You are on page 1of 42

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400

DEXCOM FACTORY 3
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800

CUB + WAREHOUSE FIT OUT 100% OF PHASE 4 CONSTRUCTION DOCUMENTS


www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
ARCHITECT DRAWING LIST - CUB + WAREHOUSE FIT OUT www.byggroup.com

DWG No. DRAWING TITLE


MECHANICAL AND ELECTRICAL ENGINEER
UB+WH_A0000 COVER SHEET

UB+WH_A0001 DRAWING SUMMARY


Pen Konsult Sdn Bhd
7L-3 Asas Center
UB+WH_A0002 SPECIFICATIONS
Jalan Gottlieb
UB+WH_A2101_A1 LEVEL 1 FLOOR PLAN (ZONE A1) 10350 Penang
Malaysia
UB+WH_A2101_A2 LEVEL 1 FLOOR PLAN (ZONE A2) 604 2282 515
UB+WH_A2102_A1 LEVEL 2 FLOOR PLAN (ZONE A1) www.penkonsult.com

UB+WH_A2102_A2 LEVEL 2 FLOOR PLAN (ZONE A2)


QUANTITY SURVEYOR
UB+WH_A2103_A1 LEVEL 3 FLOOR PLAN (ZONE A1)

UB+WH_A2103_A2 LEVEL 3 FLOOR PLAN (ZONE A2)


Unitech QS Consultancy
UB+WH_A2104_A1 LEVEL 4 FLOOR PLAN (ZONE A1)
SDN BHD
12A-A, Menara Northam, 55, Jalan
UB+WH_A2104_A2 LEVEL 4 FLOOR PLAN (ZONE A2) Sultan Ahmad Shah,
10050 Penang Malaysia
UB+WH_A2105_A1 ROOF PLAN (ZONE A1)
04 229 0092
UB+WH_A2105_A2 ROOF PLAN (ZONE A2) Web/Email: admin@uqs.com.my
UB+WH_A3201_A1 LEVEL 1 REFLECTED CEILING PLAN (ZONE A1)
PROJECT NAME
UB+WH_A3201_A2 LEVEL 1 REFLECTED CEILING PLAN (ZONE A2)

UB+WH_A3202_A1 LEVEL 2 REFELCTED CEILING PLAN (ZONE A1)


PROPOSED MANUFACTURING FACILITY CONSISTING OF:
UB+WH_A3202_A2 LEVEL 2 REFLECTED CEILING PLAN (ZONE A2)

UB+WH_A3203_A1 LEVEL 3 REFLECTED CEILING PLAN (ZONE A1) 3 STOREY CERP


UB+WH_A3203_A2 LEVEL 3 REFLECTED CEILING PLAN (ZONE A2)
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
UB+WH_A3204_A1 LEVEL 4 REFLECTED CEILING PLAN (ZONE A1)
7 STOREY OFFICE HEAD BUILDING
UB+WH_A3204_A2 LEVEL 4 REFLECTED CEILING PLAN (ZONE A2) 7 STOREY PARKING STRUCTURE
UB+WH_A3301 FLOOR FINISHES KEY PLAN 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
UB+WH_A3601 WALL KEY PLAN

UB+WH_A3701 WATERPROOFING KEY PLAN AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
UB+WH_A3801 FLOOR FLATNESS KEY PLAN PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UB+WH_A4001 ELEVATIONS
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
UB+WH_A5001 SECTIONS 1

UB+WH_A5002 SECTIONS 2

UB+WH_A7001 WALL DETAIL 1

UB+WH_A7002 WALL DETAIL 2

UB+WH_A7003 WALL DETAIL 3

UB+WH_A7101 DOOR & WINDOW SCHEDULE & DETAIL


PROJECT NUMBER
UB+WH_A7301 FLOOR & CEILING DETAIL

UB+WH_A7501 TOILET DETAIL 1 278585-00


UB+WH_A7502 TOILET DETAIL 2

UB+WH_A7801 GENERAL CONSTRUCTION DETAIL 1


PACKAGE
UB+WH_A7802 GENERAL CONSTRUCTION DETAIL 2
CUB + WAREHOUSE FIT OUT
UB+WH_A7803 GENERAL CONSTRUCTION DETAIL 3

UB+WH_A7804 GENERAL CONSTRUCTION DETAIL 4


DESIGNED DRAWN CHECKED APPROVED
UB+WH_A8001 STAIRCASE DETAIL 1

UB+WH_A8002 STAIRCASE DETAIL 2 CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

UB+WH_A8003 STAIRCASE DETAIL 3


DATE

11-JUN-2021

SCALE

1:1

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
COVER SHEET

UB+WH_A0000
1/6/2021 2:24:51 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

T1B
EAST BOUNDARY
STONE SETTING
WEST BOUNDARY OUT POINT
STONE SETTING W1
43600
LINE
6100 (20'0") SET BACK

OUT POINT
W I D E
D R I V E
W A Y
TG

16295
M M
9 1 0 0
OPEN CAR PARK C (20 NOS)

RL 3.10 DN

WH
SPRINKLER
VALVE ROOM
WH
SPRINKLER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DN

VALVE ROOM EGRESS E E E E SPRINKLER


E E E

WK
2
APRON 1 APRON VALVE ROOM

82000
15 m² STAIRS 1 F.F.L. 3.40 TOILET 1B
F.F.L. 3.30 9 m² 6 m² E F.F.L. 3.30 10 m² STAIRCASE 1 4 m²
25 m² TOILET 1A TOILET 1C
4 m² 4 m²
riser for elec/IT riser for rwdp/sprinkler/water
TOILET 1F
WH DATA PRAYER (F) FWS
STAIRCASE 5 4 m²
24 m² 21 m²
17 m² E
PRAYER (M) CORRIDOR 1A TOILET 1D TOILET 1E
WH ELEC 23 m² 25 m² 4 m² 4 m²
TEMPORARY MHE UP

PARKING 24 m² MAINTENANCE

TNB
162 m² TRUCKER'S

10690
LOUNGE
OFFICE
158 m²
HUDDLE 114 m²
F.F.L. 3.40
29 m² UP

DOCK
WH ELEC 2 LEVELLER
( 5 TONS) 1
TOILET 1
22 m²
5 m²

TOILET 2 TOILET 3 JAN


UP
UP
DOCK

5 m² 5 m² 5 m²
LEVELLER
( 5 TONS)
2
1 2 3 4 5 6 7
UP

PORTABLE
EYE WASH
Protective bollard to detail
E UP

FOLKLIFT CHARGING DN RAMP UP

DOCK
APRON LEVELLER
3

Y1
( 5 TONS)

F.F.L. 3.30
FOLKLIFT TRAVEL LANE

DOCK
8 9 10 11 12 13 PORTABLE
LEVELLER
( 5 TONS) 4

MP (388 NOS)
EYE WASH

TUNNEL BELOW
E
OFFLOADING
FOLKLIFT CHARGING VESTIBULE 1
1625 m² DOCK
LEVELLER
( 5 TONS) 5

RL 3.10 FOLKLIFT TRAVEL LANE

YA
DOCK E
LEVELLER
( 5 TONS)
6

PORTABLE
14 15 16 17 18 19 20 EYE WASH

platform
FOLKLIFT CHARGING DOCK
LEVELLER
large size ( 5 TONS) 7
BIG equipment
WH EQUIPMENT
SPRINKLER ELEVATOR
VALVE ROOM
3 BIG CONCRETE
9 m² 60M EQUIPMENT 8 PLATFORM
RADIUS
ELEVATOR VERTICAL SHAFT F.F.L. 4.30 R.L. 3.10
60M
RADIUS
EGRESS STAIRCASE 2 E
STAIRS 2 FWS 23 m²
6 m² 60M F.F.L. 3.40
60M RADIUS
RADIUS E
DOCK
LEVELLER
( 5 TONS)
9
DOMESTIC 1
FOLKLIFT TRAVEL LANE

STAIRCASE 4 21 22 23 24 25 26 27 DOCK
PORTABLE LEVELLER 10
15 m² WAREHOUSE EYE WASH
( 5 TONS)

F.F.L. 4.40 14406 m²


E

W A Y
F.F.L. 4.30 FOLKLIFT CHARGING

WH CORNER FOLKLIFT TRAVEL LANE


DOCK
LEVELLER
( 5 TONS)

DOCK
LEVELLER
( 5 TONS)
11

12
DOMESTICv2

28 29 30 31 32 33 34 OFFLOADING

COLUMN SETTING
PORTABLE VESTIBULE 2
EYE WASH
1308 m²

D R I V E
E
F.F.L. 4.30
FOLKLIFT CHARGING

DOCK
LEVELLER 13
( 5 TONS)

OUT POINT WAREHOUSE


FOLKLIFT TRAVEL LANE

DOCK
LEVELLER
( 5 TONS)
14

OPEN CARPARK B (154 NOS)


E

W I D E
TANK DOMESTIC
ELEC
MH

DOCK
LEVELLER
( 5 TONS) 15 PUMP ROOM
FOLKLIFT TRAVEL LANE

60M
DOCK ELEC
RADIUS 16
MH
LEVELLER
( 5 TONS)
35 36 37 38 39 40 41 PORTABLE
JP
PUMP
ISSUE DATE DESCRIPTION
EYE WASH SP1

C1
60M ROOM API 2
RADIUS E FP1
OFFLOADING

M M
FOLKLIFT CHARGING
VESTIBULE 3
1417 m² DOCK ELEC
MH
LEVELLER
( 5 TONS) 17
PUMP
FOLKLIFT TRAVEL LANE
ROOM API 1 SP2
FP2
DOCK
LEVELLER 18

6 1 0 0
( 5 TONS)
42 43 44 45 46 47 48 PORTABLE
METER
ELEC
EYE WASH MH

234650
E ROOM
HY1
ELEC
FOLKLIFT CHARGING DOCK
MH

LEVELLER 19 VIE
( 5 TONS)
Protective bollard to detail
AMBIENT
TANK
6,000 VAPOURISER
L

FOLKLIFT TRAVEL LANE HY2


ELEC
MH

DOCK AMBIENT

20
VAPOURISER
LEVELLER
( 5 TONS) VIE
40,000
TANK

Dexcom
VAPOURISER
L

STAIRCASE 3 AMBIENT
VAPOURISER

23 m² DN RAMP UP VAPOURISER

F.F.L. 3.40
E te
ga
100MM N2 PIPE LAID UNDERGROUND g 6340 Sequence Drive

34000
FWS
100MM N2 PIPE & AR PIPE LAID UNDERGROUND din
sli
San Diego, CA 92121

1400
100MM AR PIPE LAID UNDERGROUND te
ga
DOCK
TESTING MATERIAL
888 738 3646
LEVELLER

6100 (20'0") SET BACK LINE


er
( 5 TONS)
STAGING STAMPING
rri
75 m² 186 m²
ba
DOCK
LEVELLER
( 5 TONS)
www.dexcom.com
WASH AREA
E
(TAP & OUTLET)
RAW HAZ.

PROJECT LEAD
WASH HAZ. WASTE WASH WASH HAZ. WASTE
MATERIAL AREA AREA AREA
(TAP &
53 m² (TAP & (TAP &
54 m²
54 m² OUTLET) OUTLET) OUTLET)

Arup Jururunding Sdn Bhd

WA
WASTE WASTE AREA CORRIDOR EYEWASH
& SHOWER
HOLDING 359 m² 128 m²
SPACE

Gurney Paragon Mall Level 6

FD
273 m²
RAW HAZ. WASH WASH WASH
AREA HAZ. WASTE AREA AREA HAZ. WASTE
MATERIAL
Lots L6.01 to L6.09
(TAP & (TAP & (TAP &
OUTLET)
52 m² OUTLET) OUTLET)
53 m²
CROSS BRACING CROSS BRACING
52 m²

FREIGHT
ELEV
?
163-D Persiaran Gurney
10250 Penang Malaysia
(3 TON)

MATERIAL SUPER MATERIAL SUPER MATERIAL SUPER


CORRIDOR CORRIDOR
HIGHWAY HIGHWAY HIGHWAY FREIGHT

604 2933 800


118 m² 118 m²
692 m² 646 m² 609 m² ELEV
F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300 (3 TON)

www.arup.com

485
HR

STAIR A

CJ
HR HR HR HR HR HR HR HR
CORRIDOR FREIGHT FREIGHT FREIGHT
8 m² STAIRCASE 9 ELEV ELEV ELEV
32 m² (3 TON) (3 TON) (3 TON)
ELEC 2
ELEC 1

DESIGN ARCHITECT
FLOOR MARKING ON 56 m² FLOOR MARKING ON FLOOR MARKING ON
56 m²
ELEC 3 GOUND INDICATED GOUND INDICATED GOUND INDICATED
44 m² FREE SPACE FREIGHT FREE SPACE FREIGHT FREE SPACE FREIGHT
ELEV ELEV WASTE-OUT ELEV
(3 TON) (3 TON) 68 m² (3 TON)

ler
STAIRCASE 6 STAIRCASE 3

diate Semi-Trai
FINISED GOODS FINISED GOODS FINISED GOODS

OUT
35 m² SUPPORT 35 m² SUPPORT
PALLET STAGING KANBAN PALLET STAGING KANBAN PALLET STAGING KANBAN
29 m² 29 m² WASTE-OUT
251 m² 505 m² FREIGHT 239 m² 505 m² FREIGHT 239 m² 505 m² FREIGHT
66 m²
ELEV ELEV ELEV

SABArchitects
WASTE-OUT

WB-50 - Interme
(3 TON) (3 TON) (3 TON)
68 m²

IN
FEMALE PRAYER
ROOM

MALE PRAYER ROOM


66 m²
W1
71 m²

W1
MALE PRAYER ROOM
71 m²
W1
2 Nickerson Suite 200
Seattle, Wa 98109
HR HR HR
HR HR HR HR HR HR

PE PE PE

206 957 6400


www.sabarch.com
HR HR HR HR HR HR

89335
W2 W2 W2
KITTING SUPPLIES CALIBRATION LAB
OFFICE 154 m²
188 m² W4

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


ES

HR HR
MANUFACTURING
SPARE PARTS

BULK METER
323 m² HR HR HR HR

Arup Jururunding Sdn Bhd


W3 ENGINEERING
TESTING LAB

BUS

ba
101 m²

rr
ie
IN

r
Gurney Paragon Mall Level 6
KITTING / KITTING / KITTING /

ga
ES
PACKAGING PACKAGING PACKAGING

te
2298 m² 2112 m² 2301 m²

Lots L6.01 to L6.09


F.F.L. 4.300 F.F.L. 4.300 F.F.L. 4.300
OFFICE
65 m²

HR HR HR HR HR HR

163-D Persiaran Gurney


10250 Penang Malaysia

CER 3 CER 2 CER 1

sl
CONFERENCE ROOM

604 2933 800

id
72 m²

in
GENERAL PURPOSE

g
394 m²

www.arup.com

ga
HR

t e
PE PE PE

MAINTENANCE SHOP
260 m²

P10
HR HR

ARCHITECT
HR HR HR

BUILDING LINE
CER SPARE PARTS
186 m²
W1

HR HR HR

BYG Architecture Sdn. Bhd.


?
?
SPRINKLER SPRINKLER ? SPRINKLER
VALVE ROOM 3 VALVE ROOM 2 VALVE ROOM 1
19 m² 19 m² 19 m²
HR HR HR
ES ES ES

?
FREIGHT
ELEV
FREIGHT
ELEV ?
FREIGHT
ELEV
12A, Arratoon Road 10050
Penang, Malaysia
? (3 TON) (3 TON) ? (3 TON)

9150 (30'-0")
MAL
61 m² MAL MAL
ENGINEERING
60 m² 60 m² IT CENTER SERVER /

CA
DEVELOPMENT LAB

604 228 8852


STAIRCASE 8 FREIGHT FREIGHT FREIGHT FIRE COMMAND
45 m² 329 m² DEX TECH INVENTORY / OFFICE
ELEV ELEV STAIRCASE 2 ELEV ROOM STAIRCASE 1
288 m² 45 m² 260 m² 75 m² 46 m²
(3 TON) (3 TON) (3 TON)
STAIRCASE 7 STAIRCASE 5 STAIRCASE 4

www.byggroup.com
45 m² 45 m² 45 m²

ELEV JAN 1 HCAP 1 IT TELCO ELEV JAN 1 HCAP 1 IT TELCO ELEV JAN 1 HCAP 1 IT TELCO
7 m² 10 m² 7 m² 10 m² 7 m² 10 m² MDF ROOM
(1.6 TON 11 m² (1.6 TON 11 m² (1.6 TON 11 m²
/ 24 Pax) / 24 Pax) / 24 Pax) 7 m²
RWDP HR RWDP HR RWDP
HR HR
RWDP RWDP
RWDP

W A Y
MECHANICAL AND ELECTRICAL ENGINEER

PA Pen Konsult Sdn Bhd


STAIRCASE 3
RWDP RWDP RWDP RWDP RWDP
36 m²

7L-3 Asas Center

D R I V E
FIRE
LIFT 2
STAIRCASE 2
SPRINKLER VALVE ROOM 1 FIRE LOBBY 2

Jalan Gottlieb
34 m²
F.F.L. 4.10 17 m² 7 m²

sliding gate
F.F.L. 3.50 F.F.L. 3.60

WALL TO BE
WRAPPED UP
0.67
WALL TO BE
10350 Penang

9600
Malaysia
WITH ALUMN. WRAPPED UP

PARKING
SOLID PANEL WITH ALUMN.
F.R.L. 3.10

SOLID PANEL
604 2282 515
CER CORNER
RWDP
2 NOS.
RWDP

barrier gate
BUS www.penkonsult.com

W I D E
OUT

COLUMN SETTING FACADE ALUMN.


