ALIGNMENT DETAIL 3 TYPICAL FLOOR STRAINER DETAIL 4 TYPICAL CUBICLE DROP FINISHING 5 TYPICAL URINAL LOW WALL DETAIL IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
LEGEND MEN'S RESTROOM WOMEN'S RESTROOM San Diego, CA 92121
DESCRIPTION HANDICAPPED TOILET JANITOR MALE PRAYER ROOM FEMALE PRAYER ROOM GOWNING ROOM PERSONNEL AIR LOCK (PAL) REMARKS 888 738 3646
PLAN FRONT SIDE 1, 2 & 3 1, 2 & 3 www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
UNDERCOUNTER

Gurney Paragon Mall Level 6


BASIN

Lots L6.01 to L6.09


163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT
HANDICAP

SABArchitects
BASIN

2 Nickerson Suite 200


Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
SQUATTING PAN

Gurney Paragon Mall Level 6


Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


WATER CLOSET

12A, Arratoon Road 10050


WALL HUNG

Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
WATER CLOSET
HANDICAPPED

604 2282 515


www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my
SPRAY
BIDET

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
URINAL

3 STOREY CENTRAL UTILITY BUILDING


7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
HAND DRYER

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
MOP SINK

PROJECT NUMBER

278585-00

PACKAGE
GRAB BAR

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH CL.LEE SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021
FAUCETS

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


FLOOR
STRAI
-NER

DRAWING TITLE

ARCHITECTURAL
TOILET DETAIL
SHEET 05

CR_A7505
24/5/2021 10:45:26 AM

STAMP

1 SANITARY SCHEDULE IFC – 100% CD


© Arup
KEY PLAN

TRUE NORTH

WA

CK
4.9°

4.9°

4.9°

4.9°

4.9°
CH 4.9°

CG
ISSUE DATE DESCRIPTION

CF

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
CE
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
4.0°

4.0°
4.0°

CD www.arup.com

DESIGN ARCHITECT

4.9°
SABArchitects
4.9°

4.9°

2 Nickerson Suite 200


CC Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
CB Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
CA

BYG Architecture Sdn. Bhd.


CA1 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
CA2 www.byggroup.com

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23
MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
ROOF PLAN LEGEND 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
3 TYPICAL FALL PROTECTION LINE DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

LEGEND
PROJECT NUMBER

278585-00

x FACTOR 2 PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


40MM
MIN BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

LEGEND FOR WIND UPLIFT ZONE OF DOUBLE DECK METAL ROOF SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

TYPICAL ROOF CROSS SECTION VIEW ARCHITECTURAL


GENERAL CONSTRUCTION
SHEET 01

CR_A7801
24/5/2021 10:45:26 AM

STAMP

1 FMG WIND UPLIFT REQUIREMENT & ROOF DETAIL 2 TYPICAL DOUBLE METAL ROOF DETAIL IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

LEVEL 2A

SECTION VIEW

WA
UA
1.40

1.40
DN
CJ
BMS COMPARTMENT BMS COMPARTMENT

3.80

3.80
3.85
BMS COMPARTMENT FREIGHT
3 m² 3 m² 3 m² ELEV
6.00

6.05

6.05
CORRIDOR CORRIDOR CORRIDOR
603 m² 613 m² 610 m²
11.00

PAL GENERAL PURPOSE GENERAL PURPOSE


CER SANITIZATION 7 m² COLD STORAGE CER SANITIZATION PAL PRODUCTION CER SANITIZATION PAL COLD STORAGE FREIGHT
PRODUCTION 7 m² 7 m² 17 m²
GENERAL PURPOSE 12 m² 17 m² 12 m² COLD STORAGE 34 m² 12 m² ELEV

ES
34 m²

ES ES ES
GENERAL PURPOSE MAL
ES ES
PRODUCTION MAL GENERAL PURPOSE 17 m²
GENERAL PURPOSE
ES
GENERAL PURPOSE 28 m² PRODUCTION 26 m²
ES
ELECTRICAL

ES
25 m² PRODUCTION PRODUCTION
49 m² PRODUCTION 24 m²
24 m² 28 m² 28 m²
MAL
MANUFACTURING MANUFACTURING MANUFACTURING 21 m²