PERFORATED PANEL
STRUCTURE 0.67
F.F.L. 3.10
R.F.L. 3.025

IN
QUANTITY SURVEYOR
Unitech QS Consultancy
OUT POINT SDN BHD

M M
RWDP

RAMP UP
2 NOS.
RWDP

C1
C1
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,

6 1 0 0
10050 Penang Malaysia
04 229 0092
H17 H16 H15 H14 H13 H12 H11 H10 H9 H8 H7 H6 H5 H4 H3 H2 H1 0.67 0.67
Web/Email: admin@uqs.com.my
RWDP
2 NOS.
EXTERIOR WALKWAY PAVEMENT
RWDP

PROJECT NAME
HA F.F.L. 3.90 F.F.L. 3.70 DOCUMENT BADGE
R.F.L. 3.825 R.F.L. 3.625
CONTROL ROOM

F.F.L. 4.10
ACCESS FROM PARKING STRUCTURE

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


w/OVERHEAD DOORS
R.F.L. 4.025
HB

LOCKER ROOM
barrier gate

3 STOREY CERP
TOILETS
28 m² SHOWER ROOM
12 m²

HC 2 NOS.
RWDP

ST-02

SHOWER ROOM
12 m²
ELEV.
8 m² 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
LOCKER ROOM

BUS DEPOT
TOILETS
28 m²

EXIT CORRIDOR
ST-04
ELEV. 5802 m² 0.67
EXIT CORRIDOR
50 m² 8 m²
metal railing
UP F.F.L. 3.10
FIRE LOBBY HD
1

7 STOREY OFFICE HEAD BUILDING


trucker window UP

R.F.L. 3.025
OUTLINE OF ATRIUM
PUMP ROOM
23 m² ELEV.
81 m²
OPENING ABOVE
Receiving
8 m²
F.F.L. 4.10

7 STOREY PARKING STRUCTURE


Dock leveller Office

RAMP UP
SU-40

WALL TO BE
ST-01
51 m²

WRAPPED UP

2 STOREY SUBSTATION
LOCKER ROOM
TOILETS
27 m²
BUILDING SERVICES
HE WITH ALUMN.
SOLID PANEL
Dock leveller SHOWER ROOM 36 m²
SU-40 12 m²

ELEV.

3 NOS OF GUARDHOUSE
1.6 ton Service
TRUCK LOADING SPACE LOADING DOCK elevator WASTE
10 m² 2 NOS.
W/ OVERHEAD DOORS 188 m² RWDP
392 m² UP

SU-40

COLUMN TO BE
Dock leveller
F.F.L. 3.30 F.R.L. 3.10
1.6 ton Service SHOWER ROOM
elevator SUPPLIES ELEV.
LOCKER ROOM 12 m² -90
WRAPPED UP
10 m² TOILETS
R.F.L. 3.225
28 m²

HF WITH ALUMN. 1 : 18
SOLID PANEL RAMP UP
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
ST-03
BUILDING SERVICES
5 56 m²
IDF
MEN'S RESTROOM WOMEN'S RESTROOM 11 m²
54 m² 54 m² 0.67

HEAD BUILDING PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

W A Y
Dock leveller

WALL TO BE
WRAPPED UP

PERAI SELATAN.
HG
WITH ALUMN.
refuse compactor truck
scissor platform

SOLID PANEL

Roller shutter
ELEV. ELEV.

FOR DEXCOM (M) SDN. BHD.


4 m² 4 m²
WASTE STORAGE BUILDING SERVICES

3
40 m² 73 m²

RWDP

0.32
0.42

D R I V E
kitchen

0.22
exhaust duct
grease trap below
RECYCLE CENTER MEP ROOM RAMP (1 : 10) MOTORCYCLE (IN)
HH 50
60 m²
F.F.L. 3.50
MV ROOM LV ROOM
MEP ROOM
RECYCLE
MEP ROOMCENTER
60 m² 60 m²
LEVEL 01
MEP
?
CAR (IN)
7329 m²

9?
m² RAMP (1 : 10)

ST-05
0
IDF El ec 2 NOS.
6.9 s q.m 9.1 s q.m RWDP RWDP
HI

W I D E
RAMP (1 : 10) CAR (OUT)
EAST ENTRY EXIT DOOR

HJ
ALIGN
ENTRY
MOTORCYCLE (OUT)

EXTERIOR WALKWAY PAVEMENT

M M
RAMP (1 : 10)

PROJECT NUMBER
RWDP

ELEC
10
10 m²

FIRE

9 0 0 0
HK LIFT 3

sliding gate EXTERIOR WALKWAY PAVEMENT EXTERIOR WALKWAY PAVEMENT


FIRE LOBBY 3
LEVEL 1 VISITOR PARKING
1635 m²
14
14 m²

STAIRCASE 4
278585-00
40 m²
F.F.L. 3.40

STAIRCASE 5

PACKAGE
40 m²
VISITOR (IN) VISITOR (OUT)

RWDP RWDP RWDP RWDP RWDP

CUB + WAREHOUSE FIT OUT


F.F.L. 3.30

OPEN CAR PARK A (45 NOS) 1 : 24


RAMP DN
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE
VISITOR VISITOR
IN OUT
11-JUN-2021

SCALE
1 2 0 0 0 M M W I D E D R I V E W A Y
9150 (30'-0") BUILDING LINE
As indicated

IN OUT sliding gate DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

DN DN DN ARCHITECTURAL
DN DN DN DRAWING SUMMARY
DN

LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 KEY PLAN UB+WH_A0001


ROOF LEVEL
1/6/2021 2:26:36 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
SPECIFICATIONS

UB+WH_A0002
1/6/2021 2:26:59 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

92.60 70.00

17.00 17.00 17.00 17.00 17.00 7.60 1.40 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

UB+WH_A4001

WHS
SPRINKLER WHS SPRINKLER
D2-A1 VALVE ROOM D2-A1 SPRINKLER VALVE ROOM W3 W4
2 D2-A1 VALVE ROOM EGRESS E E E E E E E
APRON APRON 22 m²
15 m² 1 D2-A1 STAIRS 1 D2-A1 D2-A1 D2-A1
F.F.L. 3.40
TOILET 1B
D2-A1
D1-A1 F.F.L. 3.30
D2-A1
9 m² 6 m² E F.F.L. 3.30 STAIRCASE 1 4 m²
RS-4
D1-A1 25 m² TOILET 1A TOILET 1C sump

4 m² 4 m²
WK HR riser for elec/IT riser for rwdp/sprinkler/water UP WK
EYEWASH TOILET 1F
IDF-WHS-1.1 PRAYER (F)

HD

HD

HD

HD
FM200
D1-A2 FWS
HR HR & SHOWER 4 m²

FM200
D1-FD1
VCDSTAIRCASE 5 ISSUE DATE DESCRIPTION
D1-FD1 24 m² 21 m² VCD
D1-A6 17 m² D1-A1 D1-A2c
E
PRAYER (M) CORRIDOR 1A HRHR TOILET 1D TOILET 1E

F FM200 F
D1-A6 D1-A6
ELECTRICAL 23 m² 25 m² 4 m² 4 m²

12.00
TEMPORARY MHE DW-2

FM200
PARKING 24 m² MAINTENANCE
162 m²
D1-A2 D1-A5 TRUCKER'S
17.00

D1-FD2c 7 (total 6 nos.) LOUNGE ( NORTH TRENCH ) Dexcom


VCD OFFICE D1-A4c VCD 6340 Sequence Drive
158 m²
HUDDLE 114 m² San Diego, CA 92121
888 738 3646
F.F.L. 3.40
D1-FD1 www.dexcom.com
29 m²
D1-FD2
SFAP
HR
E UN PROJECT LEAD
D1-A5 D1-A5 D1-A5 D1-A5

3.715
HR
HR Arup Jururunding Sdn Bhd
D1-FD1 Gurney Paragon Mall Level 6
D1-A6 DOCK Lots L6.01 to L6.09
WHS ELEC 2 VCD D1-A6
LEVELLER
( 5 TONS)
RS-1 1 VCD 163-D Persiaran Gurney
TOILET 1 D1-FD3 FRS-4 10250 Penang Malaysia
WJ 5 m²
25 m² WJ 604 2933 800

12.00
HR HR HR D1-A6

HR

4.57
HR www.arup.com
HR
TOILET 2 TOILET 3 JAN DOCK DESIGN ARCHITECT
D1-A6 LEVELLER RS-1 2 UNDERGROUND
5 m² 5 m² 5 m² D1-A6 D1-A6 ( 5 TONS)
TUNNEL
1 2 3 4 5 6 7 SABArchitects

3.715
D1-FD2 PORTABLE
VCD
EYE WASH
233
VCD m² 2 Nickerson Suite 200
D1-A6 Seattle, Wa 98109

HR
F.F.L. 0.70
UM
206 957 6400
HR E www.sabarch.com

CB

CB

CB

CB
17.00

IT FOLKLIFT CHARGING DN RAMP UP


CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
VCD D1-A3 DOCK VCD Gurney Paragon Mall Level 6
APRON LEVELLER RS-1 3 Lots L6.01 to L6.09

12.00
( 5 TONS)
163-D Persiaran Gurney
F.F.L. 3.30 3.00 10250 Penang Malaysia

4.57
RS-5 FOLKLIFT TRAVEL LANE 604 2933 800
www.arup.com
DOCK
8 9 10 11 12 13 ARCHITECT
WH 4
WH
LEVELLER
PORTABLE ( 5 TONS)
RS-1

2.285
EYE WASH

TUNNEL BELOW
D1-A6
VCD VCD BYG Architecture Sdn. Bhd.
HR HR HR HR E UL 12A, Arratoon Road 10050

CB

CB

CB

CB
D1-A6
WHS Penang, Malaysia

3.715
D1-A6 D1-A6 FOLKLIFT CHARGING VESTIBULE 3 604 228 8852
www.byggroup.com
D1-A3
1623 m² DOCK
LEVELLER
( 5 TONS)
RS-1 5
MECHANICAL AND ELECTRICAL ENGINEER

12.00
Pen Konsult Sdn Bhd

4.57
VCD FOLKLIFT TRAVEL LANE VCD
17.00

RS-5
7L-3 Asas Center
Jalan Gottlieb
DOCK E 10350 Penang
LEVELLER
( 5 TONS)
RS-1 6 Malaysia
604 2282 515

HR
D1-A6

3.715
IT
PORTABLE www.penkonsult.com
HR 14 15 16 17 18 19 20 EYE WASH
QUANTITY SURVEYOR
D1-A6 E UK

HR
VCD VCD
D1-A6 HR Unitech QS Consultancy
D2-A1
SDN BHD

CB

CB

CB

CB
HR platform
12A-A, Menara Northam, 55, Jalan
WG WG
FOLKLIFT CHARGING DOCK
LEVELLER RS-1 Sultan Ahmad Shah,
D2-A1 BIG large size ( 5 TONS)
7 10050 Penang Malaysia
EQUIPMENT equipment 04 229 0092

4.285
HR HR HR bib tap Web/Email: admin@uqs.com.my
WHS ELEVATOR UJ1

12.00
D1-A6 D1-A6 D1-A6
1 SPRINKLER - 1
PROJECT NAME
VCD VCD
UB+WH_A5001 VALVE ROOM ---
RS-3
UB+WH_A5001
3 BIG CONCRETE PROPOSED MANUFACTURING FACILITY CONSISTING OF:
FRS-1
9 m² 8 PLATFORM

4.553
3
- 60M EQUIPMENT
UB+WH_A4001 RADIUS 3 STOREY CERP
--- ELEVATOR VERTICAL SHAFT F.F.L. 4.30 R.L. 3.10 1 STOREY WAREHOUSE
17.00

D2-A1 60M D1-A1c


3 STOREY CENTRAL UTILITY BUILDING
EGRESS
RADIUS

D1-A6
STAIRCASE 2 E UJ 7 STOREY OFFICE HEAD BUILDING
STAIRS 2 D1-A1 HR 7 STOREY PARKING STRUCTURE

HR
HR
VCD FWS 23 m² 1
UB+WH_A4001
VCD
2 STOREY SUBSTATION
6 m² 60M RS-5 D1-A3 F.F.L. 3.40
60M RADIUS D1-A6 3 NOS OF GUARDHOUSE
D1-FD1
RADIUS D1-FD1 E
D1-A3
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
DOCK
LEVELLER RS-1 9 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

12.00
( 5 TONS) PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

4.57
RS-5 FOLKLIFT TRAVEL LANE
WF WF
STAIRCASE 4 MAIN 21 22 23 24 25 26 27 DOCK
HR HR HR HR PORTABLE LEVELLER RS-1 10
15 m² WAREHOUSE EYE WASH
( 5 TONS)

D1-A6
D1-A6 F.F.L. 4.30 D1-FD1 14400 m² D1-A6 D1-A6
E UH PROJECT NUMBER

6.00
CB

CB

CB

CB
F.F.L. 4.30 FOLKLIFT CHARGING 278585-00
D1-A3 DOCK
LEVELLER
RS-1 11 PACKAGE
17.00

( 5 TONS)
IT 1

UNDERGROUND
CUB + WAREHOUSE FIT OUT

12.00
UB+WH_A5002
MATCHLINE - SEE DWG UB+WH_2101_A2

4.57
RS-5 FOLKLIFT TRAVEL LANE

DOCK 2 1 : 200
DESIGNED DRAWN CHECKED APPROVED
LEVELLER
( 5 TONS) RS-1 12
WHS CH TAN GL YEAP SK HO BEN YEOH
28 29 30 31 32 33 34
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

3.715
HR PORTABLE
EYE WASH
VESTIBULE 2
DATE
D1-A6 1336 m²
D1-A6 E UG

HR
11-JUN-2021

CB

CB

CB

CB
WE F.F.L. 4.30
HR

3.715
FOLKLIFT CHARGING
SCALE
HR HR HR D1-A3 DOCK

D1-A6 D1-A6
LEVELLER RS-1 13 1 : 200
D1-A6 ( 5 TONS)

12.00
4.57
RS-5 FOLKLIFT TRAVEL LANE DRAWING STATUS

DOCK 100% OF PHASE 4 CONSTRUCTION DOCUMENTS


RS-5 D1-A3 LEVELLER
( 5 TONS)
RS-1 14

3.715
DRAWING TITLE

HR
D1-A6
ARCHITECTURAL
HR
E UF FLOOR PLAN
IT bib tap LEVEL 1
ZONE A1

UB+WH_A2101_A1
DOCK
LEVELLER
( 5 TONS) 15
1/6/2021 6:46:07 PM

FOLKLIFT TRAVEL LANE


STAMP
3 1 2 3
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

REMARK:
D2-A1 - ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
HR HR HR
WHS
SPRINKLER
VALVE ROOM RS-3
3 BIG CONCRETE
FRS-1
8 PLATFORM
9 m² EQUIPMENT
A2
- 60M
3
UB+WH_A4001 RADIUS
--- ELEVATOR VERTICAL SHAFT F.F.L. 4.30 R.L. 3.10
D2-A1 60M D1-A1c

EGRESS
RADIUS

D1-A6
STAIRCASE 2 E UJ
STAIRS 2 D1-A1 HR

HR
HR
VCD FWS 23 m² 1
UB+WH_A4001
6 m² 60M RS-5 D1-A3 F.F.L. 3.40
60M RADIUS D1-A6
D1-FD1
RADIUS D1-FD1 E
D1-A3 DOCK
LEVELLER RS-1 9

12.00
( 5 TONS)

4.57
RS-5 FOLKLIFT TRAVEL LANE
WF
STAIRCASE 4 MAIN 21 22 23 24 25 26 27 DOCK
HR HR HR HR PORTABLE LEVELLER RS-1 10
15 m² WAREHOUSE EYE WASH
( 5 TONS)

D1-A6
D1-A6 F.F.L. 4.30 D1-FD1 14400 m² D1-A6 D1-A6
E UH

6.00
CB

CB

CB

CB
F.F.L. 4.30 FOLKLIFT CHARGING

D1-A3 DOCK
LEVELLER
RS-1 11
17.00

( 5 TONS)
IT

12.00
MATCHLINE - SEE DWG UB+WH_2101_A1

4.57
RS-5 FOLKLIFT TRAVEL LANE

DOCK
LEVELLER
( 5 TONS) RS-1 12
28 29 30 31 32 33 34 WHS

3.715
HR PORTABLE
EYE WASH
VESTIBULE 2
D1-A6 1336 m²
D1-A6 E UG

HR
CB

CB

CB

CB
WE F.F.L. 4.30
HR

3.715
FOLKLIFT CHARGING

HR HR HR D1-A3 DOCK

D1-A6 D1-A6
LEVELLER RS-1 13
D1-A6 ( 5 TONS)

12.00
4.57
RS-5 FOLKLIFT TRAVEL LANE

DOCK
RS-5 D1-A3 LEVELLER RS-1 14
17.00

( 5 TONS)

3.715
HR
D1-A6

HR
E UF
IT bib tap

3.715

FHC
D1-A3 DOCK
LEVELLER
( 5 TONS)
RS-1 15

12.00
WD

4.57
RS-5 FOLKLIFT TRAVEL LANE

60M
HR HR HR DOCK
RADIUS LEVELLER
( 5 TONS)
RS-1 16 ISSUE DATE DESCRIPTION
D1-A6 D1-A6 35 36 37 38 39 40 41

3.715
D1-A6
HR PORTABLE
EYE WASH
D1-A6
60M
RADIUS D1-A6 E UE

HR
CB

CB

CB

CB
HR
FOLKLIFT CHARGING WHS
17.00

D1-A3
VESTIBULE 1 DOCK Dexcom
1389 m² LEVELLER
( 5 TONS)
RS-1 17 6340 Sequence Drive
2 San Diego, CA 92121
888 738 3646
UB+WH_A5001

12.00
4.57
FOLKLIFT TRAVEL LANE www.dexcom.com
RS-5

PROJECT LEAD

FHC
DOCK
D1-A6 LEVELLER RS-1 18 Arup Jururunding Sdn Bhd
( 5 TONS)
Gurney Paragon Mall Level 6
42 43 44 45 46 47 48

HR

3.715
PORTABLE Lots L6.01 to L6.09
163-D Persiaran Gurney
WC HR EYE WASH
D1-A6 10250 Penang Malaysia

HR
E UD 604 2933 800
www.arup.com

CB

CB

CB

CB

2.285
HR HR HR
FOLKLIFT CHARGING DOCK
D1-A6 D1-A6 D1-A6 LEVELLER
( 5 TONS)
RS-1 19 DESIGN ARCHITECT

SABArchitects

4.57
RS-5 FOLKLIFT TRAVEL LANE
2 Nickerson Suite 200

12.00
Seattle, Wa 98109
DOCK 206 957 6400
RS-1 20
17.00

LEVELLER www.sabarch.com
D1-A3 ( 5 TONS)
D1-A6

D1-FD3c STAIRCASE 3 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


23 m² DN RS-1 RAMP UP Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING
HR HR F.F.L. 3.40 Gurney Paragon Mall Level 6
UC
IT
HR E Lots L6.01 to L6.09
D1-A6 163-D Persiaran Gurney

HR
D1-A1c
FWS 10250 Penang Malaysia
FRS-4

FS
FS
D2-A2 604 2933 800

FS
100MM N2 PIPE & AR PIPE LAID UNDERGROUND

FS
www.arup.com

WB D1-FD1 DOCK
LEVELLER
( SOUTH TRENCH ) ARCHITECT
RS-2

12.00
( 5 TONS)
HR HR HR IQA STAGING IQA BYG Architecture Sdn. Bhd.
D1-A6

4.00
FRS-4 D1-FD3
75 m² 186 m² 12A, Arratoon Road 10050
D1-A6 D1-A6 D1-A6 HR Penang, Malaysia
604 228 8852
DOCK
LEVELLER RS-2 www.byggroup.com
( 5 TONS)

MECHANICAL AND ELECTRICAL ENGINEER


E UB Pen Konsult Sdn Bhd
RAW HAZ. 7L-3 Asas Center
20.00

HAZ. WASTE 1 HAZ. WASTE 3

4.741
IT WASH AREA WASH WASH WASH Jalan Gottlieb
(TAP & OUTLET)
MATERIAL 1 AREA
D1-A6
AREA AREA
10350 Penang
FRS-3
(TAP &
53 m² (TAP & (TAP &
55 m² D1-FD3c Malaysia
55 m² OUTLET) OUTLET) OUTLET)
604 2282 515
DN HR DN DN www.penkonsult.com
WASTE HR

12.00
HR
D1-A6 MANAGEMENT D1-FD3c CORRIDOR 1B PORTABLE
FRS-3 QUANTITY SURVEYOR
FRS-3c D1-FD3c FRS-3 D1-FD3c EYE WASH D1-A6
WASTE 346 m² 128 m² D1-FD3c
FRS-3
Unitech QS Consultancy
MANAGEMENT

HR
DN DN DN SDN BHD

FD
RS-5
282 m² FRS-3 HR 12A-A, Menara Northam, 55, Jalan
RS-5 Sultan Ahmad Shah,

3.259
FRS-3
RS-5 RAW HAZ. WASH WASH WASH D1-A1c 10050 Penang Malaysia
D1-A6 D1-A6 D1-A6 D1-A6 AREA HAZ. WASTE 2 AREA AREA HAZ. WASTE 4 D1-FD3c
HR HR HR MATERIAL 2 (TAP & (TAP & (TAP & 04 229 0092

WA 53 m² 55 m² UA Web/Email: admin@uqs.com.my
OUTLET) OUTLET) OUTLET)

HR
CROSS BRACING
HR
CROSS BRACING
53 m²
PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


CJ
35.945 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
3 1 2 3 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CERP BUILDING CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 1
ZONE A2
CE
UB+WH_A2101_A2
1/6/2021 6:46:49 PM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

92.60 70.00

17.00 17.00 17.00 17.00 17.00 7.60 1.40 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

UB+WH_A4001

CONCRETE FLOOR
CONCRETE FLOOR
TOILET 2A TOILET 2B STAIRCASE 1
VD
F.F.L. 7.30
F.F.L. 7.30 3 m² 3 m² 25 m²
WK MET
riser for elec/IT UP
riser for HR FWS
rwdp/sprinkler/ ISSUE DATE DESCRIPTION
S H S H water D1-FD1c
HR
D1-A5
D2-FD2 HR

FD
FD
HR
WASH AREA
D1-A5 D1-FD3c

12.00
(TAP & OUTLET)

NET
S H S H
FRS-2
GASEOUS Dexcom
17.00

ELECTRICAL: 6340 Sequence Drive


11KV SUPPRESSION San Diego, CA 92121
ESSENTIAL 8 m² 888 738 3646
www.dexcom.com
MAIN
SWITCHGEAR UN

NET
FRS-2
PROJECT LEAD
520 m² (2 nos.) Arup Jururunding Sdn Bhd

FHC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
CONCRETE

FM200 FM200
163-D Persiaran Gurney

F
FLOOR 10250 Penang Malaysia

FHC
WJ VD VD VD VD (2 nos.) AHU 2B 604 2933 800

12.00
www.arup.com
F.F.L. 8.30 FRS-2 262 m²
DESIGN ARCHITECT
MET D1-FD2c
SABArchitects

FM200
MET
2 Nickerson Suite 200
Seattle, Wa 98109

F
D1-FD2c 206 957 6400
NRD
VCD
UM www.sabarch.com

FM200
17.00

FRS-2 VCD VCD


NRD CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
(2 nos.)
Arup Jururunding Sdn Bhd
ELECTRICAL: VCD NRD
VCD Gurney Paragon Mall Level 6

WAREHOUSE BUILDING CUB Lots L6.01 to L6.09

12.00
163-D Persiaran Gurney
ESSENTIAL/ 10250 Penang Malaysia

NET
VCD
604 2933 800
LIFE SAFETY
GASEOUS www.arup.com

HR
535 m² SUPPRESSION
FRS-2
ARCHITECT
WH 8 m² WASH AREA
(TAP & OUTLET)
D1-FD3c HR HR BYG Architecture Sdn. Bhd.
UL 12A, Arratoon Road 10050

NET

FHC
Penang, Malaysia
FRS-2 604 228 8852
(2 nos.) www.byggroup.com

FHC
MECHANICAL AND ELECTRICAL ENGINEER
FACILITIES Pen Konsult Sdn Bhd

12.00
ENGINEERING
17.00

D2-FD2
MET 7L-3 Asas Center
STORE 1 Jalan Gottlieb
10350 Penang
WASH AREA
(TAP & OUTLET) 108 m² Malaysia
604 2282 515
www.penkonsult.com
AHU 2A FRS-2
D2-A2c
108 m² QUANTITY SURVEYOR

D1-FD3
UK Unitech QS Consultancy
SDN BHD
D1-A4 12A-A, Menara Northam, 55, Jalan
MEETING
WG BIG
large size ROOM
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
equipment HR W3 34 m²
EQUIPMENT Web/Email: admin@uqs.com.my

UJ1

12.00
ELEVATOR

RS
1 CORRIDOR 2A PROJECT NAME
UB+WH_A5001
859 m² PROPOSED MANUFACTURING FACILITY CONSISTING OF:
BIG F.F.L. 11.50
EQUIPMENT 3.00 12.98 3 STOREY CERP
3
UB+WH_A4001
ELEVATOR FRS-1 1 STOREY WAREHOUSE
17.00

VERTICAL SHAFT 3 STOREY CENTRAL UTILITY BUILDING


CONCRETE UJ 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
FLOOR MET HR

FHC
IT

HR
D2-FD2c FWS
1 2 STOREY SUBSTATION
F.F.L. 7.30 ELECTRICAL: UB+WH_A4001
D1-FD1c 3 NOS OF GUARDHOUSE
WAREHOUSE

FM200 F
CONCRETE FLOOR ESSENTIAL AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
111 m² STAIRCASE 2 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

12.00
PERAI SELATAN.
23 m²
F.F.L. 8.30 FACILITIES FOR DEXCOM (M) SDN. BHD.
D2-A2c
NET
ENGINEERING
WF WASH AREA STORE 2
(TAP & OUTLET)
170 m²
HR HR

HR
VCD

HR
VCD D1-FD3c
UH PROJECT NUMBER
HR
HR HR
HR
278585-00
D1-FD3c
M
FRS-2 FRS-2 PACKAGE
17.00

FHC
CUB + WAREHOUSE FIT OUT
MATCHLINE - SEE DWG UB+WH_2102_A2

12.00
FD
VOID
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

FD
DATE
M
M
UG 11-JUN-2021
WE
SCALE

FD
1 : 200

12.00
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

HR DRAWING TITLE

HR
ARCHITECTURAL
UF

HR
HR
FLOOR PLAN

HR
HR HR HR LEVEL 2
ZONE A1

UB+WH_A2102_A1
1/6/2021 2:30:51 AM

STAMP
3 1 2 3
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002 IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.

CORRIDOR 2A
859 m²
BIG F.F.L. 11.50
EQUIPMENT
3
UB+WH_A4001
ELEVATOR FRS-1
3.00 12.98
A2
VERTICAL SHAFT
CONCRETE UJ
FLOOR MET HR

FHC
IT

HR
D2-FD2c FWS
F.F.L. 7.30 ELECTRICAL: 1
UB+WH_A4001
D1-FD1c
WAREHOUSE

FM200 F
CONCRETE FLOOR ESSENTIAL
111 m² STAIRCASE 2

12.00
23 m²
F.F.L. 8.30 D2-A2c
FACILITIES
NET
ENGINEERING
WF WASH AREA STORE 2
(TAP & OUTLET)
170 m²
HR HR

HR
VCD

HR
VCD D1-FD3c
UH
HR
HR HR
HR
D1-FD3c
M
FRS-2 FRS-2
17.00

FHC

12.00
MATCHLINE - SEE DWG UB+WH_2102_A1

FD
VOID

FD
M
M
UG
WE

FD

12.00
17.00

HR

HR
UF

HR
HR
HR
HR HR HR

FHC

FHC

12.00
WD
AHU 2C
ISSUE DATE DESCRIPTION
1245 m²

UE

HR
CDA
D1-FD3c
1312 m²
17.00

Dexcom
6340 Sequence Drive
2 FRS-2 San Diego, CA 92121
UB+WH_A5001 888 738 3646

12.00
www.dexcom.com

HR HR PROJECT LEAD

HR
HR
HR Arup Jururunding Sdn Bhd

HR
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia
UD 604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200

12.00
Seattle, Wa 98109
206 957 6400
17.00

www.sabarch.com
FRS-2

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


D1-FD3c Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6

HR

HR
FHC
Lots L6.01 to L6.09

HR
163-D Persiaran Gurney
HR HR HR
STAIRCASE 3 10250 Penang Malaysia
604 2933 800
22 m² www.arup.com

WB ARCHITECT

12.00
FWS BYG Architecture Sdn. Bhd.
HR
HR FHC 12A, Arratoon Road 10050
Penang, Malaysia
FRS-2 IT 604 228 8852
HR www.byggroup.com
HR
D1-FD1c

D1-FD3c D1-FD1 MECHANICAL AND ELECTRICAL ENGINEER


FD
UB Pen Konsult Sdn Bhd

HR
HR
20.00

7L-3 Asas Center


CONCRETE FLOOR Jalan Gottlieb
10350 Penang
ESCAPE PA
F.F.L. 7.30 Malaysia
CER CORRIDOR 604 2282 515
www.penkonsult.com
STAGING 26 m² CONCRETE

12.00
AREA FLOOR QUANTITY SURVEYOR
FSD
469 m² Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
WASH AREA HR 04 229 0092

WA (TAP & OUTLET) HR


UA Web/Email: admin@uqs.com.my

FHC
PA
DN
PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
1 3 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
UB+WH_A5002 UB+WH_A5002

3
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UB+WH_A5001 2
CH PERAI SELATAN.
UB+WH_A5002 FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CERP BUILDING CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 2
ZONE A2
CE
UB+WH_A2102_A2
1/6/2021 2:31:13 AM

STAMP

- - - IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

92.60 70.00

17.00 17.00 17.00 17.00 17.00 7.60 1.40 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

UB+WH_A4001

TOILET 3A TOILET 3B
STAIRCASE 1
3 m² 3 m²
25 m²
WK
wJ DET
riser for elec/IT UP
BMS riser for FWS
HR rwdp/sprinkler/
FACILITY HR ISSUE DATE DESCRIPTION
water D1-A5 D1-A5 D1-FD1c
BAY
D1-A4c
HR HR WASH AREA
(TAP & OUTLET)
MEETING DOCUMENT

12.00
ROOM CONTROL
W2 VD

DISCUSSION
ROOM
17.00

DW1 Dexcom
W4 W3 D1-A4c 6340 Sequence Drive
FRS-2
San Diego, CA 92121
888 738 3646
VD www.dexcom.com

UN
D1-A4 D1-A4

MET D1-A4 PROJECT LEAD


HR
D1-FD3 Arup Jururunding Sdn Bhd

HR
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
AHU 10250 Penang Malaysia
WJ
wI 604 2933 800

12.00
487 m² www.arup.com

W5
FACILITIES DESIGN ARCHITECT
OFFICE
316 m² SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com
17.00

FRS-2

WASH AREA CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


W2 (TAP & OUTLET)

D1-FD3 HR
HR Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING

FM200
Gurney Paragon Mall Level 6
HR

HR
Lots L6.01 to L6.09

12.00
D1-FD3 NET
163-D Persiaran Gurney
10250 Penang Malaysia
W3

F
604 2933 800
D1-A4c www.arup.com
FRS-2
D1-A4c
ELECTRICAL ARCHITECT
WH
wH
D1-A4
W6 MET
150 m²
BYG Architecture Sdn. Bhd.

FM200 F
EYEWASH &
SHOWER
NET
UL 12A, Arratoon Road 10050

FM200
Penang, Malaysia
FACILITIES D1-FD2
ELECTRICAL:
604 228 8852
www.byggroup.com
WORKSHOP CUB &
179 m² WAREHOUSE
FRS-2 MECHANICAL AND ELECTRICAL ENGINEER
LIFE SAFETY

12.00
(2 nos.)
RS-6
164 m² Pen Konsult Sdn Bhd
17.00

D1-A4 D1-A4
MET 7L-3 Asas Center
Jalan Gottlieb
D1-A4 10350 Penang
D1-A4c Malaysia
604 2282 515

HR
PORTABLE HR www.penkonsult.com
EYE WASH
PORTABLE
EYE WASH
QUANTITY SURVEYOR
HOT &
TOOL
STORE
MACHINING
UK Unitech QS Consultancy
DIRTY
PROCESS FACILITIES SDN BHD
ENGINEERING 12A-A, Menara Northam, 55, Jalan
WG
wG D2-A2 STORE 3 Sultan Ahmad Shah,
BIG 10050 Penang Malaysia
151 m² 04 229 0092
EQUIPEMENT CORRIDOR 3A Web/Email: admin@uqs.com.my
UJ1

12.00
ELEVATOR
1 359 m² PROJECT NAME
UB+WH_A5001 F.F.L. 18.70
FRS-1
BIG PROPOSED MANUFACTURING FACILITY CONSISTING OF:
1.50 14.48
3
UB+WH_A4001
EQUIPMENT FRS-2 3 STOREY CERP
ELEVATOR 1 STOREY WAREHOUSE
17.00

VERTICAL SHAFT 3 STOREY CENTRAL UTILITY BUILDING


UJ 7 STOREY OFFICE HEAD BUILDING

HR
HR
7 STOREY PARKING STRUCTURE

HR
HR FWS
D2-FD1c large size 1
UB+WH_A4001 2 STOREY SUBSTATION
D1-FD1c 3 NOS OF GUARDHOUSE
equipment
IT
STAIRCASE 2 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
23 m²

12.00
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

WF
wF
VD

VD UH PROJECT NUMBER

278585-00

PACKAGE
17.00

CUB + WAREHOUSE FIT OUT

12.00
MATCHLINE - SEE DWG UB+WH_2103_A2
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

VOID
HR DATE
UG

HR
11-JUN-2021
WE
wE

HR
HR SCALE

1 : 200

12.00
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF FLOOR PLAN
LEVEL 3
ZONE A1

UB+WH_A2103_A1
1/6/2021 6:47:40 PM

STAMP
3 1 2 3
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.