7.60
MATERIAL STAGING ELECTRICAL MATERIAL STAGING ELECTRICAL SUPPORT MATERIAL STAGING
SUPPORT SUPPORT

8.50
75 m² 49 m² 75 m² 49 m²
CH 88 m² SOLUTIONS 88 m² 88 m² 72 m²
MANUFACTURING SOLUTIONS SOLUTIONS
WASH ROOM 137 m² FREIGHT WASH ROOM MANUFACTURING FREIGHT WASH ROOM MANUFACTURING FREIGHT
121 m² ELEV 121 m² 137 m² ELEV 121 m² 137 m² ELEV
UP 4.34 5
3.60
DN

STAIRCASE 9
ES CHEM STORAGE
46 m²
FREIGHT
MAL
43 m²
STAIRCASE 6
34 m²
CAL CHECK MODULE
CHEM STORAGE
46 m²
FREIGHT MAL
STAIRCASE 3 CAL CHECK MODULE
CHEM STORAGE
46 m²
FREIGHT
11.00

7.395
MAL MAINTENANCE MAL 34 m² MAINTENANCE MAL MAL
CAL CHECK MODULE 8.35 9.525 4.475
ES
31 m² 51 m² ELEV 70 m² 51 m² ELEV 43 m² 70 m² 51 m² ELEV 38 m²
MAINTENANCE DN DN
ES
39 m² MAL UP MAL UP MAL
58 m² 58 m² MAL 59 m²
25 m²
FREIGHT FREIGHT FREIGHT
ELEV ELEV ELEV

TYPICAL LOW WALL DETAIL FOR LEVEL 2A CEILING AREA


MAL MAL MAL MAL MAL MAL MAL MAL MAL

6
6 m² 6 m² 9 m² 6 m² 6 m² 9 m² 6 m² 6 m² 9 m²
CG
SENSOR WIP SENSOR WIP SENSOR WIP
69 m² 69 m² 69 m²

PE PE PE
11.00

W3 W6 W6 W6 W6 W6 W6
W3 W3

GOWNING B GOWNING B GOWNING B


94 m² 93 m² 93 m²
ISSUE DATE DESCRIPTION
CF
PAL PAL PAL
9 m² 9 m² 9 m²
2.25

2.25

EXIT B EXIT B EXIT B


20 m² 20 m² 20 m²
11.00

PE PE PE
3.00

3.00

3.00
SERVICE CORRIDOR SERVICE CORRIDOR SERVICE CORRIDOR
32 m² 32 m² 32 m²
2.25

2.25

2.25
EXIT A EXIT A EXIT A
20 m² 20 m² 20 m²

Dexcom
88.00

CE
PAL
9 m²
PAL
9 m²
PAL
9 m² 6340 Sequence Drive
CER-P3 CER-P2 San Diego, CA 92121
2790 m² 2791 m²
888 738 3646
11.00

W3
CER-P1
www.dexcom.com
W3 GOWNING A W3 GOWNING A GOWNING A
W6 W6 W6 W6 W6 W6 2791 m²
94 m² 94 m² 94 m²

CEILING LEVEL PROJECT LEAD


CD Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
W8 W7 W7
Lots L6.01 to L6.09
W7 W7 W7 W7 W8
W5
OPEN OFFICE OPEN OFFICE OPEN OFFICE
163-D Persiaran Gurney
11.00

W5 W5
W8 124 m² 124 m² 124 m² 10250 Penang Malaysia
604 2933 800
www.arup.com
PAL PAL PAL

CC
18 m² 18 m² 18 m²

DESIGN ARCHITECT
ES ES ES MANUFACTURING

SABArchitects
MANUFACTURING MAL MANUFACTURING MAL ENGINEERING MAL
ENGINEERING 7 m² ENGINEERING 7 m² WORKSHOP 7 m²
11.00

WORKSHOP WORKSHOP 117 m²


117 m² 117 m²

W4
2 Nickerson Suite 200
W4
Seattle, Wa 98109

COLD STORAGE
W4

206 957 6400


www.sabarch.com
CB
WOMEN'S
RESTROOM
49 m²
FREIGHT
ELEV
MAL
30 m²
WOMEN'S
RESTROOM
49 m²
FREIGHT
ELEV
MAL
30 m²
WOMEN'S
RESTROOM
49 m²
FREIGHT
ELEV
MAL
30 m² COLD STORAGE
MAL
31 m²
MAL
31 m²
MAL
31 m² CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
11.00