CORRIDOR 3A
359 m²
F.F.L. 18.70
FRS-1
BIG
A2
1.50 14.48
3
UB+WH_A4001
EQUIPMENT FRS-2
ELEVATOR
VERTICAL SHAFT
UJ

HR
HR

HR
HR FWS
D2-FD1c large size 1
UB+WH_A4001
D1-FD1c
equipment
IT
STAIRCASE 2
23 m²

12.00
WF
wF
VD

VD UH
17.00

12.00
MATCHLINE - SEE DWG UB+WH_2103_A1

VOID
HR

UG

HR
WE
wE

HR
HR

12.00
17.00

UF

12.00
WD
wD
CHILLER HALL
3590 m²
ISSUE DATE DESCRIPTION

HR
UE

HR

HR
17.00

HR
Dexcom
6340 Sequence Drive
2 San Diego, CA 92121
888 738 3646
UB+WH_A5001

12.00
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC
wC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200

12.00
Seattle, Wa 98109
206 957 6400
17.00

www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

HR
Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING
HR Gurney Paragon Mall Level 6
UC

HR
HR
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
STAIRCASE 3
WB
wB 23 m²
ARCHITECT

12.00
IT
FWS BYG Architecture Sdn. Bhd.
D1-FD1c 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
20.00

Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

12.00
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
HR HR HR
WA
wA UA
HR Web/Email: admin@uqs.com.my

HR
HR
PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


3 1 2 3
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CERP BUILDING CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 3
ZONE A2
CE
UB+WH_A2103_A2
1/6/2021 6:47:53 PM

STAMP

- - -
IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

92.60 70.00

17.00 17.00 17.00 17.00 17.00 7.60 1.40 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

UB+WH_A4001

WK
wJ UP
FWS W1
ISSUE DATE DESCRIPTION

STAIRCASE 1
23 m² D1-FD1c

12.00
J
F.F.L. 27.80
J
17.00

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

UN

MET

NET
PROJECT LEAD
? ?
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
GENERATOR 163-D Persiaran Gurney
10250 Penang Malaysia
2
WJ
wI 604 2933 800

12.00
570 m² www.arup.com
SLOPE DEGREE SLOPE DEGREE
0.573 0.573
(2 nos.) DESIGN ARCHITECT
D1-FD2 FRS-2
SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com
17.00

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


FLASHING
Arup Jururunding Sdn Bhd
OPEN AREA GENERATOR
WAREHOUSE BUILDING
Gurney Paragon Mall Level 6
OPEN AREA Lots L6.01 to L6.09
1

12.00
279 m² 163-D Persiaran Gurney
325 m²
F.F.L. 27.70 571 m² 10250 Penang Malaysia
F.F.L. 27.70 604 2933 800
F.F.L. 27.80 www.arup.com

ARCHITECT
WH
wH
?
BYG Architecture Sdn. Bhd.
UL

MET

NET
? 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER

12.00
Pen Konsult Sdn Bhd
17.00

7L-3 Asas Center


? Jalan Gottlieb
10350 Penang
D1-A2 D1-A2 Malaysia
604 2282 515
www.penkonsult.com
3.5 4M X 4M
ACOUSTIC DOOR
QUANTITY SURVEYOR
J
FM200 IT
UK Unitech QS Consultancy
NET

FWS GENERATOR SDN BHD


12A-A, Menara Northam, 55, Jalan
WG
wG D2-FD3c D2-FD2
large size
LOAD BANK Sultan Ahmad Shah,
10050 Penang Malaysia
BIG 85 m² 04 229 0092
equipment

FM200
GENERAL J MET Web/Email: admin@uqs.com.my
EQUIPMENT UJ1

12.00
1 ELEVATOR PURPOSE
PROJECT NAME
UB+WH_A5001 310 m²
BIG PROPOSED MANUFACTURING FACILITY CONSISTING OF:
F.F.L. 27.80
3
EQUIPMENT
UB+WH_A4001 3 STOREY CERP
ELEVATOR 1 STOREY WAREHOUSE
17.00

VERTICAL SHAFT 3 STOREY CENTRAL UTILITY BUILDING


DN
UJ 7 STOREY OFFICE HEAD BUILDING
FWS
7 STOREY PARKING STRUCTURE
1
UB+WH_A4001 2 STOREY SUBSTATION
W1 3 NOS OF GUARDHOUSE
D1-A2c RS-3
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
STAIRCASE 2 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

12.00
23 m² D1-FD1c PERAI SELATAN.
F.F.L. 27.80 FOR DEXCOM (M) SDN. BHD.

WF
wF

UH

WP

WP
PROJECT NUMBER

278585-00

PACKAGE
17.00

F.F.L. 27.70
CUB + WAREHOUSE FIT OUT

12.00
MATCHLINE - SEE DWG UB+WH_2104_A2 COOLING
TOWER ZONE DESIGNED DRAWN CHECKED APPROVED
3682 m²
CH TAN GL YEAP SK HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

UG 11-JUN-2021
WE
wE
SCALE

SLOPE DEGREE SLOPE DEGREE 1 : 200


0.573 0.573

12.00
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF

WP

WP
FLOOR PLAN
LEVEL 4
ZONE A1

UB+WH_A2104_A1
1/6/2021 2:35:35 AM

STAMP
3 1 2 3
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

REMARK:
large size - ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
BIG equipment COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
EQUIPMENT GENERAL
ELEVATOR PURPOSE
310 m²
BIG F.F.L. 27.80
- EQUIPMENT
3
UB+WH_A4001 --- ELEVATOR A2
VERTICAL SHAFT
DN
UJ
FWS
1
UB+WH_A4001
W1
D1-A2c RS-3
STAIRCASE 2

12.00
23 m² D1-FD1c
F.F.L. 27.80

WF
wF

UH

WP

WP
17.00

F.F.L. 27.70

12.00
MATCHLINE - SEE DWG UB+WH_2104_A1 COOLING
TOWER ZONE
3682 m²

UG
WE
wE

SLOPE DEGREE SLOPE DEGREE


0.573 0.573

12.00
17.00

UF

WP

WP

12.00
WD
wD

ISSUE DATE DESCRIPTION


M

UE
M
17.00

Dexcom
2 6340 Sequence Drive
San Diego, CA 92121
UB+WH_A5001

12.00
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
M M
Lots L6.01 to L6.09
WC
wC 163-D Persiaran Gurney
10250 Penang Malaysia
UD

WP

WP
604 2933 800
www.arup.com

M M
D2-A3 DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200

12.00
Seattle, Wa 98109
206 957 6400
17.00

www.sabarch.com
D1-FD1c

M M
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
FWS 163-D Persiaran Gurney
W1 10250 Penang Malaysia
M M
604 2933 800
www.arup.com

WB
wB SLOPE DEGREE SLOPE DEGREE ARCHITECT

12.00
0.573 0.573
STAIRCASE 3
BYG Architecture Sdn. Bhd.
23 m² 12A, Arratoon Road 10050
Penang, Malaysia
F.F.L. 27.80
604 228 8852
www.byggroup.com
M M

UB MECHANICAL AND ELECTRICAL ENGINEER

WP

WP
Pen Konsult Sdn Bhd
20.00

M
7L-3 Asas Center
M
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com
FLASHING FLASHING

12.00
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
WA
wA UA Web/Email: admin@uqs.com.my

PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

3 1 2 3 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
CH PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG
CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CERP BUILDING CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE
CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
LEVEL 4
ZONE A2
CE
UB+WH_A2104_A2
1/6/2021 2:35:49 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

92.60 70.00

17.00 17.00 17.00 17.00 17.00 7.60 1.40 6.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

UB+WH_A4001

WK UP
F.F.L. 30.85 ISSUE DATE DESCRIPTION

CONCRETE FLOOR

12.00
17.00

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

UN PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
WJ 604 2933 800

12.00
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM 206 957 6400


www.sabarch.com

3.5
17.00

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
Gurney Paragon Mall Level 6

12.00
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

WH ARCHITECT

BYG Architecture Sdn. Bhd.


UL W7
w9 U1 U2 U3 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER

12.00
Pen Konsult Sdn Bhd
17.00

7L-3 Asas Center


Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

UK UK QUANTITY SURVEYOR
Unitech QS Consultancy
PA
SDN BHD
12A-A, Menara Northam, 55, Jalan
WG WG
wG Sultan Ahmad Shah,

FWS
10050 Penang Malaysia

3.5
CONCRETE 04 229 0092
Web/Email: admin@uqs.com.my
FLOOR UJ1 UJ1

12.00
1
F.F.L. 39.05
1 LIFT MOTOR D2-FD1 PROJECT NAME
UB+WH_A5001 UB+WH_A5001 ROOM
PA
118 m² PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3
UB+WH_A4001 F.F.L. 33.85 3 STOREY CERP
RS 1 STOREY WAREHOUSE
17.00

3 STOREY CENTRAL UTILITY BUILDING


UJ UJ 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
1
UB+WH_A4001 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

CONCRETE AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


FLOOR PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG

12.00
PERAI SELATAN.
F.F.L. 30.85 FOR DEXCOM (M) SDN. BHD.

WF
2
UB+WH_A5002

UH PROJECT NUMBER

LIFT MOTOR ROOM LEVEL 278585-00

2 1 : 200 PACKAGE
17.00

12.00
CUB + WAREHOUSE FIT OUT
MATCHLINE - SEE DWG UB+WH_2105_A2
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE
UG 11-JUN-2021
WE
SCALE

1 : 200

12.00
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF FLOOR PLAN
ROOF LEVEL
ZONE A1

UB+WH_A2105_A1
1/6/2021 2:36:06 AM

STAMP
3 1 2 3
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

REMARK:
- ALL EQUIPMENT ARE INDICATIVE IN SIZE ONLY, ACTUAL PLINTH SIZE SHALL BE N
COORDINATED WITH EQUIPMENT SUPPLIER ACTUAL MODEL AND BRAND SELECTED.
CONCRETE
FLOOR
F.F.L. 39.05

3
UB+WH_A4001 A2
UJ
1
UB+WH_A4001

CONCRETE
FLOOR

12.00
F.F.L. 30.85

WF

UH
17.00

12.00
MATCHLINE - SEE DWG UB+WH_2105_A1

UG
WE

12.00
17.00

UF

12.00
WD
ISSUE DATE DESCRIPTION

UE
17.00

Dexcom
6340 Sequence Drive
2 San Diego, CA 92121
888 738 3646
UB+WH_A5001

12.00
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200

12.00
Seattle, Wa 98109
206 957 6400
17.00

www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
CONCRETE 604 2933 800
www.arup.com
FLOOR
WB F.F.L. 30.85 ARCHITECT

12.00
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
20.00

Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

12.00
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

WA UA Web/Email: admin@uqs.com.my

PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

3 1 2 3
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UB+WH_A5001 UB+WH_A5002 UB+WH_A5002 UB+WH_A5002
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CERP BUILDING CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
FLOOR PLAN
ROOF LEVEL
ZONE A2
CE
UB+WH_A2105_A2
1/6/2021 2:36:18 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

CEILING LEGEND : N
A1

3MM THK. SKIM COAT

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

MOISTURE RESISTANCE
SEAMLESS PLATERGLASS
CEILING C/W G.I STUD FRAME &
PLASTERGLASS COVE

ALUMINIUM STRIPS CEILING

WHS W4
SPRINKLER WHS
VALVE ROOM SPRINKLER
2 STAIRCASE 5 VALVE ROOM EGRESS SPRINKLER TOILET 1B
1 STAIRS 1 VALVE ROOM TOILET 1A TOILET 1C

WK UP WK
STAIRCASE 1 TOILET 1F
IDF-WHS-1.1 PRAYER (F) (CEILING HEIGHT = 3M)
ISSUE DATE DESCRIPTION
(CEILING HEIGHT = 3.6M)

CORRIDOR 1A TOILET 1E
PRAYER (M) (CEILING HEIGHT = 3.6M)
TOILET 1D
MHE (CEILING HEIGHT = 3.6M)
ELECTRICAL
MAINTENANCE
(CEILING HEIGHT = 4.5M)
(CEILING HEIGHT = 5M)
TRUCKER'S Dexcom
6340 Sequence Drive
(CEILING HEIGHT = 3.6M)
LOUNGE
OFFICE San Diego, CA 92121
HUDDLE (CEILING HEIGHT = 3.6M)
888 738 3646
www.dexcom.com

UN PROJECT LEAD
TOILET 3 Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
TOILET 1 WHS ELEC 2 163-D Persiaran Gurney
10250 Penang Malaysia
WJ WJ
(CEILING HEIGHT = 3M)
604 2933 800
www.arup.com

TOILET 2 JAN DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
WH WH
BYG Architecture Sdn. Bhd.
UL 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


WHS Pen Konsult Sdn Bhd
VESTIBULE 3 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
UK Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
WG WG Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
BIG Web/Email: admin@uqs.com.my
EQUIPMENT UJ1
ELEVATOR PROJECT NAME

BIG PROPOSED MANUFACTURING FACILITY CONSISTING OF:


EQUIPMENT
3 STOREY CERP
ELEVATOR 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
UJ 7 STOREY OFFICE HEAD BUILDING
STAIRCASE 2 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


STAIRCASE 4 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

WF WF

UH PROJECT NUMBER

278585-00

UNDERGROUND PACKAGE

MATCHLINE - SEE DWG UB+WH_3201_A2


2 1 : 200
CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED


WHS
VESTIBULE 2 CH TAN GL YEAP SK HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

UG 11-JUN-2021
WE
SCALE

1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF REFLECTED CEILING PLAN
LEVEL 1
ZONE A1

UB+WH_A3201_A1
1/6/2021 2:36:39 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

N
BIG
EQUIPMENT
ELEVATOR

BIG
EQUIPMENT
ELEVATOR A2
UJ
STAIRCASE 2

STAIRCASE 4

WF

UH

MATCHLINE - SEE DWG UB+WH_3201_A1


CEILING LEGEND :
WHS
VESTIBULE 2

UG 3MM THK. SKIM COAT


WE

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
UF 50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)

WD
MOISTURE RESISTANCE
MAIN
WAREHOUSE
SEAMLESS PLATERGLASS ISSUE DATE DESCRIPTION
CEILING C/W G.I STUD FRAME &
PLASTERGLASS COVE
UE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

ALUMINIUM STRIPS CEILING PROJECT LEAD


WHS Arup Jururunding Sdn Bhd
VESTIBULE 1 Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
STAIRCASE 3 10250 Penang Malaysia
604 2933 800
www.arup.com

WB IQA STAGING IQA ARCHITECT


(CEILING HEIGHT = 5M)
BYG Architecture Sdn. Bhd.
(CEILING HEIGHT = 5M)

12A, Arratoon Road 10050


Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
RAW HAZ.
HAZ. WASTE 1 HAZ. WASTE 3 Jalan Gottlieb
MATERIAL 1 10350 Penang
Malaysia
604 2282 515
www.penkonsult.com
WASTE
MANAGEMENT QUANTITY SURVEYOR
WASTE CORRIDOR 1B
Unitech QS Consultancy
MANAGEMENT
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
RAW HAZ. HAZ. WASTE 2 HAZ. WASTE 4 10050 Penang Malaysia
04 229 0092
MATERIAL 2
WA UA Web/Email: admin@uqs.com.my

PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 1
ZONE A2
CE
UB+WH_A3201_A2
1/6/2021 2:36:56 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

N
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

CEILING LEGEND :

3MM THK. SKIM COAT

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)

TOILET 2B
TOILET 2A
WK UP MOISTURE RESISTANCE
(CEILING HEIGHT
= 3M) STAIRCASE 1 SEAMLESS PLATERGLASS
CEILING C/W G.I STUD FRAME & ISSUE DATE DESCRIPTION

PLASTERGLASS COVE

ELECTRICAL:
Dexcom
11KV 6340 Sequence Drive
ESSENTIAL San Diego, CA 92121
888 738 3646
MAIN
SWITCHGEAR ALUMINIUM STRIPS CEILING www.dexcom.com

UN PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
WJ 604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com
AHU 2B
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
Gurney Paragon Mall Level 6
ELECTRICAL: Lots L6.01 to L6.09
163-D Persiaran Gurney
CUB 10250 Penang Malaysia
ESSENTIAL/ 604 2933 800
www.arup.com
LIFE SAFETY
ARCHITECT
WH
BYG Architecture Sdn. Bhd.
UL 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


FACILITIES Pen Konsult Sdn Bhd
7L-3 Asas Center
ENGINEERING Jalan Gottlieb
STORE 1 10350 Penang
Malaysia
(CEILING HEIGHT = 3.6M)
604 2282 515
www.penkonsult.com
AHU 2A
QUANTITY SURVEYOR
UK Unitech QS Consultancy
SDN BHD
MEETING 12A-A, Menara Northam, 55, Jalan
WG ROOM
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
(CEILING HEIGHT = 3.6M)
Web/Email: admin@uqs.com.my
? UJ1
CORRIDOR 2A PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
? 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
UJ 7 STOREY OFFICE HEAD BUILDING
STAIRCASE 2 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
ELECTRICAL:
WAREHOUSE AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
ESSENTIAL PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FACILITIES FOR DEXCOM (M) SDN. BHD.

WF ENGINEERING
STORE 2
(CEILING HEIGHT = 3.6M)

UH PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT


MATCHLINE - SEE DWG UB+WH_3202_A2
(CEILING HEIGHT = 12M) DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

UG 11-JUN-2021
WE
SCALE

1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF REFLECTED CEILING PLAN
LEVEL 2
ZONE A1

UB+WH_A3202_A1
1/6/2021 2:37:09 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

N
(CEILING HEIGHT = 3.6M)

CORRIDOR 2A

?
A2
UJ
STAIRCASE 2
ELECTRICAL:
WAREHOUSE
ESSENTIAL

FACILITIES
WF ENGINEERING
STORE 2
(CEILING HEIGHT = 3.6M)

UH

MATCHLINE - SEE DWG UB+WH_3202_A1 CEILING LEGEND :


(CEILING HEIGHT = 12M)

UG 3MM THK. SKIM COAT


WE

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
UF 50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)

WD AHU 2C CDA MOISTURE RESISTANCE


SEAMLESS PLATERGLASS
ISSUE DATE DESCRIPTION
CEILING C/W G.I STUD FRAME &
PLASTERGLASS COVE
UE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
ALUMINIUM STRIPS CEILING
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

WB STAIRCASE 3 ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
ESCAPE 10350 Penang
Malaysia
CORRIDOR 604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

WA UA Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


CJ
3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 2
ZONE A2
CE
UB+WH_A3202_A2
1/6/2021 2:37:21 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

N
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

CEILING LEGEND :

3MM THK. SKIM COAT

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)

TOILET 3B

TOILET 3A
MOISTURE RESISTANCE
WK (CEILING HEIGHT
UP SEAMLESS PLATERGLASS
= 3M) STAIRCASE 1
CEILING C/W G.I STUD FRAME & ISSUE DATE DESCRIPTION
PLASTERGLASS COVE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
ALUMINIUM STRIPS CEILING www.dexcom.com

UN PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
WJ 604 2933 800
www.arup.com
FACILITIES AHU
OFFICE DESIGN ARCHITECT
(CEILING HEIGHT = 3.6M)

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
WH ELECTRICAL
BYG Architecture Sdn. Bhd.
UL 12A, Arratoon Road 10050
Penang, Malaysia
FACILITIES 604 228 8852
www.byggroup.com
WORKSHOP
(CEILING HEIGHT = 3.6M) ELECTRICAL:
CUB & MECHANICAL AND ELECTRICAL ENGINEER
WAREHOUSE Pen Konsult Sdn Bhd
LIFE SAFETY 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
UK Unitech QS Consultancy
FACILITIES
ENGINEERING SDN BHD
12A-A, Menara Northam, 55, Jalan
STORE 3
WG Sultan Ahmad Shah,
10050 Penang Malaysia
(CEILING HEIGHT = 3.6M) 04 229 0092
BIG Web/Email: admin@uqs.com.my
EQUIPMENT UJ1
ELEVATOR PROJECT NAME

BIG PROPOSED MANUFACTURING FACILITY CONSISTING OF:


EQUIPMENT
3 STOREY CERP
ELEVATOR 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
UJ 7 STOREY OFFICE HEAD BUILDING
STAIRCASE 2 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

WF

UH PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT


MATCHLINE - SEE DWG UB+WH_3203_A2
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

UG 11-JUN-2021
WE
SCALE

1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE
CHILLER HALL
ARCHITECTURAL
UF REFLECTED CEILING PLAN
LEVEL 3
ZONE A1

UB+WH_A3203_A1
1/6/2021 2:37:40 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

(CEILING HEIGHT = 3.6M)


N
BIG
EQUIPMENT
ELEVATOR

BIG
EQUIPMENT
ELEVATOR A2
UJ
STAIRCASE 2

WF

UH

MATCHLINE - SEE DWG UB+WH_3203_A1 CEILING LEGEND :

UG 3MM THK. SKIM COAT


WE

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
CHILLER HALL SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
UF
AREA TO APPLY CLIP)

WD MOISTURE RESISTANCE
SEAMLESS PLATERGLASS
ISSUE DATE DESCRIPTION
CEILING C/W G.I STUD FRAME &
PLASTERGLASS COVE
UE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
ALUMINIUM STRIPS CEILING
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

WB STAIRCASE 3 ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

WA UA Web/Email: admin@uqs.com.my

PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 3
ZONE A2
CE
UB+WH_A3203_A2
1/6/2021 2:37:55 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

N
A1

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10

CEILING LEGEND :

3MM THK. SKIM COAT

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
AREA TO APPLY CLIP)

MOISTURE RESISTANCE
WK UP
STAIRCASE 1
SEAMLESS PLATERGLASS
CEILING C/W G.I STUD FRAME & ISSUE DATE DESCRIPTION

PLASTERGLASS COVE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
ALUMINIUM STRIPS CEILING www.dexcom.com

UN PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
WJ 604 2933 800
www.arup.com
GENERATOR
2 DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

UM
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


OPEN AREA OPEN AREA Arup Jururunding Sdn Bhd

WAREHOUSE BUILDING
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
WH
BYG Architecture Sdn. Bhd.
UL 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com
GENERATOR
1 W7 U1 U2 U3 MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

UK UK QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
GENERATOR
WG LOAD BANK
WG Sultan Ahmad Shah,
10050 Penang Malaysia
BIG 04 229 0092
Web/Email: admin@uqs.com.my
EQUIPMENT
ELEVATOR
GENERAL
PURPOSE
UJ1 UJ1
PROJECT NAME
LIFT MOTOR
ROOM PROPOSED MANUFACTURING FACILITY CONSISTING OF:
BIG
EQUIPMENT
3 STOREY CERP
ELEVATOR 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
UJ UJ 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
STAIRCASE 2
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

WF LIFT MOTOR ROOM LEVEL


2 1 : 200
UH PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT


MATCHLINE - SEE DWG UB+WH_3204_A2
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

UG 11-JUN-2021
WE COOLING
TOWER ZONE SCALE

1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
UF REFLECTED CEILING PLAN
LEVEL 4
ZONE A1

UB+WH_A3204_A1
1/6/2021 2:38:12 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 TRUE NORTH

N
BIG
EQUIPMENT GENERAL
ELEVATOR PURPOSE

BIG
EQUIPMENT
ELEVATOR
A2
UJ
STAIRCASE 2

WF

UH

MATCHLINE - SEE DWG UB+WH_3204_A1 CEILING LEGEND :

UG 3MM THK. SKIM COAT


WE COOLING
TOWER ZONE

600x1200MM LAMINATED GYPSUM


BOARD WITH EDGE WRAPPED
SUSPENDED BY CEILING C/W
50MM T-FRAME (WAREHOUSE
UF AREA TO APPLY CLIP)

WD MOISTURE RESISTANCE
SEAMLESS PLATERGLASS
CEILING C/W G.I STUD FRAME & ISSUE DATE DESCRIPTION

PLASTERGLASS COVE
UE

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
ALUMINIUM STRIPS CEILING
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
WC 10250 Penang Malaysia

UD 604 2933 800


www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WAREHOUSE BUILDING UC
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

WB STAIRCASE 3 ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UB Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

WA UA Web/Email: admin@uqs.com.my

PROJECT NAME

CJ PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
CH PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE
CG CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

11-JUN-2021

SCALE

CF 1 : 200

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
REFLECTED CEILING PLAN
LEVEL 4
ZONE A2
CE
UB+WH_A3204_A2
1/6/2021 2:38:21 AM

STAMP

IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6
N
A1

STAIRCASE 1 CONCRETE FLOOR


TOILET 3A STAIRCASE 1
WK
wJ UP WK
wJ UP WK UP
A2

UN GENERATOR UN UN
FACILITIES 2
WJ
wI OFFICE AHU
WJ
wI WJ
OPEN AREA
UM UM UM
OPEN AREA
ELECTRICAL
WH
wH ELECTRICAL: WH
wH WH
CUB & UL UL UL
FACILITIES WAREHOUSE
WORKSHOP LIFE SAFETY
FACILITIES
ENGINEERING
STORE 3
UK UK UK
WG
wG WG
wG GENERAL WG
UJ1 PURPOSE UJ1 CONCRETE UJ1
FLOOR
3
UB+WH_A4001 3
UB+WH_A4001 3
UB+WH_A4001
DN
UJ UJ UJ
STAIRCASE 2 STAIRCASE 2 CONCRETE
WF
wF WF
wF WF FLOOR

UH UH UH
COOLING
TOWER ZONE

WE
wE UG WE
wE UG WE UG

CHILLER HALL
UF UF UF
WD
wD WD
wD WD
UE UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING WAREHOUSE BUILDING
ISSUE DATE DESCRIPTION

WC
wC UD WC
wC UD WC UD

STAIRCASE 3 STAIRCASE 3
UC UC CONCRETE UC Dexcom
6340 Sequence Drive
WB
wB WB
wB WB FLOOR San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
UB UB UB Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
WA
wA UA WA
wA UA WA UA www.arup.com

DESIGN ARCHITECT
CJ CJ CJ SABArchitects
2 Nickerson Suite 200

LEVEL 3 FLOOR FINISHES KEY PLAN LEVEL 4 FLOOR FINISHES KEY PLAN ROOF LEVEL FLOOR FINISHES KEY PLAN
Seattle, Wa 98109
206 957 6400
www.sabarch.com

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
SPRINKLER
VALVE ROOM PRAYER (M) W4 www.arup.com

ARCHITECT
STAIRCASE 1 TOILET 2A STAIRCASE 1
WK UP WK UP WK BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
STAIRCASE 5 WHS MHE CONCRETE FLOOR CONCRETE FLOOR
WHS EGRESS TRUCKER'S
Penang, Malaysia

SPRINKLER SPRINKLER MAINTENANCE TOILET 1F ELECTRICAL:


604 228 8852
STAIRS 1 LOUNGE www.byggroup.com
VALVE ROOM VALVE ROOM OFFICE 11KV
2 1 ESSENTIAL
UN CONCRETE FLOOR
MAIN UN MECHANICAL AND ELECTRICAL ENGINEER
CORRIDOR 1A SWITCHGEAR Pen Konsult Sdn Bhd
WJ 25 m²
WJ WJ 7L-3 Asas Center
Jalan Gottlieb
TOILET 1 WHS ELEC 2 AHU 2B 10350 Penang
Malaysia
DN UM UM 604 2282 515
www.penkonsult.com
ELECTRICAL:
CUB W7 U1 U2 U3
QUANTITY SURVEYOR
ESSENTIAL/ Unitech QS Consultancy
WH WH LIFE SAFETY WH SDN BHD
UL UL 12A-A, Menara Northam, 55, Jalan
WHS Sultan Ahmad Shah,

WHS VESTIBULE 3 FACILITIES 10050 Penang Malaysia


04 229 0092
SPRINKLER 1623 m² ENGINEERING Web/Email: admin@uqs.com.my

VALVE ROOM AHU 2A STORE 1


3 UK UK PROJECT NAME

WG WG
CORRIDOR 2A
WG UK
UJ1 UJ1 WG
wG PROPOSED MANUFACTURING FACILITY CONSISTING OF:

CONCRETE
LIFT MOTOR UJ1 3 STOREY CERP
3
UB+WH_A4001 3
UB+WH_A4001 ROOM 1 STOREY WAREHOUSE
FLOOR
UJ ELECTRICAL: UJ 3 STOREY CENTRAL UTILITY BUILDING
EGRESS
STAIRS 2 STAIRCASE 4
STAIRCASE 2 WAREHOUSE STAIRCASE 2 UJ 7 STOREY OFFICE HEAD BUILDING
CONCRETE FLOOR 7 STOREY PARKING STRUCTURE
ESSENTIAL FACILITIES 2 STOREY SUBSTATION
WF WF ENGINEERING
STORE 2
WF 3 NOS OF GUARDHOUSE

UH UH AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
WHS PERAI SELATAN.
VESTIBULE 2 FOR DEXCOM (M) SDN. BHD.

AHU 2C FLOOR FINISHES LEGEND :


WE UG WE UG
UNDERGROUND TUNNEL LIFT MOTOR ROOM TILES FINISHES
MAIN
WAREHOUSE
FLOOR FINISHES KEY PLAN FLOOR FINISHES KEY PLAN PROJECT NUMBER

UF UF PU 6MM THK.
278585-00

PACKAGE
WD WD
CUB + WAREHOUSE FIT OUT

UE UE PU COATING
WAREHOUSE BUILDING WAREHOUSE BUILDING
CDA DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

WHS CHEMICAL RESISTANT PU


VESTIBULE 1
WC WC WITH ESD DATE
UD UD
11-JUN-2021
STONE PLASTIC SCALE
MAL DN COMPOSITE VINYL TILES
1 : 500
STAIRCASE 3
UC UC
WB WB STAIRCASE 3 POWER FLOAT DRAWING STATUS

IQA (ramp area to provide groove line)


IQA STAGING 100% OF PHASE 4 CONSTRUCTION DOCUMENTS
UB UB BURNISHED CONCRETE DRAWING TITLE
WASTE DN DN DN
MANAGEMENT CONCRETE CONCRETE FINISHED ARCHITECTURAL
WASTE DN DN DN FLOOR FLOOR FLOOR FINISHES KEY PLAN
MANAGEMENT
WA UA WA DN UA BARE CONCRETE FINISHED
UB+WH_A3301
RAW HAZ. ESCAPE
MATERIAL 2 HAZ. WASTE 4
CJ CORRIDOR CJ
1/6/2021 6:49:32 PM

STAMP

LEVEL 1 FLOOR FINISHES KEY PLAN LEVEL 2 FLOOR FINISHES KEY PLAN IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W7 U1 U2 U3 U4 U5 U6
N
A1
W4
STAIRCASE 1
TOILET 3A STAIRCASE 1
WK
wJ UP WK
wJ UP WK CONCRETE FLOOR
UP WK
A2

UN GENERATOR UN UN
FACILITIES
2
WJ
wI OFFICE
AHU
WJ
wI WJ WJ
OPEN AREA
UM UM UM
OPEN AREA W7 U1 U2 U3
ELECTRICAL
WH
wH ELECTRICAL: WH
wH WH WH
CUB & UL UL UL
FACILITIES WAREHOUSE
WORKSHOP LIFE SAFETY
FACILITIES
ENGINEERING UK UK UK UK
STORE 3
WG
wG WG
wG GENERAL WG WG WG
wG
UJ1 PURPOSE UJ1 CONCRETE UJ1 LIFT MOTOR UJ1
FLOOR ROOM
3
UB+WH_A4001 3
UB+WH_A4001
UJ
DN
UJ UJ UJ
STAIRCASE 2 STAIRCASE 2 CONCRETE
WF
wF WF
wF WF FLOOR WF
UH UH UH
COOLING
TOWER ZONE

WE
wE UG WE
wE UG WE UG
UNDERGROUND TUNNEL LIFT MOTOR ROOM
CHILLER HALL
UF UF UF WALL KEY PLAN WALL KEY PLAN
WD
wD WD
wD WD
UE UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING
ISSUE DATE DESCRIPTION

WC
wC UD WC
wC UD WC UD

STAIRCASE 3 STAIRCASE 3
UC UC CONCRETE UC Dexcom
6340 Sequence Drive
WB
wB WB
wB WB FLOOR San Diego, CA 92121
888 738 3646
www.dexcom.com

UB UB UB PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
WA
wA UA WA
wA UA WA UA www.arup.com

DESIGN ARCHITECT

CJ CJ CJ SABArchitects
2 Nickerson Suite 200

LEVEL 3 WALL KEY PLAN LEVEL 4 WALL KEY PLAN ROOF LEVEL WALL KEY PLAN
Seattle, Wa 98109
206 957 6400
www.sabarch.com

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
SPRINKLER www.arup.com
VALVE ROOM PRAYER (M)
ARCHITECT
STAIRCASE 1 TOILET 2A STAIRCASE 1
WK UP WK UP BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
STAIRCASE 5 WHS MHE CONCRETE FLOOR CONCRETE FLOOR
WHS EGRESS Penang, Malaysia
SPRINKLER MAINTENANCE TOILET 1F ELECTRICAL:
604 228 8852
SPRINKLER STAIRS 1 www.byggroup.com
VALVE ROOM VALVE ROOM OFFICE ? 11KV
2 1 CONCRETE FLOOR ESSENTIAL
UN MAIN UN MECHANICAL AND ELECTRICAL ENGINEER
CORRIDOR 1A SWITCHGEAR Pen Konsult Sdn Bhd
WJ 25 m²
WJ WALL LEGEND : 7L-3 Asas Center
Jalan Gottlieb
AHU 2B 10350 Penang
TOILET 1 WHS ELEC 2 Malaysia
DN UM UM 150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANEL C/W 604 2282 515
www.penkonsult.com
ELECTRICAL: PLASTERING & PAINT ON BOTH SIDES (2HRS FIRE RATED)
CUB
ESSENTIAL/ (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION) QUANTITY SURVEYOR
Unitech QS Consultancy
WH WH LIFE SAFETY 150MM THK. FIRE RATED LIGHT WEIGHT CONCRETE PANEL C/W SDN BHD
UL UL PLASTERING & PAINT ON BOTH SIDES (4HRS FIRE RATED) 12A-A, Menara Northam, 55, Jalan
WHS Sultan Ahmad Shah,
VESTIBULE 3 FACILITIES (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION) 10050 Penang Malaysia
04 229 0092
WHS 1623 m² ENGINEERING
SPRINKLER STORE 1
150MM THK. LIGHT WEIGHT CONCRETE PANEL C/W Web/Email: admin@uqs.com.my

AHU 2A
VALVE ROOM UK UK PLASTERING & PAINT ON BOTH SIDES PROJECT NAME
3 CORRIDOR 2A
WG WG (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION) PROPOSED MANUFACTURING FACILITY CONSISTING OF:
UJ1 UJ1 150MM THK. LIGHT WEIGHT CONCRETE PANELS C/W PLASTERING & PAINT AND 3 STOREY CERP
3
UB+WH_A4001 3
UB+WH_A4001 CONCRETE ALUMINIUM PANEL & INSULATION EXTERNALLY 1 STOREY WAREHOUSE

STAIRCASE 2
UJ FLOOR ELECTRICAL: UJ 3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
WAREHOUSE STAIRCASE 2
EGRESS STAIRCASE 4 CONCRETE FLOOR
ESSENTIAL
150MM THK. FIRE RATED BRICK WALL C/W PLASTERING & PAINT 7 STOREY PARKING STRUCTURE
2 STOREY SUBSTATION
WF
STAIRS 2
WF ON BOTH SIDES (2HRS FIRE RATED) 3 NOS OF GUARDHOUSE
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
UH UH AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
WHS FACILITIES 230MM THK. FIRE RATED BRICK WALL C/W PLASTERING & PAINT PERAI SELATAN.
VESTIBULE 2 ENGINEERING ON BOTH SIDES (4HRS FIRE RATED) FOR DEXCOM (M) SDN. BHD.
STORE 2 (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
AHU 2C
WE UG WE UG
150MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
MAIN PROJECT NUMBER
WAREHOUSE
UF UF 230MM THK. BRICK WALL C/W PLASTERING & PAINT ON BOTH SIDES 278585-00
(UP TO UNDER SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION)
PACKAGE
WD WD
230MM THK. BRICK WALL WITH PLASTERING & PAINT C/W ALUMINIUM PANEL & CUB + WAREHOUSE FIT OUT

UE UE INSULATION EXTERNALLY WITH INTERNAL DRYWALL PARTITION LINER UP TO UNDER


WAREHOUSE BUILDING WAREHOUSE BUILDING
CDA DESIGNED DRAWN CHECKED APPROVED
SIDE OF FLOOR SLAB SOFFIT / ROOFING SHEET OR BASED ON ELEVATION (PERIMETER
WAREHOUSE BRICK WALL ONLY AT 1000MM HEIGHT & RWDP ENCASEMENT WITHOUT CH TAN GL YEAP SK HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

WHS
VESTIBULE 1 BRICK WALL)
WC UD WC UD
DATE

150MM THK. BRICK WALL WITH PLASTERING & PAINT C/W ALUMINIUM PANEL & 11-JUN-2021
INSULATION EXTERNALLY
SCALE
MAL DN
1 : 500
STAIRCASE 3
UC UC DRYWALL PARTITION (FOR WAREHOUSE AREA) UP TO UNDER SIDE OF FLOOR SLAB
WB WB STAIRCASE 3 SOFFIT / ROOFING SHEET OR BASED ON ELEVATION DRAWING STATUS