FREIGHT FREIGHT FREIGHT

Arup Jururunding Sdn Bhd


DN DN 4.10 4.02 DN
MEN'S ELEV DN MEN'S ELEV DN MEN'S ELEV
4.10 4.02 DN
RESTROOM RESTROOM STAIRCASE 2 RESTROOM
17 m² STAIRCASE 5 17 m² STAIRCASE 4 17 m² STAIRCASE 1
STAIRCASE 7 43 m²
STAIRCASE 8
43 m² ACCESSIBLE TOILET
W9 W9
45 m² 43 m²
IDF-CER2-2.1
W9 W9
45 m² 45 m²
Gurney Paragon Mall Level 6
IDF-CER3-2.1 ACCESSIBLE TOILET 13 m² IDF-CER1-2.1 ACCESSIBLE TOILET
Lots L6.01 to L6.09
ELEV 11 m² ELEV ELEV
13 m² 11 m² 15 m² 9 m²

CA 163-D Persiaran Gurney


W9 W9
WA7
W9 W9
WA7 CRAC CONDENSING 10250 Penang Malaysia
4.00

BMS COMPARTMENT
BMS COMPARTMENT
2 m² CORRIDOR
UNITS
7 m² 604 2933 800
CORRIDOR WA6 160 m² BMS COMPARTMENT

CA1
2 m²
www.arup.com
8.00

434 m² 2 m²

CORRIDOR WA5
4.00

536 m²

WA4 ARCHITECT
CA2

8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
64.00 69.00 69.00 LEVEL 2 Penang, Malaysia
604 228 8852
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23 www.byggroup.com

SECTION
FLOOR PLAN MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
LEGEND 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
WA Malaysia
UA 604 2282 515
1.40

1.40
CJ www.penkonsult.com
FREIGHT
ELEV

MATERIAL SUPER
MATERIAL SUPER
HIGHWAY C
MATERIAL SUPER
MATERIAL SUPER
HIGHWAY B
MATERIAL SUPER
HIGHWAY A
QUANTITY SURVEYOR
11.00

HIGHWAY B HIGHWAY A FREIGHT


10.895

Unitech QS Consultancy
116 m² 116 m² 599 m²
684 m² 637 m² ELEV

BMS COMPARTMENT
BMS COMPARTMENT
2 m²
BMS COMPARTMENT SDN BHD
12A-A, Menara Northam, 55, Jalan
2 m² 2 m²

CH
STAIRCASE 9 FREIGHT STAIRCASE 6 FREIGHT STAIRCASE 3 FREIGHT 4 TYPICAL RWDP DISCHARGE TO SUMP DETAIL 5 TYPICAL COLD STORAGE DETAIL ON LEVEL 2 Sultan Ahmad Shah,
10050 Penang Malaysia
31 m² ELEV 35 m² ELEV 35 m² ELEV
CORRIDOR
04 229 0092

27.94
15 m² UP
6.24

ELECTRICAL ELECTRICAL
ELECTRICAL
48 m²
59 m² 59 m² Web/Email: admin@uqs.com.my
FREIGHT 3.465 FREIGHT 3.465 FREIGHT
11.00

WASTE-OUT
ELEV ELEV ELEV
64 m²

PROJECT NAME
UP UP
FINISHED GOODS FINISHED GOODS
STAGING MATERIAL STAGING STAGING MATERIAL STAGING FINISHED GOODS MATERIAL STAGING
198 m² 505 m² FREIGHT 214 m² 505 m² FREIGHT STAGING 505 m² FREIGHT WASTE-OUT
ELEV ELEV 213 m² ELEV 65 m²

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


CG
12.70

WASTE-OUT

RUPS
64 m² RUPS
150 m²
RUPS
150 m² 3 STOREY CERP
140 m²
3.75 12.555 11.695 36.00 1 STOREY WAREHOUSE
11.00

3 STOREY CENTRAL UTILITY BUILDING


7 STOREY OFFICE HEAD BUILDING
3.70

3.70

3.70

CORRIDOR CORRIDOR CORRIDOR


271 m² 271 m² 203 m²
7 STOREY PARKING STRUCTURE
3.06

RUPS AHU

PE PE PE
RUPS AHU RUPS AHU
2 STOREY SUBSTATION
35 m²
35 m² 35 m²
CF
3 NOS OF GUARDHOUSE
GENERAL PURPOSE
GENERAL PURPOSE PRODUCTION
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
ES
PRODUCTION 93 m²
11.00

PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG


103 m²

8.58 3.65
PERAI SELATAN.
MANUFACTURING
ENGINEERING
STORE
KITTING SUPPLIES
OFFICE
GENERAL PURPOSE
PRODUCTION
FOR DEXCOM (M) SDN. BHD.
195 m²
88.00