IQA STAGING IQA


200MM THK. DRYWALL PARTITION C/W INSULATION WITH G.I STUD AND M.S 100% OF PHASE 4 CONSTRUCTION DOCUMENTS
UB UB FRAME AT 2400MM C/C BOTHWAYS (UP TO UNDER SIDE OF FLOOR SLAB SOFFIT DRAWING TITLE
WASTE DN DN DN
CONCRETE
OR CEILING LEVEL)
MANAGEMENT CONCRETE ARCHITECTURAL
WASTE FLOOR
MANAGEMENT
DN DN DN FLOOR REMARK : WALL KEY PLAN

WA UA WA DN UA - ALL THE STEEL COLUMNS NEED TO BE BOX-UP WITH DRY WALL PARTTION /
UP TO CEILING LEVEL FOR WAREHOUSE & LOADING DOCK AREA
UB+WH_A3601
RAW HAZ. ESCAPE
MATERIAL 2 HAZ. WASTE 4 - PROVIDE PLASTER & PAINT TO WALLS LEFT UNFINISHED UNDER BUILDING
CJ CORRIDOR CJ
1/6/2021 2:42:05 AM

SHEEL PACKAGE (REFER TO BUILDING SHEEL WALL KEY PLAN DRAWING)


STAMP

LEVEL 1 WALL KEY PLAN LEVEL 2 WALL KEY PLAN IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6
N
A1

STAIRCASE 1 CONCRETE FLOOR


TOILET 3A STAIRCASE 1
WK
wJ UP WK
wJ UP WK UP
A2

UN GENERATOR UN UN
FACILITIES 2
WJ
wI OFFICE AHU WJ
wI WJ
OPEN AREA
UM UM UM
OPEN AREA

ELECTRICAL
WH
wH ELECTRICAL: WH
wH WH
CUB & UL UL UL
FACILITIES WAREHOUSE
WORKSHOP LIFE SAFETY
FACILITIES
ENGINEERING
STORE 3
UK UK UK
WG
wG WG
wG GENERAL WG
UJ1 PURPOSE UJ1 CONCRETE UJ1
FLOOR
3
UB+WH_A4001 3
UB+WH_A4001 3
UB+WH_A4001
DN
UJ UJ UJ
STAIRCASE 2 STAIRCASE 2 CONCRETE
WF
wF WF
wF WF FLOOR

UH UH UH
COOLING
TOWER ZONE

WE
wE UG WE
wE UG WE UG

CHILLER HALL
UF UF UF
WD
wD WD
wD WD
UE UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING WAREHOUSE BUILDING
ISSUE DATE DESCRIPTION

WC
wC UD WC
wC UD WC UD

STAIRCASE 3 STAIRCASE 3
UC UC CONCRETE UC Dexcom
6340 Sequence Drive
WB
wB WB
wB WB FLOOR San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
UB UB UB Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
WA
wA UA WA
wA UA WA UA www.arup.com

DESIGN ARCHITECT

CJ CJ CJ SABArchitects
2 Nickerson Suite 200

LEVEL 3 WATERPROOFING KEY PLAN LEVEL 4 WATERPROOFING KEY PLAN ROOF LEVEL WATERPROOFING KEY PLAN
Seattle, Wa 98109
206 957 6400
www.sabarch.com

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
SPRINKLER
VALVE ROOM PRAYER (M) W4 www.arup.com

ARCHITECT
STAIRCASE 1 TOILET 2A STAIRCASE 1
WK UP WK UP WK BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
STAIRCASE 5 WHS MHE CONCRETE FLOOR CONCRETE FLOOR
WHS EGRESS
Penang, Malaysia
SPRINKLER MAINTENANCE TOILET 1F ELECTRICAL:
604 228 8852
SPRINKLER STAIRS 1 www.byggroup.com
VALVE ROOM VALVE ROOM OFFICE ? 11KV
2 1 CONCRETE FLOOR ESSENTIAL
UN MAIN UN MECHANICAL AND ELECTRICAL ENGINEER
CORRIDOR 1A SWITCHGEAR Pen Konsult Sdn Bhd
WJ 25 m²
WJ WJ 7L-3 Asas Center
Jalan Gottlieb
AHU 2B 10350 Penang
TOILET 1 WHS ELEC 2 Malaysia
DN UM UM 604 2282 515
www.penkonsult.com
ELECTRICAL:
CUB
W7 U1 U2 U3
QUANTITY SURVEYOR
ESSENTIAL/ Unitech QS Consultancy
WH WH LIFE SAFETY WH SDN BHD
UL UL 12A-A, Menara Northam, 55, Jalan
WHS Sultan Ahmad Shah,

WHS VESTIBULE 3 FACILITIES 10050 Penang Malaysia


04 229 0092
SPRINKLER 1623 m² ENGINEERING Web/Email: admin@uqs.com.my

VALVE ROOM AHU 2A STORE 1


3 UK CORRIDOR 2A
UK UK
PROJECT NAME

WG WG WG WG
wG PROPOSED MANUFACTURING FACILITY CONSISTING OF:
UJ1 UJ1 LIFT MOTOR UJ1 3 STOREY CERP
3
UB+WH_A4001 3
UB+WH_A4001 CONCRETE ROOM 1 STOREY WAREHOUSE

STAIRCASE 2
UJ FLOOR ELECTRICAL: UJ UJ
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
EGRESS STAIRCASE 4 WAREHOUSE STAIRCASE 2
CONCRETE FLOOR 7 STOREY PARKING STRUCTURE
STAIRS 2 ESSENTIAL FACILITIES 2 STOREY SUBSTATION
WF WF ENGINEERING
STORE 2
WF 3 NOS OF GUARDHOUSE

UH UH AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
WHS PERAI SELATAN.
VESTIBULE 2 FOR DEXCOM (M) SDN. BHD.

AHU 2C
WE UG WE UG
UNDERGROUND TUNNEL LIFT MOTOR ROOM
WATERPROOFING KEY PLAN WATERPROOFING KEY PLAN PROJECT NUMBER

UF UF 278585-00

PACKAGE
WD WD
CUB + WAREHOUSE FIT OUT
MAIN
WAREHOUSE UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING
CDA DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

WHS
VESTIBULE 1
WC UD WC UD
DATE

11-JUN-2021

SCALE
MAL DN
1 : 500
STAIRCASE 3
UC UC WATERPROOFING LEGEND :
WB WB STAIRCASE 3 DRAWING STATUS

IQA STAGING IQA ADMIXTURE WATERPROOFING


100% OF PHASE 4 CONSTRUCTION DOCUMENTS
UB UB DRAWING TITLE
WASTE DN DN DN
CONCRETE CONCRETE ADMIXTURE + MEMBRANE
WASTE MANAGEMENT ARCHITECTURAL
MANAGEMENT
DN DN DN FLOOR FLOOR WATERPROOFING WATERPROOFING KEY PLAN

WA UA WA DN UA
UNDERSLAB WATERPROOFING
UB+WH_A3701
RAW HAZ. ESCAPE
MATERIAL 2 HAZ. WASTE 4
CJ CORRIDOR CJ
1/6/2021 2:44:41 AM

STAMP

LEVEL 1 WATERPROOFING KEY PLAN LEVEL 2 WATERPROOFING KEY PLAN IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH
W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6
N
A1

STAIRCASE 1
TOILET 3A STAIRCASE 1
WK
wJ UP WK
wJ UP WK CONCRETE FLOOR
UP
A2

FACILITIES
UN GENERATOR UN UN
OFFICE 2
WJ
wI AHU WJ
wI WJ
OPEN AREA
UM UM UM
OPEN AREA
ELECTRICAL
ELECTRICAL:
WH
wH CUB & WH
wH WH
WAREHOUSE UL UL UL
FACILITIES LIFE SAFETY
WORKSHOP
FACILITIES
ENGINEERING
STORE 3 UK UK UK
WG
wG WG
wG GENERAL WG
UJ1 PURPOSE UJ1 CONCRETE UJ1
FLOOR
3
UB+WH_A4001 3
UB+WH_A4001 3
UB+WH_A4001
DN
UJ UJ UJ
STAIRCASE 2 STAIRCASE 2 CONCRETE
WF
wF WF
wF WF FLOOR

UH UH UH
COOLING
TOWER ZONE

WE
wE UG WE
wE UG WE UG

CHILLER HALL
UF UF UF
WD
wD WD
wD WD
UE UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING WAREHOUSE BUILDING
ISSUE DATE DESCRIPTION

WC
wC UD WC
wC UD WC UD

STAIRCASE 3 STAIRCASE 3
UC UC CONCRETE UC Dexcom
6340 Sequence Drive
WB
wB WB
wB WB FLOOR San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
UB UB UB Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
WA
wA UA WA
wA UA WA UA www.arup.com

DESIGN ARCHITECT

CJ CJ CJ SABArchitects
2 Nickerson Suite 200

LEVEL 3 FLOOR FLATNESS KEY PLAN LEVEL 4 FLOOR FLATNESS KEY PLAN ROOF LEVEL FLOOR FLATNESS KEY PLAN
Seattle, Wa 98109
206 957 6400
www.sabarch.com

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
SPRINKLER
VALVE ROOM PRAYER (M) W4 www.arup.com

ARCHITECT
STAIRCASE 1 TOILET 2A STAIRCASE 1
WK UP WK UP WK BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
STAIRCASE 5 WHS MHE CONCRETE FLOOR CONCRETE FLOOR
WHS EGRESS
Penang, Malaysia
SPRINKLER MAINTENANCE TOILET 1F ELECTRICAL:
604 228 8852
SPRINKLER STAIRS 1 www.byggroup.com
VALVE ROOM VALVE ROOM OFFICE ? 11KV
2 1 CONCRETE FLOOR ESSENTIAL
UN MAIN UN MECHANICAL AND ELECTRICAL ENGINEER
CORRIDOR 1A SWITCHGEAR Pen Konsult Sdn Bhd
WJ 25 m²
WJ WJ 7L-3 Asas Center
Jalan Gottlieb
TOILET 1 WHS ELEC 2 AHU 2B 10350 Penang
Malaysia
DN UM UM 604 2282 515
www.penkonsult.com
ELECTRICAL:
CUB
W7 U1 U2 U3
QUANTITY SURVEYOR
ESSENTIAL/ Unitech QS Consultancy
WH WH LIFE SAFETY WH SDN BHD
UL UL 12A-A, Menara Northam, 55, Jalan
WHS Sultan Ahmad Shah,
VESTIBULE 3 FACILITIES 10050 Penang Malaysia
04 229 0092
1623 m² ENGINEERING Web/Email: admin@uqs.com.my
WHS AHU 2A STORE 1
SPRINKLER UK CORRIDOR 2A
UK UK
PROJECT NAME
VALVE ROOM
WG 3 WG WG WG
wG PROPOSED MANUFACTURING FACILITY CONSISTING OF:
UJ1 UJ1 LIFT MOTOR UJ1 3 STOREY CERP
3
UB+WH_A4001 3
UB+WH_A4001 CONCRETE ROOM 1 STOREY WAREHOUSE

STAIRCASE 2
UJ FLOOR
ELECTRICAL: UJ UJ
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
EGRESS WAREHOUSE STAIRCASE 2
STAIRCASE 4 CONCRETE FLOOR 7 STOREY PARKING STRUCTURE
STAIRS 2 ESSENTIAL FACILITIES 2 STOREY SUBSTATION
WF WF ENGINEERING
STORE 2
WF 3 NOS OF GUARDHOUSE

UH UH AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
WHS PERAI SELATAN.
VESTIBULE 2 FOR DEXCOM (M) SDN. BHD.

AHU 2C
WE UG WE UG
MAIN
UNDERGROUND TUNNEL LIFT MOTOR ROOM
WAREHOUSE FLOOR FLATNESS KEY PLAN FLOOR FLATNESS KEY PLAN PROJECT NUMBER

UF UF 278585-00

PACKAGE
WD WD
CUB + WAREHOUSE FIT OUT

UE UE
WAREHOUSE BUILDING WAREHOUSE BUILDING
CDA DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

WHS
VESTIBULE 1
WC UD WC UD
DATE

11-JUN-2021

SCALE
MAL DN FLOOR FLATNESS LEGEND :
1 : 500
STAIRCASE 3
UC UC
WB WB STAIRCASE 3 FF100 FL50 DRAWING STATUS

IQA STAGING IQA


100% OF PHASE 4 CONSTRUCTION DOCUMENTS
UB UB FF35 FL25 DRAWING TITLE
WASTE DN DN DN
CONCRETE CONCRETE
WASTE MANAGEMENT ARCHITECTURAL
DN DN DN FLOOR FLOOR FLOOR FLATNESS KEY PLAN
MANAGEMENT
WA UA WA DN UA SLOPE 1 : 100

UB+WH_A3801
RAW HAZ. ESCAPE
MATERIAL 2 HAZ. WASTE 4
CJ CORRIDOR CJ
2:47:09 AM
1/6/2021 2:47:10

STAMP

LEVEL 1 FLOOR FLATNESS KEY PLAN LEVEL 2 FLOOR FLATNESS KEY PLAN IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH

UA UB UC UD UE UF UG UH UJ UJ1 UK UL UM UN UP N
A1
CJ

ROOF LEVEL EXTERIOR FINISH MATERIAL LEGEND :


39.201
A2

5.351
500x3000MM RAL# 7047 EGGSHELL
LIFT MOTOR ROOM LEVEL
33.85

6.15
1000x2000MM RAL# 7038 METALLIC
LEVEL 4
27.70

9.00
2000x1000MM RAL# 9022 METALIC

36.101
LEVEL 3
18.70

2000x1600MM RAL# 7043 MATTE

7.20
LEVEL 2
11.50
PAINTED PMS 369 PANTONE GREEN

7.20
LEVEL 1

1.20
4.30
PAINTED RAL#7043 METALIC
UNDERGROUND
UNDERGROUND
LEVEL
70

EAST ELEVATION
1 1 : 200
ISSUE DATE DESCRIPTION

U10 U9 U8 U7 U6 U5 U4 U3 U2 U1 W7 W6 W5 W4 W3 W2 W1
ROOF LEVEL
39.201 Dexcom
6340 Sequence Drive

5.351
San Diego, CA 92121
888 738 3646
www.dexcom.com

LIFT MOTOR ROOM LEVEL PROJECT LEAD


33.85 Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09

6.15
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
LEVEL 4
27.70 DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

9.00
206 957 6400
www.sabarch.com

36.101
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
LEVEL 3 Arup Jururunding Sdn Bhd
18.70 Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia

7.20
604 2933 800
www.arup.com

WAREHOUSE BUILDING LEVEL 2


ARCHITECT

BYG Architecture Sdn. Bhd.


11.50 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

7.20
MECHANICAL AND ELECTRICAL ENGINEER
LEVEL 1 Pen Konsult Sdn Bhd
7L-3 Asas Center

1.20
4.30 Jalan Gottlieb
10350 Penang
Malaysia
UNDERGROUND 604 2282 515
www.penkonsult.com
70
QUANTITY SURVEYOR

NORTH ELEVATION Unitech QS Consultancy


SDN BHD
2 1 : 200
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

UJ1 VIEW 1 PROJECT NAME

4 PROPOSED MANUFACTURING FACILITY CONSISTING OF:

WK WJ WH WG WF WE WD WC WB WA CJ 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
ROOF LEVEL 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
39.201
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN

5.351
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
LIFT MOTOR ROOM LEVEL
33.85

6.15
PROJECT NUMBER
LEVEL 4 278585-00
27.70
PACKAGE

CUB + WAREHOUSE FIT OUT

9.00
DESIGNED DRAWN CHECKED APPROVED

36.101
CH TAN GL YEAP SK HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

LEVEL 3 DATE
18.70
11-JUN-2021

SCALE

7.20
WAREHOUSE BUILDING As indicated

LEVEL 2 DRAWING STATUS


11.50
100% OF PHASE 4 CONSTRUCTION DOCUMENTS

7.20
DRAWING TITLE

ARCHITECTURAL
ELEVATIONS
LEVEL 1

1.20
4.30

UNDERGROUND UB+WH_A4001
1/6/2021 3:00:37 AM

70 STAMP
WEST ELEVATION VIEW 2
3 1 : 200
5 IFC - 100% CD
© Arup
KEY PLAN
TRUE NORTH
CJ WA WB WC WD WE WF WG WH WJ WK
N

ROOF LEVEL
39.201

5.351
LIFT MOTOR ROOM LEVEL
33.85

6.15
LEVEL 4
27.70

9.00

36.101
LEVEL 3
18.70

CERP

7.20
BUILDING LEVEL 2
11.50
WAREHOUSE BUILDING

7.20
MAIN
WAREHOUSE
LEVEL 1

1.20
4.30

UNDERGROUND
70

SECTION 3
3 1 : 200

ISSUE DATE DESCRIPTION

U9 U8 U7 U6 U5 U4 U3 U2 U1 W7
w9 W6
w8 W5
w7 W4
w6 W3
w5 W2
w4 W1
w3 w2 w1
ROOF LEVEL
39.201
Dexcom

5.351
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com
LIFT MOTOR ROOM LEVEL
33.85 PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6

6.15
Lots L6.01 to L6.09
COOLING 163-D Persiaran Gurney
TOWER ZONE 10250 Penang Malaysia
604 2933 800
LEVEL 4 www.arup.com

27.70
DESIGN ARCHITECT

SABArchitects

9.00
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400

36.101
www.sabarch.com
CHILLER HALL
LEVEL 3 CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
18.70 Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney

7.20
10250 Penang Malaysia
604 2933 800

WAREHOUSE BUILDING
www.arup.com
CDA
LEVEL 2 ARCHITECT
11.50
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
Penang, Malaysia

7.20
MAIN 604 228 8852
www.byggroup.com
WHS WAREHOUSE
VESTIBULE 1
LEVEL 1 MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd

1.20
4.30 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
UNDERGROUND Malaysia
604 2282 515
70 www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SECTION 2 SDN BHD
12A-A, Menara Northam, 55, Jalan

2 1 : 200
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

W1
w3 W2
w4 W3
w5 W4
w6 W5
w7 W6
w8 W7
w9 U1 U2 U3 U4 U5 U6 U7 U8 U9 PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
ROOF LEVEL 1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
39.201 7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE

5.351
LIFT MOTOR 2 STOREY SUBSTATION
ROOM 3 NOS OF GUARDHOUSE

LIFT MOTOR ROOM LEVEL AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
33.85 PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.
BIG

6.15
EQUIPMENT
ELEVATOR
LEVEL 4
27.70
PROJECT NUMBER
VERTICAL 278585-00
SHAFT

9.00
PACKAGE

36.101
CUB + WAREHOUSE FIT OUT
CORRIDOR 3A
LEVEL 3 DESIGNED DRAWN CHECKED APPROVED
18.70 CH TAN GL YEAP SK HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

DATE

7.20
11-JUN-2021
WAREHOUSE BUILDING CORRIDOR 2A
LEVEL 2 SCALE

11.50 1 : 200

DRAWING STATUS

7.20
MAIN
WAREHOUSE WHS 100% OF PHASE 4 CONSTRUCTION DOCUMENTS
VESTIBULE 3
LEVEL 1 DRAWING TITLE

1.20
4.30 ARCHITECTURAL
SECTIONS
UNDERGROUND SHEET 01

70

UB+WH_A5001
1/6/2021 3:01:10 AM

SECTION 1 STAMP

1 1 : 200 IFC - 100% CD


© Arup
KEY PLAN
TRUE NORTH

N
UP UN UM UL UK UJ1 UJ UH UG UF UE UD UC UB UA CJ

ROOF LEVEL
39.201

5.351
LIFT MOTOR ROOM LEVEL
33.85

6.15
STAIRCASE 1 OPEN AREA COOLING
? STAIRCASE 2 TOWER ZONE
LEVEL 4
27.70

9.00

34.901
CHILLER HALL
LEVEL 3
18.70

FACILITIES FACILITIES CERP

7.20
ENGINEERING ENGINEERING
AHU 2B
STORE 1 STORE 2
CDA
BUILDING
LEVEL 2
11.50

7.20
WHS WASTE
CORRIDOR 1A OFFICE VESTIBULE 3 WHS WHS
MANAGEMENT
VESTIBULE 2 VESTIBULE 1
LEVEL 1
4.30

SECTION 6
3 1 : 200
ISSUE DATE DESCRIPTION

CJ UA UB UC UD UE UF UG UH UJ UJ1 UK UL UM UN UP

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
ROOF LEVEL www.dexcom.com

39.201 PROJECT LEAD


Arup Jururunding Sdn Bhd
LIFT MOTOR

5.351
Gurney Paragon Mall Level 6
ROOM Lots L6.01 to L6.09
163-D Persiaran Gurney
LIFT MOTOR ROOM LEVEL 10250 Penang Malaysia
604 2933 800
33.85 www.arup.com
GENERATOR
GENERAL 2 DESIGN ARCHITECT

6.15
COOLING PURPOSE
TOWER ZONE SABArchitects
2 Nickerson Suite 200
LEVEL 4 Seattle, Wa 98109
206 957 6400
27.70 www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER

9.00
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6

36.101
Lots L6.01 to L6.09
? 163-D Persiaran Gurney
CHILLER HALL 10250 Penang Malaysia
604 2933 800
LEVEL 3 www.arup.com
18.70
ARCHITECT
ELECTRICAL: ELECTRICAL:
CERP ELECTRICAL: CUB 11KV
BYG Architecture Sdn. Bhd.

7.20
WAREHOUSE ESSENTIAL/ ESSENTIAL
BUILDING AHU 2C ESSENTIAL CORRIDOR 2A AHU 2A LIFE SAFETY MAIN
SWITCHGEAR
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com
LEVEL 2
11.50 MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
7L-3 Asas Center

7.20
Jalan Gottlieb
10350 Penang
WASTE WHS WHS WHS MHE
IQA Malaysia
MANAGEMENT VESTIBULE 1 VESTIBULE 2 VESTIBULE 3 MAINTENANCE 604 2282 515
LEVEL 1 www.penkonsult.com

1.20
4.30 QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092

SECTION 5 Web/Email: admin@uqs.com.my

2 1 : 200
PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:


WK WJ WH WG WF WE WD WC WB WA CJ 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 STOREY PARKING STRUCTURE
ROOF LEVEL
2 STOREY SUBSTATION
39.201 3 NOS OF GUARDHOUSE

5.351
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
LIFT MOTOR ROOM LEVEL FOR DEXCOM (M) SDN. BHD.

33.85

6.15
PROJECT NUMBER
LEVEL 4
278585-00
27.70
PACKAGE

CUB + WAREHOUSE FIT OUT

9.00
DESIGNED DRAWN CHECKED APPROVED

CH TAN GL YEAP SK HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Interior-Fit-Out.rvt

LEVEL 3
DATE
18.70

CERP 11-JUN-2021

7.20
BUILDING SCALE

1 : 200
LEVEL 2
DRAWING STATUS
11.50
WAREHOUSE BUILDING 100% OF PHASE 4 CONSTRUCTION DOCUMENTS

7.20
DRAWING TITLE
MAIN
WAREHOUSE ARCHITECTURAL
LEVEL 1 SECTIONS
SHEET 02
UNDERGROUND 4.30
TUNNEL
UNDERGROUND
UB+WH_A5002
1/6/2021 3:01:26 AM

70
SECTION 4 STAMP
1 1 : 200 IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

ELEVATION ENCASEMENT BELOW 1M ENCASEMENT AT 1M AND ABOVE

12 TYPICAL STEEL COLUMN & BEAM FINISHES DETAIL 13 TYPICAL STEEL COLUMN ENCASEMENT DETAIL 14 WAREHOUSE & OFFLOADING VESTIBULE DIVIDING WALL DETAIL

ISSUE DATE DESCRIPTION

Refer Detail A
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09

TYPICAL DETAIL A 163-D Persiaran Gurney


10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
X Seattle, Wa 98109
DETAIL 9.1 206 957 6400
www.sabarch.com

X
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
R.C FLOOR TYPICAL DETAIL X - THIN BED ADHESIVE BETWEEM PANELS Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


Refer Detail B 12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
BOLLARD - ELEVATION VIEW www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
ISOMETRIC VIEW Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
TYPICAL DETAIL B www.penkonsult.com
TYPICAL DRYWALL DETAIL TYPICAL HALF GLASS PARTITION DETAIL TYPICAL DRYWALL DETAIL TYPICAL HALF GLASS PARTITION DETAIL ELEVATION VIEW 10-20mm gap
QUANTITY SURVEYOR
(FOR MORE THAN 3 METER HEIGHT) (FOR MORE THAN 3 METER HEIGHT) Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
8 TYPICAL DRYWALL PARTITION SECTIONAL DETAIL 9 TYPICAL DRYWALL PARTITION JUNCTION JOINT DETAIL 10 TYPICAL LIGHT WEIGHT CONCRETE PANELS DETAIL 11 TYPICAL M.S BOLLARD DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DETAIL 7.1 DETAIL 7.2 PROJECT NUMBER

278585-00

ELEVATION 1 PACKAGE

TYPICAL DRYWALL EXPANSION JOINT DETAIL CUB + WAREHOUSE FIT OUT

TYPICAL METAL FRAMING DRY WALL PARTITION DETAIL DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

TYPICAL DRYWALL PARTITION DETAIL ARCHITECTURAL


WALL DETAIL
SHEET 01
ISOMETRIC VIEW
TYPICAL BRICK WALL SEPARATION JOINT DETAIL UB+WH_A7001
13/4/2021 6:52:20 PM

TYPICAL SECTION
ELEVATION 2 STAMP

1 TYPICAL DRYWALL PARTITION DETAIL 2 TYPICAL DRYWALL PARTITION/BRICKWORK/ 3 TYPICAL WALL SEPARATION/EXPANSION JOINT DETAIL 4 TYPICAL CORNER GUARD DETAIL 5 TYPICAL PARTITION FIXING DETAIL 6 TYPICAL DRYWALL FRAMING SUPPORT AT DOOR OPENING 7 TYPICAL UTILITIES PENETRATION THROUGH FIRE WALL IFC - 100% CD
CONCRETE BLOCK WALL JOINTS DETAIL
© Arup
KEY PLAN

TRUE NORTH

SECTION 1 SECTION 2

PLAN

5 TYPICAL DRYWALL REINFORCEMENT FOR HANGING CABINETS, TV, DBS 6 TYPICAL FACADE ALUMINIUM PANEL DETAIL

ISSUE DATE DESCRIPTION

W1 W2 W3 W4 W5 W6 W7 U1 U2 U3 U4 U5 U6 U7 U8 U9 U10
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
WK UP Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

UN DESIGN ARCHITECT

WJ SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
DN UM www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
WH
UL Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

UK ARCHITECT

WG BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852

UJ www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


WF Pen Konsult Sdn Bhd
7L-3 Asas Center
*** NOTE :- UH Jalan Gottlieb
10350 Penang
ALL STUD & HOLLOW SECTION SIZE TO REFER TO DRYWALL LIMITING TABLE Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
WE UG Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
2 TYPICAL NORMAL DRYWALL R.H.S. & G.I. STUD FRAMING DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
UF Web/Email: admin@uqs.com.my

PROJECT NAME
WD
PROPOSED MANUFACTURING FACILITY CONSISTING OF:

UE 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
WC UD
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
DN FOR DEXCOM (M) SDN. BHD.
UC
WB

UB PROJECT NUMBER

278585-00

PACKAGE

WA UA CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED


CJ
BEN YEOH GL.YEAP SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

LEVEL 1 KEY PLAN


DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

*** NOTE :- ARCHITECTURAL


ALL STUD & HOLLOW SECTION SIZE TO REFER TO DRYWALL LIMITING TABLE WALL DETAIL
SHEET 02

2
UB+WH_A7001
13/4/2021 6:52:20 PM

STAMP

1 TYPICAL FULL HEIGHT DRYWALL R.H.S. & G.I. STUD FRAMING DETAIL 3 DRYWALL LIMITTING TABLE 4 WALL PROTECTION DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

PLAN - CUB FACADE LOUVRES FEATURE ENCASEMENT 278585-00

SECTION- CUB FACADE LOUVRES FEATURE ENCASEMENT PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
WALL DETAIL
SHEET 03

SECTION- WAREHOUSE FACADE LOUVRES FEATURE ENCASEMENT UB+WH_A7003


13/4/2021 6:52:20 PM

PLAN - WAREHOUSE RWDP ENCASEMENT PLAN - CUB RWDP ENCASEMENT AT GRID W7/U1 PLAN - CUB RWDP ENCASEMENT AT TRUCKER LOUNGE SECTION - FACADE FEATURE ENCASEMENT (NORTH SIDE) SECTION - FACADE FEATURE ENCASEMENT (EAST SIDE) STAMP

1 RWDP ENCASEMENT DETAIL IFC - 100% CD


© Arup
KEY PLAN

TRUE NORTH

N
SIGNAGE PLATES

125 x 125 x 1.0MM THK. AISI. 304 GRADE. STAINLESS STEEL


MIRROR ETCHED & PAINTED WITH ADHESIVE FIXING PLAN VIEW ISOMETRIC VIEW

FOR EXTERNAL ROLLER SHUTTER

TYPICAL DOOR, WINDOW FRAME FOR BRICKWALL


9 TYPICAL DOOR SIGNAGE DETAIL

ELEVATION

TYPICAL DOOR, WINDOW FRAME WITH DRYWALL PARTITION JOINING DETAIL

TYPICAL SECTION DETAIL 7.1 ELEVATION ELEVATION

6 TYPICAL DOOR, WINDOW FRAME WITH WALL JOINING DETAIL 7 TYPICAL ROLLER SHUTTER BOTTOM BAR DETAIL 8 TYPICAL EXTERNAL DOOR THRESHOLD DETAIL 10 TYPICAL ALUMINIUM HASP DETAIL 11 TYPICAL DECORATIVE DOOR HANDLE DETAIL

ISSUE DATE DESCRIPTION

RS-1 RS-2 RS-3 RS-4 RS-5 RS-6 FRS-1 FRS-2 FRS-3 FRS-4

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com
ELEVATION ELEVATION
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
SECTION SECTION
10250 Penang Malaysia
604 2933 800
www.arup.com

D1-A1 D1-A1c D1-A2 D1-A2c D1-A3 D1-A4 D1-A4c D1-A5 D1-A6 D1-FD1 D1-FD1c D1-FD2 D1-FD2c D1-FD3 D1-FD3c D2-A1 FRS-3c ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE
QUANTITY SURVEYOR
FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
4 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR 5 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR Sultan Ahmad Shah,
WITH CLEAR GLASS DETAIL WITH VISION PANEL DETAIL 10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

D2-A2 D2-A2c D2-A3 D2-FD1 D2-FD1c D2-FD2 D2-FD2c D2-FD3c W1 W2 W3 W4 PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

NOTES : -
- ALL LOCKSET IS CYLINDRICAL
LEVER LOCK PROJECT NUMBER

278585-00
- ALL ESCAPE DOOR TO BE PANIC BAR
- ALL EXTERNAL DOOR TO HAVE PACKAGE
S.S. THRESHOLD CUB + WAREHOUSE FIT OUT
ELEVATION
ELEVATION DESIGNED DRAWN CHECKED APPROVED

W5 W6 DW1 DW2 BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

SECTION DATE

11-JUN-2021
SECTION
SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
DOOR & WINDOW SCHEDULE & DETAIL

UB+WH_A7101
13/4/2021 6:52:20 PM

SECTION *** REFER TO DOOR SCHEDULE SECTION *** REFER TO DOOR SCHEDULE STAMP
FOR IRONMONGERY & SIZES FOR IRONMONGERY & SIZES

1 DOORS, WINDOWS & ROLLER SHUTTERS SCHEDULE 2 TYPICAL DOUBLE LEAVES M.S. FRAME M.S. DOOR DETAIL 3 TYPICAL SINGLE LEAF M.S. FRAME M.S. DOOR DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

12 ROOF LEVEL TPO DETAIL 13 BURNISH FLOOR SKIRTING DETAIL 14 LEVEL 2 OUTDOOR CONCRETE ROOF DETAIL 15 DUCT WORK / PIPING PENETRATION DETAIL 16 HAZARDOUS WASTE RAMP DETAIL

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
MEP EQUIPMENT Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
PLAN VIEW DETAIL 2 WITH BOARD RETAINING CLIP 2 Nickerson Suite 200
Seattle, Wa 98109
PLAN VIEW 206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

SECTION
MECHANICAL AND ELECTRICAL ENGINEER
SECTION TYPICAL SECTION Pen Konsult Sdn Bhd
SECTION VIEW 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
WITHOUT BOARD RETAINING CLIP www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
7 M&E EQUIPMENT R.C. PLINTH DETAIL 8 TYPICAL GRID CEILING DETAIL 9 TYPICAL COVE LIGHT DETAIL 10 TYPICAL CEILING ACCESS PANEL DETAIL 11 TYPICAL SPRINKLER PIPE / AIR-COND. DIFFUSER / Sultan Ahmad Shah,
LIGHT FITTINGS HANGING DETAIL 10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
PLAN VIEW FOR DEXCOM (M) SDN. BHD.
A.H.U

ISOMETRIC VIEW
PROJECT NUMBER

278585-00

PLAN VIEW DETAIL 1 PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


TYPICAL SECTION VIEW
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

A.H.U
DATE

11-JUN-2021
FINISHING DETAIL BETWEEN ALL
DIFFERENT FLOOR FINISHES SCALE

As indicated

DRAWING STATUS
TYPICAL UTILITIES PENETRATION THROUGH FLOOR
100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE
SECTION ARCHITECTURAL
FLOOR & CEILING DETAIL

TYPICAL SKIRTING DETAIL


DETAIL 4.1 UB+WH_A7301
13/4/2021 6:52:20 PM

STAMP

1 FLOOR SKIRTING & COVING DETAIL 2 TYPICAL FLOOR TILES DETAIL 3 FINISHING DETAIL BETWEEN TWO DIFFERENT TYPE FLOOR FINISHES 4 TYPICAL CONCREATE COVER DETAIL 5 FINISHING DETAIL BETWEEN TWO DIFFERENT TYPE FLOOR FINISHES 6 TYPICAL AHU PLINTH SCUPPER DRAIN DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH
REMARK :
1. NO EXPOSED RIVET & SCREW ON SURFACE OF PHENOLIC
BOARD AT TOILET CUBICLE. N
2. NO EXPOSED RIVET & SCREW ON SURFACE OF BASIN
COUNTER TOP CABINET.
3. NO EXPOSED DOWN LIGHT ON THE CEILING .
4. NO EXPOSED EXHAUST AIR GRILLE ON CEILING SURFACE.