264 m² 263 m²
CE
QUALITY RELEASE
CORRIDOR
247 m²
ES 102 m²

DETAIL 1
CORRIDOR GENERAL PURPOSE
247 m² PRODUCTION
KITTING / KITTING / KITTING /
PACKAGING PACKAGING 272 m²
11.00

PACKAGING
1715 m² 1715 m² 1715 m²
CORRIDOR
263 m²

OFFICE
3.65 12.605 3.70 12.56 65 m²

3.70 12.555 PROJECT NUMBER


CD
278585-00
MALE PRAYER ROOM
204 m² CONFERENCE ROOM
73 m²

ES DETAIL 1 DETAIL 2
W8
PACKAGE
11.00

8.58 3.65

FEMALE PRAYER
W8
8.58 3.65
CERs FIT OUT
ROOM

FLOOR PLAN
111 m²
GENERAL PURPOSE GENERAL PURPOSE

EYEWASH & SHOWER


W8 PRODUCTION PRODUCTION
262 m² 261 m²
CC PE PE PE FIRE COMMAND
ROOM
70 m² DESIGNED DRAWN CHECKED APPROVED
CALIBRATION
BEN YEOH CL.LEE SK.HO BEN YEOH
3.60
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

187 m²
11.00

JANITOR 2
28 m² JANITOR 1

ES ES ES
28 m²

SPRINKLER VALVE SPRINKLER VALVE SPRINKLER VALVE


DATE
19 m² 19 m² 19 m²

CB 28-MAY-2021
2.755

CORRIDOR
WOMEN'S FREIGHT WOMEN'S FREIGHT WOMEN'S FREIGHT
RESTROOM ELEV
4.99 RESTROOM ELEV 4.99 RESTROOM ELEV 4.99 102 m² MPOE-CER1
9 m²
3.60 3.38 5
2.28

MAL MDF-CER1-1.1
38 m² ENGINEERING 3.60 3.385
MAL
38 m²
MAL
39 m²
101 m²
SCALE
11.00

DEVELOPMENT LAB IT
3.38 5 FREIGHT
319 m²
FREIGHT
DEX TECH
FREIGHT
62 m²
ELEV ELEV ELEV
319 m²
UP UP IT BUILD ROOM UP
8.69

AS SHOWN
UP UP 52 m²
UP CRAC
STAIRCASE 7 MEN'S 20 m² STAIRCASE 1
MEN'S
ACCESSIBLE TOILET 46 m² RESTROOM ACCESSIBLE TOILET STAIRCASE 4 STAIRCASE 2 MEN'S 2.725 47 m²
STAIRCASE 8 RESTROOM IDF-CER3-1.1 STAIRCASE 5 IDF-CER2-1.1 IDF-CER1-1.1
44 m²
ELEV 11 m²
13 m² 44 m²
ELEV 11 m²
13 m²
46 m² 44 m² RESTROOM ELEV
14 m²
2.80 7.26 6.30 11.80

CA DRAWING STATUS
4.00

CORRIDOR
4.555

CORRIDOR
416 m² 142 m²
BMS COMPARTMENT CORRIDOR BMS COMPARTMENT BMS COMPARTMENT

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


2 m² 551 m² 2 m²
CA1
2 m²
8.00

8.245

8.245
4.00

WA2 WA3
WA1
CA2 DRAWING TITLE
8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 1.00 4.00 8.00 8.00 12.00 12.00 12.00 12.00 PLAN VIEW ARCHITECTURAL
64.00 69.00 69.00 PE GENERAL CONSTRUCTION
SHEET 02
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16C17 C18 C19 C20 C21 C22 C23
PORTABLE EYEWASH TYPICAL SECTION
ELEVATION VIEW CR_A7802
24/5/2021 10:45:26 AM

SECTION
STAMP

1 SAFETY SHOWER/EYEWASH DETAIL 2 TYPICAL GOWNING BASIN DETAIL 3 TYPICAL WASH AREA DETAIL @ AHU PLANT ROOM IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

CEILING LEVEL CEILING LEVEL

R.A.C R.A.C PAL

RAC PRODUCTION OFFICE PRODUCTION

EXIT 2

R.A.C

TYPICAL TYPE A SECTIONAL TYPICAL TYPE B SECTIONAL


DETAIL - RETURN AIR CHASE DETAIL - RETURN AIR CHASE

DISPOSAL

5 TYPICAL RAC CLEAN ROOM RETURN AIR GRILLE DETAIL


R.A.C

ISSUE DATE DESCRIPTION

EXIT 1 Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
CE R.A.C 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
R.A.C R.A.C
PAL R.A.C
DESIGN ARCHITECT
FLOOR PLAN SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
CEILING LEVEL 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
R.A.C 604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515