LEGEND :

FFL. 4.300 PIPINGS/CABLES ENCASEMENT

START START START START FEMALE PRAYER ROOM ABLUTION AREA


POINT POINT POINT POINT
TOILET 1 TOILET 2 TOILET 3 JANITOR FFL. 4.400 FFL. 4.300

FFL. 4.30
START
POINT

FFL. 4.30 FFL. 4.30

MALE PRAYER ROOM CORRIDOR 1A


FFL. 4.400 FFL. 4.300

FFL. 4.30
ABLUTION AREA
FFL. 4.300

TOILET 2A/3A TOILET 2B/3B TOILET 2A/3A TOILET 2B/3B START


POINT

START
POINT

ISSUE DATE DESCRIPTION


MALE/FEMALE PRAYER ROOM DETAIL

CUB 2A/2B/3A/3B TOILET DETAIL - LEVEL 2 & 3 CUB 2A/2B/3A/3B REFLECTED CEILING PLAN - LEVEL 2 & 3

WAREHOUSE TOILET 1/2/3 & JANITOR DETAIL - LEVEL 1 WAREHOUSE TOILET 1/2/3 & JANITOR DETAIL - LEVEL 1
Dexcom
6340 Sequence Drive
San Diego, CA 92121
CONCRETE CONCRETE CONCRETE CONCRETE CEILING LEVEL 888 738 3646
www.dexcom.com
FLOOR LEVEL FLOOR LEVEL FLOOR LEVEL FLOOR LEVEL
PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
MALE PRAYER ROOM ABLUTION AREA www.arup.com

DESIGN ARCHITECT

SABArchitects
LEVEL 1 2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
JANITOR TOILET 3 TOILET 2 TOILET 1 www.sabarch.com

TOILET 2A/3A TOILET 2B/3B TOILET 2A/3A


CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
CEILING LEVEL
ARCHITECT

PIPINGS/CABLES ENCASEMENT
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
CUB CUB WAREHOUSE WAREHOUSE Penang, Malaysia
604 228 8852
LEVEL 2/3 LEVEL 2/3 LEVEL 1 LEVEL 1 www.byggroup.com

ABLUTION AREA ABLUTION AREA


MECHANICAL AND ELECTRICAL ENGINEER
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
LEVEL 1 Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
2 CUB - LEVEL 2 & 3 TOILET DETAIL 3 WAREHOUSE - LEVEL 1 TOILET 1/2/3 & JANITOR ROOM DETAIL 4 CUB - LEVEL 1 MALE/FEMALE PRAYER ROOM DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
TRUCKER LOUNGE TRUCKER LOUNGE FOR DEXCOM (M) SDN. BHD.
CEILING LEVEL CEILING LEVEL

PROJECT NUMBER

278585-00

PACKAGE
TOILET 1A TOILET 1B TOILET 1C TOILET 1D TOILET 1E TOILET 1F TOILET 1A
CUB + WAREHOUSE FIT OUT
FFL. 3.35
DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021
TOILET 1A TOILET 1B TOILET 1C TOILET 1D TOILET 1E TOILET 1F TOILET 1A TOILET 1B TOILET 1C TOILET 1D TOILET 1E TOILET 1F
LEVEL 1 LEVEL 1
SCALE

As indicated
START TRUCKER TRUCKER
POINT DRAWING STATUS
LOUNGE LOUNGE
LEVEL LEVEL 100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE
FFL. 3.400
ARCHITECTURAL
TOILET DETAIL
TRUCKER LOUNGE TOILET 1A/B/C/D/E & F DETAIL - LEVEL 1 TRUCKER LOUNGE TOILET 1A/B/C/D/E & F REFLECTED CEILING PLAN - LEVEL 1 SHEET 01

UB+WH_A7501
13/4/2021 6:52:20 PM

STAMP

1 CUB - TRUCKER LOUNGE LEVEL 1 TOILET 1A/1B/1C/1D/1E/1F TOILET DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

LEGEND
DESCRIPTION ALL TOILETS
PLAN FRONT SIDE
WALL-HUNG
BASIN
WATER CLOSET
WALL HUNG
SPRAY
BIDET

ISSUE DATE DESCRIPTION


URINAL

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
HAND DRYER

Arup Jururunding Sdn Bhd


Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT
MOP SINK

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
FAUCETS

www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com
FLOOR
STRAI
-NER

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
4 SANITARY SCHEDULE Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT


PLAN
DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


SECTION
DRAWING TITLE

ARCHITECTURAL
TOILET DETAIL
SHEET 02

ISOMETRIC VIEW UB+WH_A7502


13/4/2021 6:52:20 PM

STAMP

1 TYPICAL TILING ALIGNMENT DETAIL 2 TYPICAL FLOOR STRAINER DETAIL 3 TYPICAL LOW WALL WITH TILES ON TOP DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

GUARD RAIL - SECTION VIEW GUARD RAIL - ELEVATION VIEW

U3 U4 U5 U6

PROTECTION RAIL - SECTION VIEW PROTECTION RAIL - ELEVATION VIEW

5 FOLKLIFT CHARGING & PARKIG DETAIL

UJ

ISSUE DATE DESCRIPTION

LEVEL 4 FLOOR PLAN

Dexcom
U4 U5 U6 6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
UJ www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


LEVEL 4
12A, Arratoon Road 10050
LEVEL 3 FLOOR PLAN Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


U4 U5 U6 Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
4 TYPICAL RWDP DISCHARGE TO SUMP DETAIL Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
LEVEL 3
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


UJ PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

LEVEL 2 FLOOR PLAN

PROJECT NUMBER

U4 U5 U6 278585-00
DETAIL 1
PACKAGE

CUB + WAREHOUSE FIT OUT

LEVEL 2 DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

ARCHITECTURAL
PLAN VIEW GENERAL CONSTRUCTION DETAIL
UJ SHEET 01
LEVEL 1
TYPICAL SECTION
UB+WH_A7801
13/4/2021 6:52:20 PM

ROAD
LEVEL 1 FLOOR PLAN LEVEL TYPICAL SECTION
STAMP

1 VERTICAL SHAFT DETAIL 2 DOCK LEVELLER DETAIL 3 WASH AREA DETAIL @ AHU PLANT ROOM IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

EXTERNAL WALL STEEL FRAMING PLAN - CUB

EXTERNAL WALL STEEL FRAMING PLAN - CUB

EXTERNAL WALL STEEL FRAMING PLAN - WAREHOUSE

6 MOVEMENT JOINT DETAIL 7 EXTERNAL WALL STEEL FRAMING PLAN

ISSUE DATE DESCRIPTION

x FACTOR 2
Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
LEGEND Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
LEGEND FOR WIND UPLIFT ZONE OF DOUBLE DECK METAL ROOF Seattle, Wa 98109

LE
206 957 6400
www.sabarch.com

AB
IC
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
40MM

PL
Arup Jururunding Sdn Bhd
x FACTOR 2 MIN

AP
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
x FACTOR 2 163-D Persiaran Gurney

T
10250 Penang Malaysia

O
604 2933 800
www.arup.com

N
ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
TYPICAL ROOF CROSS SECTION VIEW 7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD

3 FMG WIND UPLIFT REQUIREMENT & ROOF DETAIL 4 TYPICAL EXTERNAL WALL WIND UPLIFT FORCE 5 TYPICAL DOUBLE METAL ROOF DETAIL 12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

TYPICAL SECTION TYPICAL ELEVATION SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

LEGEND ARCHITECTURAL
GENERAL CONSTRUCTION DETAIL
SHEET 02

PLAN VIEW
UB+WH_A7802
13/4/2021 6:52:20 PM

STAMP

1 TYPICAL FALL PROTECTION LINE DETAIL 2 HOSE REEL COMPARTMENT DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com
SECTION 1.3
DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com
SECTION 1.1 SECTION 1.2 SECTION 1.4 SECTION 1.5
QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS

DRAWING TITLE

SECTION 2.1 SECTION 2.2 SECTION 2.3 ARCHITECTURAL


GENERAL CONSTRUCTION DETAIL
SHEET 03

UB+WH_A7803
13/4/2021 6:52:20 PM

STAMP

1 FACADE PANEL DETAIL 2 LEVEL 4 GENSET ROOF DETAIL 3 ROOF RIDGE CAPPING AND FLASHING DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
ELEVATION Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

DETAIL 2
MECHANICAL AND ELECTRICAL ENGINEER
PLAN DETAIL 1
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD

4 REMOVABLE RAILING DETAIL 5 DOUBLE ROLLER SHUTTER AT ELECTRICAL ROOM/ GASEOUS ROOM 5 LEVEL 4 GASEOUS ROOM DETAIL 12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE
LEVEL 2 AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
U6 U7 LEVEL 2 PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

UH PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated

DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 1
LEVEL 1 DRAWING TITLE

ARCHITECTURAL
UG GROUND GENERAL CONSTRUCTION DETAIL
GROUND SHEET 04
LEVEL
LEVEL

SECTION 4
UB+WH_A7803
13/4/2021 6:52:20 PM

ROOF PLAN SECTION


STAMP

1 FACADE PANEL DETAIL 2 LOADING DOCK ROOF DETAIL 3 TRUCKER'S LOUNGE ROOF DETAIL IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

DETAIL 1.1 DETAIL 1.2

LEVEL 4 LEVEL 4

ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

DN (60 RISER) PROJECT LEAD


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
DN (60 RISER) Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

LEVEL 4 FLOOR PLAN CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


LEVEL 4 FLOOR PLAN
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

ARCHITECT
LEVEL 3 LEVEL 3
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
Penang, Malaysia
UP (60 RISER) 604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


UP (60 RISER)
Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
DN (48 RISER) 10350 Penang
Malaysia
604 2282 515
SECTION 1.1 TYPICAL CAPPING DETAIL www.penkonsult.com

DN (48 RISER)
QUANTITY SURVEYOR
Unitech QS Consultancy
LEVEL 3 FLOOR PLAN SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
LEVEL 3 FLOOR PLAN Web/Email: admin@uqs.com.my

PROJECT NAME

PROPOSED MANUFACTURING FACILITY CONSISTING OF:

3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
UP (48 RISER)
3 NOS OF GUARDHOUSE
LEVEL 2 LEVEL 2
AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN
PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
UP (48 RISER) PERAI SELATAN.
FOR DEXCOM (M) SDN. BHD.

DN (48 RISER)

DN (48 RISER)
PROJECT NUMBER

LEVEL 2 FLOOR PLAN 278585-00

PACKAGE

LEVEL 2 FLOOR PLAN CUB + WAREHOUSE FIT OUT

DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE
UP (6 RISER)
As indicated

DRAWING STATUS
UP (48 RISER)

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 1 LEVEL 1
UP (48 RISER)
DRAWING TITLE

ROAD ROAD ARCHITECTURAL


STAIRCASE DETAIL
LEVEL UP (6 RISER)
LEVEL SHEET 01

LEVEL 1 FLOOR PLAN


TYPICAL SECTION
UB+WH_A8001
13/4/2021 6:52:20 PM

SECTION LEVEL 1 FLOOR PLAN SECTION STAMP

1 STAIRCASE 1 AND STEEL STAIRCASE DETAIL 2 STAIRCASE 2 DETAIL IFC - 100% CD


© Arup
KEY PLAN

TRUE NORTH

R.C. FLAT ROOF


LEVEL

DN (60 RISER)

LEVEL 1

GROUND
LEVEL

R.C. FLAT ROOF R.C. FLAT ROOF


LEVEL LEVEL

ENCASED SPRINKLER PIPINGS

ENCASED SPRINKLER PIPINGS


LEVEL 4 FLOOR PLAN LEVEL 4

LEVEL 1 LEVEL 1

GROUND GROUND
LEVEL LEVEL
ISSUE DATE DESCRIPTION

Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
DN (48 RISER) R.C. FLAT ROOF R.C. FLAT ROOF 163-D Persiaran Gurney
10250 Penang Malaysia
UP (60 RISER) LEVEL LEVEL 604 2933 800
www.arup.com

ENCASED SPRINKLER PIPINGS


DESIGN ARCHITECT

SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109
206 957 6400
www.sabarch.com

LEVEL 3
CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
LEVEL 3 FLOOR PLAN LEVEL 1 LEVEL 1 Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
SPRINKLER VALVE SPRINKLER VALVE 604 2933 800
ROOM ROOM www.arup.com
GROUND GROUND
ARCHITECT
LEVEL LEVEL
BYG Architecture Sdn. Bhd.
12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
7L-3 Asas Center
Jalan Gottlieb
10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

QUANTITY SURVEYOR
Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan
Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

LEVEL 2 PROJECT NAME

R.C. FLAT ROOF PROPOSED MANUFACTURING FACILITY CONSISTING OF:


DN (48 RISER)
FFL. 7.30
UP (48 RISER) 3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
ENCASED SPRINKLER PIPINGS ENCASED SPRINKLER PIPINGS 2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
PERAI SELATAN.
R.C. FLAT ROOF LEVEL FOR DEXCOM (M) SDN. BHD.

LEVEL 2 FLOOR PLAN


PROJECT NUMBER

278585-00

PACKAGE

CUB + WAREHOUSE FIT OUT

APRON DESIGNED DRAWN CHECKED APPROVED


UP (48 RISER) FFL. 3.30
BEN YEOH GL.YEAP SK.HO BEN YEOH
BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

LEVEL 1 DATE

11-JUN-2021

UP (6 RISER) ROAD SPRINKLER VALVE


SCALE
UP (6 RISERS)
LEVEL ROOM FFL. 4.20
As indicated
FFL. 3.30
DRAWING STATUS

100% OF PHASE 4 CONSTRUCTION DOCUMENTS


LEVEL 1 FLOOR PLAN SECTION ENCASED SPRINKLER PIPINGS FFL. 4.30 ENCASED SPRINKLER PIPINGS

DRAWING TITLE

ARCHITECTURAL
LEVEL 1 FLOOR PLAN STAIRCASE DETAIL
SHEET 02

UB+WH_A8002
13/4/2021 6:52:20 PM

STAMP

1 STAIRCASE 3 DETAIL 2 EGRESS STAIRS WITH SPRINKLER VALVE ROOM IFC - 100% CD
© Arup
KEY PLAN

TRUE NORTH

LIFT MOTOR ROOM LEVEL

LEVEL 4
R.C. FLAT ROOF R.C. FLAT ROOF
LEVEL LEVEL

ENCASED SPRINKLER PIPINGS


DN (32 RISER)

LEVEL 1 LEVEL 1
SPRINKLER VALVE SPRINKLER VALVE
ROOM ROOM
GROUND GROUND
LEVEL LEVEL

LIFT MOTOR ROOM LEVEL PLAN ISSUE DATE DESCRIPTION

UNDERGROUND
UNDERGROUND TUNNEL

LEVEL Dexcom
6340 Sequence Drive
San Diego, CA 92121
888 738 3646
www.dexcom.com

PROJECT LEAD
Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
UP (32 RISER) 163-D Persiaran Gurney
10250 Penang Malaysia
604 2933 800
www.arup.com

DESIGN ARCHITECT
LEVEL 4 FLOOR PLAN
SABArchitects
2 Nickerson Suite 200
Seattle, Wa 98109

3 LIFT MOTOR ROOM STAIRCASE DETAIL 206 957 6400


www.sabarch.com

CIVIL, STRUCTURAL, GEOTECHNICAL ENGINEER


Arup Jururunding Sdn Bhd
Gurney Paragon Mall Level 6
Lots L6.01 to L6.09
163-D Persiaran Gurney
10250 Penang Malaysia
R.C. FLAT ROOF 604 2933 800
www.arup.com
FFL. 7.30
ARCHITECT

BYG Architecture Sdn. Bhd.


12A, Arratoon Road 10050
Penang, Malaysia
604 228 8852
www.byggroup.com
ENCASED SPRINKLER PIPINGS ENCASED SPRINKLER PIPINGS

MECHANICAL AND ELECTRICAL ENGINEER


Pen Konsult Sdn Bhd
LEVEL 1 WAREHOUSE WAREHOUSE
7L-3 Asas Center
Jalan Gottlieb

R.C. FLAT ROOF LEVEL


10350 Penang
Malaysia
604 2282 515
www.penkonsult.com

R.C. FLAT ROOF R.C. FLAT ROOF QUANTITY SURVEYOR


LEVEL LEVEL Unitech QS Consultancy
SDN BHD
12A-A, Menara Northam, 55, Jalan

ENCASED SPRINKLER PIPINGS

ENCASED SPRINKLER PIPINGS


Sultan Ahmad Shah,
10050 Penang Malaysia
04 229 0092
Web/Email: admin@uqs.com.my

PROJECT NAME
UNDERGROUND UNDERGROUND
PROPOSED MANUFACTURING FACILITY CONSISTING OF:
LEVEL TUNNEL
3 STOREY CERP
1 STOREY WAREHOUSE
3 STOREY CENTRAL UTILITY BUILDING
LEVEL 1 LEVEL 1 7 STOREY OFFICE HEAD BUILDING
7 SOTREY PARKING STRUCTURE
2 STOREY SUBSTATION
3 NOS OF GUARDHOUSE

APRON GROUND GROUND AT PLOT 350 B, PERSIARAN CASSIA SELATAN 3, TAMAN


PERINDUSTRIAN BATU KAWAN, MUKIM 13, SEBERANG
DN (16 RISERS) FFL. 3.30 LEVEL LEVEL PERAI SELATAN.
SPRINKLER VALVE
FOR DEXCOM (M) SDN. BHD.
ROOM
FFL. 3.30
DN (24 RISER)

FFL. 4.30 UP (5 RISERS)

PROJECT NUMBER

278585-00
ENCASED SPRINKLER PIPINGS ENCASED SPRINKLER PIPINGS
PACKAGE

FFL. 4.30 CUB + WAREHOUSE FIT OUT


R.C. FLAT ROOF
LEVEL 1 FLOOR PLAN LEVEL 1 FLOOR PLAN
LEVEL DESIGNED DRAWN CHECKED APPROVED

BEN YEOH GL.YEAP SK.HO BEN YEOH


BIM 360://602679-09 Dexcom Factory 3 Penang/DXCM-3D-UB-A-Building-Shell.rvt

DATE

11-JUN-2021

SCALE

As indicated
UP (16 RISERS)
DRAWING STATUS
LEVEL 1
100% OF PHASE 4 CONSTRUCTION DOCUMENTS

FFL. 0.70 DRAWING TITLE


UP (24 RISER)
GROUND
ARCHITECTURAL
LEVEL STAIRCASE DETAIL
UNDERGROUND SHEET 03
TUNNEL

BASEMENT FLOOR PLAN BASEMENT FLOOR PLAN UB+WH_A8003


13/4/2021 6:52:20 PM

STAMP

1 STAIRCASE 4 DETAIL 2 STAIRCASE 5 AND CONCRETE STAIRCASE DETAIL IFC - 100% CD


© Arup