EXIT 2 PAL www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

FLOOR PLAN PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

SECTION 3 STOREY CERP


1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

CEILING LEVEL AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

CEILING LEVEL

PROJECT NUMBER

278585-00

PACKAGE
EXIT 1 CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


PAL BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE

28-MAY-2021

TYPICAL SECTION TYPICAL ELEVATION SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


SECTION
DRAWING TITLE

ARCHITECTURAL
GENERAL CONSTRUCTION
SHEET 03
SECTION
PLAN VIEW
CR_A7803
24/5/2021 10:45:26 AM

STAMP

1 TYPICAL DISPOSAL ROOM & EXIT CORRIDOR DETAIL 2 TYPICAL PAL DETAIL ON LEVEL 2 3 TYPICAL FIRE HOSE REEL DRYWALL COMPARTMENT DETAIL 4 TYPICAL MOVEMENT JOINT DETAIL IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

73 75 80 84

85 90 95 96
RWDP RWDP
DN (96 RISER)
FFL. 18.70 VOID

FFL. 18.70

DN (48 RISER)

96 95 90 85
84 80 75 73

LEVEL 3 FLOOR PLAN


LEVEL 3 FLOOR PLAN

30 35 38

50 55 60

36 40 45 48

FFL. 11.50
RWDP UP (48 RISER) RWDP
DN (48 RISER)
FFL. 11.50 VOID

FFL. 11.50

DN (20 RISER)

HR
DN (48 RISER)
48 45 40 UP (48 RISER)

48 45 40 36
60 55 50

LEVEL 2 FLOOR PLAN


LEVEL 2 FLOOR PLAN LEVEL 2 FLOOR PLAN

25 30 35

30 35 38
ISSUE DATE DESCRIPTION
1 5 10 12
FFL. 11.50 15 20 24
UP (20 RISER)
RWDP UP (48 RISER)

FFL. 8.50
RWDP
RWDP FFL. 4.30 Dexcom
6340 Sequence Drive
San Diego, CA 92121
DN (48 RISER) FFL. 4.30
888 738 3646
www.dexcom.com

PROJECT LEAD
48 45 40 36 DN (28 RISER)
Arup Jururunding Sdn Bhd
UP (96 RISER) Gurney Paragon Mall Level 6
HR Lots L6.01 to L6.09
163-D Persiaran Gurney
28 25 20 15 14 10250 Penang Malaysia
24 20 15 12 10 5 1 604 2933 800
www.arup.com
LEVEL 2 FLOOR PLAN
DESIGN ARCHITECT
LEVEL 1A FLOOR PLAN
LEVEL 1 FLOOR PLAN SABArchitects
LEVEL 1 FLOOR PLAN 2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


1 5 10 12
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
1 5 10 14 Lots L6.01 to L6.09
163-D Persiaran Gurney
UP (48 RISER) 10250 Penang Malaysia
604 2933 800
www.arup.com
UP (28 RISER)
FFL. 4.30
ARCHITECT
FFL. 4.30
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
RWDP Penang, Malaysia
604 228 8852
www.byggroup.com
LEVEL 3 LEVEL 3
MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
24 20 15 HR 7L-3 Asas Center
Jalan Gottlieb
28 25 20 15 10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
LEVEL 1 FLOOR PLAN
LEVEL 1 FLOOR PLAN Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
HR 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

LEVEL 2 LEVEL 2 LEVEL 2 LEVEL 2

PROJECT NUMBER

278585-00

PACKAGE

CERs FIT OUT

DESIGNED DRAWN CHECKED APPROVED


LEVEL 1A
BEN YEOH CL.LEE SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-CR-A-Interior-Fit-Out.rvt

DATE
HR
28-MAY-2021

SCALE

AS SHOWN

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
STAIRCASE DETAIL
LEVEL 1 LEVEL 1 LEVEL 1 LEVEL 1 SHEET 01

CR_A8001
24/5/2021 10:45:26 AM

SECTION SECTION SECTION SECTION STAMP

1 TYPICAL STEEL STAIRCASE 1 , 4 & 7 DETAIL 2 TYPICAL STEEL STAIRCASE 2 , 5 & 8 DETAIL 3 TYPICAL STEEL STAIRCASE 3 & 6 DETAIL 4 TYPICAL STEEL STAIRCASE 9 DETAIL IFC – 100% CD
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09

TYPICAL CAPPING DETAIL 163-D Persiaran Gurney


10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

You might also like